CN214402141U - An assembled steel beam-column connection node - Google Patents
An assembled steel beam-column connection node Download PDFInfo
- Publication number
- CN214402141U CN214402141U CN202022718916.4U CN202022718916U CN214402141U CN 214402141 U CN214402141 U CN 214402141U CN 202022718916 U CN202022718916 U CN 202022718916U CN 214402141 U CN214402141 U CN 214402141U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- end plate
- steel
- steel beam
- roof beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
一种装配式钢梁柱连接节点,包括H型钢柱,所述H型钢柱、腹板方向带有端板的H型钢梁和端板方向带有端板的H型钢梁,它们之间均由高强螺栓连接。所述H型钢梁加劲肋和带螺栓孔的端板下面有三角斜支撑,所述加劲肋和三角斜支撑可以增加钢梁端部的强度,由于力的传递,加劲肋增加了节点的强度,同时H钢梁运用也加大了梁柱纵横之间的跨度,满足工程使用要求,钢梁柱连接节点可以避免复杂的施工环境和高强度的劳动量,最大程度降低施工难度、工程成本和服役期的维护成本,结构形式独特,满足工程的需要,明显的降低了施工现场工人的工作量和工作环境,并且提高了施工工程质量,工作效率高,无危害性。
An assembled steel beam-column connection node, comprising an H-shaped steel column, the H-shaped steel column, the H-shaped steel beam with end plates in the direction of the web plate, and the H-shaped steel beam with end plates in the direction of the end plate, all of which are connected by High-strength bolt connection. The stiffeners of the H-shaped steel beams and the end plates with bolt holes are provided with triangular oblique supports. The stiffeners and triangular oblique supports can increase the strength of the ends of the steel beams. Due to the transmission of force, the stiffeners increase the strength of the joints. At the same time, the use of H steel beams also increases the span between beams and columns, meeting the requirements of engineering use. The maintenance cost during the service period, the unique structure, meets the needs of the project, significantly reduces the workload and working environment of the construction site workers, and improves the quality of the construction project, with high work efficiency and no harm.
Description
技术领域technical field
本实用新型涉及建筑钢结构工程技术领域,特别涉及一种装配式钢梁柱连接节点。The utility model relates to the technical field of building steel structure engineering, in particular to an assembled steel beam-column connecting node.
背景技术Background technique
随着钢结构在建筑行业的应用,明显提高了施工现场的工作环境,但是由于现有施工技术的提高和人们对工作空间的需求,现有的结构形式已经不能够满足工厂工作空间的需求,设计出工程满足大垮度、使用的适用性、安全性和稳定性的结构需要进一步的研究,满足大跨的结构又可能不够稳定。With the application of steel structure in the construction industry, the working environment of the construction site has been significantly improved. However, due to the improvement of existing construction technology and people's demand for working space, the existing structural form can no longer meet the needs of factory working space. Designing a structure that satisfies the large collapse degree, applicability, safety and stability of the project requires further research, and the structure that meets the large span may not be stable enough.
实用新型内容Utility model content
本实用新型的目的在于针对现有技术中的上述不足,提供一种装配式钢梁柱连接节点,以解决现有钢结构建筑不能大跨度的稳定性问题。The purpose of the present utility model is to provide a prefabricated steel beam-column connection node in view of the above-mentioned deficiencies in the prior art, so as to solve the stability problem that the existing steel structure building cannot have a large span.
为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above purpose, the present utility model adopts the following technical solutions:
一种装配式钢梁柱连接节点,包括H型钢柱,所述H型钢柱四周有带端板的H型钢梁,所述H型钢柱和H型钢梁之间均由高强螺栓进行连接。A prefabricated steel beam-column connection node includes an H-shaped steel column surrounded by an H-shaped steel beam with end plates, and the H-shaped steel column and the H-shaped steel beam are connected by high-strength bolts.
所述H型钢柱包括带螺栓孔的翼缘板和腹板加劲肋上带螺栓孔端板,所述翼缘板和腹板加劲肋上的螺栓孔为了与腹板方向带端板的H型钢梁和端板方向带端板的H型钢梁对应端板的螺栓孔采用高强螺栓进行连接。The H-shaped steel column includes flange plates with bolt holes and end plates with bolt holes on the web stiffeners. The bolt holes of the corresponding end plate of the H-shaped steel beam with the end plate in the direction of the steel beam and the end plate are connected by high-strength bolts.
所述带端板的H型钢梁,所述腹板方向带端板的H型钢梁和端板方向带端板的H型钢梁,所述腹板方向带端板的H型钢梁两端带螺栓孔钢端板、腹板方向钢梁下三角斜支撑和相应位置有加劲肋均通过焊缝连接形成一个腹板方向带端板的H型钢梁,所述端板方向带端板的H型钢梁两端带螺栓孔钢端板、端板方向钢梁下三角斜支撑和相应位置有加劲肋均通过焊缝连接形成一个端板腹板方向带端板的H型钢梁,焊接工作均在工厂里完成。The H-shaped steel beam with end plates, the H-shaped steel beam with end plates in the web direction and the H-shaped steel beam with end plates in the end plate direction, the two ends of the H-shaped steel beam with end plates in the web direction The steel end plate with bolt holes, the lower triangular inclined support of the steel beam in the web direction and the stiffeners at the corresponding positions are all connected by welding seams to form an H-shaped steel beam with end plates in the web direction. The steel end plates with bolt holes at both ends of the H-shaped steel beam, the lower triangular inclined support of the steel beam in the direction of the end plate, and the stiffeners at the corresponding positions are connected by welding seams to form an H-shaped steel beam with end plates in the direction of the end plate web. The work is done in the factory.
所述高强螺栓,在施工现场整个连接节点均由高强螺栓进行连接的。The high-strength bolts are connected by high-strength bolts throughout the connection nodes at the construction site.
本实用新型的有益效果为,The beneficial effects of the present utility model are:
1、本实用新型装置通过高强螺栓连接H型钢柱和H型钢梁,梁柱结构构件均由机械设计和工厂化生产的,构件比较精密准确,几乎没有加工误差,现场只需吊装和拧紧螺栓就可以完成工作,减少工人的工作量,提高了工程质量和工作效率,缩短工程工期,节约成本。1. The device of the present utility model connects the H-shaped steel column and the H-shaped steel beam through high-strength bolts. The beam-column structural components are all mechanically designed and produced in factories. The components are relatively precise and accurate, and there is almost no processing error. The site only needs to hoist and tighten the bolts. It can complete the work, reduce the workload of workers, improve the quality and work efficiency of the project, shorten the construction period and save costs.
2、结构形式简单,满足工程的需要,明显的降低了施工现场工人的工作量和工作环境,并且提高了施工工程质量,工作效率高,无危害性,如果建筑满足服役期需要拆卸,结构可以有序的拆除,全部构件可以全部回收或者进行二次利用,或者随着时间的增加,某些构件不能满足正常使用要求,可以快速更换构件,减少服役期的维护成本。2. The structure is simple, meets the needs of the project, significantly reduces the workload and working environment of the construction site workers, and improves the quality of the construction project, with high work efficiency and no harm. If the building meets the service period and needs to be dismantled, the structure can be dismantled. Orderly dismantling, all components can be recycled or reused, or with the increase of time, some components can not meet the normal use requirements, components can be quickly replaced, reducing maintenance costs during the service period.
3、本实用新型H型钢梁两端由H型钢梁的端部有带螺栓孔钢端板、下方有斜支撑和腹板相应位置有加劲肋组成,增加了节点的连接强度,大大的增加了钢柱纵横之间的大跨距离,有利于现代化大跨度建筑的需求,同时满足对工程质量、工作环境、施工工期、劳动量、施工成本等的要求和结构使用的适用性、安全性和稳定性。3. Both ends of the H-shaped steel beam of the present utility model are composed of steel end plates with bolt holes at the ends of the H-shaped steel beams, oblique supports at the bottom and stiffeners at the corresponding positions of the webs, which increases the connection strength of the nodes and greatly increases the connection strength of the joints. The long-span distance between the vertical and horizontal steel columns is increased, which is beneficial to the needs of modern long-span buildings, and at the same time meets the requirements for engineering quality, working environment, construction period, labor volume, construction cost, etc., as well as the applicability and safety of structural use and stability.
附图说明Description of drawings
图1是本实用新型提供的钢梁柱连接节点分解示意图。Figure 1 is an exploded schematic diagram of a steel beam-column connection node provided by the present invention.
图2是本实用新型提供的钢梁柱连接节点总装示意图。FIG. 2 is a schematic diagram of the general assembly of the steel beam-column connection node provided by the present invention.
图3是本实用新型提供的钢梁柱连接节点俯视图。FIG. 3 is a top view of a steel beam-column connection node provided by the present invention.
图4是本实用新型提供的钢梁柱连接节点左视图。Figure 4 is a left side view of a steel beam-column connection node provided by the present invention.
图5是本实用新型提供的钢梁柱连接节点前视图。FIG. 5 is a front view of a steel beam-column connecting node provided by the present invention.
其中,in,
1—H型钢柱,101—带螺栓孔的H型钢柱的翼缘板,102—H型钢柱腹板加劲肋上的连接端板,2—腹板方向带端板的H型钢梁,3—端板方向带端板的H型钢梁,4—所有的螺栓孔,5—腹板方向带端板的H型钢梁端的端板,6—端板方向带端板的H型钢梁端的端板, 7—所有的高强螺栓,8—腹板方向钢梁下的三角斜支撑,9—端板方向钢梁下的三角斜支撑,10—H型钢梁的加劲肋。1—H-shaped steel column, 101—flange plate of H-shaped steel column with bolt holes, 102—connecting end plate on web stiffener of H-shaped steel column, 2—H-shaped steel beam with end plate in web direction, 3 - H-beam with end plate in end plate direction, 4 - all bolt holes, 5 - end plate at the end of H-beam with end plate in web direction, 6 - H-beam with end plate in end plate direction The end plate at the end, 7—all high-strength bolts, 8—the triangular inclined support under the steel beam in the direction of the web, 9—the triangular inclined support under the steel beam in the direction of the end plate, 10—the stiffener of the H-beam.
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步的详细说明。The present utility model will be further described in detail below in conjunction with the accompanying drawings.
为了解决现有结构节点存在的问题,如图1至图5所示,一种装配式钢梁柱连接节点,包括H型钢柱1,包括H型钢柱1、腹板方向带端板的H型钢梁2、端板方向带端板的 H型钢梁3和高强螺栓7,所述H型钢柱1、腹板方向带端板的H型钢梁2和端板方向带端板的H型钢梁3之间均由高强螺栓7进行连接。In order to solve the problems of existing structural nodes, as shown in Figures 1 to 5, a fabricated steel beam-column connection node includes an H-
所述H型钢柱1包括带螺栓孔的翼缘板101和腹板加劲肋上带螺栓孔端板102,所述翼缘板101和腹板加劲肋上端板102的螺栓孔4为了与腹板方向带端板的H型钢梁2和端板方向带端板的H型钢梁3对应端板的螺栓孔4采用高强螺栓7进行连接。The H-
所述腹板方向带端板的H型钢梁2和端板方向带端板的H型钢梁3,所述腹板方向带端板的H型钢梁两端带螺栓孔钢端板5、腹板方向粱下三角斜支撑9和相应位置有加劲肋10均通过焊缝连接形成一个腹板方向带端板的H型钢梁2,所述端板方向带端板的H 型钢梁两端带螺栓孔钢端板6、端板方向梁下三角斜支撑8和相应位置有加劲肋10均通过焊缝连接形成一个端板腹板方向带端板的H型钢梁3,焊接工作均在工厂里完成。The H-
所述高强螺栓7,在施工现场整个连接节点均由高强螺栓7进行连接的。The high-strength bolts 7 are connected by high-strength bolts 7 on the entire connection node at the construction site.
本实用新型的施工过程为以下步骤,The construction process of the present utility model is as follows:
步骤1,根据现场的施工条件和人们的需求,由机械设计公司进行部件的精准设计,然后由工厂进行加工,运回施工现场;
步骤2,在施工现场,有机械车吊装H型钢柱1,扭紧H型柱脚的高强螺栓7一部分预紧力,用四根绳索固定竖立;
步骤3,吊起腹板方向带端板的H型钢梁2或者端板方向带端板的H型钢梁3与两侧的H型钢柱1进行对准组装,组装对准之后把连接处的高强螺栓7的预紧力均扭到最大状态,完成一种装配式钢梁柱连接节点的安装;Step 3: Lift the H-
以上所述仅为本实用新型的工程实例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above is only an engineering example of the present utility model, and is not intended to limit the present utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model shall be included in the present utility model. within the scope of protection.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202022718916.4U CN214402141U (en) | 2020-11-23 | 2020-11-23 | An assembled steel beam-column connection node |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202022718916.4U CN214402141U (en) | 2020-11-23 | 2020-11-23 | An assembled steel beam-column connection node |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN214402141U true CN214402141U (en) | 2021-10-15 |
Family
ID=78034984
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202022718916.4U Expired - Fee Related CN214402141U (en) | 2020-11-23 | 2020-11-23 | An assembled steel beam-column connection node |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN214402141U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116950220A (en) * | 2023-04-21 | 2023-10-27 | 北京市建筑设计研究院有限公司 | Novel assembly node and design method |
-
2020
- 2020-11-23 CN CN202022718916.4U patent/CN214402141U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116950220A (en) * | 2023-04-21 | 2023-10-27 | 北京市建筑设计研究院有限公司 | Novel assembly node and design method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11332929B2 (en) | Large-angle sloping roof steel structure and construction method thereof | |
| CN108468384B (en) | Assembled self-restoring energy-consuming frame core tube structure system | |
| CN110258795A (en) | A fully bolted prefabricated beam-column joint | |
| CN110630015A (en) | Large-span steel bar truss floor support plate assembled support and construction method | |
| CN209457144U (en) | A Beam-Column Assembled Joint of H-section for Frames with Unequal Spans | |
| CN108560702A (en) | A kind of assembled outer ring plate bean column node | |
| CN110158771A (en) | A kind of anti-buckling support energy consumption type bean column node for construction steel structure | |
| CN112267565A (en) | Assembled steel beam column connected node | |
| CN214219954U (en) | A steel structure beam-column assembled connection node | |
| CN214614570U (en) | Assembled steel truss beam column connection part | |
| CN214402141U (en) | An assembled steel beam-column connection node | |
| CN112267562A (en) | Assembled steel truss beam column connection part | |
| CN214062433U (en) | Temporary supporting structure of assembled steel structure | |
| CN214614569U (en) | Steel beam column connection node for fine construction | |
| CN211285977U (en) | A high-strength steel beam flange conical weakened beam-column joint | |
| CN219431008U (en) | Assembled special-shaped column steel frame-supporting structure system capable of recovering functions | |
| CN220247723U (en) | Detachable lattice column supporting jig frame with overhanging steel structure | |
| CN111335498A (en) | A cross-bracing structure with a central energy-dissipating plate | |
| CN112095798A (en) | Super high-rise double-layer super large cantilever steel structure | |
| CN207794690U (en) | The assembled steel reinforced machining shed that can be had enough to meet the need | |
| CN214614568U (en) | A memory alloy inclined bar steel truss beam-column connection part | |
| CN216041712U (en) | High-precision mounting and connecting structure for rigid beam column and frame beam | |
| CN214994605U (en) | Modularization steel structure spare | |
| CN215715995U (en) | Assembled steel structure node for connecting inhaul cable | |
| CN223753483U (en) | A steel structure rear-mounted auxiliary beam fixing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211015 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |