CN214495401U CN202120796895.XU CN202120796895U CN214495401U CN 214495401 U CN214495401 U CN 214495401U CN 202120796895 U CN202120796895 U CN 202120796895U CN 214495401 U CN214495401 U CN 214495401U
Authority
CN
China
Prior art keywords
vertical rod
steel pipe
middle vertical
rod
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120796895.XU
Other languages
Chinese (zh)
Inventor
丁若阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Institute of Engineering
Original Assignee
Henan Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Institute of Engineering filed Critical Henan Institute of Engineering
Priority to CN202120796895.XU priority Critical patent/CN214495401U/en
Application granted granted Critical
Publication of CN214495401U publication Critical patent/CN214495401U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a building steel pipe hoisting device, which effectively solves the problems of batch hoisting chucking and length adaptation of steel pipes; the technical scheme for solving the problem is that the device comprises a hanging beam, wherein the left end and the right end of the hanging beam are hoisted through steel wire ropes; the lower parts of the hanging beams are connected with clamps through ropes; the clamp comprises a middle vertical rod connected with the rope, and a front vertical rod and a rear vertical rod are respectively arranged on the front side and the rear side of the middle vertical rod; the bottoms of the middle vertical rod and the front vertical rod as well as the bottoms of the middle vertical rod and the rear vertical rod are hinged through an upper bottom cross rod and a lower bottom cross rod which are parallel to each other, so that a front parallelogram structure and a rear parallelogram structure are formed; all articulated through a top horizontal pole parallel with low horizontal pole between the top of well montant and preceding montant and well montant and back montant, the top horizontal pole can be dismantled, the utility model discloses adapt to different length, the steel pipe of different diameters realizes automatic chucking, and is automatic to loosen, and is simple easy-to-use, and the security is strong.

Description

Building steel pipe hoist device
Technical Field
The utility model relates to a building construction equipment field, especially a building steel pipe hoist device.
Background
At present, most of welded steel pipe transportation, loading and unloading lifting adopt a tool formed by combining a steel wire rope and a lifting hook, in the lifting process, the lifting hook is directly clamped at two ports of a steel pipe, the lifting hook after being stressed is directly pressed on a convex edge of a groove of the steel pipe, the groove is easily damaged, the angle between the lifting hook and the steel wire rope is small during lifting, the steel pipe end can be broken into an opening or the unhooking phenomenon is caused, and the potential safety hazard exists. Meanwhile, the mode can only hoist one steel pipe generally; and after the length of steel pipe is longer, the accident appears more easily.
When batch hoisting is carried out, steel pipes are generally bundled by using a steel wire rope, then hoisting is carried out, and then the steel pipes are easy to slide due to the fact that the contact surface between the rope and the steel pipes is too small, and knotting and untwisting are complex, so that the steel pipes are not beneficial to use; due to the fact that the lengths of the steel pipes are different, most devices cannot be used universally, and hoisting equipment with various sizes is needed. Therefore, a more convenient and faster hoisting clamp is needed at present.
Disclosure of Invention
To the above-mentioned condition, for solving the problem that exists among the prior art, the utility model aims at providing a building steel pipe hoist device, can effectively solve the problem of steel pipe hoist and mount chucking and length adaptation in batches.
The technical scheme for solving the problem is that the device comprises a hanging beam, wherein the left end and the right end of the hanging beam are hoisted through steel wire ropes; the lower parts of the hanging beams are connected with clamps through ropes; the clamp comprises a middle vertical rod connected with the rope, and a front vertical rod and a rear vertical rod are respectively arranged on the front side and the rear side of the middle vertical rod; the bottoms of the middle vertical rod and the front vertical rod as well as the bottoms of the middle vertical rod and the rear vertical rod are hinged through an upper bottom cross rod and a lower bottom cross rod which are parallel to each other, so that a front parallelogram structure and a rear parallelogram structure are formed; the top of the middle vertical rod, the top of the front vertical rod, the top of the middle vertical rod and the top of the rear vertical rod are hinged through a top cross rod parallel to the lower cross rod, and the top cross rod can be detached.
The lower end of the hanging beam is evenly provided with a plurality of lifting hooks, and the rope above the clamp is fixed on the lifting hooks.
The upper end of the middle vertical rod is fixed with a hanging ring, and the lower end of the rope is fixed on the hanging ring.
The articulated shaft of the articulated point department of top horizontal pole and well montant can be demolishd, the one end of articulated shaft is provided with the arch, the other end cartridge has the spacer pin.
The outer edge surfaces of the middle vertical rod, the front vertical rod and the rear vertical rod are all wrapped with rubber layers.
The hanging beam is hoisted through a plurality of steel wire ropes.
The utility model discloses can adapt to different length, the steel pipe of different diameters realizes automatic chucking, loosens automatically, and is simple easy-to-use, and the security is strong.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a right side view of the clamp (state one).
Fig. 3 is a right side view of the jig (state two).
Fig. 4 is a right side view of the jig (state three).
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings.
As shown in fig. 1 to 4, the utility model comprises a hanging beam 1, wherein the left and right ends of the hanging beam 1 are hoisted by a steel wire rope 2; the lower parts of the hanging beams 1 are connected with clamps 3 through ropes 4; the clamp 3 comprises a middle vertical rod 301 connected with the rope 4, and a front vertical rod 302 and a rear vertical rod 303 are respectively arranged on the front side and the rear side of the middle vertical rod 301; the bottoms of the middle vertical rod 301 and the front vertical rod 302 as well as the bottoms of the middle vertical rod 301 and the rear vertical rod 303 are hinged through an upper bottom cross rod and a lower bottom cross rod which are parallel to each other, so that a front parallelogram structure and a rear parallelogram structure are formed; the tops of the middle vertical rod 301, the front vertical rod 302, the middle vertical rod 301 and the rear vertical rod 303 are hinged through a top cross rod 305 parallel to the low cross rod 304, and the top cross rod 305 can be detached.
In order to adapt to steel pipes with different lengths, a plurality of lifting hooks 5 are uniformly distributed at the lower end of the lifting beam 1, and a rope 4 above the clamp 3 is fixed on the lifting hooks 5.
For the convenience of hoisting, a hanging ring 306 is fixed at the upper end of the middle vertical rod 301, and the lower end of the rope 4 is fixed on the hanging ring 306.
In order to realize the dismantlement and the quick installation of top horizontal pole 305, the articulated shaft of the articulated point department of top horizontal pole 305 and well montant 301 can be demolishd, the one end of articulated shaft is provided with the arch, the other end cartridge has the spacer pin.
In order to increase friction, the outer edge surfaces of the middle vertical rod 301, the front vertical rod 302 and the rear vertical rod 303 are all wrapped with rubber layers.
In order to enhance the strength of the hanging beam 1, the hanging beam 1 is hoisted through a plurality of steel wire ropes 2.
When the utility model is used, firstly, the lifting hook 5 on the lifting beam 1 is properly selected according to the length of the steel pipe, and the rope 4 is connected with the lifting ring 306 on the clamp 3 through the lifting hook 5; by pulling out the top cross bar 305 at the point where the top cross bar 305 is hinged to the middle vertical bar 301, referring to fig. 2, the two top cross bars 305 on each clamp 3 can swing around the front vertical bar 302 or the rear vertical bar 303, and the top cross bar 305 can be rotated to one side so that it is no longer blocked between the middle vertical bar 301 and the front vertical bar 302 and between the middle vertical bar 301 and the rear vertical bar 303.
At the moment, the whole clamp 3 is placed on the ground, and the bottoms between the middle vertical rod 301, the front vertical rod 302 and the rear vertical rod 303 are hinged with two bottom cross rods which are vertically placed and are parallel to each other, so that the middle vertical rod 301, the front vertical rod 302 and the rear vertical rod 303 can be kept in a vertical state, and the steel pipes can be conveniently placed; when placing the steel pipe, lift the steel pipe to well montant 301 and preceding montant 302 through the manual work to and between well montant 301 and the back montant 303, through the dead weight of steel pipe, can keep the stability of whole device temporarily, make it not take place the slope, simultaneously in order to ensure safety, can keep wire rope 2 to have certain tensile force, thereby montant 301 keeps vertical state in the messenger, so, alright in order to better avoiding the device slope.
When the steel pipes are placed, the steel pipes are placed uniformly, namely, the same number of steel pipes are placed on the front side and the rear side of the middle vertical rod 301 as far as possible, so that the steel pipes are prevented from inclining during hoisting. The top cross bar 305 and the central vertical bar 301 may then be articulated again. Referring to fig. 3, the entire steel tube is now confined within the parallelogram formed by the central vertical rod 301, the front vertical rod 302 (the rear vertical rod 303), the top horizontal rod 305 and the bottom horizontal rod.
Afterwards alright lift by crane, because the gravity of steel pipe, this moment in montant 301 and preceding montant 302 (back montant 303), top horizontal pole 305, the parallelogram structure that the end horizontal pole is constituteed can take place to incline, see figure 4, the steel pipe can extrude end horizontal pole under the effect of dead weight this moment, thereby according to parallelogram structure's principle, then preceding montant 302 and well montant 301, and the interval between back montant 303 and the well montant 301 diminishes, press from both sides the steel pipe wherein, and because well montant 301, all be provided with the rubber layer on the outer fringe face of preceding montant 302 and back montant 303, consequently, can guarantee the stable centre gripping to the steel pipe.
After the steel pipe is conveyed to a destination, the whole device falls to the ground, and the parallelogram structure can be restored to the rectangular structure under the action of the gravity of the steel pipe, namely, the state of fig. 4 is restored to the state of fig. 3, and contrary to the step of placing the steel pipe, the steel pipe can be taken out after the top cross rod 305 is detached again.
This device is through montant 301 in setting up, preceding montant 302 (back montant 303), top horizontal pole 305, low horizontal pole 304 constitute parallelogram structure, can rely on the dead weight of steel pipe, thereby makes parallelogram structure warp and compresses tightly the steel pipe, has realized the chucking automatically, must extra action, can also be adapted to the steel pipe of different diameters simultaneously.
This device can keep the vertical state of preceding montant 302 or back montant 303 through setting up two low horizontal poles 304, conveniently carries out placing and taking out of steel pipe, guarantees that whole device can not take place the slope.
This device is through setting up a plurality of lifting hooks 5 in the bottom of hanging beam 1, can adjust the interval between two anchor clamps 3 about, conveniently is adapted to the steel pipe of different length.

Claims (6)

1. A building steel pipe hoisting device comprises a hoisting beam (1), and is characterized in that the left end and the right end of the hoisting beam (1) are hoisted through steel wire ropes (2); the lower parts of the hanging beams (1) are connected with clamps (3) through ropes (4); the clamp (3) comprises a middle vertical rod (301) connected with the rope (4), and the front side and the rear side of the middle vertical rod (301) are respectively provided with a front vertical rod (302) and a rear vertical rod (303); the bottoms of the middle vertical rod (301), the front vertical rod (302), the middle vertical rod (301) and the rear vertical rod (303) are hinged through an upper bottom cross rod and a lower bottom cross rod which are parallel to each other, so that a front parallelogram structure and a rear parallelogram structure are formed; the tops of the middle vertical rod (301), the front vertical rod (302), the middle vertical rod (301) and the rear vertical rod (303) are hinged through a top cross rod (305) parallel to the low cross rod (304), and the top cross rod (305) can be detached.
2. The building steel pipe hoisting device according to claim 1, wherein a plurality of lifting hooks (5) are uniformly distributed at the lower end of the hoisting beam (1), and the rope (4) above the clamp (3) is fixed on the lifting hooks (5).
3. The building steel pipe hoisting device as claimed in claim 1, wherein a hanging ring (306) is fixed at the upper end of the middle vertical rod (301), and the lower end of the rope (4) is fixed on the hanging ring (306).
4. The building steel pipe hoisting device as claimed in claim 1, wherein the hinged shaft at the hinged point of the top cross bar (305) and the middle vertical bar (301) can be removed, one end of the hinged shaft is provided with a bulge, and the other end of the hinged shaft is inserted with a limit pin.
5. The building steel pipe hoisting device as claimed in claim 1, wherein the outer edge surfaces of the middle vertical rod (301), the front vertical rod (302) and the rear vertical rod (303) are all wrapped with rubber layers.
6. The building steel pipe hoisting device according to claim 1, wherein the hoisting beam (1) is hoisted by a plurality of steel wire ropes (2).
CN202120796895.XU 2021-04-19 2021-04-19 Building steel pipe hoist device Expired - Fee Related CN214495401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120796895.XU CN214495401U (en) 2021-04-19 2021-04-19 Building steel pipe hoist device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120796895.XU CN214495401U (en) 2021-04-19 2021-04-19 Building steel pipe hoist device

Publications (1)

Publication Number Publication Date
CN214495401U true CN214495401U (en) 2021-10-26

Family

ID=78203138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120796895.XU Expired - Fee Related CN214495401U (en) 2021-04-19 2021-04-19 Building steel pipe hoist device

Country Status (1)

Country Link
CN (1) CN214495401U (en)

Similar Documents

Publication Publication Date Title
CN210286484U (en) Reinforcing bar overhead hoist for construction
RU2004113257A (en) BALLASTING DEVICE FOR LOAD CRANE
CN102060232B (en) Transportation method for refractory brick for stove construction
CN214495401U (en) Building steel pipe hoist device
CN110065884A (en) A kind of pile press machine hello stake hanging method and lifting device
CN210973557U (en) High mound construction reinforcing bar stone tongs
CN213326312U (en) Steel material feeding device
CN206188215U (en) Hoist and mount of concrete pipe are pressed from both sides
CN211419349U (en) Combined lifting appliance for lifting I-steel
CN210340060U (en) Equidistant lifting hook carrying pole for traveling crane
CN214989686U (en) Reinforcing bar bundle stone tongs
CN212334353U (en) Building steel pipe hoist device
CN219730263U (en) Assembled hoist and mount fixing device
CN214879580U (en) Highway precast concrete U type canal hoist and mount fixture
CN112079148A (en) Brick clamping tool
CN211813005U (en) Lifting appliance for hinge type prefabricated block
CN210480640U (en) Simple device for balanced hoisting of whole bundle of I-shaped steel
CN216945861U (en) Simple bagged cement grabbing device
CN215711044U (en) General novel reinforcing bar hoist and mount device
CN219384451U (en) Culvert lifting device
CN212355791U (en) Brick clamping tool
CN219259292U (en) Steel bar lifting structure
CN210682939U (en) Plate-shaped article hoisting clamp
CN212832396U (en) Auxiliary lifting appliance for horizontally lifting long straight piece
CN213475175U (en) Multipurpose lifting appliance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211026