CN214885524U - Tool for reserving holes in floor slab - Google Patents

Tool for reserving holes in floor slab Download PDF

Info

Publication number
CN214885524U
CN214885524U CN202120011272.7U CN202120011272U CN214885524U CN 214885524 U CN214885524 U CN 214885524U CN 202120011272 U CN202120011272 U CN 202120011272U CN 214885524 U CN214885524 U CN 214885524U
Authority
CN
China
Prior art keywords
bevel gear
threaded rod
rod
box
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120011272.7U
Other languages
Chinese (zh)
Inventor
薛玉祯
郝晨军
房博
赵瞳
杨楚桥
都春龙
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Installation Engineering Co Ltd filed Critical China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority to CN202120011272.7U priority Critical patent/CN214885524U/en
Application granted granted Critical
Publication of CN214885524U publication Critical patent/CN214885524U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种用于楼板预留孔洞的工具,包括调节箱和固定杆,调节箱的上方设置有T字形调节转把,T字形调节转把的下端连接有第一锥齿轮,第一锥齿轮的两侧分别连接有第二锥齿轮与第三锥齿轮,第二锥齿轮与第三锥齿轮分别通过第一螺纹杆和第二螺纹杆与调节箱的侧壁转动连接,固定杆上设置有螺纹,固定杆的一端贯穿T字形调节转把的竖向部分和第一锥齿轮的中心裸露于外部环境,固定杆的另一端设置有把手,固定杆在把手与调节转把之间套接有螺母,调节箱的下方设置有两个L字形调节杆,L字形调节杆分别与第一螺纹杆和第二螺纹杆螺纹连接,本实用新型结构简单,通过旋拧调节转把与把手即可完成钢管位置的固定,防止钢管在浇筑时移动。

Figure 202120011272

The utility model discloses a tool for reserving holes in floor slabs, comprising an adjusting box and a fixing rod. A T-shaped adjusting handle is arranged above the adjusting box, and a first bevel gear is connected to the lower end of the T-shaped adjusting handle. Two sides of a bevel gear are respectively connected with a second bevel gear and a third bevel gear. The second bevel gear and the third bevel gear are respectively connected to the side wall of the adjustment box through the first threaded rod and the second threaded rod. There is a thread on it, one end of the fixing rod penetrates the vertical part of the T-shaped adjusting handle and the center of the first bevel gear is exposed to the external environment, the other end of the fixing rod is provided with a handle, and the fixing rod is between the handle and the adjusting handle A nut is sleeved, and two L-shaped adjustment rods are arranged below the adjustment box. The L-shaped adjustment rods are respectively connected with the first threaded rod and the second threaded rod. The structure of the utility model is simple. The position of the steel pipe can be fixed to prevent the steel pipe from moving during pouring.

Figure 202120011272

Description

Tool for reserving holes in floor slab
Technical Field
The utility model relates to a construction technical field, in particular to an instrument that is used for floor to reserve hole.
Background
At present, in the construction of concrete floor slabs, holes for pipelines to penetrate through are required to be reserved in the floor slabs, the traditional reservation mode generally adopts the steps of cutting off a steel pipe, welding a handle on the side wall of the steel pipe, fixing the steel pipe on a floor formwork by using iron wires and iron nails, sealing by using an adhesive tape to prevent concrete from entering a mold, and pulling out the mold after the concrete is poured; however, the fixing mode of the binding wire and the iron nail often causes the movement of the mold due to manual or stress during pouring, so that the reserved hole does not meet the requirements of construction drawings, and a large amount of manpower is consumed for repairing.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides an instrument for hole is reserved to floor to solve the fixed unstable, the higher problem of construction cost of the steel pipe that is used for reserving the hole among the prior art.
In order to achieve the above object, the utility model relates to a technical scheme that is used for floor to reserve instrument of hole is: the T-shaped adjusting rotating handle is arranged above the adjusting box, one end of the vertical part of the T-shaped adjusting rotating handle extends downwards into the adjusting box, one end of the T-shaped adjusting rotating handle in the adjusting box is connected with a first bevel gear, two sides of the first bevel gear are respectively connected with a second bevel gear and a third bevel gear, one sides, far away from each other, of the second bevel gear and the third bevel gear are respectively connected with the side wall of the adjusting box in a rotating way through a first threaded rod and a second threaded rod, the vertical part of the T-shaped adjusting rotating handle is of a hollow structure, a thread is arranged on the fixing rod, one end of the fixing rod penetrates through the vertical part of the T-shaped adjusting rotating handle and the center of the first bevel gear to be exposed in the external environment, the other end of the fixing rod is provided with a handle, and a nut is sleeved on the fixing rod between the handle and the adjusting rotating handle, the below symmetry of regulating box is provided with two L font and adjusts the pole, the vertical part of L font regulation pole upwards extends to in the regulating box and respectively with first threaded rod with second threaded rod threaded connection, the diapire of regulating box is seted up and is supplied L font to adjust the pole and follow first threaded rod with the gliding spout of extending direction of second threaded rod.
Has the advantages that: firstly, a threaded hole is arranged on a floor, an adjusting box is placed above a steel pipe when the adjusting box is used, an L-shaped adjusting rod at the bottom of the adjusting box is positioned in the steel pipe, a fixed rod penetrates through a T-shaped adjusting rotating handle and the adjusting box to be in threaded connection with the threaded hole on the floor, the adjusting rotating handle is rotated to enable a first bevel gear to drive a first threaded rod and a second threaded rod to rotate through a second bevel gear and a third bevel gear, the second bevel gear and the third bevel gear are arranged on two sides of the first bevel gear, the rotating directions of the second bevel gear and the third bevel gear are opposite, the second bevel gear and the third bevel gear respectively drive the first threaded rod and the second threaded rod to rotate, the L-shaped adjusting rod cannot rotate along with the threaded rods under the limit of a sliding groove at the bottom wall of the adjusting box, but can simultaneously approach to or move away from each other along the sliding groove, and outwards extrudes the steel pipe when the L-shaped adjusting rod moves away from each other, then the nut is screwed to extrude the adjusting rotating handle downwards, so that the adjusting rotating handle cannot rotate, and the limiting between the steel pipe and the adjusting box is realized; the utility model discloses simple structure adjusts the fixed of changeing the handle and can accomplishing the steel pipe position with the handle through revolving to twist, prevents that the steel pipe from removing when pouring, moreover the utility model discloses can be applicable to the steel pipe of different diameters to realize the reservation of the hole in different apertures.
Furthermore, an elastic clamping head is arranged at one end, away from the vertical part, of the transverse part of the L-shaped adjusting rod.
Has the advantages that: reserve the through-hole on the steel pipe at first, rotatory T font is adjusted and is changeed the elasticity dop that makes the L font of adjusting the bottom of the case portion and pass the through-hole, and then through the elasticity dop with the steel pipe with the utility model discloses the joint together, treat to water and accomplish the back, rotatory handle makes the dead lever break away from the floor, then directly upwards lift the regulating box and can extract the steel pipe from the concrete.
Furthermore, one end of the first threaded rod, which is far away from the second bevel gear, and one end of the second threaded rod, which is far away from the third bevel gear, are respectively in rotating connection with the side wall of the adjusting box through bearings.
Has the advantages that: the bearing is arranged to support the first threaded rod and the second threaded rod to rotate, so that the first threaded rod and the second threaded rod are prevented from rubbing against the side wall of the adjusting box.
Furthermore, first threaded rod with be provided with first support column between the diapire of regulating box, first support column is located between the L font of second bevel gear and first threaded rod is adjusted the pole, just first support column with first threaded rod passes through the bearing and connects, the second threaded rod with be provided with the second support column between the diapire of regulating box, the second support column is located between the L font of third bevel gear and second threaded rod is adjusted the pole, just the second support column with the second thread passes through the bearing and connects.
Has the advantages that: further support first threaded rod and second threaded rod through setting up the support column, guarantee its pivoted stability.
Furthermore, one end of the fixing rod, which is far away from the handle, is conical.
Has the advantages that: through the conical design, internal threads can be directly drilled on the floor slab when the fixed rod is screwed, so that the fixed rod is connected with the floor slab without additionally punching holes on the floor slab.
Drawings
Fig. 1 is the utility model discloses an overall structure schematic diagram of a tool for hole is reserved to floor.
In the figure: 1. a bearing; 2. adjusting the rotating handle; 3. a first bevel gear; 4. a second bevel gear; 5. a third bevel gear; 6. a support pillar; 7. a first threaded rod; 8. a right L-shaped adjusting rod; 9. a second threaded rod; 10. a left L-shaped adjusting rod; 11. fixing the rod; 12. a steel pipe; 13. a nut; 14. a handle; 15. an elastic chuck.
Detailed Description
Embodiments of the present invention will be further described with reference to the accompanying drawings, wherein the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like refer to the same orientation or positional relationship as shown in the drawings, which is for convenience of description and simplicity of description, and does not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
As shown in fig. 1, a tool for reserving holes in a floor slab comprises an adjusting box and a fixing rod 11, wherein a T-shaped adjusting rotating handle 2 is arranged above the adjusting box, and one end of the vertical part of the T-shaped adjusting rotating handle 2 extends downwards into the adjusting box; one end of the T-shaped adjusting rotating handle 2 in the adjusting box is connected with a first bevel gear 3, two sides of the first bevel gear 3 are respectively connected with a second bevel gear 4 and a third bevel gear 5, one sides of the second bevel gear 4 and the third bevel gear 5, which are far away from each other, are respectively provided with a first threaded rod 7 and a second threaded rod 9, the first threaded rod 7 and the second threaded rod 9 are respectively in rotating connection with the left side wall and the right side wall of the adjusting box through bearings 1, and the thread turning directions of the first threaded rod 7 and the second threaded rod 9 are the same; the vertical part of the T-shaped adjusting rotating handle 2 is of a hollow structure, a thread is arranged on the fixed rod 11, the bottom end of the fixed rod 11 penetrates through the vertical part of the T-shaped adjusting rotating handle 2 and the center of the first bevel gear 3 to be exposed in the external environment, a handle 14 is arranged at the top end of the fixed rod 11, and a nut 13 is sleeved between the handle 14 and the adjusting rotating handle 2 of the fixed rod 11; the below symmetry of regulating box is provided with left L font and adjusts pole 10 and right L font and adjust pole 8, the vertical part that pole 8 was adjusted to left L font 10 and right L font upwards extends to the regulating box in, the screw has been seted up to the structure of adjusting pole 8 in the regulating box to left L font adjusting pole 10 and right L font, be provided with in the screw with first, the internal thread of second threaded rod screw thread revolves to looks adaptation, it adjusts pole 10 or right L font and adjusts pole 8 and slide left and right in the horizontal direction to realize left L font through rotating first threaded rod 7 or second threaded rod 9, the gliding spout of pole 8 is adjusted to confession left L font adjusting pole 10 or right L font to the diapire of regulating box.
In this embodiment, the one end that vertical part was kept away from to left L font regulation pole 10 and 8 horizontal parts of right L font regulation pole is provided with elasticity dop 15, and is concrete, and elasticity dop 15's shape is arrow point shape, during the use with the through-hole that elasticity dop 15 passed steel pipe 12 and reserve with steel pipe 12 with the utility model discloses the joint together, treat to water and accomplish the back, rotatory handle 14 makes dead lever 11 break away from the floor, then directly upwards carry and draw the regulating box and can extract steel pipe 12 from the concrete.
In this embodiment, in order to further strengthen the stability of the rotation of the first threaded rod 7 and the second threaded rod 9, a first supporting column 6 is arranged between the first threaded rod 7 and the bottom wall of the adjusting box, the first supporting column 6 is located between the second bevel gear 4 and the left L-shaped adjusting rod 10, the first supporting column 6 is connected with the first threaded rod 7 through a bearing 1, a second supporting column 6 is arranged between the second threaded rod 9 and the bottom wall of the adjusting box, the second supporting column 6 is located between the third bevel gear 5 and the right L-shaped adjusting rod 8, and the second supporting column 6 is connected with the second threaded rod through a bearing 1.
In this embodiment, in order to increase the convenience of the device, the end of the fixing rod 11 away from the handle 14 is conical, so that when the fixing rod 11 is screwed, an internal thread can be directly drilled on the floor slab, thereby completing the connection between the fixing rod 11 and the floor slab without additionally drilling holes on the floor slab.
The tool for reserving the holes in the floor slab is specifically used in the following steps of firstly placing an adjusting box above a steel pipe 12, positioning a left L-shaped adjusting rod 10 and a right L-shaped adjusting rod 8 at the bottom of the adjusting box in the steel pipe 12, and screwing a fixed rod 11 on the floor slab after penetrating through a T-shaped adjusting rotating handle 2 and the adjusting box; the adjusting rotating handle 2 is rotated, so that the first bevel gear 3 drives the first threaded rod 7 and the second threaded rod 9 to rotate through the second bevel gear 4 and the third bevel gear 5, because the second bevel gear 4 and the third bevel gear 5 are arranged at two sides of the first bevel gear 3, the rotating directions of the second bevel gear 4 and the third bevel gear 5 are opposite, the second bevel gear 4 and the third bevel gear respectively drive the first threaded rod 7 and the second threaded rod 9 to rotate reversely, so that the left L-shaped adjusting rod 10 and the right L-shaped adjusting rod 8 move away from each other until the elastic clamping heads 15 arranged at the parts of the left L-shaped adjusting rod 10 and the right L-shaped adjusting rod 8 away from the vertical part penetrate through the reserved holes of the steel pipe 12, then screwing the nut 13 to extrude the adjusting rotating handle 2 downwards, so that the adjusting rotating handle 2 cannot rotate, and finally the steel pipe 12 cannot move left and right relative to the floor slab, and then concrete pouring can be carried out; after the pouring is finished, the handle 14 is rotated to enable the fixing rod 11 to be separated from the floor slab, and then the adjusting box is directly lifted upwards to pull out the steel pipe 12 from the concrete.
In the above embodiment, the horizontal portions of the left L-shaped adjusting rod and the right L-shaped adjusting rod are provided with the elastic chucks at ends far away from the vertical portion, and in other embodiments, the elastic chucks may not be provided.

Claims (5)

1.一种用于楼板预留孔洞的工具,其特征在于:包括调节箱和固定杆,所述调节箱的上方设置有T字形调节转把,所述T字形调节转把竖向部分的一端向下延伸至所述调节箱内,所述T字形调节转把在所述调节箱内的一端连接有第一锥齿轮,所述第一锥齿轮的两侧分别连接有第二锥齿轮与第三锥齿轮,所述第二锥齿轮与所述第三锥齿轮远离彼此的一侧分别通过第一螺纹杆和第二螺纹杆与所述调节箱的侧壁转动连接,所述T字形调节转把的竖向部分为中空结构,所述固定杆上设置有螺纹,所述固定杆的一端贯穿所述T字形调节转把的竖向部分和第一锥齿轮的中心裸露于外部环境,所述固定杆的另一端设置有把手,所述固定杆在所述把手与所述调节转把之间套接有螺母,所述调节箱的下方对称设置有两个L字形调节杆,所述L字形调节杆的竖向部分向上延伸至所述调节箱内并分别与所述第一螺纹杆和所述第二螺纹杆螺纹连接,所述调节箱的底壁开设有供L字形调节杆沿所述第一螺纹杆和所述第二螺纹杆的延伸方向滑动的滑槽。1. a kind of tool that is used for floor plate reservation hole is characterized in that: comprise adjustment box and fixed rod, the top of described adjustment box is provided with T-shaped adjustment turning handle, one end of the vertical part of described T-shaped adjustment turning handle Extending down into the adjustment box, one end of the T-shaped adjustment handle in the adjustment box is connected with a first bevel gear, and two sides of the first bevel gear are respectively connected with a second bevel gear and a second bevel gear. Three bevel gears, the sides of the second bevel gear and the third bevel gear away from each other are rotatably connected to the side wall of the adjusting box through a first threaded rod and a second threaded rod, respectively, and the T-shaped adjusting rotary The vertical part of the handle is a hollow structure, the fixing rod is provided with a thread, and one end of the fixing rod is exposed to the external environment through the vertical part of the T-shaped adjusting handle and the center of the first bevel gear. The other end of the fixing rod is provided with a handle, the fixing rod is sleeved with a nut between the handle and the adjusting turning handle, and two L-shaped adjusting rods are symmetrically arranged below the adjusting box. The vertical part of the adjustment rod extends upward into the adjustment box and is respectively connected with the first threaded rod and the second threaded rod, and the bottom wall of the adjustment box is provided with an L-shaped adjustment rod along the A chute for sliding the extension directions of the first threaded rod and the second threaded rod. 2.根据权利要求1所述的一种用于楼板预留孔洞的工具,其特征在于:所述L字形调节杆横向部分远离竖向部分的一端设置有弹性卡头。2 . The tool for reserving holes in floor slabs according to claim 1 , wherein the end of the lateral part of the L-shaped adjusting rod away from the vertical part is provided with an elastic chuck. 3 . 3.根据权利要求2所述的一种用于楼板预留孔洞的工具,其特征在于:所述第一螺纹杆背离第二锥齿轮的一端、所述第二螺纹杆背离第三锥齿轮的一端分别通过轴承与所述调节箱的侧壁转动连接。3. A tool for reserving holes in a floor plate according to claim 2, characterized in that: one end of the first threaded rod facing away from the second bevel gear, and the end of the second threaded rod facing away from the third bevel gear One end is respectively rotatably connected with the side wall of the adjusting box through a bearing. 4.根据权利要求3所述的一种用于楼板预留孔洞的工具,其特征在于:所述第一螺纹杆与所述调节箱的底壁之间设置有第一支撑柱,所述第一支撑柱位于第二锥齿轮与第一螺纹杆上的L字形调节杆之间,且所述第一支撑柱与所述第一螺纹杆通过轴承连接,所述第二螺纹杆与所述调节箱的底壁之间设置有第二支撑柱,所述第二支撑柱位于第三锥齿轮与第二螺纹杆上的L字形调节杆之间,且所述第二支撑柱与所述第二螺纹通过轴承连接。4 . The tool for reserving holes in floor slabs according to claim 3 , wherein a first support column is arranged between the first threaded rod and the bottom wall of the adjustment box, and the first support column is arranged between the first threaded rod and the bottom wall of the adjustment box. A support column is located between the second bevel gear and the L-shaped adjustment rod on the first threaded rod, and the first support column and the first threaded rod are connected by a bearing, and the second threaded rod is connected to the adjustment rod A second support column is arranged between the bottom wall of the box, the second support column is located between the third bevel gear and the L-shaped adjustment rod on the second threaded rod, and the second support column is connected to the second The threads are connected by bearings. 5.根据权利要求1或4所述的一种用于楼板预留孔洞的工具,其特征在于:所述固定杆远离所述把手的一端为圆锥形。5 . The tool for reserving holes in floor slabs according to claim 1 or 4 , wherein the end of the fixing rod away from the handle is conical. 6 .
CN202120011272.7U 2021-01-05 2021-01-05 Tool for reserving holes in floor slab Expired - Fee Related CN214885524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120011272.7U CN214885524U (en) 2021-01-05 2021-01-05 Tool for reserving holes in floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120011272.7U CN214885524U (en) 2021-01-05 2021-01-05 Tool for reserving holes in floor slab

Publications (1)

Publication Number Publication Date
CN214885524U true CN214885524U (en) 2021-11-26

Family

ID=78864047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120011272.7U Expired - Fee Related CN214885524U (en) 2021-01-05 2021-01-05 Tool for reserving holes in floor slab

Country Status (1)

Country Link
CN (1) CN214885524U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114559585A (en) * 2022-03-05 2022-05-31 广德和美印务科技有限公司 Quick-cooling bag making mold for plastic bag production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114559585A (en) * 2022-03-05 2022-05-31 广德和美印务科技有限公司 Quick-cooling bag making mold for plastic bag production

Similar Documents

Publication Publication Date Title
CN107237493A (en) Quickly remove formula and reserve device in concrete floor hole
CN102828615A (en) Overlapped shear wall template system and construction method thereof
CN206625580U (en) Post joint bar regulating positioning device
CN211499887U (en) Reinforcing device for an ancient building
CN208996446U (en) A kind of column mould strengthening frame structure
CN205928319U (en) Easy power F type anchor clamps
CN206458110U (en) Rectangle steel tubing string construction plumbing device in inverse method one-column one-pile
CN212897551U (en) Structure for preventing concrete leakage of wall and column
CN221143712U (en) Template support
CN206445432U (en) Clamping device for bicycle beam weld jig
CN220760846U (en) Reinforcing steel bar bending device
CN208152535U (en) One kind can have enough to meet the need scaffold building pedestal
CN218152693U (en) Underground pipe gallery pre-buried couple
CN207211735U (en) Adjustable ring beam sizing fixture
CN210798281U (en) Early-dismantling jacking structure for double lead screws of building template
CN216891986U (en) Quick pull rod device of cable-stay bridge large-section pylon
CN215786436U (en) Steel bar connection alignment mechanism for building engineering
CN110185471A (en) One kind being used for lining trolley bulkhead height adjustment device
CN211774617U (en) Pre-buried equipment is used in civil engineering
CN114069526B (en) Portable strain clamp fastening device
CN216949497U (en) Hole reservation device
CN220768844U (en) Construction device for hanging mould of reserved hole of structural plate
CN222847796U (en) Quick detachable can have enough to meet need pre-buried fixing device of aluminium mould floor stagnant water festival
CN108532464A (en) Three-direction adjustment method of turning and climbing formwork for high bridge piers
CN209429531U (en) A kind of tightening formula concrete floor hole reservation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211126