CN214785568U - Subway waiting area wall veneer metal sheet installing the system - Google Patents

Subway waiting area wall veneer metal sheet installing the system Download PDF

Info

Publication number
CN214785568U
CN214785568U CN202022743370.8U CN202022743370U CN214785568U CN 214785568 U CN214785568 U CN 214785568U CN 202022743370 U CN202022743370 U CN 202022743370U CN 214785568 U CN214785568 U CN 214785568U
Authority
CN
China
Prior art keywords
mounting
waiting area
metal sheet
piece
area wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022743370.8U
Other languages
Chinese (zh)
Inventor
徐志强
陈望霜
王红成
周亮
刘国舟
胡敏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Decoration Engineering Co Ltd filed Critical China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority to CN202022743370.8U priority Critical patent/CN214785568U/en
Application granted granted Critical
Publication of CN214785568U publication Critical patent/CN214785568U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a subway waiting area wall veneer metal sheet mounting system, its characterized in that: comprises a first mounting part and a second mounting part; the first mounting piece is locally fixed on the square tube; the second mounting piece and the facing metal plate are fixedly mounted with each other; the first mounting piece is provided with a mounting part; the mounting part and the square tube are provided with a mounting space; the second installation part is provided with a groove structure, and the groove structure is placed on the installation part, so that the second installation part and the first installation part can be detachably installed with each other. The utility model discloses only adopt the vertical keel, connect the purpose of accomplishing the decorative board installation through the link plate connecting piece at the U type connecting piece and the decorative board back on the vertical keel. Each plate can be independently disassembled or assembled, so that the veneer is effectively prevented from generating resonance.

Description

Subway waiting area wall veneer metal sheet installing the system
Technical Field
The utility model relates to a building technology and structure specifically, relate to a subway waiting area wall veneer metal sheet installing the system and the mounting method.
Background
The subway waiting area can produce small resonance because of going of subway, and traditional wall veneer sheet metal keel is that vertical stand main joist and horizontal secondary joist welding form a face, is unfavorable for the shock attenuation.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects and provide a veneer installation process and structure capable of avoiding resonance influence
The utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that: comprises a first mounting part and a second mounting part;
wherein, the first installation component is locally fixed on the square tube;
the second mounting piece and the facing metal plate are mutually fixed;
the first mounting member having a mounting portion;
the installation part and the square tube are provided with an installation space;
above-mentioned second installed part has groove structure, through the mode of laying groove structure on the installation department, realizes installing each other with first installed part detachable.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the first mounting member having a first mounting end and a second mounting end;
the first mounting end and the second mounting end are respectively mounted on two opposite side parts of the square tube.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the first mounting piece is in a U-shaped shape;
the opening positions of the U-shaped model are a first mounting end and a second mounting end respectively;
the first mounting end and the second mounting end are respectively mounted on two opposite side parts of the square tube.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
and the mounting part of the first mounting part is provided with an anti-skid part.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the anti-slip piece is made of rubber materials.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the anti-skid piece is detachably arranged on the first mounting piece.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the second mounting member comprises a head end and a tail end;
the tail end is fixed on the facing metal plate;
when the second installation part and the first installation part are installed mutually, the head end is positioned in the installation space.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the groove structure has a guide surface.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the second mounting member has a hook-shaped configuration.
Further, the utility model provides a pair of subway waiting area wall veneer metal sheet installing the system, its characterized in that still lies in:
the second mounting piece is mounted at the edge position of the facing metal plate;
the second installation parts of the two adjacent installed facing metal plates are fixedly installed with each other through a connecting mechanism.
Additionally, the utility model also provides a subway waiting area wall veneer metal sheet's mounting method, a serial communication port, including following step:
step 1, measuring and paying off, determining the veneer typesetting of a metal plate and the installation position of a galvanized square tube;
step 2, installing an embedded part;
step 3, installing a galvanization square tube;
and 4, popping up a height marking line for installing the U-shaped connecting piece on the galvanized square tube, punching out the installation in-out position of the U-shaped connecting piece by using a level gauge, fixing, sleeving a rubber mat on the U-shaped connecting piece before installing the veneer to prevent the veneer from sliding, and sequentially installing the veneer from bottom to top and from left to right.
The utility model discloses an effect and effect:
the utility model discloses only adopt the vertical keel, connect the purpose of accomplishing the decorative board installation through the link plate connecting piece at the U type connecting piece and the decorative board back on the vertical keel. Each plate can be independently disassembled or assembled, so that the veneer is effectively prevented from generating resonance.
Drawings
Fig. 1 is a schematic structural diagram of a system for installing a wall facing metal plate in a waiting area of a subway provided by the embodiment.
Fig. 2 is a schematic structural diagram of a system for installing a wall-facing metal plate in a waiting area of a subway provided by the embodiment.
Detailed Description
As shown in fig. 1 and 2, the disclosed mounting system for the wall veneer metal plate of the subway waiting area comprises a veneer mounting component and a square tube fixing component;
the veneer mounting component is a hanging plate connecting piece 2, and one end surface of the veneer mounting component is mutually fixed with the metal plate veneer;
the other end of the hanging plate connecting piece 2 is provided with a hook-shaped structure;
the cross section of the hook-shaped structure is similar to a trapezoid, and the inclined plane of the hook-shaped structure is slightly cambered, so that the hook-shaped structure can be used as a guide in the fitting process.
The square tube fixing component is a U-shaped connecting piece 5, and in the installation process, the square tube fixing component is clamped on a galvanized square tube 7 in a semi-surrounding mode and then fixed with the galvanized square tube 7 through self-tapping screws 6.
A certain installation space is formed between the middle part of the U-shaped connecting piece 5 and the galvanized square tube 7;
the middle part of this U type connecting piece 5 is equipped with cushion 3 corresponding to the position that articulates of link plate connecting piece 2, installs in U type connecting piece 5 back when link plate connecting piece 2, realizes skid-proof effect through this cushion.
In the installation process, between the metal sheet veneer of two horizontal settings, its link plate connecting piece that corresponds sets up in adjacent position to accomplish to articulate the installation back when two metal sheet veneers, carry out the installation of reciprocal anchorage with two adjacent link plate connecting pieces 2 through rivet 4.
The specific construction process flow of the structure is as follows:
measuring and paying off → installing an embedded plate → installing a galvanized square tube → installing a U-shaped connecting piece → installing a metal plate.
The operating points are as follows:
1. measuring line
Positioning and paying off according to drawing design requirements and control lines given out by civil engineering, precisely resetting three lines provided by the civil engineering by using a level gauge, then paying off construction lines of all working surfaces, determining a metal plate plane to finish surface lines, performing metal plate veneer typesetting according to paying off sizes, determining a galvanized square tube mounting position typesetting designer and a first square intention to perform grid plate arrangement, drawing a plate arrangement diagram, and performing next construction after rechecking.
2. Installation of embedded parts
And in field installation, the installation position of the square tube is accurately placed according to the elastic line, the distances between the L40-4 mm galvanized corner connectors and the square tube and the floor and the top surface are accurately determined, the connecting bolts of the corner connectors and the square tube are fastened, and the corner connectors are drawn on the floor and the top surface by using a marking pen. And (4) installing a square tube after drilling holes, correcting the installation position of the square tube, and then screwing the L40 × 4mm galvanized corner connectors and expansion bolts on the floor and the top surface.
3. Installation of galvanized square tube
And cutting the 50 x 4mm galvanized square tube according to the installation height on site, rechecking the installation position of the galvanized square tube when the galvanized square tube is fixed on the embedded plate, and welding and fixing the galvanized square tube after the rechecking is determined.
4. Veneer installation
Popping up a marking line for installing the U-shaped connecting piece on the galvanized square tube, utilizing a level gauge to beat out the installation in-and-out position of the U-shaped connecting piece and fixing the U-shaped connecting piece by using a self-tapping screw, sleeving a rubber mat on the U-shaped connecting piece before installing the veneer to prevent the veneer from sliding, and sequentially installing the veneer in the installation sequence from bottom to top and from left to right.

Claims (10)

1. The utility model provides a subway waiting area wall veneer metal sheet installing the system which characterized in that: comprises a first mounting part and a second mounting part;
the first mounting piece is locally fixed on the square tube;
the second mounting piece and the facing metal plate are fixedly mounted with each other;
the first mounting piece is provided with a mounting part;
the mounting part and the square tube are provided with a mounting space;
the second installation part is provided with a groove structure, and the groove structure is placed on the installation part, so that the second installation part and the first installation part can be detachably installed with each other.
2. A subway waiting area wall facing metal sheet mounting system as claimed in claim 1, wherein: the first mounting piece is provided with a first mounting end and a second mounting end;
the first mounting end and the second mounting end are respectively mounted on two opposite side parts of the square tube.
3. A subway waiting area wall facing metal sheet mounting system as claimed in claim 1, wherein: the first mounting piece is in a U-shaped shape;
the opening positions of the U-shaped model are a first mounting end and a second mounting end respectively;
the first mounting end and the second mounting end are respectively mounted on two opposite side parts of the square tube.
4. A subway waiting area wall facing metal sheet mounting system as claimed in claim 1, wherein: and an anti-skid piece is arranged on the mounting part of the first mounting piece.
5. A subway waiting area wall facing metal sheet mounting system as claimed in claim 4, wherein: the anti-skid piece is detachably arranged on the first installation piece.
6. A subway waiting area wall facing metal sheet mounting system as claimed in claim 4, wherein: the anti-slip member is made of rubber material.
7. A subway waiting area wall facing metal sheet mounting system as claimed in claim 1, wherein: the second mounting piece comprises a head end and a tail end;
the tail end is fixed on the facing metal plate;
when the second installation part and the first installation part are installed mutually, the head end is located in the installation space.
8. A subway waiting area wall facing metal sheet mounting system as claimed in claim 1, wherein: the groove structure has a guide surface.
9. A subway waiting area wall facing metal sheet mounting system as claimed in claim 1, wherein: the second mounting member has a hook-like shape.
10. A subway waiting area wall facing metal sheet mounting system as claimed in claim 1, wherein:
the second mounting piece is mounted at the edge position of the facing metal plate;
the second installation parts of the two adjacent installed facing metal plates are fixedly installed with each other through a connecting mechanism.
CN202022743370.8U 2020-11-24 2020-11-24 Subway waiting area wall veneer metal sheet installing the system Active CN214785568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022743370.8U CN214785568U (en) 2020-11-24 2020-11-24 Subway waiting area wall veneer metal sheet installing the system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022743370.8U CN214785568U (en) 2020-11-24 2020-11-24 Subway waiting area wall veneer metal sheet installing the system

Publications (1)

Publication Number Publication Date
CN214785568U true CN214785568U (en) 2021-11-19

Family

ID=78709592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022743370.8U Active CN214785568U (en) 2020-11-24 2020-11-24 Subway waiting area wall veneer metal sheet installing the system

Country Status (1)

Country Link
CN (1) CN214785568U (en)

Similar Documents

Publication Publication Date Title
CN201598791U (en) Dry-hang dale keel
CN105569325A (en) Leveling device, wall surface assembly and installing method
CN214785568U (en) Subway waiting area wall veneer metal sheet installing the system
CN112709395A (en) Subway waiting area wall facing metal plate mounting system and method
CN210032618U (en) K plate leveling rod
CN105464273A (en) Novel ceiling mounting structure
CN210032684U (en) Subassembly of control gypsum board installation board seam width
CN210530332U (en) Use mounting structure that stupefied back of body is consolidated to K board
CN205778907U (en) The side position block of location is installed for tunnel duct piece simulation test
CN204449760U (en) A kind of curtain skeleton leg welding positioning tool
CN206677452U (en) Large-size box square shape framework tendons skeleton assembly tool
CN216076085U (en) Assembled wall leveling structure
CN210067191U (en) Assembled aluminum plate wall
CN213682938U (en) Assembled wallboard
CN215889078U (en) Adjustable decorative wall surface
CN208039707U (en) Building decoration Metal wall mounting device
CN215594570U (en) Keel keel for ceiling keel
CN212295684U (en) Detachable wallboard connecting piece
CN216130406U (en) A high-efficient curtain installing the system for green building
CN210562785U (en) Clip type bridge cut-off connecting piece
CN211172862U (en) Embedded assembly body
CN103266703B (en) Terracotta panel curtain wall installation structure
CN110258894B (en) Mounting structure and mounting method of ceiling board
CN209975935U (en) Indoor assembling device for inorganic veneer
CN215367922U (en) Metal sound insulation wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant