CN214655058U - Converter primary flue gas full-dry processing device - Google Patents

Converter primary flue gas full-dry processing device Download PDF

Info

Publication number
CN214655058U
CN214655058U CN202120295158.1U CN202120295158U CN214655058U CN 214655058 U CN214655058 U CN 214655058U CN 202120295158 U CN202120295158 U CN 202120295158U CN 214655058 U CN214655058 U CN 214655058U
Authority
CN
China
Prior art keywords
heat conduction
pipe
flue gas
converter
conduction case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120295158.1U
Other languages
Chinese (zh)
Inventor
夏婷
Original Assignee
夏婷
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 夏婷 filed Critical 夏婷
Priority to CN202120295158.1U priority Critical patent/CN214655058U/en
Application granted granted Critical
Publication of CN214655058U publication Critical patent/CN214655058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a flue gas full dry processing apparatus of converter, including base and roof, the top outer wall of base has the heat conduction case through the fix with screw, the inlet tube has been cup jointed to the top exocoel of heat conduction case, and has cup jointed the drain pipe bottom one side exocoel of heat conduction case, the through hole has been seted up to the top outer wall of heat conduction case, and the air duct has been cup jointed to the inner wall of through hole, the jet-propelled pipe has been cup jointed to the bottom of air duct, the top outer wall of roof is fixed with the converter through suspending in midair the mechanism, the open-top of converter is provided with air exhaust mechanism. The utility model discloses an air duct is leading-in to the inner wall of heat conduction case, has placed clear water in the inner chamber of heat conduction case, sets up to filtering liquid in the inner wall of heat conduction case, and waste gas passes through jet-propelled pipe blowout for in the heat conduction in the waste gas to the inner wall of heat conduction case, make the heat in the waste gas can preserve, effectively collected a large amount of waste heat in the waste gas, the feature of environmental protection promotes.

Description

Converter primary flue gas full-dry processing device
Technical Field
The utility model relates to a flue gas processing technology field especially relates to a converter flue gas full dry process processing apparatus.
Background
The flue gas treatment equipment is used for effectively treating toxic and harmful substances contained in flue gas to below a specified concentration and avoiding adverse phenomena such as corrosion or blockage of the equipment, and generally the flue gas treatment equipment applied to garbage incineration plants is divided into two types of dust removal equipment and acid gas removal equipment.
Flue gas is discharged along with a large amount of hot air in the converter flue gas treatment process, energy loss is wasted, the existing equipment cannot reasonably utilize heat in the flue gas, and the environmental protection performance is poor, so that a converter primary flue gas full-dry method treatment device is urgently needed to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a converter primary flue gas full-dry processing device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a converter primary flue gas full dry processing apparatus, includes base and roof, the top outer wall of base has the heat conduction case through the fix with screw, the inlet tube has been cup jointed to the top exocoel of heat conduction case, and has cup jointed the drain pipe bottom one side exocoel of heat conduction case, the through hole has been seted up to the top outer wall of heat conduction case, and the inner wall of through hole has cup jointed the air duct, the bottom of air duct has cup jointed jet-propelled pipe, the top outer wall of roof is fixed with the converter through suspending the mechanism in midair, the open-top of converter is provided with air exhaust mechanism, top outer wall one side of base is provided with gas filtering mechanism.
Preferably, the air pumping mechanism comprises an air pump, and the air pump is fixed on the outer wall of the bottom of the top plate through a bolt.
Preferably, one end of the air pump is fixed with an exhaust tube through a screw, and one end of the air pump is connected with one end of the air guide tube through a sleeve joint.
Preferably, the outer walls of the air guide pipe and the exhaust pipe are sleeved with a suspender, and the bottom end of the suspender is fixed on the outer wall of the bottom of the top plate through a bolt.
Preferably, the filtering mechanism comprises a filtering box, a first filtering plate and a second filtering plate are fixed on the inner wall of the filtering box through screws, and a connecting pipe is sleeved on the outer wall of one side of the filtering box.
Preferably, one end of the connecting pipe is connected with the outer wall of the top of the heat conduction box in a sleeved mode, and the outer wall of one side of the connecting pipe is fixed with the sampling pipe through a bolt.
Preferably, the outer wall of one side of the air duct is sleeved with a spray pipe, and the inner wall of one side of the heat conduction box is fixed with disturbance fan blades through a bearing.
Compared with the prior art, the utility model provides a flue gas full dry process processing apparatus of converter possesses following beneficial effect:
1. through air duct, heat conduction case and the jet-propelled pipe that sets up, leading-in to the inner wall of heat conduction case through the air duct, placed clear water in the inner chamber of heat conduction case, set up to filtering liquid in the inner wall of heat conduction case, waste gas passes through the jet-propelled pipe blowout for in the heat conduction in the waste gas to the inner wall of heat conduction case, make the heat in the waste gas can preserve, effectively collected a large amount of waste heat in the waste gas, the feature of environmental protection promotes.
2. Through connecting pipe, rose box, first filter and the second filter that sets up, gas after the prefiltering passes through the connecting pipe and guides into the inner wall of rose box, can carry out the secondary filter to waste gas through first filter and second filter, promotes harmful substance's in the waste gas treatment effect.
3. Through the spray tube and the disturbance flabellum that set up, the spray tube aperture is less for spun gas drives the disturbance flabellum and takes place to continuously rotate, and then makes the abundant disturbance of filtrate, promotes the filtration efficiency of waste gas, improves reaction efficiency.
Drawings
Fig. 1 is a schematic front sectional view of a primary flue gas full-dry processing device of a converter provided in embodiment 1 of the present invention;
fig. 2 is a schematic structural diagram of a heat conduction box part in a converter primary flue gas full-dry processing device provided in embodiment 1 of the present invention;
fig. 3 is a schematic structural diagram of a disturbing blade part in a converter primary flue gas full dry processing device according to embodiment 2 of the present invention.
In the figure: 1-base, 2-heat conducting box, 3-converter, 4-air exhaust pipe, 5-hanger rod, 6-air guide pipe, 7-top plate, 8-air pump, 9-sampling pipe, 10-connecting pipe, 11-first filter plate, 12-filter box, 13-second filter plate, 14-air jet pipe, 15-water inlet pipe, 16-water discharge pipe, 17-disturbing fan blade and 18-spray pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1
Referring to fig. 1-2, a converter primary flue gas full-dry processing apparatus, including base 1 and roof 7, the top outer wall of base 1 has heat conduction case 2 through the fix with screw, the top exocoel of heat conduction case 2 has cup jointed inlet tube 15, and one side exocoel bottom of heat conduction case 2 has cup jointed drain pipe 16, the through hole has been seted up to the top outer wall of heat conduction case 2, the inner wall of through hole has cup jointed air duct 6, jet-propelled pipe 14 has been cup jointed to the bottom of air duct 6, the top outer wall of roof 7 is fixed with converter 3 through suspending the mechanism in midair, the open-top of converter 3 is provided with air exhaust mechanism, top outer wall one side of base 1 is provided with gas filtering mechanism.
The utility model discloses in, the mechanism of bleeding includes air pump 8, and air pump 8 passes through the bolt fastening in the bottom outer wall of roof 7.
The utility model discloses in, the one end of air pump 8 is passed through the fix with screw and is had exhaust tube 4, and the one end of air pump 8 is connected through cup jointing with the one end of air duct 6.
The utility model discloses in, jib 5 has been cup jointed to the outer wall of air duct 6 and exhaust tube 4, and the bottom of jib 5 is fixed in the bottom outer wall of roof 7 through the bolt.
The utility model discloses in, filtering mechanism includes rose box 12, and the inner wall of rose box 12 has first filter 11 and second filter 13 through the fix with screw, and one side outer wall of rose box 12 has cup jointed connecting pipe 10.
The utility model discloses in, the one end of connecting pipe 10 is connected through cup jointing with the top outer wall of heat conduction case 2, and one side outer wall of connecting pipe 10 has sampling tube 9 through the bolt fastening.
The working principle is as follows: during the use, start the waste gas that air pump 8 produced in with converter 3 through exhaust tube 4 and collect, lead to the inner wall of heat conduction case 2 through air duct 6 in, the clear water has been placed in the inner chamber of heat conduction case 2, set up to filtering liquid in the inner wall of heat conduction case 2, waste gas passes through jet-propelled pipe 14 blowout, make in the heat conduction in the waste gas to the inner wall of heat conduction case 2, make the heat in the waste gas can be preserved, a large amount of waste heat in the waste gas has effectively been collected, the feature of environmental protection promotes, gas after the prefiltering leads to in the inner wall of rose box 12 through connecting pipe 10, can carry out the secondary filter to waste gas through first filter 11 and second filter 13, promote the treatment effect of harmful substance in the waste gas, and can extract the monitoring to the waste gas of preliminary treatment through sampling tube 9 that sets up, make the processing procedure of waste gas dynamic controllable.
Example 2
Referring to fig. 3, the present embodiment of the device for treating primary flue gas of a converter by the full dry method further includes a nozzle 18 sleeved on an outer wall of one side of the gas guide tube 6, and a disturbance fan blade 17 fixed on an inner wall of one side of the heat conduction box 2 through a bearing.
The working principle is as follows: the 18 apertures of the spray pipe that sets up are less for spun gas drives disturbance flabellum 17 and takes place to last the rotation, and then makes the abundant disturbance of filtrate, promotes the filtration efficiency of waste gas, improves reaction efficiency.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a converter primary flue gas full-dry processing apparatus, includes base (1) and roof (7), its characterized in that, the top outer wall of base (1) has heat conduction case (2) through the fix with screw, the top exocoel of heat conduction case (2) has cup jointed inlet tube (15), and has cup jointed drain pipe (16) bottom one side exocoel of heat conduction case (2), the through hole has been seted up to the top outer wall of heat conduction case (2), and the inner wall of through hole has cup jointed air duct (6), the bottom of air duct (6) has cup jointed jet-propelled pipe (14), the top outer wall of roof (7) is fixed with converter (3) through suspending the mechanism in midair, the open-top of converter (3) is provided with air exhaust mechanism, top outer wall one side of base (1) is provided with gas filtering mechanism.
2. The converter primary flue gas full dry processing device according to claim 1, wherein the air pumping mechanism comprises an air pump (8), and the air pump (8) is fixed on the outer wall of the bottom of the top plate (7) through bolts.
3. The converter primary flue gas full-dry processing device according to claim 2, wherein an air suction pipe (4) is fixed at one end of the air pump (8) through a screw, and one end of the air pump (8) is connected with one end of the air guide pipe (6) through a sleeve joint.
4. The converter primary flue gas full dry processing device according to claim 3, wherein the outer walls of the gas guide tube (6) and the exhaust tube (4) are sleeved with a suspension rod (5), and the bottom end of the suspension rod (5) is fixed on the outer wall of the bottom of the top plate (7) through a bolt.
5. The converter primary flue gas full dry processing device according to claim 1, wherein the filtering mechanism comprises a filtering box (12), the inner wall of the filtering box (12) is fixed with a first filtering plate (11) and a second filtering plate (13) through screws, and the outer wall of one side of the filtering box (12) is sleeved with a connecting pipe (10).
6. The converter primary flue gas full dry processing device according to claim 5, wherein one end of the connecting pipe (10) is connected with the outer wall of the top of the heat conducting box (2) through sleeving, and the sampling pipe (9) is fixed on the outer wall of one side of the connecting pipe (10) through a bolt.
7. The converter primary flue gas full dry processing device according to claim 1, wherein a nozzle (18) is sleeved on the outer wall of one side of the gas guide tube (6), and disturbance fan blades (17) are fixed on the inner wall of one side of the heat guide box (2) through a bearing.
CN202120295158.1U 2021-02-02 2021-02-02 Converter primary flue gas full-dry processing device Active CN214655058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120295158.1U CN214655058U (en) 2021-02-02 2021-02-02 Converter primary flue gas full-dry processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120295158.1U CN214655058U (en) 2021-02-02 2021-02-02 Converter primary flue gas full-dry processing device

Publications (1)

Publication Number Publication Date
CN214655058U true CN214655058U (en) 2021-11-09

Family

ID=78445341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120295158.1U Active CN214655058U (en) 2021-02-02 2021-02-02 Converter primary flue gas full-dry processing device

Country Status (1)

Country Link
CN (1) CN214655058U (en)

Similar Documents

Publication Publication Date Title
CN214655058U (en) Converter primary flue gas full-dry processing device
CN207591599U (en) A kind of solid waste rotary kiln exhaust gas purifier
CN211885878U (en) Smoke dust collecting device
CN209576228U (en) A kind of coal-burning power plant's chimney reducing atmosphere pollution
CN211562422U (en) Energy-saving exhaust treatment device
CN214389391U (en) Dust collector is used in polishing of metal saw bit
CN214809793U (en) High-pressure spray tower gas circulation structure for organic waste gas treatment
CN215027153U (en) High-efficient exhaust treatment device
CN209934335U (en) Industrial dust collector convenient to deashing
CN213467330U (en) Factory building exhaust gas purification system
CN213668540U (en) Environmental protection machinery tail gas recovery unit
CN213159909U (en) High-efficient empty tower sprays flue gas desulphurization unit
CN211216162U (en) Chemical industry equipment exhaust gas purification device
CN211676919U (en) Frequency conversion dust collector
CN213101576U (en) High-concentration waste gas collecting and purifying device for sewage treatment plant
CN214209961U (en) Environment-friendly smoke whitening equipment
CN214734932U (en) Energy-saving emission-reducing reflux device of thermal power plant desulfurization system
CN216498249U (en) Industrial waste gas treatment is with waste gas scrubbing tower that has high-efficient circulation to purify
CN214862303U (en) Pneumatic cyclone separation and purification device
CN215086153U (en) Absorption tower of high-efficient SOx/NOx control device of flue gas
CN214513582U (en) Dry dust recovery device with spraying function
CN212915022U (en) Processing workshop dust extraction that does not have secondary pollution
CN215138345U (en) Activated carbon adsorption purification treatment device
CN211328654U (en) Dust collecting equipment is used in production of heat preservation decorative board