CN214163461U - Prefabricated component stand framework of steel reinforcement location fixture - Google Patents
Prefabricated component stand framework of steel reinforcement location fixture Download PDFInfo
- Publication number
- CN214163461U CN214163461U CN202022753908.3U CN202022753908U CN214163461U CN 214163461 U CN214163461 U CN 214163461U CN 202022753908 U CN202022753908 U CN 202022753908U CN 214163461 U CN214163461 U CN 214163461U
- Authority
- CN
- China
- Prior art keywords
- positioning
- rod
- cross beam
- steel reinforcement
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a prefabricated component stand steel reinforcement framework positioning fixture, be in including baffle part, setting crossbeam and the positioning fixture of setting on the crossbeam on the baffle part, positioning fixture's quantity is one at least, positioning fixture is in including adjusting the pole and setting adjust the lever on the pole, adjust the pole including wear to establish the screw rod in the crossbeam and with screw rod bottom integrated into one piece's locating lever, adjustment handle establishes with the setting at the nut on screw rod top including the cover handle on the nut, baffle part is including setting up the first locating plate of the one end of crossbeam and setting up the second locating plate at the other end of crossbeam. The utility model relates to a rationally and with low costs, convenient easy operation has improved prefabricated component work efficiency of construction, reduces the consumption of concrete cushion material.
Description
Technical Field
The utility model belongs to the technical field of prefabricated component framework of steel reinforcement positioner, especially, relate to a prefabricated component stand framework of steel reinforcement location fixture.
Background
In the construction process of the prefabricated part, a steel reinforcement framework is generally bound firstly, a concrete cushion block is arranged at the bottom of the steel reinforcement framework, and the concrete cushion block is bound with the bottom of the steel reinforcement framework through a binding wire, so that after the steel reinforcement framework is poured with concrete, a steel reinforcement protective layer is formed at the bottom of the steel reinforcement framework;
however, in the current construction process, the concrete cushion block is bound with the bottom of the reinforcement cage through the binding wire and is difficult to fix firmly, and the reinforcement cage is easy to shift in the concrete pouring and vibrating process, so that the thickness of the reinforcement protective layer is difficult to control, and the durability of the prefabricated part in the line operation process is influenced;
in addition, the support control is carried out through the concrete cushion blocks, but the concrete cushion blocks have the problem of larger volume compared with the prefabricated parts, and the number of the concrete cushion blocks used by the prefabricated parts is large, so that the overall strength of the concrete of the prefabricated parts can be reduced;
secondly, the steel bar protection layer is controlled through binding and positioning of the concrete cushion block and the steel bar framework, the working efficiency of the concrete cushion block and the steel bar framework is low, and the operation is inconvenient.
Therefore, at present, a prefabricated part steel bar framework positioning clamp which is simple in structure and reasonable in design is lacked, the operation is convenient and easy, the quality of the prefabricated part is ensured, the consumption of concrete cushion materials is reduced, and the construction efficiency of the prefabricated part is improved.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that the content will be solved lies in to the not enough among the above-mentioned prior art, provides a prefabricated component stand framework of steel reinforcement location fixture, and its reasonable in design and with low costs, and convenient easy operation ensures the quality of prefabricated component, reduces the consumption of concrete cushion material, and has improved prefabricated component work efficiency of construction.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a prefabricated component stand framework of steel reinforcement location fixture which characterized in that: the adjustable positioning device comprises a baffle plate part, a cross beam arranged on the baffle plate part and a positioning fixture arranged on the cross beam, wherein the positioning fixture comprises an adjusting rod and an adjusting handle arranged on the adjusting rod, the adjusting rod comprises a screw rod penetrating through the cross beam and a positioning rod integrally formed with the bottom of the screw rod, the adjusting handle comprises a nut sleeved at the top end of the screw rod and a handle arranged on the nut, the handle is positioned above the cross beam, a direction rod is welded at the upper end of the screw rod, and the top of the direction rod is higher than the top of the handle;
the baffle plate component comprises a first positioning plate arranged at one end of the cross beam and a second positioning plate arranged at the other end of the cross beam;
the bottom of the cross beam is provided with a first suspender and a second suspender which are used for positioning the steel reinforcement framework of the prefabricated part.
Foretell prefabricated component stand framework of steel reinforcement location fixture, its characterized in that: the first positioning plate and the second positioning plate respectively comprise an upper connecting plate connected with the bottom of the cross beam and a vertical plate which is connected with the upper connecting plate and vertically arranged, and the first positioning plate and the second positioning plate are symmetrically arranged.
Foretell prefabricated component stand framework of steel reinforcement location fixture, its characterized in that: the positioning rod comprises an arc-shaped connecting portion connected with the screw rod and a horizontal rod portion integrally formed with the arc-shaped connecting portion, and the horizontal rod portion is arranged in parallel with the cross beam.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses set up the baffle part, fix a position the bottom of framework of steel reinforcement to make things convenient for the bottom of framework of steel reinforcement to form the protective layer of steel reinforcement, saved the back-up and the ligature of a plurality of concrete cushion on the one hand, reduce the consumption of concrete cushion material, improved the efficiency of construction; on the other hand can realize the regulation of the height of steel reinforcement framework's bottom through the baffle part, and then realize the not control of co-altitude of steel reinforcement protective layer, convenient operation.
2. The utility model discloses a prefabricated component framework of steel reinforcement location fixture is economy, practical most, and control effect is best, can fix a position the framework of steel reinforcement position fast.
3. The utility model discloses a prefabricated component framework of steel reinforcement location fixture dismouting simple and convenient, the field processing is easy, with low costs, weight volume is less, can use repeatedly, has improved application range.
4. The utility model discloses replaced traditional concrete cushion, positioning fixture can take out after concrete placement vibrates, has saved concrete cushion cost expense promptly, has increased concrete prefabricated component's bulk strength again.
To sum up, the utility model relates to a rationally and with low costs, convenient easy operation has both improved prefabricated component work efficiency of construction, reduces the consumption of concrete cushion material again.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of the present invention.
Description of reference numerals:
1-a cross beam; 2, a handle; 3, a nut;
4-a first positioning plate; 4-1-upper connecting plate; 4-2-vertical plates;
5-a first boom; 6, mounting holes; 7-screw rod;
8, positioning a rod; 8-1-an arc-shaped connecting part; 8-2-horizontal bar portion;
9-a second boom; 10-a second positioning plate; 11-direction lever.
Detailed Description
As shown in fig. 1 and 2, the utility model discloses a baffle part, set up crossbeam 1 on the baffle part and the positioning fixture of setting on crossbeam 1, the quantity of positioning fixture is at least one, positioning fixture includes the regulation pole and sets up the adjustment handle on the regulation pole, the regulation pole includes the screw rod 7 of wearing to establish in crossbeam 1 and the locating lever 8 with screw rod 7 bottom integrated into one piece, the adjustment handle includes the nut 3 of cover setting at the top of screw rod 7 and sets up handle 2 on the nut 3, handle 2 is located the top of crossbeam 1, screw rod 7 upper end welding has direction pole 11, the top of direction pole 11 is higher than the top of handle 2;
the baffle plate component comprises a first positioning plate 4 arranged at one end of the cross beam 1 and a second positioning plate 10 arranged at the other end of the cross beam 1;
the bottom of the cross beam 1 is provided with a first suspender 5 and a second suspender 9 which are used for positioning the steel reinforcement framework of the prefabricated part.
In this embodiment, the first positioning plate 4 and the second positioning plate 10 both include an upper connecting plate 4-1 connected to the bottom of the beam 1 and a vertical plate 4-2 connected to the upper connecting plate and vertically disposed, and the first positioning plate 4 and the second positioning plate 10 are symmetrically disposed.
In this embodiment, the positioning rod 8 includes an arc-shaped connecting portion 8-1 connected to the screw 7 and a horizontal rod portion 8-2 integrally formed with the arc-shaped connecting portion 8-1, and the horizontal rod portion 8-2 is arranged in parallel with the cross beam 1.
The direction rod 11 is arranged in the embodiment, so that the direction rod 11 can drive the horizontal rod part 8-2 conveniently, and the horizontal rod part 8-2 is inserted into a gap between the concrete reinforcement cage and the steel bars.
In the embodiment, the height of the handle 2 from the upper surface of the beam 1 is 6 cm.
In this embodiment, during actual installation, the nut 3 rotates the screw 7 forward to move upward, and the nut 3 rotates the screw 7 backward to move downward.
In this embodiment, during actual installation, the nut 3 and the screw 7 are detachably connected.
In this embodiment, the middle of the cross beam 1 is provided with a mounting hole 6 for a screw 7 to penetrate through.
In this embodiment, set up first jib 5 and second jib 9 for reinforced concrete stand prefab construction, because stand prefab steel reinforcement skeleton is long, first jib 5 and second jib 9 are the fixed stand steel reinforcement skeleton both sides respectively, and prevention stand steel reinforcement skeleton is partial to the left side or is partial to the right, avoids stand steel reinforcement skeleton to be partial to the left and partial to the right.
In the embodiment, during specific use, aiming at the reinforced concrete upright post prefabricated part construction, templates are erected around a reinforced concrete upright post reinforcement cage, positioning fixtures are installed at the upper edge of each template, and the positioning fixtures are arranged along the length direction of the reinforced concrete upright post reinforcement cage; firstly, respectively penetrating a first suspender 5 and a second suspender 9 in a positioning fixture into two sides of a reinforced concrete column reinforced skeleton to fix the column reinforced skeleton, when an operation direction rod 11 rotates reversely, simultaneously pressing a handle 2 to ensure that the lower surface of a nut 3 is attached to the top of a cross beam 1 and ensure that the nut 3 does not act so as to enable a screw 7 to drive a positioning rod 8 to rotate, penetrating the positioning rod 8 in the positioning fixture into the reinforced concrete column reinforced skeleton, adjusting a direction rod 11 to drive a horizontal rod part 8-2, inserting the horizontal rod part 8-2 into a gap between reinforced concrete skeleton reinforcements so as to enable the horizontal rod part 8-2 to clamp the reinforced concrete column reinforced skeleton, and adjusting the screw 7 to move up and down by rotating the handle 2 so as to realize the adjustment of the bottom of the reinforced concrete column reinforced skeleton to meet construction requirements, and supporting a concrete cushion block at the bottom of the reinforced concrete column reinforced skeleton, fixing a steel reinforcement framework, pouring concrete, vibrating, after the concrete is vibrated, reversely rotating the screw 7 by the handle 2 to move downwards, adjusting the direction rod 11, driving the horizontal rod part 8-2 on the screw 7 to rotate by the direction rod 11, adjusting the horizontal rod part 8-2 to the gap of the steel reinforcement framework of the reinforced concrete upright column, holding the handle 2 and taking out the positioning clamp, thereby facilitating the next reuse.
The above, only be the utility model discloses a preferred embodiment, it is not right the utility model discloses do any restriction, all according to the utility model discloses the technical entity all still belongs to any simple modification, change and the equivalent structure change of doing above embodiment the utility model discloses technical scheme's within the scope of protection.
Claims (3)
1. The utility model provides a prefabricated component stand framework of steel reinforcement location fixture which characterized in that: the adjustable positioning device comprises a baffle plate component, a cross beam (1) arranged on the baffle plate component and a positioning clamp arranged on the cross beam (1), wherein the positioning clamp comprises an adjusting rod and an adjusting handle arranged on the adjusting rod, the adjusting rod comprises a screw rod (7) penetrating through the cross beam (1) and a positioning rod (8) integrally formed with the bottom of the screw rod (7), the adjusting handle comprises a nut (3) sleeved at the top end of the screw rod (7) and a handle (2) arranged on the nut (3), the handle (2) is positioned above the cross beam (1), a direction rod (11) is welded at the upper end of the screw rod (7), and the top of the direction rod (11) is higher than the top of the handle (2);
the baffle plate component comprises a first positioning plate (4) arranged at one end of the cross beam (1) and a second positioning plate (10) arranged at the other end of the cross beam (1);
the bottom of the cross beam (1) is provided with a first suspender (5) and a second suspender (9) which are used for positioning the steel reinforcement framework of the prefabricated part.
2. The prefabricated member stand steel reinforcement framework positioning fixture according to claim 1, characterized in that: the first positioning plate (4) and the second positioning plate (10) respectively comprise an upper connecting plate (4-1) connected with the bottom of the cross beam (1) and vertical plates (4-2) which are connected with the upper connecting plate and vertically distributed, and the first positioning plate (4) and the second positioning plate (10) are symmetrically distributed.
3. The prefabricated member stand steel reinforcement framework positioning fixture according to claim 1, characterized in that: the positioning rod (8) comprises an arc-shaped connecting part (8-1) connected with the screw rod (7) and a horizontal rod part (8-2) integrally formed with the arc-shaped connecting part (8-1), and the horizontal rod part (8-2) is arranged in parallel with the cross beam (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022753908.3U CN214163461U (en) | 2020-11-25 | 2020-11-25 | Prefabricated component stand framework of steel reinforcement location fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022753908.3U CN214163461U (en) | 2020-11-25 | 2020-11-25 | Prefabricated component stand framework of steel reinforcement location fixture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214163461U true CN214163461U (en) | 2021-09-10 |
Family
ID=77602295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022753908.3U Active CN214163461U (en) | 2020-11-25 | 2020-11-25 | Prefabricated component stand framework of steel reinforcement location fixture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214163461U (en) |
-
2020
- 2020-11-25 CN CN202022753908.3U patent/CN214163461U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201666157U (en) | Inverted arch integral type moving die carrier | |
CN212715972U (en) | Prefabricated bed-jig suitable for multiple specification pier stud reinforcing bar | |
CN108678288A (en) | A kind of reinforcing bar positioning integrating device | |
CN214163461U (en) | Prefabricated component stand framework of steel reinforcement location fixture | |
CN209817430U (en) | Template supporting structure of tower crane reserved hole | |
CN110397280A (en) | Pour funnel | |
CN213890539U (en) | Prefabricated component framework of steel reinforcement location fixture | |
CN207710173U (en) | A kind of air entrained concrete plank rebar cylinder mould weldment | |
CN112536910B (en) | Manufacturing method of prefabricated part | |
CN215749917U (en) | Portable precast beam reinforcing bar stop device | |
CN214272109U (en) | Ground beam formwork device | |
CN213477684U (en) | Double-layer reinforcing mesh support frame for building construction | |
CN213015403U (en) | Adjustable pin-connected panel L type side form steel form | |
CN207296186U (en) | Suspension type adjustable steel bar split heads | |
CN212002272U (en) | Bidirectional adjustable frame beam template clamp structure | |
CN211967866U (en) | Vibrator device for improving qualification rate of dam prefabricated blocks | |
CN203626264U (en) | Protective layer control apparatus for hogging moment reinforced steel bar suspension construction | |
CN107327082A (en) | Suspension type adjustable steel bar split heads | |
CN216465224U (en) | Steel bar structure positioning tool | |
CN210798079U (en) | Floor reinforcing bar protective layer thickness control device | |
CN217735505U (en) | Tunnel ditch cable duct moving die carrier | |
CN208456086U (en) | A kind of portable panels reinforced mesh welding stool | |
CN216076307U (en) | Structural assembly for supporting beam formwork | |
CN218436515U (en) | Curb back pouring template supporting tool | |
CN215107586U (en) | A spandrel girder reinforcing apparatus for building structure design |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |