CN214248524U - Support arrangement for municipal construction pipeline - Google Patents

Support arrangement for municipal construction pipeline Download PDF

Info

Publication number
CN214248524U
CN214248524U CN202022897090.2U CN202022897090U CN214248524U CN 214248524 U CN214248524 U CN 214248524U CN 202022897090 U CN202022897090 U CN 202022897090U CN 214248524 U CN214248524 U CN 214248524U
Authority
CN
China
Prior art keywords
ring
semi
supporting
municipal construction
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022897090.2U
Other languages
Chinese (zh)
Inventor
薛峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchi Construction Engineering Co ltd
Original Assignee
Xinchi Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchi Construction Engineering Co ltd filed Critical Xinchi Construction Engineering Co ltd
Priority to CN202022897090.2U priority Critical patent/CN214248524U/en
Application granted granted Critical
Publication of CN214248524U publication Critical patent/CN214248524U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the pipeline supporting equipment and specifically relates to a strutting arrangement for municipal construction pipeline is related to, its include the supporting shoe, first semi-ring that base, cavity set up and with first semi-ring complex second semi-ring, supporting shoe one end with the base is connected, the other end with first semi-ring is connected, first semi-ring and second semi-ring one side are rotated and are connected, first semi-ring passes through locking device with the opposite side of second semi-ring and is connected. The utility model provides a strutting arrangement for municipal construction pipeline through first semi-ring and second semi-ring, the placing of the pipeline of being convenient for, and the rotation of first semi-ring and second semi-ring is connected, and the opening and shutting of first semi-ring and second semi-ring of being convenient for, and then has improved municipal construction pipeline's installation effectiveness.

Description

Support arrangement for municipal construction pipeline
Technical Field
The application relates to the field of pipeline supporting equipment, in particular to a supporting device for municipal construction pipelines.
Background
The pipeline is a device which is connected by pipes, pipe connectors, valves and the like and is used for conveying gas, liquid or fluid with solid particles, the pipeline is mainly used for water supply, water drainage, heat supply, gas supply, long-distance petroleum and natural gas conveying, agricultural irrigation, hydraulic engineering and various industrial devices, and in the municipal construction process, a supporting device is required to support the conveying pipeline so as to ensure the smooth transmission of the pipeline.
Application number 201922374795.3's chinese patent discloses a strutting arrangement for municipal construction pipeline, the on-line screen storage device comprises a base, fixed connection can be dismantled with ground to the base, is provided with the support frame on the base, the support frame include with base fixed connection's the canned paragraph of taking the scale, sliding connection has the elevator section of taking the scale on the canned paragraph, the elevator section slides along vertical direction, the support window that is used for supporting the pipeline is offered at the elevator section center, be provided with the lifting unit of control elevator section height on the relative lateral wall of elevator section.
Above-mentioned strutting arrangement during operation for municipal construction pipeline: adjusting two groups of leveling devices, rotating a first disc, driving a first threaded rod to rotate by the first disc, driving a second disc to rotate by the first threaded rod until a base connected to the first threaded rod is positioned on the same horizontal plane, rotating a rocker, driving a gear to rotate by the rocker, driving a rack to move by the gear, driving a lifting section to slide up and down along a fixed section by the rack, reading scales on the fixed section, determining the height of the lifting section, fixing one end of a limiting block with a mounting plate through a bolt at the moment, meshing a limiting tooth at the other end with the gear, placing a boosting platform close to one side of a feed inlet of a support window, and pushing a pipeline into the support window along the boosting platform, at the moment, the second threaded rod is rotated, the second threaded rod pushes the fixing block to move towards the inner side of the supporting window, and the fixing block drives the limiting roller to move until the limiting roller is tightly abutted to the surface of the pipeline, so that the pipeline is conveyed.
In view of the above-mentioned related art, the inventor believes that the support device for municipal construction pipelines is inconvenient to place the pipelines when the pipelines are long.
SUMMERY OF THE UTILITY MODEL
In order to facilitate the placing of pipeline, this application provides a strutting arrangement for municipal construction pipeline.
The application provides a pair of strutting arrangement for municipal construction pipeline adopts following technical scheme:
the utility model provides a strutting arrangement for municipal construction pipeline, including base, the supporting shoe of cavity setting, first semi-ring and with first semi-ring complex second semi-ring, supporting shoe one end with the base is connected, the other end with first semi-ring is connected, first semi-ring and second semi-ring one side are rotated and are connected, the opposite side of first semi-ring and second semi-ring passes through locking device and connects.
By adopting the technical scheme, when the supporting device for the municipal construction pipeline is used, the locking device is adjusted, and the second half ring is rotated to separate the second half ring from the first half ring, so that the pipeline is placed; the supporting device for the municipal construction pipeline is convenient for placing the pipeline through the first half ring and the second half ring, the first half ring is connected with the second half ring in a rotating mode, the first half ring and the second half ring are convenient to open and close, and therefore the installing efficiency of the municipal construction pipeline is improved.
Optionally, the locking device includes a first connection lug, a second connection lug, a lock catch and a fixture block for hanging the lock catch, the first connection lug is located on the first half ring, the lock catch is rotatably connected with the first connection lug, the second connection lug is located on the second half ring, and the fixture block is located on the second connection lug.
Through adopting above-mentioned technical scheme, locking of first semi-ring and second semi-ring is convenient for, and then the pipeline of being convenient for is fixed in locking device's setting.
Optionally, a jacking member is arranged in the inner cavity of the supporting block, the jacking member comprises a supporting rod, a tray capable of being attached to the pipeline and a driving assembly for driving the supporting rod to move, one end of the supporting rod is connected with the tray, and a through hole for the tray to pass through is formed in the bottom wall of the first semi-ring.
By adopting the technical scheme, the first half ring and the second half ring are opened, then the driving component is adjusted, the driving component drives the supporting rod to move along the length direction of the driving component, the supporting rod drives the tray to move until the tray is contacted with the pipeline, then the driving component drives the supporting rod to move downwards, the supporting rod drives the tray to move until the pipeline on the tray is contacted with the first half ring, and then the first half ring and the second half ring are locked to realize the fixation of the pipeline; the setting of jacking component is convenient for support different specification pipelines, and simultaneously, the slow descending of the pipeline of being convenient for reduces the collision of pipeline and first semicircle, reduces the damage on surface, and the reinforcing is to the protection of municipal construction pipeline.
Optionally, the driving assembly comprises a gear, a driving shaft and a rack, the rack is located on the side wall of the supporting rod, the rack is arranged along the length direction of the supporting rod, the gear is meshed with the rack, and one end of the driving shaft is connected with the gear.
By adopting the technical scheme, when the jacking mechanism works, the driving shaft is rotated, the driving shaft drives the gear to rotate, the gear drives the rack to move, the rack drives the supporting rod to move, and the supporting rod drives the tray to move, so that the pipeline is supported; the driving assembly is arranged, so that force can be applied to the supporting rod, the supporting rod can move up and down, and the pipeline is supported.
Optionally, a handle is arranged at one end of the driving shaft extending out of the side wall of the supporting block.
Through adopting above-mentioned technical scheme, the setting of handle is convenient for to the drive shaft application of force, realizes the rotation of drive shaft.
Optionally, a limiting block capable of being abutted to the handle is arranged on the outer side wall of the supporting block, and a limiting hole for the limiting block to be inserted is formed in the side wall of the supporting block.
Through adopting above-mentioned technical scheme, the setting of stopper, the height of the fixed support pole of being convenient for, the setting in spacing hole, the flexible of the stopper of being convenient for avoids handle during operation and stopper to interfere, influences municipal construction strutting arrangement's for the pipeline normal work.
Optionally, at least three fixing assemblies are arranged on the inner wall of the supporting block, each fixing assembly comprises a connecting rod, a support and a rotating roller which can be abutted against the side wall of the supporting rod, one end of each connecting rod is connected with the inner wall of the supporting block, the other end of each connecting rod is connected with the support, and the support is rotatably connected with the rotating roller.
Through adopting above-mentioned technical scheme, the directional motion of the bracing piece of being convenient for is avoided the bracing piece motion in-process to take place the skew, improves the stability of bracing piece motion in the setting of fixed subassembly.
Optionally, one side of the tray, which is far away from the supporting rod, is provided with a rubber layer.
Through adopting above-mentioned technical scheme, the setting on rubber layer provides a cushion effect for the pipeline, avoids the pipeline directly to collide with the tray, causes the damage of pipeline.
In summary, the present application includes at least one of the following beneficial technical effects:
1. according to the designed support device for the municipal construction pipeline, the pipeline is convenient to place through the first half ring and the second half ring, the first half ring is rotatably connected with the second half ring, the first half ring and the second half ring are convenient to open and close, and the mounting efficiency of the municipal construction pipeline is improved;
2. the jacking component is arranged, so that pipelines with different specifications can be supported conveniently, the pipelines can fall slowly conveniently, the collision between the pipelines and the first semi-ring is reduced, the damage to the surface is reduced, and the protection to municipal construction pipelines is enhanced;
3. the arrangement of the fixing component facilitates the directional movement of the supporting rod, avoids the deviation of the supporting rod in the movement process, and improves the stability of the movement of the supporting rod.
Drawings
Fig. 1 is a schematic view of the overall structure of the support device for municipal construction pipelines of the embodiment.
Fig. 2 is a sectional view of the supporting device for municipal construction piping of the embodiment.
Fig. 3 is an enlarged view of a portion a of fig. 1.
Description of reference numerals: 1. a base; 2. a support block; 21. a jacking member; 211. a tray; 212. a support bar; 213. a drive assembly; 2131. a gear; 2132. a drive shaft; 2133. a rack; 2134. a handle; 2135. a limiting block; 214. a rubber layer; 22. a limiting hole; 23. a fixing assembly; 231. a connecting rod; 232. a support; 233. rotating the roller; 3. a first half ring; 31. a through hole; 4. a second half ring; 5. a locking device; 51. a first connecting tab; 52. a second connecting tab; 53. locking; 54. and (7) clamping blocks.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses strutting arrangement for municipal construction pipeline. Referring to fig. 1 and 2, the supporting device for the municipal construction pipeline comprises a base 1, a hollow supporting block 2, a first semi-ring 3 and a second semi-ring 4 matched with the first semi-ring 3, wherein one end of the supporting block 2 is welded to the base 1, the other end of the supporting block 2 is welded to the first semi-ring 3, one side of the first semi-ring 3 is rotatably connected with one side of the second semi-ring 4 through a rotating shaft, and the other side of the first semi-ring 3 is connected with the other side of the second semi-ring 4 through a locking device 5.
Referring to fig. 3, the locking device 5 includes a first connection lug 51, a second connection lug 52, a lock catch 53 and a fixture block 54 for hanging the lock catch 53, the first connection lug 51 is welded on the side wall of the first half ring 3, the first connection lug 51 is connected with a mounting seat through a bolt, the mounting seat is provided with a mounting hole for mounting the lock catch 53, the lock catch 53 is rotatably connected with the mounting seat through the mounting hole, the second connection lug 52 is welded on the side wall of the second half ring 4, and the fixture block 54 is connected with the second connection lug 52 through a bolt.
Referring to fig. 1 and 2, a jacking member 21 is arranged in an inner cavity of the support block 2, the jacking member 21 includes a support rod 212, a tray 211 capable of being attached to the pipeline, and a driving assembly 213 for driving the support rod 212 to move, a rubber layer 214 is adhered to one side of the tray 211, which is far away from the support rod 212, the tray 211 is welded to one end of the support rod 212, which is close to the first half-ring 3, and a through hole 31 for the tray 211 to pass through is formed in the bottom wall of the first half-ring 3; the driving assembly 213 comprises a gear 2131, a driving shaft 2132 and a rack 2133, the rack 2133 is connected with the side wall of the supporting rod 212 through a bolt, the rack 2133 is arranged along the length direction of the supporting rod 212, the gear 2131 is meshed with the rack 2133, one end of the driving shaft 2132 is connected with the gear 2131 through a key, one end of the driving shaft 2132, which extends out of the side wall of the supporting block 2, is welded with a handle 2134, the handle 2134 is sleeved with an anti-skidding rubber sleeve, the outer side wall of the supporting block 2 is welded with a limiting block 2135 which can be abutted against the handle 2134, and the side wall of the supporting block 2 is provided with a limiting hole 22 for the limiting block 2135 to be inserted.
Referring to fig. 2, at least three fixing components 23 are arranged on the inner wall of the supporting block 2, in this embodiment, three fixing components 23 are arranged, each fixing component 23 includes a connecting rod 231, a bracket 232 and a rotating roller 233 capable of abutting against the side wall of the supporting rod 212, one end of the connecting rod 231 is welded to the inner wall of the supporting block 2, the other end of the connecting rod is welded to the bracket 232, and the bracket 232 is rotatably connected to the rotating roller 233.
The implementation principle of the supporting device for the municipal construction pipeline in the embodiment of the application is as follows: when a municipal construction pipeline is installed, firstly, the lock catch 53 is pushed to enable the lock catch 53 to be separated from the clamping block 54, then the second half ring 4 is rotated to separate the first half ring 3 from the second half ring 4, then the handle 2134 is rotated to drive the driving shaft 2132 to rotate, the driving shaft 2132 drives the gear 2131 to rotate, the gear 2131 drives the rack 2133 to move, the supporting rod 212 moves along the length direction of the supporting rod 212, the supporting rod 212 drives the tray 211 to move until the tray 211 is contacted with the pipeline, so that the pipeline is supported, the handle 2134 is rotated reversely, the driving shaft 2132 is driven by the handle 2134 to rotate reversely, the gear 2131 drives the rack 2133 to move, the rack 2133 drives the supporting rod 212 to move, the supporting rod 212 drives the tray 211 to move until the pipeline is contacted with the bottom wall of the first half ring 3, the supporting rod 2132 continues to move, and the tray 211 moves to be located in an inner cavity of the supporting block 2132, then the limiting block 2135 slides out, so that the handle 2134 is overlapped with the limiting block 2135, and the support and the fixation of the pipeline are realized.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a strutting arrangement for municipal construction pipeline, its characterized in that, including base (1), hollow setting's supporting shoe (2), first semi-ring (3) and with first semi-ring (3) complex second semi-ring (4), supporting shoe (2) one end with base (1) is connected, the other end with first semi-ring (3) are connected, first semi-ring (3) and second semi-ring (4) one side are rotated and are connected, first semi-ring (3) and the opposite side of second semi-ring (4) are passed through locking device (5) and are connected.
2. The supporting device for the municipal construction pipeline according to claim 1, wherein the locking device (5) comprises a first connecting lug (51), a second connecting lug (52), a lock catch (53) and a clamping block (54) for hanging the lock catch (53), the first connecting lug (51) is located on the first half ring (3), the lock catch (53) is rotatably connected with the first connecting lug (51), the second connecting lug (52) is located on the second half ring (4), and the clamping block (54) is located on the second connecting lug (52).
3. The supporting device for the municipal construction pipeline according to claim 1, wherein a jacking member (21) is arranged in the inner cavity of the supporting block (2), the jacking member (21) comprises a supporting rod (212), a tray (211) which can be attached to the pipeline and a driving assembly (213) which drives the supporting rod (212) to move, one end of the supporting rod (212) is connected with the tray (211), and a through hole (31) for the tray (211) to pass through is formed in the bottom wall of the first half ring (3).
4. The support device for the municipal construction pipeline according to claim 3, wherein the drive assembly (213) comprises a gear (2131), a drive shaft (2132) and a rack (2133), the rack (2133) is positioned on the side wall of the support rod (212), the rack (2133) is arranged along the length direction of the support rod (212), the gear (2131) is meshed with the rack (2133), and one end of the drive shaft (2132) is connected with the gear (2131).
5. The support device for the municipal construction pipeline according to claim 4, wherein a handle (2134) is provided at one end of the driving shaft (2132) extending out of the side wall of the support block (2).
6. The supporting device for the municipal construction pipeline according to claim 5, wherein a limiting block (2135) capable of abutting against the handle (2134) is arranged on the outer side wall of the supporting block (2), and a limiting hole (22) for the limiting block (2135) to be inserted is formed in the side wall of the supporting block (2).
7. The supporting device for the municipal construction pipeline according to claim 3, wherein at least three fixing components (23) are arranged on the inner wall of the supporting block (2), each fixing component (23) comprises a connecting rod (231), a bracket (232) and a rotating roller (233) which can be abutted against the side wall of the supporting rod (212), one end of each connecting rod (231) is connected with the inner wall of the supporting block (2), the other end of each connecting rod is connected with the corresponding bracket (232), and the brackets (232) are rotatably connected with the rotating rollers (233).
8. The support device for the municipal construction pipe according to claim 3, wherein a rubber layer (214) is provided on the side of the tray (211) away from the support rod (212).
CN202022897090.2U 2020-12-02 2020-12-02 Support arrangement for municipal construction pipeline Expired - Fee Related CN214248524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022897090.2U CN214248524U (en) 2020-12-02 2020-12-02 Support arrangement for municipal construction pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022897090.2U CN214248524U (en) 2020-12-02 2020-12-02 Support arrangement for municipal construction pipeline

Publications (1)

Publication Number Publication Date
CN214248524U true CN214248524U (en) 2021-09-21

Family

ID=77736270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022897090.2U Expired - Fee Related CN214248524U (en) 2020-12-02 2020-12-02 Support arrangement for municipal construction pipeline

Country Status (1)

Country Link
CN (1) CN214248524U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114151727A (en) * 2021-11-27 2022-03-08 舜元建设(集团)有限公司 Mounting device for pressure container

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114151727A (en) * 2021-11-27 2022-03-08 舜元建设(集团)有限公司 Mounting device for pressure container

Similar Documents

Publication Publication Date Title
CN116658679A (en) Buried pipeline construction device and construction method for municipal wastewater treatment
CN214248524U (en) Support arrangement for municipal construction pipeline
CN214114675U (en) A gallows for concrete drain pipe
CN114738549B (en) Pipeline laying device for municipal engineering narrow space construction
CN215367446U (en) A full-scale test device for torsion resistance of deformed seam joints of multi-cabin integrated pipe gallery
CN108146480B (en) A transport vehicle suitable for a variety of aero-engine turbine rotors
CN214935677U (en) An integral lifting device for an electromechanical installation engineering pipeline
CN113152537A (en) Full chi testing arrangement of many cabins utility tunnel movement joint anti-torsion performance
CN221075556U (en) Water conservancy pipeline bearing structure
CN210978735U (en) A kind of pipeline installation and adjustment device for building construction
CN214368204U (en) A civil engineering building construction pipeline support device
CN214404937U (en) A pressure pipe support structure
CN217377190U (en) Portable lifting and mounting equipment for building electromechanical pipelines
CN219673502U (en) Floating-resisting device for ground source heat pump pipe
CN220504013U (en) Portable emergent secondary water supply device
CN222255279U (en) Pipeline laying traction device
CN222209267U (en) Pipeline support for construction
CN221854077U (en) Municipal construction lifts
CN220592688U (en) Municipal administration heat supply pipeline surface rust cleaning device
CN220787822U (en) Pipe installation hanging pipe device
CN221461850U (en) A positioning structure for installing curtain wall in building engineering
CN213684127U (en) Push bench for hydraulic engineering
CN223344888U (en) A concrete drainage pipe hanger
CN220845336U (en) A pipeline construction auxiliary tool
CN222596974U (en) A support structure for pipeline construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210921