CN214660240U - Buckle formula high-speed joint steelframe connects - Google Patents
Buckle formula high-speed joint steelframe connects Download PDFInfo
- Publication number
- CN214660240U CN214660240U CN202022739499.1U CN202022739499U CN214660240U CN 214660240 U CN214660240 U CN 214660240U CN 202022739499 U CN202022739499 U CN 202022739499U CN 214660240 U CN214660240 U CN 214660240U
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- joint
- draw
- groove
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a buckle formula high-speed joint steelframe connects, including the first steel sheet and the second steel sheet that set up respectively, the joint is formed by first steel sheet and second steel sheet butt joint, all be equipped with on first steel sheet and the second steel sheet and tie head and draw-in groove, but the draw-in groove position of the tie head of first steel sheet and second steel sheet is corresponding and the joint cooperation, but the tie head of second steel sheet and the draw-in groove position of first steel sheet are corresponding and the joint cooperation. The utility model discloses take steelframe quick-operation joint to connect with the form of hole chucking, buckle and draw-in groove have interlock, anticreep effect, connect the resistance to compression effectual, and anti dislocation rigidity is big, and has certain resistance to plucking ability, and it is strong to resist special loading ability.
Description
Technical Field
The utility model relates to a tunnel preliminary bracing's steel frame joint design especially relates to a buckle formula high-speed joint steel frame connects.
Background
At present, tunnels built in China and other large underground projects mostly adopt a mine method and a certain number of TBM methods, a large number of steel frames are adopted for supporting to ensure construction safety, the section shapes of the steel frames which can be manufactured are flexible, the steel frames also have certain adaptability to surrounding rock deformation, and the steel frames have great advantages, and particularly, the steel frames are adopted as primary supports for the tunnels built in poor strata such as soft rock large deformation zones and fault broken zones, so that the steel frames have great benefits. However, the existing steel frame joint adopts a bolt flange connection mode, as shown in fig. 1, screws and nuts need to be threaded, so that the following problems exist:
1. at present, most of the process is finished by manpower, and the process has the prominent difficulties of difficult manual steel frame positioning, scaffold needed in the tightening process and the like;
2. the consumed manpower and the consumed time are large, and the requirement of quick support is not met;
3. the steel arch structure mostly mainly takes small eccentric compression-bending as a main condition, so that the connecting joint has compression resistance and certain anti-dislocation capacity, and the existing angle steel-flange plate connecting form has poor economy.
Therefore, there is a need for a new snap-in quick connect steel frame joint that overcomes the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, provide a buckle formula high-speed joint steel frame connects, mainly to adopting the steelframe as the tunnel and other underground works that just prop up, improved quick construction ability.
The utility model discloses a realize like this:
the utility model provides a buckle formula high-speed joint steelframe connects, including the first steel sheet and the second steel sheet that set up respectively, the joint is formed by first steel sheet and second steel sheet butt joint, all be equipped with on first steel sheet and the second steel sheet and tie head and draw-in groove, but the tie head of first steel sheet and the draw-in groove position of second steel sheet are corresponding and the joint cooperation, but the tie head of second steel sheet and the draw-in groove position of first steel sheet are corresponding and the joint cooperation.
Furthermore, the clamping groove is an L-shaped groove, and the bolt head is clamped after moving along a certain track in the L-shaped groove correspondingly matched with the bolt head.
Furthermore, a pre-dislocation amount is arranged between the bolt head and the L-shaped groove.
Further, an enlarged head is arranged on the outer side of the bolt head.
The utility model discloses following beneficial effect has:
1. the utility model discloses take steelframe quick-operation joint to connect with the form of hole chucking, buckle and draw-in groove have interlock, anticreep effect, connect the resistance to compression effectual, and anti dislocation rigidity is big, and has certain resistance to plucking ability, and it is strong to resist special loading ability.
2. The steel frame installation time is greatly shortened, the steel frame installation working strength is reduced, the steel frame can be quickly constructed in a severe and narrow tunnel working environment, the steel frame can be closed into a ring in time, the supporting resistance is provided, the stability of tunnel surrounding rock can be quickly improved, the construction safety is ensured, and good social benefits are achieved.
3. Due to the adoption of the buckle type joint, the using amount of the traditional joint angle steel can be properly reduced, the bolt is omitted, and the economic benefit is higher.
4. The utility model discloses only connecting to current steelframe and reforming transform, utilizing existing steelframe main part, can not increase too many materials, the cost is lower.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention (taking the grid steel frame as an example), and for those skilled in the art, other drawings (such as the steel frame) can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of a conventional steel frame connection structure;
fig. 2 is a schematic end face structure view of a first steel plate and a second steel plate provided by an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a plug head according to an embodiment of the present invention;
fig. 4 is an assembly connection diagram of the snap-in type quick connection steel frame joint provided by the embodiment of the present invention.
In the figure: 1-a first steel plate; 2-a second steel plate; 3-bolt head; 4-a card slot; 5-an enlarged head; 6-bolt head clamping point; 101-a steel frame; 102-connecting angle steel; 103-screw hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 2-4, the embodiment of the utility model provides a buckle formula high-speed joint steelframe connects, including the first steel sheet and the second steel sheet that set up respectively, connect and form by first steel sheet and second steel sheet butt joint, all be equipped with on first steel sheet and the second steel sheet and tie head and draw-in groove, but the draw-in groove position of the tie head of first steel sheet and second steel sheet is corresponding and the joint cooperation, but the tie head of second steel sheet and the draw-in groove position of first steel sheet are corresponding and the joint cooperation.
The clamping groove is an L-shaped groove, and the bolt head moves along a certain track in the L-shaped groove correspondingly matched with the clamping groove and then is clamped; a pre-dislocation amount is arranged between the bolt head and the L-shaped groove, so that the steel frames on the two sides can still be centered after being clamped; the outer side of the bolt head is provided with an expanding head to play a role in resisting falling. When first steel sheet and second steel sheet bayonet socket butt joint, tie the head and follow L type draw-in groove edge and get into L type draw-in groove, along L type draw-in groove motion, because the head of tying of two steel sheets and draw-in groove are mutual corresponding, insert and carry out the form connection of dislocation translation with the chucking in order to the hole, can form the whole atress system that has anti-drop ability.
The utility model discloses a buckle formula high-speed joint steelframe connects takes steelframe high-speed joint to connect in order to connect to the form of hole chucking, buckle and draw-in groove have the interlock, the anticreep effect of keeping apart, it is effectual to connect the resistance to compression, anti diastrophism rigidity is big, and certain resistance to plucking has, it is strong to resist special loading ability, the shortcoming that current conventional steelframe bolted joint wasted time and energy has been avoided, shorten steelframe installation time greatly, steelframe installation working strength has been alleviateed, can be abominable, construct fast in narrow and small tunnel operational environment, can in time make the steelframe seal the cyclization, provide and strut resistance, can improve tunnel country rock stability fast, ensure construction safety, good social has.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (4)
1. The utility model provides a buckle formula high-speed joint steelframe connects, its characterized in that, including first steel sheet and the second steel sheet that sets up respectively, the joint is formed by first steel sheet and the butt joint of second steel sheet, all be equipped with on first steel sheet and the second steel sheet and tie head and draw-in groove, but the corresponding joint cooperation of joint in tie head of first steel sheet and the draw-in groove position of second steel sheet, but the corresponding joint cooperation of joint in tie head of second steel sheet and the draw-in groove position of first steel sheet.
2. The snap-in quick connect steel frame joint of claim 1, wherein: the clamping groove is an L-shaped groove, and the bolt head moves along a certain track in the L-shaped groove correspondingly matched with the L-shaped groove and then is clamped.
3. The snap-in quick connect steel frame joint of claim 2, wherein: and a pre-dislocation amount is arranged between the bolt head and the L-shaped groove.
4. The snap-in quick connect steel frame joint of claim 1, wherein: the outer side of the bolt head is provided with an expanding head.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022739499.1U CN214660240U (en) | 2020-11-24 | 2020-11-24 | Buckle formula high-speed joint steelframe connects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022739499.1U CN214660240U (en) | 2020-11-24 | 2020-11-24 | Buckle formula high-speed joint steelframe connects |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214660240U true CN214660240U (en) | 2021-11-09 |
Family
ID=78469697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022739499.1U Active CN214660240U (en) | 2020-11-24 | 2020-11-24 | Buckle formula high-speed joint steelframe connects |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214660240U (en) |
-
2020
- 2020-11-24 CN CN202022739499.1U patent/CN214660240U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214660240U (en) | Buckle formula high-speed joint steelframe connects | |
CN209293241U (en) | A kind of assembled architecture wallboard intermediate connecting body | |
CN203655316U (en) | Top isolating device for coal mine filling bracket | |
CN206608506U (en) | The T-shaped wire clamp of photovoltaic | |
CN208830705U (en) | A kind of silo sliding formwork steel form | |
CN209665264U (en) | One kind taking out tool for nuclear power station self-sealing gate valve self-sealing packing pressure ring | |
CN214660239U (en) | Plug-in type quick connection steel frame joint | |
CN208203303U (en) | A kind of separate tunnel liner structure | |
CN205908012U (en) | Positioner of high -rise shear force wall construction joint department's reinforcing bar and template | |
CN111472390A (en) | Prefabricated well of pin-connected panel cable | |
CN204642752U (en) | A kind of tie-beam structure for floating plate in build-up type | |
CN207597661U (en) | For the curtain skeleton connection structure filled after transom | |
CN215631565U (en) | Building templates of junction antiseep | |
CN110778344A (en) | Shield tunnel segment seam waterproof construction | |
CN205387667U (en) | Double slit formula bridge rubber expansion joint device | |
CN205190982U (en) | A seal structure that is used for forced draft pipeline to wear wall department | |
CN210917259U (en) | Waterproof structure of water conservancy and hydropower construction concrete template | |
CN205265215U (en) | Novel husky apron is prevent wind to cable pit | |
CN204875693U (en) | High dam antipriming | |
CN214944325U (en) | Axial positioning, guiding and connecting device for tunnel steel arch frame | |
CN219118142U (en) | Corrosion-resistant concrete pipe pile | |
CN217128130U (en) | Ecological water utilizes concatenation formula ecological protective wall | |
CN218152883U (en) | Sealing flange with pressure check ring | |
CN203080752U (en) | Locking piece connecting structure of corner of curtain wall unit | |
CN216810345U (en) | Assembled building sealing waterproof device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |