CN214005605U - Construction device for cast-in-place concrete panel of upstream slope of dam - Google Patents
Construction device for cast-in-place concrete panel of upstream slope of dam Download PDFInfo
- Publication number
- CN214005605U CN214005605U CN202022287232.3U CN202022287232U CN214005605U CN 214005605 U CN214005605 U CN 214005605U CN 202022287232 U CN202022287232 U CN 202022287232U CN 214005605 U CN214005605 U CN 214005605U
- Authority
- CN
- China
- Prior art keywords
- dam
- slope
- plate
- construction
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 69
- 238000011144 upstream manufacturing Methods 0.000 title claims description 15
- 230000007246 mechanism Effects 0.000 claims abstract description 33
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 15
- 239000011440 grout Substances 0.000 claims abstract description 4
- 239000000725 suspension Substances 0.000 claims description 31
- 239000002002 slurry Substances 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 6
- 238000009415 formwork Methods 0.000 claims description 3
- 239000007788 liquid Substances 0.000 abstract description 13
- 238000011065 in-situ storage Methods 0.000 abstract description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
- 238000004381 surface treatment Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a domatic cast in situ concrete panel construction equipment that faces water of dam for at hillside top and dam facing site operation, including the slipform, the concrete tank car, the hoist engine, the side form, string form negative pressure chute, open type chute, hillside top construction platform, mechanism and hanging flower basket operation platform are suspended in midair to the walking, be equipped with slipform pulling equipment at the hillside top, slipform pulling equipment drives the slipform through pulling the steel wire and removes at the dam facing, the grout outlet and the string form negative pressure chute intercommunication that sets up at the dam facing of concrete tank car for transport the dam facing with the concrete and pour, the side form is through anti-overflow connecting piece connection side form anti-overflow thick liquid folded sheet, the side form anti-overflow thick liquid folded sheet turns up and turns over the thick liquid and spills over when being used for preventing concrete placement. Compared with the prior art that the construction personnel directly operate on the top of the slope, the construction efficiency is greatly improved.
Description
Technical Field
The application relates to the field of civil engineering, in particular to a construction device for cast-in-place concrete panels of a water-facing slope surface of a dam.
Background
The concrete face rockfill dam is a dam type which is adopted by domestic hydropower stations in recent years, and is widely applied to engineering. The panel concrete is used as a main structure for preventing seepage of the dam, and has important influence on the comprehensive benefit of the concrete panel rock-fill dam construction.
The dam concrete panel construction technology degree of difficulty is high, especially to overlength super large concrete panel, top operation platform working face is narrow, and equipment material drops into greatly, and personnel's short-term input is great, and the interference is great between the equipment during the construction, and the coordination degree of difficulty is big, has proposed the completion examination to on-the-spot construction management, construction organization.
In view of this, in order to improve the construction efficiency of the cast-in-place concrete panel on the upstream slope of the dam and reduce the labor cost, the invention provides a cast-in-place concrete panel construction device for the upstream slope of the dam, which has high on-site construction efficiency and low construction difficulty.
SUMMERY OF THE UTILITY MODEL
Based on this, this application provides dam upstream slope surface cast in situ concrete panel construction equipment to solve the construction efficiency that dam upstream slope surface panel pour among the correlation technique low, the construction degree of difficulty is big, the period is long, the cost of labor scheduling problem.
The application provides a domatic cast in situ concrete panel construction equipment of dam head-on-water, including being used for at the top of a slope and dam face site operation, including slipform pulling equipment and slipform, slipform pulling equipment sets up at the top of a slope, slipform pulling equipment drives the slipform through traction wire and removes at the dam face, the left and right sides of slipform are fixed with the side form respectively, be equipped with the concrete tank car on the top of a slope, the grout outlet and the chute intercommunication of setting at the dam face of concrete tank car, be used for transporting the concrete to the dam face through the chute and pour, the side form is through anti-overflow connecting piece connection side form anti-overflow thick liquid folded sheet, the side form anti-overflow thick liquid folded sheet turns over the book upwards and is used for preventing that the thick liquid spills over when concrete placement, the side form anti-overflow thick liquid spills over the book and is used for preventing concrete placement
In a possible implementation mode, the chute is a string-shaped negative pressure chute and comprises a main chute communicated with a slurry outlet of the concrete tank truck and at least two branch chutes communicated with the main chute, and the tail part of each branch chute is provided with an open chute.
In a possible implementation mode, sliding form sliding rails are welded on two sides of the side mold, sliding form idler wheels are installed at the bottom of the sliding form plate, and the sliding form idler wheels roll in the sliding form sliding rails.
In a possible implementation mode, an anti-skid plate is anchored at the top of the slope, a top of the slope construction platform is arranged on the top of the slope, a slip form traction device is arranged on the top of the slope construction platform, a walking type suspension mechanism is arranged on the top of the slope construction platform, one end of the walking type suspension mechanism is connected with a hanging basket steel wire rope, the hanging basket steel wire rope is connected with a hanging basket operation platform, the walking type suspension mechanism comprises a suspension rod, an inclined strut and a suspension mechanism bottom plate, a suspension mechanism roller is installed at the bottom of the suspension mechanism bottom plate, and the suspension mechanism roller moves along a track arranged on the top of the slope construction platform.
In a possible implementation mode, the hanging basket operation platform comprises an upper operation platform and a bottom operation platform, the upper operation platform comprises an operation platform adjusting rod, a rotary opening and closing plate and an upper operation platform bottom plate, the position of the rotary opening and closing plate is adjusted through the operation platform adjusting rod, the upper operation platform bottom plate is hinged to a hanging basket bottom plate, the hanging basket bottom plate is connected through an electric height-adjusting rod, and the inclination angle of the upper operation platform is adjusted through the electric height-adjusting rod.
In one possible implementation, the basket wire rope passes through the boom to be connected with the weight box, and the weight box is filled with water through the water inlet to adjust the balance weight.
In a possible implementation manner, the sliding mode traction device comprises two winches, and the two winches are respectively and correspondingly arranged at one end of the two sliding mode sliding rails.
In a possible implementation mode, the slip form plate further comprises a lifting ring, a cross beam, a steel panel and a welding plate, one end of a traction steel wire rope is connected with the lifting ring, the other end of the traction steel wire rope is connected with a winch, and the winch drives the slip form plate to move on the dam face along the slip form sliding rail.
In a possible implementation mode, the top of the antiskid plate is provided with a slope top pulley, the traction steel wire rope penetrates through the slope top pulley to be connected with the winch, and the slope top pulley is used for controlling the sliding template to turn.
In one possible implementation mode, when the winch does not work, the sliding form plate and the side die are temporarily fixed through the screw and the nut, and when the winch works, the sliding form plate moves in the sliding form sliding rail on the side die.
Compared with the prior art, the utility model has the following characteristics and beneficial effect:
(1) this scheme has set up the anti-overflow thick liquid folded sheet on the side form, and the side form anti-overflow thick liquid folded sheet can turn over and roll over, and the thick liquid spills over when preventing concrete placement, and this scheme passes through the slipform and slides along the concrete surface that has watered, makes the concrete reach the height of design.
(2) This scheme adopts bottom operation platform and upper portion operation platform's hanging flower basket system, can carry out the operation on hanging flower basket operation platform, has solved the platform working face narrowly, leads to constructor can't be quick construction on the dam facing, problem that the efficiency of construction is low. The operation platform at the upper part of the hanging basket can be adjusted by the electric heightening rod and the rotary rising and closing plate, so that construction is facilitated.
(3) This scheme has set up the weight box on the walking suspends mechanism in midair, and accessible water inlet water injection adjusts the counter weight, makes the walking suspend the flexibility of mechanism in midair high. The walking type suspension mechanism is used for controlling the position of the hanging basket operation platform on the dam face, and construction workers can complete construction operation on the dam face quickly and conveniently.
Drawings
In order to more clearly illustrate the embodiments of the present application or technical solutions in related arts, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a schematic view of the sliding formwork construction of the upstream slope of the dam of the present invention;
FIG. 2 is a schematic view of the basket operating platform of the present invention;
FIG. 3 is a schematic diagram of concrete placement according to the present invention;
fig. 4 is a cross-sectional view of the slip-form construction of the present invention.
In the figure: 1-dam surface, 2-slipform, 3-concrete tank truck, 4-winch, 5-side mould, 6-side mould spill-proof folding plate, 7-string negative pressure chute, 8-spill-proof plate connecting piece, 9-open chute, 10-traction steel wire rope, 11-lifting ring, 12-screw, 13-nut, 14-slipform roller, 15-beam, 16-slipform slide rail, 17-steel panel, 18-welding plate, 19-poured concrete, 20-feed inlet, 21-skid plate, 22-pitched roof pulley, 23-pitched roof construction platform, 24-walking suspension mechanism, 25-suspender, 26-diagonal brace, 27-counterweight box, 28-water inlet, 29-suspension mechanism bottom plate, 30-suspension mechanism roller, 31-rail, 32-hanging basket steel wire rope, 33-bottom operation platform, 34-upper operation platform, 35-upper operation platform bottom plate, 36-hanging basket bottom plate, 37-electric height-adjusting rod, 38-pull cable, 39-lifter, 40-hanging basket roller, 41-operation platform adjusting rod, 42-guardrail and 43-rotary opening and closing plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application. All other examples, which can be obtained by a person skilled in the art without making any inventive step based on the examples in this application, are within the scope of protection of this application.
It is obvious that the drawings in the following description are only examples or embodiments of the application, from which the application can also be applied to other similar scenarios without inventive effort for a person skilled in the art. Moreover, it should be appreciated that in the development of any such actual implementation, as in any engineering or design project, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with system-related and business-related constraints, which may vary from one implementation to another.
Reference in the specification to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the specification. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments.
Unless otherwise defined, technical or scientific terms used in the claims and the specification should have the ordinary meaning as understood by those of ordinary skill in the art to which this application belongs. The use of the terms "a" and "an" and "the" and similar referents in the context of describing and claiming the application are not to be construed as limiting in any way, but rather as indicating the singular or plural. The word "comprise" or "comprises", and the like, means that the element or item listed before "comprises" or "comprising" covers the element or item listed after "comprising" or "comprises" and its equivalent, and does not exclude other elements or items. "connected" or "coupled" and similar terms are not restricted to physical or mechanical connections, but may include electrical connections, whether direct or indirect. As used in the specification and claims of this application, "a plurality" means two or more. "and/or" describes the association relationship of the associated objects, meaning that there may be three relationships, e.g., a and/or B, which may mean: a exists alone, A and B exist simultaneously, and B exists alone. The character "/" generally indicates that the former and latter associated objects are in an "or" relationship.
It will be understood that when an element is referred to as being "mounted on" another element, it can be directly mounted on the other element or intervening elements may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. When an element is referred to as being "secured to" another element, it can be directly secured to the other element or intervening elements may also be present.
Steel sheet welding technical requirement, screw rod construction technique, concrete placement construction requirement etc. no longer give unnecessary details in this embodiment, the key explanation the utility model relates to an embodiment of structure.
Referring to fig. 1 to 4, in the embodiment of the present application, there is provided a construction apparatus for cast-in-place concrete panels on a water-slope surface of a dam, the device is used for site construction on a slope top and a dam face 1, and comprises a slip form 2, a concrete tank truck 3, a winch 4, a side form 5, a string-shaped negative pressure chute 7, an open type chute 9, a slope top construction platform 23, a walking type suspension mechanism 24 and a hanging basket operation platform, wherein a feeding hole 20 is arranged at the top of the dam face 1, a slip form traction device is arranged at the top of the slope, the slip form traction device drives the slip form plate 2 to move on the dam face 1 through a traction steel wire, a slurry outlet of the concrete tank truck 3 is communicated with a string-shaped negative pressure chute 7 arranged on the dam face 1, the concrete pouring device is used for conveying concrete to a dam face 1 for pouring, the side die 5 is connected with the side die slurry overflowing preventing folding plate 6 through the slurry overflowing preventing plate connecting piece 8, and the side die slurry overflowing preventing folding plate 6 is turned upwards to prevent slurry from overflowing during concrete pouring.
In one embodiment, the string-shaped negative pressure chute 7 comprises a main chute communicated with the slurry outlet of the concrete tank truck 3 and at least two branch chutes communicated with the main chute, and the tail parts of the branch chutes are provided with open chutes 9. Compared with the conventional chute, the string-shaped negative pressure chute 7 is suitable for the concrete panel with super-long and super-large length, and can be used for pouring the whole dam surface 1 during concrete pouring. The string-shaped negative pressure chute 7 is reinforced by adopting an iron wire of phi 10 to be pulled on the reinforcing steel bar net.
In one embodiment, slip form slide rails 16 are welded on two sides of the side mold 5, slip form rollers 14 are mounted at the bottom of the slip form 2, and the slip form rollers 14 roll in the slip form slide rails 16.
The slope top is anchored with an anti-skid plate 21, a slope top construction platform 23 is arranged on the slope top, the slip form traction equipment is arranged on the slope top construction platform 23, a walking type suspension mechanism 24 is arranged on the slope top construction platform 23, one end of the walking type suspension mechanism 24 is connected with a hanging basket steel wire rope 32, the hanging basket steel wire rope 32 is connected with a hanging basket operation platform, the walking type suspension mechanism 24 comprises a hanging rod 25, an inclined strut 26 and a suspension mechanism bottom plate 29, a suspension mechanism roller 30 is arranged at the bottom of the suspension mechanism bottom plate 29, and the suspension mechanism roller 30 moves along a track 31 arranged on the slope top construction platform 23.
The hanging flower basket operation platform includes upper portion operation platform 34 and bottom operation platform 33, and upper portion operation platform 34 includes operation platform regulation pole 41, rotatory board 43 that opens and close, upper portion operation platform bottom plate 35, adjusts the position that rotatory board 43 opened and close through operation platform regulation pole 41, and upper portion operation platform bottom plate 35 articulates there is hanging flower basket bottom plate 36, and hanging flower basket bottom plate 36 connects through electronic heightening pole 37, adjusts the inclination of upper portion operation platform 34 through electronic heightening pole 37. The bottom operating platform 33 is connected with the upper operating platform bottom plate 35 through a guy cable 38, a lifting machine is arranged on the basket bottom plate 36, and a basket roller 40 is arranged at the bottom of the basket bottom plate 36.
The basket wire rope 32 is connected to the weight box 27 through the boom 25, and the weight box 27 is filled with water through the water inlet 28 to adjust the weight.
In one embodiment, the sliding form traction device comprises two winches 4 of 5t, and the two winches 4 are respectively and correspondingly arranged at one end of two sliding form sliding rails 16. The slipform 2 also comprises a lifting ring 11, a cross beam 15, a steel panel 17 and a welding plate 18, wherein the steel panel 17 can be a steel plate with the thickness of 5mm, and the slipform 2 can be processed in sections and assembled in a secondary combination way on site. The traction steel wire rope 10 is a steel wire rope with the diameter of 21.5mm, one end of the traction steel wire rope is connected with the hanging ring 11, the other end of the traction steel wire rope is connected with the winch 4, and the winch 4 drives the slip form plate 2 to move on the dam face 1 along the slip form slide rail 16. The top of the antiskid plate 21 is provided with a top-slope pulley 22, the traction steel wire rope 10 passes through the top-slope pulley 22 and is connected with the winch 4, and the top-slope pulley 22 is used for controlling the direction change of the slipform 2. When the winch 4 does not work, namely the slip form slide rail 16 and the slip form roller 14 are installed, the slip form plate 2 and the side mold 5 are temporarily fixed through the screw 12 and the nut 13 for facilitating installation, and when the winch 4 works, the screw 12 and the nut 13 are removed, and the slip form plate 2 moves in the slip form slide rail 16 on the side mold 5.
To sum up, this scheme provides dam slope surface cast in situ concrete panel construction equipment that faces water to solve among the correlation technique the construction efficiency that the slope surface panel of dam face water was pour low, the construction degree of difficulty is big, the construction period is long, the cost of labor is high problem. Compared with the prior art that the construction personnel directly operate on the top of the slope, the construction efficiency is greatly improved. Specifically, in the construction, as shown in fig. 1-4, an anti-skid plate 21 is anchored on the slope top of the upstream slope of the dam, a slope top construction platform 23 is then poured, a release agent is coated on the surface of a front template for mounting the side mold 5, and the mounting of the side mold 5 can be carried out according to the sequence of numbering from top to bottom. And (3) assembling the slip form plate 2, welding slip form slide rails 16 on the side molds 5, and enabling the slip form plate 2 to slide on the slip form slide rails 16 to enable the concrete to reach the designed height. And then the hanging basket operation platform is transported to a construction site, an installer carries out installation of the walking type suspension mechanism 24, the upper operation platform 34 and the bottom operation platform 33, concrete is poured by adopting a string-shaped negative pressure chute 7, the tail part of the string-shaped negative pressure chute 7 is an open chute 9, and chute reinforcement can be realized by adopting an iron wire of phi 10 to be pulled on a reinforcing steel net. 2 winches 4 with the length of 5t are selected to enable the sliding form rollers 14 at the bottom of the sliding form plate 2 to slide up and move forward along sliding form slide rails 16 welded on two sides of the side form 5, and finally, operators can manually collect and treat the surface of the concrete panel on an upper operating platform 34 and a bottom operating platform 33 of a hanging basket. And finishing the site construction of the slope cast-in-place concrete panel. The difference of this scheme and prior art lies in, has set up the anti-overflow thick liquid folded sheet on side form 5, and side form anti-overflow thick liquid folded sheet 6 can turn over and roll over, and the thick liquid spills over when preventing concrete placement, can practice thrift the time in clearance place in construction later stage to this scheme slides along the concrete surface who has watered through slip form 2, makes the concrete reach the height of design, becomes fixed die plate and is sliding movable steel mould, can accelerate the speed of site operation. In addition, this scheme adopts bottom operation platform 33 and upper portion operation platform 34's hanging flower basket system, and when constructor carried out artifical face and surface treatment of receiving to the concrete panel, can carry out the operation on hanging flower basket operation platform, solved original dam because the platform working face is narrow, lead to constructor can't be quick construction on dam facing 1, problem that the efficiency of construction is low. And, the operation platform 34 on the upper part of the hanging basket can be adjusted by the electric height-adjusting rod 37 and the rotary closing and opening plate, so that the construction is convenient. In addition, the weight box 27 is arranged on the walking type suspension mechanism 24, water can be injected through the water inlet 28, and the balance weight is adjusted, so that the walking type suspension mechanism 24 is high in flexibility. The walking type suspension mechanism 24 is used for controlling the position of the hanging basket operation platform on the dam face 1, and is convenient for constructors to quickly complete construction operation on the dam face 1.
The technical features of the above embodiments can be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the above embodiments are not described, but should be considered as the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present application. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, which falls within the scope of protection of the present application. Therefore, the protection scope of the present patent shall be subject to the appended claims.
Claims (10)
1. A construction device for a cast-in-place concrete panel of a water-facing slope surface of a dam is used for site construction on a slope top and a dam face (1), and is characterized by comprising a slip form traction device and a slip form plate (2), wherein the slip form traction device is arranged on the slope top, the slip form traction device drives the dam face (1) to move through a traction steel wire, side molds (5) are fixed on the left side and the right side of the slip form plate (2) respectively, a concrete tank truck (3) is arranged on the slope top, a grout outlet of the concrete tank truck (3) is communicated with a chute arranged on the dam face (1), the slip form is used for conveying concrete to the dam face (1) through the chute to pour, the side molds (5) are connected with a side mold spill-proof folding plate (6) through a spill-proof plate connecting piece (8), and the side mold spill-proof folding plate (6) is folded upwards to prevent grout from overflowing during.
2. The construction device of the cast-in-place concrete panel of the upstream slope surface of the dam according to the claim 1, characterized in that the chute is a string-shaped negative pressure chute (7) which comprises a trunk chute communicated with the slurry outlet of the concrete tank truck (3) and at least two branch chutes communicated with the trunk chute, and the tail part of the branch chute is provided with an open chute (9).
3. The construction device for the cast-in-place concrete panel of the upstream slope of the dam according to claim 1, characterized in that sliding form slide rails (16) are welded at two sides of the side forms (5), sliding form rollers (14) are installed at the bottom of the sliding form plate (2), and the sliding form rollers (14) roll in the sliding form slide rails (16).
4. The construction device of the cast-in-place concrete panel for the upstream slope surface of the dam according to claim 1, wherein a skid-proof plate (21) is anchored on the slope top, a slope top construction platform (23) is arranged on the slope top, a slip form traction device is arranged on the slope top construction platform (23), a walking type suspension mechanism (24) is arranged on the slope top construction platform (23), one end of the walking type suspension mechanism (24) is connected with a hanging basket steel wire rope (32), the hanging basket steel wire rope (32) is connected with a hanging basket operation platform, the walking type suspension mechanism (24) comprises a hanging rod (25), an inclined strut (26) and a suspension mechanism bottom plate (29), a suspension mechanism roller (30) is arranged at the bottom of the suspension mechanism bottom plate (29), and the suspension mechanism roller (30) moves along a track (31) arranged on the slope top construction platform (23).
5. The dam water-facing slope cast-in-place concrete panel construction device according to claim 4, characterized in that the hanging basket operation platform comprises an upper operation platform (34) and a bottom operation platform (33), the upper operation platform (34) comprises an operation platform adjusting rod (41), a rotary opening and closing plate (43) and an upper operation platform bottom plate (35), the position of the rotary opening and closing plate (43) is adjusted through the operation platform adjusting rod (41), the upper operation platform bottom plate (35) is hinged with a hanging basket bottom plate (36), the hanging basket bottom plate (36) is connected through an electric height-adjusting rod (37), and the inclination angle of the upper operation platform (34) is adjusted through the electric height-adjusting rod (37).
6. A construction device for a cast-in-place concrete panel of a water-facing slope surface of a dam as claimed in claim 4, characterized in that a basket steel wire rope (32) passes through the hanger rod (25) and is connected with a weight box (27), and the weight box (27) is filled with water through the water inlet (28) to adjust the weight.
7. The construction device for the cast-in-place concrete panel of the upstream slope of the dam according to claim 3, characterized in that the sliding formwork traction equipment comprises two windlasses (4), and the two windlasses (4) are respectively and correspondingly arranged at one end of the two sliding formwork slide rails (16).
8. The construction device for the cast-in-place concrete panel of the upstream slope of the dam according to claim 7, wherein the slip-form plate (2) further comprises a hanging ring (11), a cross beam (15), a steel panel (17) and a welding plate (18), one end of the traction steel wire rope (10) is connected with the hanging ring (11), the other end of the traction steel wire rope is connected with the winch (4), and the winch (4) drives the slip-form plate (2) to move on the dam face (1) along the slip-form sliding rail (16).
9. The construction device of the cast-in-place concrete panel of the upstream slope surface of the dam according to claim 8, characterized in that a top pulley (22) is arranged at the top of the antiskid plate (21), the traction steel wire rope (10) passes through the top pulley (22) to be connected with the winch (4), and the top pulley (22) is used for controlling the direction of the slip-form plate (2).
10. The construction device of the cast-in-place concrete panel of the upstream slope of the dam according to claim 7, characterized in that when the winch (4) does not work, the slip form (2) and the side form (5) are temporarily fixed through the screw (12) and the nut (13), and when the winch (4) works, the slip form (2) moves in the slip form slide rail (16) on the side form (5).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202022287232.3U CN214005605U (en) | 2020-10-14 | 2020-10-14 | Construction device for cast-in-place concrete panel of upstream slope of dam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202022287232.3U CN214005605U (en) | 2020-10-14 | 2020-10-14 | Construction device for cast-in-place concrete panel of upstream slope of dam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN214005605U true CN214005605U (en) | 2021-08-20 |
Family
ID=77299601
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202022287232.3U Active CN214005605U (en) | 2020-10-14 | 2020-10-14 | Construction device for cast-in-place concrete panel of upstream slope of dam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN214005605U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113928999A (en) * | 2021-10-13 | 2022-01-14 | 王新林 | Slope construction inclined transportation tool for mountain highway |
| CN115233619A (en) * | 2022-07-15 | 2022-10-25 | 浙江省围海建设集团股份有限公司 | Concrete paver and concrete slope protection construction method |
| CN116240763A (en) * | 2023-03-17 | 2023-06-09 | 浙江滨源建设科技发展有限公司 | Construction method of cast-in-place concrete full-protection foam light soil spliced wide embankment |
| CN116497769A (en) * | 2023-05-11 | 2023-07-28 | 中国水利水电第三工程局有限公司 | Concrete slip form lining machine for face plates of dams and reservoir basins |
-
2020
- 2020-10-14 CN CN202022287232.3U patent/CN214005605U/en active Active
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113928999A (en) * | 2021-10-13 | 2022-01-14 | 王新林 | Slope construction inclined transportation tool for mountain highway |
| CN113928999B (en) * | 2021-10-13 | 2023-03-14 | 王新林 | Slope construction inclined transportation tool for mountain highway |
| CN115233619A (en) * | 2022-07-15 | 2022-10-25 | 浙江省围海建设集团股份有限公司 | Concrete paver and concrete slope protection construction method |
| CN115233619B (en) * | 2022-07-15 | 2024-05-28 | 浙江省围海建设集团股份有限公司 | Concrete paver and concrete slope protection construction method |
| CN116240763A (en) * | 2023-03-17 | 2023-06-09 | 浙江滨源建设科技发展有限公司 | Construction method of cast-in-place concrete full-protection foam light soil spliced wide embankment |
| CN116240763B (en) * | 2023-03-17 | 2025-04-15 | 浙江滨源建设科技发展有限公司 | Construction method of widening embankment with cast-in-place concrete full-protection foam lightweight soil |
| CN116497769A (en) * | 2023-05-11 | 2023-07-28 | 中国水利水电第三工程局有限公司 | Concrete slip form lining machine for face plates of dams and reservoir basins |
| CN116497769B (en) * | 2023-05-11 | 2023-11-03 | 中国水利水电第三工程局有限公司 | Concrete slip form lining machine for face plates of dams and reservoir basins |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112160290B (en) | Construction device and construction method for cast-in-place concrete panel of upstream slope of dam | |
| CN107059640B (en) | Bridge girder erection machine for prefabricated segmental beam span-by-span construction and construction method thereof | |
| CN107614813B (en) | Cast-in-place wall core blocks and molds, manufacturing methods and masonry methods, reinforcing pipes, curved bottom line boxes | |
| CN106351180B (en) | The all-hydraulic unlatching self-propelled template system of aqueduct | |
| CN208087078U (en) | A kind of boom hoisting of large span steel reinforced concrete combination beam Bridge Erector | |
| CN108951683A (en) | A kind of prefabricated cushion cap of land superposed type and its production and installation method | |
| CN108214837A (en) | Precast prestressed floor production mould, production equipment and production technology | |
| CN109183842A (en) | A kind of list cabin rectangle pipe gallery production method | |
| CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
| CN106223983A (en) | A kind of diversion tunnel inclined shaft, flat section tunneling boring primary steel mould trolley | |
| CN106013233A (en) | Slip system and construction method for cast-in-place construction of underground pipe gallery | |
| CN109930591A (en) | Diaphram wall and its construction method | |
| CN110438941A (en) | A method of throwing Cyke Gebin by using mold box | |
| CN107815971A (en) | Self-climbing hydraulic formwork turning system for high pier | |
| CN106801384A (en) | Assembled steel reinforced concrete aliform type culvert opening and construction method | |
| CN104947674B (en) | Construction method for concrete face dam water stop mortar bed construction trolley | |
| CN206830207U (en) | A kind of tunnel splash guard reinforcing steel bar laying device | |
| CN202064281U (en) | Slip form frame | |
| CN109763458A (en) | Trolley for seepage-proof wall of dam body, wall building mechanism, construction method of seepage-proof wall of dam body | |
| CN215368761U (en) | Subway station side wall large formwork moving device | |
| CN112012365B (en) | A construction technology for pouring and forming of a large-scale sewage pool supporting arm rib beam type wall | |
| CN119825415A (en) | Diameter-variable full-circle needle beam trolley and lining construction method | |
| CN209669811U (en) | Dam body seepage wall trolley and its walling mechanism | |
| CN211306798U (en) | Demoulding device is used in production of concrete prefabricated member | |
| CN210973786U (en) | Movable small template hoisting support |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |