CN214780489U - High-rise building outer wall decoration construction device - Google Patents
High-rise building outer wall decoration construction device Download PDFInfo
- Publication number
- CN214780489U CN214780489U CN202121334002.6U CN202121334002U CN214780489U CN 214780489 U CN214780489 U CN 214780489U CN 202121334002 U CN202121334002 U CN 202121334002U CN 214780489 U CN214780489 U CN 214780489U
- Authority
- CN
- China
- Prior art keywords
- construction
- lifting
- fixed
- rise building
- sets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 66
- 238000005034 decoration Methods 0.000 title claims abstract description 16
- 230000001360 synchronised effect Effects 0.000 claims abstract description 24
- 238000004804 winding Methods 0.000 claims abstract description 13
- 230000007246 mechanism Effects 0.000 claims abstract description 9
- 230000009471 action Effects 0.000 claims description 10
- 244000309464 bull Species 0.000 claims description 10
- 125000003003 spiro group Chemical group 0.000 claims description 4
- 230000002146 bilateral effect Effects 0.000 claims description 2
- 230000033228 biological regulation Effects 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 13
- 230000008569 process Effects 0.000 abstract description 6
- 230000001174 ascending effect Effects 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000007423 decrease Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a high-rise building outer wall decoration construction device, which comprises a construction base, wherein the outer side walls at the two ends of the construction base are provided with a movable supporting mechanism, the two sides of the top of the construction base are symmetrically fixed with construction supporting plates, the top of the two groups of construction supporting plates are fixed with an adjusting housing, the level of the inner cavity of the adjusting housing is provided with a rope winding rotating rod, the side wall of the construction supporting plate at the left side is provided with a servo motor, the output end of the servo motor is sleeved with a synchronous driving wheel, the rope winding rotating rod rotates to penetrate through the side wall at the left end of the adjusting housing and is sleeved with a synchronous driven wheel, the synchronous driving wheel is mutually sleeved with the synchronous driving wheel through a connecting rotating belt, the outer side walls at the two ends of the rope winding rotating rod are wound and connected with a first lifting sling and a second lifting sling, the bottoms of the first lifting sling and the second lifting sling are positioned below the adjusting housing and are fixed with a lifting sling, the device can ensure the stability of the lifting sling in the ascending or descending process of the lifting sling, the lifting platform is prevented from shaking left and right in the lifting process.
Description
Technical Field
The utility model relates to a building construction field, concretely relates to high-rise building outer wall decoration construction equipment.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The place of construction work is called "construction site" or "construction site".
When the building construction outer wall is decorated, a hoisting device is often used, the existing high-rise building outer wall decoration construction device has the defects that the stability of the lifting hanging platform in the ascending or descending process during transportation is insufficient, and the lifting hanging platform shakes left and right in the ascending and descending process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the above-mentioned problem that exists among the prior art, provide a high-rise building outer wall decoration construction equipment.
In order to realize the technical purpose, the technical effect is achieved, the utility model discloses a realize through following technical scheme:
the utility model provides a high-rise building outer wall decoration construction equipment, includes the construction base, the removal supporting mechanism is installed to construction base both ends lateral wall, construction base top bilateral symmetry is fixed with the construction fagging, and is two sets of construction fagging top is fixed with the regulation housing, it is provided with the wiring bull stick, left side to adjust housing inner chamber level servo motor is installed to construction fagging lateral wall, servo motor output has cup jointed synchronous action wheel, the wiring bull stick rotates to run through and adjusts housing left end lateral wall and has cup jointed synchronous from the driving wheel, synchronous action wheel cup joints each other through connecting the commentaries on classics area and synchronous action wheel, wiring bull stick both ends lateral wall winding is connected with first lift lifting rope, second lift lifting rope, first lift lifting rope, second lift lifting rope bottom are located and adjust the housing below and are fixed with the lift platform.
Preferably, the movable supporting mechanism comprises two groups of supporting sleeve seats, the supporting sleeve seats are fixedly connected with the side walls of the two ends of the construction base respectively, the top of each supporting sleeve seat is connected with a lifting screw rod in a penetrating and screwed mode, the bottom of each lifting screw rod is fixed with a roller mounting seat, and the bottom of each roller mounting seat is provided with a movable universal wheel.
Preferably, the top of the two groups of lifting screws is fixed with a rotating handle above the supporting sleeve seat.
Preferably, the side walls of the opposite ends of the two groups of construction supporting plates are provided with fixed sliding grooves, and the outer side walls of the two ends of the lifting platform are fixed with lifting sliding blocks which are connected with the fixed sliding grooves in a sliding manner.
Preferably, the outer wall of the rope winding rotating rod is positioned between the first lifting sling and the second lifting sling and is sleeved with a limit stop.
Preferably, the construction supporting plate on the right side is fixed with a connecting push handle.
Preferably, the right side of the rope winding rotating rod is rotatably connected with the right end side wall of the inner cavity of the adjusting cover shell through a rotating shaft.
Has the advantages that:
1. at first, the construction tool that will hoist is put into on the lift platform, start servo motor drive synchronous action wheel afterwards and rotate, because synchronous action wheel cup joints each other through connecting the commentaries on classics area and synchronous follow driving wheel, rotate the wiring bull stick through synchronous driven wheel, through first lift lifting rope, the second lift lifting rope hoists the lift platform, the first lift lifting rope that sets up, second lift lifting rope and lift platform both ends lateral wall are fixed with fixed spout sliding connection's lift slider, can guarantee to lift the in-process of platform transportation rising or decline and guarantee its stability, prevent to rock about the in-process lift platform that goes up and down.
2. When carrying out construction hoist and mount, rotatory handle that rotates drives the lifting screw and rotates, because lifting screw and support cover seat top looks spiro union, and then drive the removal universal wheel rebound of bottom, until make and remove the universal wheel and break away from ground, support cover seat bottom and ground looks butt, prevent effectively that the in-process to building tool hoist and mount, the construction base is not steady.
Of course, it is not necessary for any product to achieve all of the above advantages simultaneously in practicing the invention.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection of the lifting platform of the present invention;
FIG. 3 is a schematic view of the structure of the mobile support mechanism of the present invention;
the reference numbers in the drawings are as follows:
1-construction base, 2-moving support mechanism, 201-support sleeve seat, 202-lifting screw, 203-roller mounting seat, 204-moving universal wheel, 3-construction support plate, 4-adjusting housing, 5-rope-winding rotating rod, 6-servo motor, 7-synchronous driving wheel, 8-synchronous driven wheel, 9-connecting rotating belt, 10-first lifting sling, 11-second lifting sling, 12-lifting platform, 13-rotating handle, 14-fixed sliding chute, 15-limit stop, 16-connecting pushing handle, 17-rotating shaft and 18-lifting slide block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Example 1:
as shown in figures 1-3, the utility model relates to a high-rise building outer wall decoration construction device, which comprises a construction base 1, the outer side walls of the two ends of the construction base 1 are provided with a movable supporting mechanism 2, the two sides of the top of the construction base 1 are symmetrically fixed with construction supporting plates 3, the tops of two groups of construction supporting plates 3 are fixed with an adjusting housing 4, the inner cavity of the adjusting housing 4 is horizontally provided with a rope winding rotating rod 5, the side wall of the left construction supporting plate 3 is provided with a servo motor 6, the output end of the servo motor 6 is sleeved with a synchronous driving wheel 7, the rope winding rotating rod 5 rotates to penetrate through the left side wall of the adjusting housing 4 and is sleeved with a synchronous driven wheel 8, the synchronous driving wheel 7 is sleeved with the synchronous driving wheel 7 through a connecting rotating belt 9, the outer side walls of the two ends of the rope winding rotating rod 5 are connected with a first lifting rope 10, a second lifting rope 11 and a first lifting rope 10, a lifting platform 12 is fixed at the bottom of the second lifting sling 11 below the adjusting cover 4.
One specific application of this embodiment is: the utility model provides a high-rise building outer wall decoration construction equipment, at first put into lift platform 12 with the construction tool who needs hoist and mount on, start servo motor 6 afterwards and drive synchronous action wheel 7 and rotate, because synchronous action wheel 7 cup joints each other with synchronous follow driving wheel 8 through connecting the commentaries on classics area 9, rotate around rope bull stick 5 through synchronous follow driving wheel 8, through first lift lifting rope 10, second lift lifting rope 11 lifts lift platform 12, the first lift lifting rope 10 that sets up, second lift lifting rope 11 and lift platform 12 both ends lateral wall are fixed with the lifting slide of fixed spout 14 sliding connection, can guarantee to lift platform 12 transportation ascending or the in-process of descending and guarantee its stability, prevent to rock about the in-process lift platform 12 that goes up and down.
Example 2:
wherein, remove supporting mechanism 2 and include two sets of support sleeve seats 201, two sets of support sleeve seats 201 respectively with 1 both ends lateral wall fixed connection of construction base, two sets of support sleeve seats 201 top is run through the spiro union and is had lifting screw 202, two sets of lifting screw 202 bottoms are fixed with gyro wheel mount pad 203, two sets of gyro wheel mount pads 203 bottoms are installed and are removed universal wheel 204, two sets of lifting screw 202 tops are located support sleeve seat 201 top and are fixed with rotation handle 13, two sets of construction fagging 3 looks remote site lateral walls have seted up fixed spout 14, lifting platform 12 both ends lateral wall is fixed with fixed spout 14 sliding connection's elevator slide block 18, 5 outer walls of wiring bull stick are located and have cup jointed limit stop 15 between first lift lifting rope 10 and the second lift rope 11, right side construction fagging 3 is fixed with and connects pushing handle 16, wiring bull stick 5 right side is passed through axis of rotation 17 and is adjusted the 4 inner chamber lateral walls of housing and is rotated and is connected.
The specific application of this embodiment is: when carrying out construction hoist and mount, rotatory handle 13 that rotates drives lifting screw 202 and rotates, because lifting screw 202 and support sleeve seat 201 top looks spiro union, and then drive the removal universal wheel 204 rebound of bottom, until making remove universal wheel 204 and break away from ground, support sleeve seat 201 bottom and ground looks butt effectively prevent at the in-process to building tool hoist and mount, construction base 1 is not steady.
In the description herein, references to the description of the terms "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed, and obviously many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.
Claims (7)
1. The utility model provides a construction equipment is decorated to high-rise building outer wall which characterized in that: including construction base (1), removal supporting mechanism (2) are installed to construction base (1) both ends lateral wall, construction base (1) top bilateral symmetry is fixed with construction fagging (3), and is two sets of construction fagging (3) top is fixed with adjusts housing (4), it is provided with wiring bull stick (5) to adjust housing (4) inner chamber level, the left side servo motor (6) are installed to construction fagging (3) lateral wall, servo motor (6) output has cup jointed synchronous action wheel (7), wiring bull stick (5) are rotated and are run through regulation housing (4) left end lateral wall and have cup jointed synchronous follow driving wheel (8), synchronous action wheel (7) are cup jointed each other through connecting change area (9) and synchronous action wheel (7), wiring bull stick (5) both ends lateral wall winding is connected with first lift lifting rope (10), And the bottoms of the first lifting rope (10) and the second lifting rope (11) are positioned below the adjusting housing (4) and are fixedly provided with a lifting platform (12).
2. The high-rise building exterior wall decoration construction device according to claim 1, characterized in that: remove supporting mechanism (2) including two sets of support cover seats (201), it is two sets of support cover seat (201) respectively with construction base (1) both ends lateral wall fixed connection, it is two sets of support cover seat (201) top is run through the spiro union and is had lifting screw (202), and is two sets of lifting screw (202) bottom is fixed with gyro wheel mount pad (203), and is two sets of remove universal wheel (204) are installed to gyro wheel mount pad (203) bottom.
3. The high-rise building exterior wall decoration construction device according to claim 2, characterized in that: and the top parts of the two groups of lifting screw rods (202) are positioned above the supporting sleeve seat (201) and are fixedly provided with rotating handles (13).
4. The high-rise building exterior wall decoration construction device according to claim 1, characterized in that: the side walls of the opposite ends of the two groups of construction supporting plates (3) are provided with fixed sliding grooves (14), and the outer side walls of the two ends of the lifting hanging platform (12) are fixed with lifting sliding blocks (18) which are connected with the fixed sliding grooves (14) in a sliding manner.
5. The high-rise building exterior wall decoration construction device according to claim 1, characterized in that: and the outer wall of the rope winding rotating rod (5) is positioned between the first lifting rope (10) and the second lifting rope (11) and is sleeved with a limit stop (15).
6. The high-rise building exterior wall decoration construction device according to claim 1, characterized in that: and a connecting push handle (16) is fixed on the construction supporting plate (3) on the right side.
7. The high-rise building exterior wall decoration construction device according to claim 1, characterized in that: the right side of the rope winding rotating rod (5) is rotatably connected with the side wall of the right end of the inner cavity of the adjusting cover shell (4) through a rotating shaft (17).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121334002.6U CN214780489U (en) | 2021-06-16 | 2021-06-16 | High-rise building outer wall decoration construction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121334002.6U CN214780489U (en) | 2021-06-16 | 2021-06-16 | High-rise building outer wall decoration construction device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN214780489U true CN214780489U (en) | 2021-11-19 |
Family
ID=78712819
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202121334002.6U Expired - Fee Related CN214780489U (en) | 2021-06-16 | 2021-06-16 | High-rise building outer wall decoration construction device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN214780489U (en) |
-
2021
- 2021-06-16 CN CN202121334002.6U patent/CN214780489U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208137422U (en) | Integral lifting hoistway formwork support system | |
| CN212174317U (en) | Steel sheet overhead hoist for construction | |
| CN108590172A (en) | A kind of integral lifting hoistway formwork supporting mechanism | |
| WO2022252633A1 (en) | Method for arranging upside-down hoisting power device in attached lifting scaffold | |
| CN212425137U (en) | Concrete block hoist device | |
| CN107651564B (en) | Crane hoisting posture adjusting device | |
| CN214780489U (en) | High-rise building outer wall decoration construction device | |
| CN206624573U (en) | A kind of Architectural Equipment for being used to lift weight | |
| CN216340801U (en) | Building decoration outer wall transformation platform lifting device | |
| CN206972169U (en) | Drilling equipment | |
| CN212105028U (en) | Safe type scaffold frame for construction | |
| CN212687416U (en) | Heavy object hoisting apparatus for construction | |
| CN218205824U (en) | Super large specification stone material masonry device | |
| CN217708636U (en) | Building wallboard hoisting device | |
| CN217578145U (en) | Construction material lifting machine | |
| JPH06263369A (en) | Elevator | |
| CN213141338U (en) | Electric construction elevating gear | |
| CN112661026B (en) | High building construction of security uses hoisting device | |
| CN211169564U (en) | Special crane for stacking autoclaved aerated concrete products | |
| CN212426800U (en) | A suspension bridge maintenance workbench | |
| CN211871183U (en) | A hoisting device for construction | |
| CN210710521U (en) | Elevating gear for construction | |
| CN211813309U (en) | Multi-functional lifting device of architectural equipment | |
| CN210239082U (en) | Temporary hydropower integrated bracket for construction site | |
| CN221459708U (en) | Movable type slab wall hoisting and installing vehicle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211119 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |