CN214595423U - Integral curtain box structure - Google Patents
Integral curtain box structure Download PDFInfo
- Publication number
- CN214595423U CN214595423U CN202022754321.4U CN202022754321U CN214595423U CN 214595423 U CN214595423 U CN 214595423U CN 202022754321 U CN202022754321 U CN 202022754321U CN 214595423 U CN214595423 U CN 214595423U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixed
- curtain box
- bearing plate
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 239000012634 fragment Substances 0.000 claims abstract description 33
- 238000010276 construction Methods 0.000 claims description 5
- 230000000149 penetrating effect Effects 0.000 claims description 5
- 238000009434 installation Methods 0.000 abstract description 19
- 238000004806 packaging method and process Methods 0.000 abstract 2
- 238000000034 method Methods 0.000 description 9
- 238000010079 rubber tapping Methods 0.000 description 6
- 229910000746 Structural steel Inorganic materials 0.000 description 4
- 230000005484 gravity Effects 0.000 description 4
- 238000011900 installation process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Curtains And Furnishings For Windows Or Doors (AREA)
Abstract
The utility model provides an integral curtain box structure belongs to assembled furred ceiling technical field. The integral curtain box structure comprises a bearing plate, a curtain box, a keel and a hoisting structure. The utility model provides a fossil fragments bottom is connected in loading board top middle part, the fossil fragments top is hung, hoist loading board top middle part through fossil fragments, hoist the structure bottom and connect in loading board top end, will hoist the structure top and hang, hoist loading board top end through hoisting the structure, and at installation curtain box, fossil fragments, each other does not influence when hoisting the structure, whole part is subaerial to be assembled, the equipment is convenient, do not restricted by space factor, the packaging efficiency is high simultaneously, whole packaging efficiency is high, also be difficult for appearing damaging, the precision is also high, curtain box is whole, the structure is whole lifting installation, than former scheme single installation rate piece, therefore, holistic installation effectiveness has obtained effective the promotion.
Description
Technical Field
The utility model relates to an assembled furred ceiling technical field, concretely relates to integral curtain box structure.
Background
The existing method has the following problems in the installation process of the curtain box module by the suspended ceiling during assembly; the L-shaped angle iron has high cost, heavy weight, expansion and labor-hour installation; the L-shaped angle iron occupies a large space and has high dependence on a wall body; the lower hanging part has a complex structure, high production difficulty and high cost; the multi-fit relation of the components is high, the material cost is high, the requirement on the installation precision is high, and the fault tolerance rate is low. The existing curtain box installation steps are as follows: the method comprises the following steps: fixing the L-shaped angle iron on the wall body through expansion bolts; secondly, the step of: fixing the bearing panel on the L-shaped angle iron by using a self-tapping screw; ③: the wood-plastic lines are arranged on the bearing panel; and fourthly, the NP bending plate is fixed on the bearing panel, the whole installation process is carried out on the top surface, the installation process is complex, and the installation difficulty is high. Therefore, an integral curtain rail structure with simple structure, easy installation and high stability is needed.
Chinese patent CN209074090U, published japanese 2019-07-09 discloses an assembled curtain box, which includes: the device comprises at least two bases which are arranged in parallel at intervals, hoisting pieces, box bodies and supporting pieces, wherein the hoisting pieces, the box bodies and the supporting pieces are arranged in one-to-one correspondence to the bases; each hoisting piece is fixedly connected with the corresponding base body, and a first fixing part is formed at the lower part of each hoisting piece; the box body comprises a top plate, the top plate is fixedly connected with the first fixing part, and one side, close to the wall body, of the top plate is attached to the wall body; the support piece is arranged at the lower part of the top plate and attached to the wall body to support the top plate, so that the integral attractiveness of the curtain box is guaranteed while the quality of construction operation can be guaranteed, and the operation environment of a construction site can be kept. The multiple parts in the curtain box in the patent are matched, so that the requirement on installation accuracy is high, the structure is complex, and the installation is troublesome.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an integral curtain box structure aiming at the defects of the prior art.
The utility model provides an integral curtain box structure, including the loading board, be fixed in the curtain box of loading board bottom, the bottom is connected in loading board top middle part, is used for the fossil fragments that hoist in the middle part of the loading board, and the bottom is connected in loading board top end, is used for the structure of hoisting that the loading board tip hoisted.
Further, the curtain box is a wood-plastic extruded curtain box.
Further, fossil fragments are nearly font fossil fragments, nearly font fossil fragments bottom both ends are two joint boards respectively, the loading board middle part is fixed with a plurality of joint spare, the joint spare is including being fixed in two joint structures on the loading board, the joint structure is including being fixed in the first fixed plate on the loading board, is fixed in the second fixed plate on the first fixed plate, the first draw-in groove that is enclosed by first fixed plate, second fixed plate, one on nearly font fossil fragments the joint integrated circuit board connects in the first draw-in groove on a joint structure, another joint integrated circuit board on nearly font fossil fragments connects in the first draw-in groove on another joint structure.
Furthermore, the second fixing plate is provided with a mounting hole, and the second fixing plate further comprises a first fastening structure, wherein one end of the first fastening structure penetrates through the mounting hole, the clamping and connecting plate and the first fixing plate in sequence and is fixed on the bearing plate.
Furthermore, the hoisting structure comprises a supporting block for hoisting the end part of the bearing plate, and a mounting plate with one end connected to the supporting block and the other end connected to the wall.
Further, the length of a few font fossil fragments bottom tip to top is less than the length of a few font fossil fragments bottom middle part to top, form the second draw-in groove between a few font fossil fragments bottom tip and the loading board, the supporting shoe joint is in the second draw-in groove, still includes and runs through in the mounting panel and be fixed in the second fastening structure on the wall for one end.
The curtain box further comprises a corner fastener, a third fastening structure and a fourth fastening structure, wherein one end of the third fastening structure penetrates through one end of the corner fastener and is fixed at one side end of the curtain box, and one end of the fourth fastening structure penetrates through the other end of the corner fastener and is fixed on a wall.
Furthermore, the n-shaped keels are two symmetrically arranged about a first central line of the bearing plate, and the hoisting structures are two symmetrically arranged about a second central line of the bearing plate.
Furthermore, the supporting block is a supporting block with a hollow inner part, the supporting block and the mounting plate are integrally formed, and a round angle is arranged at the joint of the supporting block and the mounting plate.
Further, the corner connectors are two symmetrically arranged.
The utility model discloses an integral curtain box structure has following beneficial effect:
1. the curtain box is fixed at the bottom end of the bearing plate to improve the stability of the installation of the curtain box, the bottom end of the keel is connected with the middle part of the top end of the bearing plate, the top end of the keel is hung, the middle part of the top end of the bearing plate can be lifted by the keel, the bottom end of the lifting structure is connected with the end part of the top end of the bearing plate, the top end of the lifting structure is suspended, the end part of the top end of the bearing plate can be lifted by the lifting structure, thereby the bearing plate can be respectively hoisted by the keel and the hoisting structure, the bearing plate is not mutually influenced when the curtain box, the keel and the hoisting structure are installed, the whole part is assembled on the ground, the assembly is convenient, and the bearing plate is not limited by space factors, meanwhile, the assembly efficiency is high, the integral assembly efficiency is high, the damage is not easy to occur, the precision is high, the integral structure of the curtain box is integrally lifted and installed, and compared with the single installation speed block in the original scheme, the integral installation efficiency is effectively improved;
2. the first fixing plate is fixed on the bearing plate, the second fixing plate is fixed on the first fixing plate, the first fixing plate and the second fixing plate enclose a first clamping groove, the clamping piece comprises two clamping structures, one clamping plate at the bottom end of the inverted V-shaped keel is connected with the first clamping groove on one clamping structure, the other clamping plate at the bottom end of the inverted V-shaped keel is connected with the second clamping groove on the other clamping structure, so that the bottom end of the inverted V-shaped keel can be stably connected with the bearing plate, the use of the top end of the inverted V-shaped keel is not influenced, the width of the first clamping groove can be larger than or equal to that of the clamping plate, the width of the clamping plate can be larger than 1/2-2/3 of the width of the first clamping groove, the gravity center of the clamping plate is positioned at the inner side of the first clamping groove, the clamping plate is used for pressing the first fixing plate, and the gravity center of the clamping plate is positioned at the outer side edge of the first clamping groove due to the over short width of the clamping plate is avoided, the first fixing plate can not effectively support the column clamping plate, and the installation is simple and convenient;
3. a second clamping groove is formed between the bottom end part of the n-shaped keel and the bearing plate, and the supporting block is clamped in the second clamping groove, so that when the mounting plate is lifted, the supporting block is lifted, the n-shaped keel is pulled, the bottom end part of the bearing plate is lifted, and the mounting is simple and convenient.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and together with the description, serve to explain the principles of the invention. In the drawings, like reference numerals are used to indicate like elements. The drawings in the following description are directed to some, but not all embodiments of the invention. For a person skilled in the art, other figures can be derived from these figures without inventive effort.
Fig. 1 is a schematic structural view of an integral curtain box structure according to an embodiment of the present invention;
fig. 2 is an enlarged view of a portion a of fig. 1 in the integral type curtain box structure according to the embodiment of the present invention;
fig. 3 is a side view of an integrated curtain rail structure according to an embodiment of the present invention.
In the figure: the curtain rod comprises a bearing plate 1, a first fixing plate 11, a second fixing plate 12, a curtain box 2, a 21-corner connector, a keel 3, a hoisting structure 4, a support block 41 and a mounting plate 42.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. It should be noted that the embodiments and features of the embodiments in the present application may be arbitrarily combined with each other without conflict.
Please refer to fig. 1 to 3. The utility model discloses integral curtain box structure, including loading board 1, be fixed in the curtain box 2 of 1 bottom of loading board, the bottom is connected in 1 top middle part of loading board, is used for the fossil fragments 3 that hoist in 1 middle part of loading board, and the bottom is connected in 1 top tip of loading board, is used for the structure 4 that hoists of 1 tip of loading board.
Here, the curtain box 2 is fixed at the bottom of the bearing plate 1, which improves the stability of installing the curtain box 2, the bottom of the keel 3 is connected to the middle of the top of the bearing plate 1, the top of the keel 3 is hung, the middle of the top of the bearing plate 1 can be lifted by the keel 3, the bottom of the lifting structure 4 is connected to the top of the bearing plate 1, the top of the lifting structure 4 is hung, the top of the bearing plate 1 can be lifted by the lifting structure 4, so that the bearing plate 1 can be lifted by the keel 3 and the lifting structure 4, and the curtain box 2, the keel 3 and the lifting structure 4 are not affected by each other when being installed, the whole part is assembled on the ground, the assembling is convenient, and is not limited by space factors, meanwhile, the assembling efficiency is high, the whole assembling efficiency is high, the damage is not easy to occur, the precision is also high, the curtain box 2 is integral, the structure is integrally lifted and installed, compared with the single installing speed block of the original scheme, therefore, the whole installation efficiency is effectively improved.
The curtain box 2 can be a wood-plastic extruded curtain box 2. The bearing plate 1 can be an NP plate, and the curtain box 2 is an extrusion piece, so that the difficulty of assembling the NP plate in a factory is reduced, the pressure of factory manufacturing is reduced, the breakage rate is reduced, and the material manufacturing cost and the transportation cost are reduced.
The second fixing plate 12 may have a mounting hole, and further includes a first fastening structure having one end sequentially penetrating through the mounting hole, the clamping plate, and the first fixing plate 11 and fixed to the bearing plate 1. The first fastening structure may be a self-tapping screw, a bolt, a gun nail.
The lifting structure 4 may include a supporting block 41 for lifting the end of the loading plate 1, and a mounting plate 42 having one end connected to the supporting block 41 and the other end connected to the wall.
The length of 3 bottom tip to the top of a few font fossil fragments can be less than the length of 3 bottom middle parts to the top of a few font fossil fragments, forms the second draw-in groove between 3 bottom tip of a few font fossil fragments and the loading board 1, and the supporting shoe 41 joint is in the second draw-in groove, still including the second fastening structure that runs through in mounting panel 42 and be fixed in on the wall for one end. Form the second draw-in groove between 3 bottom tip of a few font fossil fragments and the loading board 1, supporting shoe 41 joint in the second draw-in groove to when mounting panel 42 hoisted, supporting shoe 41 hoisted, thereby pulled a few font fossil fragments 3, and then hoisted 1 bottom tip of loading board, simple installation. The second fastening structure may be a self-tapping screw, bolt, gun nail.
The integral type structure of the curtain rail in this embodiment may further include a corner brace 21, a third fastening structure having one end penetrating one end of the corner brace 21 and fixed to one side end of the curtain rail 2, and a fourth fastening structure having one end penetrating the other end of the corner brace 21 and fixed to the wall. The third fastening structure may be a self-tapping screw, a bolt, a gun nail. The fourth fastening structure may be a self-tapping screw, a bolt, a gun nail.
The inverted V-shaped keels 3 can be two symmetrically arranged relative to a first central line of the bearing plate 1, and the hoisting structures 4 are two symmetrically arranged relative to a second central line of the bearing plate 1, so that the stability of the whole structure is improved.
Supporting shoe 41 can be inside hollow supporting shoe 41, and supporting shoe 41 sets up with mounting panel 42 integrated into one piece, and the junction of supporting shoe 41 and mounting panel 42 is equipped with the fillet, avoids striking few font fossil fragments 3 and damage fossil fragments 3 when the border position of supporting shoe 41 is the right angle when with supporting shoe 41 joint in the second draw-in groove. The second locking groove may be a rectangular locking groove, and the supporting block 41 may be a rectangular supporting block 41.
The corner brace 21 may be two symmetrically arranged.
Referring to fig. 1 to 3, an installation method of an integral curtain rail structure includes the following steps:
s1: fixing the curtain box 2 at the bottom end of the bearing plate 1;
s2: connecting a clamping board on the keel 3 to a first clamping groove on one clamping structure, connecting another clamping board on the keel 3 to a first clamping groove on another clamping structure, and sequentially penetrating one end of the first fastening structure through the mounting hole, the clamping board and the first fixing plate 11 and fixing the first fastening structure on the bearing plate 1;
s3: one end of the second fastening structure is penetrated through the mounting plate 42 and fixed on the wall, and the supporting block 41 is clamped in a second clamping groove formed between the end part of the bottom end of the inverted U-shaped keel 3 and the bearing plate 1.
Step S3 may be followed by: one end of the third fastening structure penetrates through one end of the corner brace 21 and is fixed at one side end of the curtain box 2, and one end of the fourth fastening structure penetrates through the other end of the corner brace 21 and is fixed on the wall.
On the ground, the curtain box 2 is fixed at the bottom end of the bearing plate 1 through self-tapping screws, then the n-shaped keels 3 are installed in the middle of the top end of the bearing table, the installed curtain box 2 is integrally lifted, and the supporting blocks 41 are clamped in the second clamping grooves on the supporting and hoisting structure 4.
The above-described embodiments can be implemented individually or in various combinations, and such variations are within the scope of the present invention.
It should be noted that, in the description of the present application, it should be noted that the terms "upper end", "lower end" and "bottom end" indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the drawings or the orientation or positional relationship which the product of the application is usually placed in when the product of the application is used, and are only for convenience of describing the present application and simplifying the description, but do not indicate or imply that the device referred to must have a specific orientation, be constructed in a specific orientation and be operated, and thus, should not be construed as limiting the present application. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.
Claims (10)
1. An integral curtain box structure is characterized in that: the curtain box comprises a bearing plate (1) and a curtain box (2) fixed at the bottom end of the bearing plate (1), wherein the bottom end of the curtain box is connected to the middle of the top end of the bearing plate (1) and used for lifting the middle of the bearing plate (1), and the bottom end of the curtain box is connected to the top end of the bearing plate (1) and used for lifting the end part of the bearing plate (1) to form a lifting structure (4).
2. The integral type curtain rail structure as claimed in claim 1, wherein: the curtain box (2) is a wood-plastic extruded curtain box (2).
3. A one-piece headrail construction according to claim 1 or claim 2 wherein: fossil fragments (3) are a few font fossil fragments (3), a few font fossil fragments (3) bottom both ends are two joint boards respectively, loading board (1) middle part is fixed with a plurality of joint spare, the joint spare is including being fixed in two joint structures on loading board (1), the joint structure is including being fixed in first fixed plate (11) on loading board (1), is fixed in second fixed plate (12) on first fixed plate (11), by first fixed plate (11), the first draw-in groove that second fixed plate (12) enclose, a on a few font fossil fragments (3) the joint integrated circuit board connects in the first draw-in groove of a joint structure, another joint integrated circuit board on a few font fossil fragments (3) connects in the structural first draw-in groove of another joint.
4. A one-piece headrail construction according to claim 3 wherein: the second fixing plate (12) is provided with a mounting hole, and the second fixing plate further comprises a first fastening structure, wherein one end of the first fastening structure penetrates through the mounting hole, the clamping and connecting plate and the first fixing plate (11) in sequence and is fixed on the bearing plate (1).
5. The integral type curtain rail structure as claimed in claim 4, wherein: the hoisting structure (4) comprises a supporting block (41) for hoisting the end part of the bearing plate (1), and a mounting plate (42) with one end connected to the supporting block (41) and the other end connected to the wall.
6. The integral type curtain rail structure as claimed in claim 5, wherein: the length of a bottom end part to a top end of the n-shaped keel (3) is smaller than the length of a bottom middle part to a top end of the n-shaped keel (3), a second clamping groove is formed between the bottom end part of the n-shaped keel (3) and the bearing plate (1), the supporting block (41) is connected with the second clamping groove in a clamped mode, and the second fastening structure is used for penetrating through the mounting plate (42) at one end and is fixed on the wall.
7. A one-piece headrail construction according to claim 3 wherein: the curtain rod further comprises an angle bracket (21), a third fastening structure and a fourth fastening structure, wherein one end of the third fastening structure penetrates through one end of the angle bracket (21) and is fixed at one side end of the curtain box (2), and one end of the fourth fastening structure penetrates through the other end of the angle bracket (21) and is fixed on a wall.
8. The integral type curtain rail structure as claimed in claim 6, wherein: the n-shaped keels (3) are two symmetrically arranged about a first central line of the bearing plate (1), and the hoisting structures (4) are two symmetrically arranged about a second central line of the bearing plate (1).
9. The integral type curtain rail structure as claimed in claim 6, wherein: the supporting block (41) is a supporting block (41) with a hollow inner part, the supporting block (41) and the mounting plate (42) are integrally formed, and a round angle is arranged at the joint of the supporting block (41) and the mounting plate (42).
10. The integral headrail structure of claim 7, wherein: the corner connectors (21) are two symmetrically arranged.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202022754321.4U CN214595423U (en) | 2020-11-25 | 2020-11-25 | Integral curtain box structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202022754321.4U CN214595423U (en) | 2020-11-25 | 2020-11-25 | Integral curtain box structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN214595423U true CN214595423U (en) | 2021-11-05 |
Family
ID=78427579
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202022754321.4U Withdrawn - After Issue CN214595423U (en) | 2020-11-25 | 2020-11-25 | Integral curtain box structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN214595423U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112450704A (en) * | 2020-11-25 | 2021-03-09 | 浙江亚厦装饰股份有限公司 | Integral curtain box structure and mounting method thereof |
-
2020
- 2020-11-25 CN CN202022754321.4U patent/CN214595423U/en not_active Withdrawn - After Issue
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112450704A (en) * | 2020-11-25 | 2021-03-09 | 浙江亚厦装饰股份有限公司 | Integral curtain box structure and mounting method thereof |
| CN112450704B (en) * | 2020-11-25 | 2024-09-06 | 浙江亚厦装饰股份有限公司 | Integral curtain box structure and installation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112450704A (en) | Integral curtain box structure and mounting method thereof | |
| CN211200855U (en) | Building curtain wall mounting and fixing device | |
| CN111980431A (en) | Assembled wallboard supporting box structure | |
| CN202551519U (en) | Cabinet combination system for electric cabinet | |
| CN215368163U (en) | Suspended ceiling structure suitable for square steel keel | |
| CN210316214U (en) | A prefabricated steel structure building special-shaped column | |
| CN216920957U (en) | Assembly type inverted-V-shaped keel ceiling structure | |
| CN214246526U (en) | Scaffold for building construction | |
| CN218504709U (en) | PCB board cutting device | |
| CN212336289U (en) | Supporting equipment of assembled PC balcony component | |
| CN203790972U (en) | Combined bracket for central testbed | |
| CN223201444U (en) | Safe and efficient color steel plate erection fixture | |
| CN210274371U (en) | Line erecting device for communication equipment | |
| CN209936806U (en) | Lifting oil cylinder assembling and disassembling tool | |
| CN208220977U (en) | A kind of mounting rack of plant area's wind-driven generator | |
| CN222863866U (en) | A kind of hollow wall bridge fixed hook | |
| CN203201085U (en) | Square light board installing device | |
| CN221577178U (en) | Mounting structure and ledge thereof | |
| CN221371231U (en) | High-temperature material frame for metal heat treatment | |
| CN221479292U (en) | Motor test tool | |
| CN218208455U (en) | Auxiliary device is fixed in construction electrical construction | |
| CN218292612U (en) | Link plate wall support frame convenient to equipment | |
| CN219106959U (en) | Groove type bridge frame capable of being rapidly disassembled | |
| CN216774251U (en) | Fire barrier structure is vertically installed to cross arm | |
| CN214317593U (en) | Section bar and wall skeleton for intelligence show |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20211105 Effective date of abandoning: 20240906 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20211105 Effective date of abandoning: 20240906 |
|
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |