CN214062343U - Connecting structure between concrete pouring formworks of building - Google Patents

Connecting structure between concrete pouring formworks of building Download PDF

Info

Publication number
CN214062343U
CN214062343U CN202022016209.0U CN202022016209U CN214062343U CN 214062343 U CN214062343 U CN 214062343U CN 202022016209 U CN202022016209 U CN 202022016209U CN 214062343 U CN214062343 U CN 214062343U
Authority
CN
China
Prior art keywords
rod
mounting
explosion
box
concrete pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022016209.0U
Other languages
Chinese (zh)
Inventor
魏海涛
余西锋
刘肖
李闯
王广军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202022016209.0U priority Critical patent/CN214062343U/en
Application granted granted Critical
Publication of CN214062343U publication Critical patent/CN214062343U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a connecting structure between concrete pouring formworks of a house building, which comprises a bottom plate, a mounting box, a pull rod, a screw rod and an anti-explosion slurry device; four angle fixed mounting of bottom plate bottom have the regulation pole, adjust the pole fixedly connected with connecting rod between two liang, the central point department fixed mounting of position of connecting rod bottom front side has the air level pipe, there is concave type box at the top of bottom plate through bracing piece fixed mounting, the positive both sides fixed mounting at the back of bracing piece has the mounting box, there is the mounting panel inside of mounting box through spring fixed mounting, the both ends fixed mounting of mounting panel front side has the inserted bar, the inserted bar extends to the inboard of concave type box. The existing connecting structure between the house building concrete pouring formworks cannot ensure the horizontal connection of the formworks after the two house building concrete pouring formworks are connected, and the deviation of a concrete machine structure at the pouring position of the concrete pouring formworks is easily caused.

Description

Connecting structure between concrete pouring formworks of building
Technical Field
The utility model relates to a house building concrete placement field specifically is a house building concrete placement template connection structure between.
Background
The concrete pouring refers to a process from pouring concrete into a mold to plasticizing, materials such as concrete and the like are put into the mold to be made into a preset shape in civil construction engineering, pouring templates are needed when concrete is poured, when the length of the templates is insufficient, a plurality of groups of templates need to be connected, at the moment, a connecting structure between the concrete pouring templates of the building needs to be used, and a connecting structure between the concrete pouring templates of the building needs to be used.
The existing connecting structure between the concrete pouring formworks of the house building has the following defects:
1. the connecting structure between the existing concrete pouring formworks for building is generally fixed through bolts and formworks, so that the formworks and the connecting structure are troublesome to disassemble and assemble, and are not convenient to use.
2. The existing connecting structure between the concrete pouring formworks of the house building is easy to cause slurry explosion phenomenon at the crack of the two groups of concrete pouring formworks after the two groups of concrete pouring formworks are connected.
3. The existing connecting structure between the house building concrete pouring formworks cannot ensure the horizontal connection of formworks after the two house building concrete pouring formworks are connected, and the concrete machine structural body at the pouring position of the concrete pouring formworks is prone to deviation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a connection structure between concrete placement template is built in room to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a connecting structure between concrete pouring formworks of a house building comprises a bottom plate, a mounting box, a pull rod, a screw rod and an anti-explosion grout device; four angle fixed mounting of bottom plate bottom have the regulation pole, adjust the pole fixedly connected with connecting rod between two liang, the central point department fixed mounting of position of connecting rod bottom front side has the air level pipe, bracing piece fixed mounting has concave type box at the top of bottom plate, the bracing piece is positive and the both sides fixed mounting at the back has the mounting box, there is the mounting panel inside of mounting box through spring fixed mounting, the both ends fixed mounting of mounting panel front side has the inserted bar, the inserted bar extends to the inboard of concave type box, the central point department fixed mounting of position of mounting panel rear side has the pull rod, there is explosion-proof thick liquid device at the positive central point department at concave type box and the back through screw rod fixed mounting.
Preferably, the explosion-proof thick liquid device includes L type cardboard and explosion-proof thick liquid layer, and explosion-proof thick liquid layer pastes the medial surface at L type cardboard.
Preferably, the leveling tube is filled with liquid, and air bubbles are provided inside the liquid.
Preferably, the adjusting rod comprises a main rod, a branch rod and a base, the branch rod is fixedly mounted at the lower end of the main rod, and the base is fixedly mounted at the bottom of the branch rod.
Preferably, the pull rod extends to the outer side end of the mounting box and is fixedly provided with a circular ring, and an anti-slip sleeve is sleeved on the surface of the circular ring.
Preferably, the outer side end of the screw rod is fixedly provided with a screwing disc, and the inner side end of the screw rod is provided with a bearing seat.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses be equipped with the mounting box, a spring, the mounting panel, inserted bar and pull rod, handheld pull rod pulling mounting panel moves compression spring to the backshift, it removes to the inboard to drive the inserted bar, then will mix earth and pour the inside back that the template inserted the concave box, loosen the pull rod, push the mounting panel under the effect of spring, the mounting panel drives the inserted bar and removes forward, then the inserted bar inserts inside the jack that mixes earth and pour the template, the fixed connection of template is pour to mixing earth to the completion, be convenient for through this kind of mode mix earth and pour the dismantlement installation of template.
2. The utility model discloses install explosion-proof thick liquid device, can closely install explosion-proof thick liquid device in the junction of concrete placement template, at the pouring in-process, the junction of concrete placement template is closely wrapped up by explosion-proof thick liquid layer, prevents at the in-process that mixes earth and pour, and the thick liquid oozes from the joint line department of concrete placement template.
3. The utility model discloses install the air level pipe, before personnel pour, the bubble in the adjustment device is in the central position department of air level pipe to can guarantee that the device is in the horizontality, make concrete placement template horizontally connect, improve the quality of pouring the physique.
Drawings
Fig. 1 is a schematic top view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a view showing the structure of the installation box, the pull rod and the insertion rod of the present invention;
FIG. 4 is a side view of the grout explosion prevention device of the present invention;
fig. 5 is an enlarged schematic view of the screw of the present invention.
In the figure: 1. a base plate; 2. adjusting a rod; 201. a main rod; 202. a strut; 203. a base; 3. a connecting rod; 4. a support bar; 5. mounting a box; 501. a spring; 502. mounting a plate; 6. a pull rod; 601. a circular ring; 602. an anti-slip sleeve; 7. inserting a rod; 8. a concave box; 9. a screw; 901. screwing a plate; 902. a bearing seat; 10. an explosion-proof pulp device; 1001. an L-shaped clamping plate; 1002. an explosion-proof slurry layer; 11. a leveling tube; 1101. a liquid; 1102. air bubbles.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides an embodiment: a connecting structure between concrete pouring formworks of a house building comprises a bottom plate 1, a mounting box 5, a pull rod 6, a screw rod 9 and an anti-explosion grout device 10; four corners at the bottom of a bottom plate 1 are fixedly provided with adjusting rods 2 through bolts, the adjusting rods 2 are used for fixedly supporting the device, the device can be horizontally adjusted through the adjusting rods 2, connecting rods 3 are welded between every two adjusting rods 2 to ensure the stability between the four groups of adjusting rods 2, a level pipe 11 is fixedly arranged at the central position of the front side of the bottom of each connecting rod 3 through bolts, the level pipe 11 is convenient for personnel to adjust the device to be in a horizontal state to improve the quality of a pouring body, a concave box 8 is welded at the top of the bottom plate 1 through a supporting rod 4, two groups of concrete pouring templates can be installed in the concave box 8 to be connected by personnel, installation boxes 5 are welded at the front side and the back side of the concave box 8, installation plates 502 are welded in the installation boxes 5 through springs 501, inserting rods 7 are welded at the two ends of the front side of the installation plates 502, and pull rods 6 are fixedly installed at, before placing the concrete pouring template into the concave box 8, firstly, the pull rod 6 is held by hand to pull the mounting plate 502 to move the compression spring 501 backwards to drive the inserted rod 7 to move inwards, then, after the concrete pouring template is inserted into the concave box 8, the pull rod 6 is loosened, the mounting plate 502 is pushed under the action of the spring 501, the mounting plate 502 drives the inserted rod 7 to move forwards, then the inserted bar 7 is inserted into the inner part of the jack of the concrete pouring template to complete the fixed connection of the concrete pouring template, in this way, the concrete pouring template is convenient to disassemble and assemble, the center positions of the front surface and the back surface of the concave box 8 are fixedly provided with the slurry explosion-proof device 10 through the screw rod 9, after the two groups of concrete pouring templates are fixed inside the concave box 8, the screw rod 9 is screwed to drive the mortar explosion prevention device 10 to move forwards and be clamped at the joint of the two groups of templates for mortar explosion protection.
Further, explosion-proof thick liquid device 10 includes L type cardboard 1001 and explosion-proof thick liquid layer 1002, and explosion-proof thick liquid layer 1002 pastes the medial surface at L type cardboard 1001, twists and move screw rod 9 and can closely install explosion-proof thick liquid device 10 in the junction of concrete placement template, and in the process of pouring, the junction of concrete placement template is closely pasted by explosion-proof thick liquid layer 1002, prevents that the grout oozes from the joint seam of concrete placement template in the in-process that the concrete was poured.
Further, the liquid 1101 is filled in the leveling tube 11, the air bubble 1102 is arranged in the liquid 1101, and before a person connects concrete pouring formworks, whether the air bubble 1102 is located at the center of the leveling tube 11 or not is observed, so that whether the device is in a horizontal state or not can be judged.
Further, adjust pole 2 and include mobile jib 201, branch 202 and base 203, the lower extreme of mobile jib 201 has branch 202 through helicitic texture fixed mounting, and the bottom welding of branch 202 has base 203, twists branch 202 and can carry out horizontal adjustment to the device, then the base 203 and the ground contact of branch 202 bottom carry out fixed stay to the device.
Further, the outer side end of the pull rod 6 extending to the mounting box 5 is welded with a circular ring 601, the surface of the circular ring 601 is sleeved with an anti-slip sleeve 602, the pull rod 6 can be pulled by a person by hand, the anti-slip sleeve 602 increases friction between the circular ring 601 and a palm, and the phenomenon that the person slips when holding the circular ring 601 is avoided.
Further, the outer side end of the screw rod 9 is welded with a screwing disc 901, the inner side end of the screw rod 9 is provided with a bearing seat 902, the screwing disc 901 facilitates a person to screw the screw rod 9, the screw rod 9 is fixedly connected with the explosion-proof slurry device 10 through the bearing seat 902, and when the person screws the screw rod 9, the screw rod 9 can drive the explosion-proof slurry device 10 to move back and forth.
The working principle is as follows: when the device is used, the device is moved to a specified position, a person twists the supporting rod 202 to enable the air bubbles 1102 in the leveling pipe 11 to be located at the central position of the leveling pipe 11, adjusts the device to be in a horizontal state, then holds the pull rod 6 to pull the mounting plate 502 to move the compression spring 501 towards the rear side to drive the inserting rod 7 to move towards the inner side, then inserts the concrete pouring template into the concave box 8, loosens the pull rod 6, pushes the mounting plate 502 under the action of the spring 501, drives the inserting rod 7 to move forwards, then inserts the inserting rod 7 into the insertion hole of the concrete pouring template to complete the fixed connection of the concrete pouring template, twists the screw 9 to push the L-shaped clamping plate 1001 to enable the anti-explosion mortar layer 1002 to be tightly arranged at the connection position of the concrete pouring template, and in the pouring process, the connection position of the concrete pouring template is tightly adhered by the anti-explosion mortar layer 1002, the grout is prevented from seeping out of the connecting joints of the concrete pouring formworks in the concrete pouring process.
The details of the present invention are well known to those skilled in the art.
Finally, it is to be noted that: the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to the examples, it should be understood by those skilled in the art that the technical solutions of the present invention can be modified and replaced with equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be covered by the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a connection structure between concrete placement template in room, its characterized in that: comprises a bottom plate (1), a mounting box (5), a pull rod (6), a screw (9) and an explosion-proof slurry device (10); four corners at the bottom of the bottom plate (1) are fixedly provided with adjusting rods (2), every two adjusting rods (2) are fixedly connected with connecting rods (3), a level pipe (11) is fixedly arranged at the central position of the front side of the bottom of the connecting rod (3), the top of the bottom plate (1) is fixedly provided with a concave box (8) through a support rod (4), the two sides of the front and the back of the supporting rod (4) are fixedly provided with mounting boxes (5), a mounting plate (502) is fixedly arranged in the mounting box (5) through a spring (501), the two ends of the front side of the mounting plate (502) are fixedly provided with inserting rods (7), the inserting rods (7) extend to the inner side of the concave box (8), a pull rod (6) is fixedly arranged at the central position of the rear side of the mounting plate (502), and the center positions of the front surface and the back surface of the concave box (8) are fixedly provided with an explosion-proof slurry device (10) through a screw rod (9).
2. The concrete casting form connection structure for house buildings according to claim 1, wherein: the anti-explosion mortar device (10) comprises an L-shaped clamping plate (1001) and an anti-explosion mortar layer (1002), and the anti-explosion mortar layer (1002) is adhered to the inner side face of the L-shaped clamping plate (1001).
3. The concrete casting form connection structure for house buildings according to claim 1, wherein: the liquid (1101) is filled in the leveling tube (11), and the air bubbles (1102) are arranged in the liquid (1101).
4. The concrete casting form connection structure for house buildings according to claim 1, wherein: the adjusting rod (2) comprises a main rod (201), a branch rod (202) and a base (203), the branch rod (202) is fixedly installed at the lower end of the main rod (201), and the base (203) is fixedly installed at the bottom of the branch rod (202).
5. The concrete casting form connection structure for house buildings according to claim 1, wherein: the pull rod (6) extends to the outer side end of the mounting box (5) and is fixedly provided with a circular ring (601), and an anti-slip sleeve (602) is sleeved on the surface of the circular ring (601).
6. The concrete casting form connection structure for house buildings according to claim 1, wherein: the outer side end of the screw rod (9) is fixedly provided with a screwing disc (901), and the inner side end of the screw rod (9) is provided with a bearing seat (902).
CN202022016209.0U 2020-09-15 2020-09-15 Connecting structure between concrete pouring formworks of building Active CN214062343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022016209.0U CN214062343U (en) 2020-09-15 2020-09-15 Connecting structure between concrete pouring formworks of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022016209.0U CN214062343U (en) 2020-09-15 2020-09-15 Connecting structure between concrete pouring formworks of building

Publications (1)

Publication Number Publication Date
CN214062343U true CN214062343U (en) 2021-08-27

Family

ID=77394455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022016209.0U Active CN214062343U (en) 2020-09-15 2020-09-15 Connecting structure between concrete pouring formworks of building

Country Status (1)

Country Link
CN (1) CN214062343U (en)

Similar Documents

Publication Publication Date Title
CN111472538B (en) Aluminum alloy template installation structure of exempting from to plaster
CN211818028U (en) Pulling-on piece formula aluminum mould board supports reinforcing apparatus
CN209942029U (en) Light prefabricated assembled external wall panel
CN214062343U (en) Connecting structure between concrete pouring formworks of building
CN117779969A (en) Building heat preservation core material connection fixing construction device
CN213952973U (en) Superimposed sheet bearing structure
CN205776259U (en) A kind of deep basal pit retaining wall one side formwork constructing device
CN214423395U (en) Assembled waterproof wall of leading
CN211286573U (en) Scaffold foot supporting component capable of being recycled
CN211572564U (en) Wall post template root leak protection device
CN210140991U (en) Toilet falls board R angle circular arc template device
CN214462546U (en) Aluminum mould passes material mouth to pour and uses brace mould
CN207277832U (en) A kind of high armpit angle concreting simple support structure
CN216429022U (en) Building template with turnover use function
CN216766676U (en) Tile paving device
CN210140932U (en) Corner wallboard
CN217419584U (en) U-shaped lower hanging Larsen steel sheet pile steel purlin bracket replacing device
CN218265000U (en) Grouting machine for building reinforcement engineering
CN218264805U (en) Floor tile laying structure for hotel decoration
CN219691090U (en) Auxiliary tool for formwork support of stairway on construction site
CN210263444U (en) Seam structure of assembled KT board
CN214834669U (en) Device for supporting steel pipe upright on plate surface rib
CN213674623U (en) Prefabricated component production is with pouring device convenient to control roughness
CN215055363U (en) Building bottom of pool axillary angle template strutting arrangement
CN215107305U (en) Supporting structure of post-cast strip template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant