CN213937452U - Black start-up system of thermal power plant with small-size water and electricity - Google Patents

Black start-up system of thermal power plant with small-size water and electricity Download PDF

Info

Publication number
CN213937452U
CN213937452U CN202022695454.9U CN202022695454U CN213937452U CN 213937452 U CN213937452 U CN 213937452U CN 202022695454 U CN202022695454 U CN 202022695454U CN 213937452 U CN213937452 U CN 213937452U
Authority
CN
China
Prior art keywords
switch
bus
transformer
generator
winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022695454.9U
Other languages
Chinese (zh)
Inventor
寇水潮
兀鹏越
孙钢虎
田磊陈
陈聪平
王小辉
柴琦
李志鹏
孙梦瑶
张立松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202022695454.9U priority Critical patent/CN213937452U/en
Application granted granted Critical
Publication of CN213937452U publication Critical patent/CN213937452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model relates to a black start-up system of thermal power plant with small-size water and electricity, including first hydraulic generator, second hydraulic generator, third hydraulic generator, fourth hydraulic generator, first main transformer, second main transformer, first step-down transformer, second step-down transformer, first three winding station transformer, second three winding station transformer, first double winding station transformer, second double winding station transformer, 35kV send out T wiring way; after the line sent by the thermal power unit loses power, the thermal power unit is quickly started through small hydropower in the thermal power plant, the small hydropower supplies power to one section of bus of a power system of the thermal power plant, the other section of bus is connected with a small hydropower bus and passes through a three-winding transformer to supply power, the two sections of power system buses of the thermal power plant recover to supply power, and the power system loses power quickly; when the thermal power generating unit output line normally runs, the small-sized water and electricity can assist the thermal power generating unit to participate in AGC frequency modulation or supply power to a power grid through a T connection line.

Description

Black start-up system of thermal power plant with small-size water and electricity
Technical Field
The utility model belongs to the technical field of the black start-up of thermal power plant with small-size water and electricity, concretely relates to black start-up system of thermal power plant with small-size water and electricity.
Background
At present, black start in China mainly comprises water, electricity and a gas turbine, thermal power is limited by too many factors and does not have black start capability, the main reason is that a plurality of thermal power auxiliary machines are arranged, a large power supply is needed during black start to drive the thermal power auxiliary machines to operate, meanwhile, after power grid power loss occurs, after the thermal power plant uses the auxiliary machines for a period of time, the temperatures of a boiler and a steam turbine gradually transit towards a cold state, and when all complex processes have no faults, restarting is carried out for several hours or more than one day, so that thermal power is a key technology for limiting black start due to special operation conditions and physical characteristics of the thermal power. The condition that the thermal power has the black start capability is that after the power grid loses power, all auxiliary machines can be switched to a power supply with larger capacity for supplying power, namely the power supply can be rapidly sent out in a short time under the condition of extreme hot states of a boiler and a steam turbine, and at present, the thermal power urgently needs a power supply which can store energy and is controllable and has larger capacity than auxiliary machines for factories to realize black start.
The current black start technology of the thermal power plant mainly has the following problems: (1) the thermal power plant has no capacity except for starting the standby power supply, so that the black starting capability of the thermal power plant is restricted due to the fact that the thermal power plant can start the controllable small-sized water power; (2) relevant literature data of small hydropower auxiliary thermal power plant units for thermal power plants are not seen; (3) at present, no case and report for AGC (automatic gain control) frequency modulation of a small hydropower auxiliary thermal power generating unit exists; (4) at present, no related technology for realizing the starting of the small hydroelectric auxiliary thermal power generating unit by utilizing the penetration power supply of a three-winding transformer exists.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the prior art, the utility model provides a black start-up system of thermal power plant with small-size water and electricity can make thermal power generating unit possess black start-up ability, provides the safety guarantee for the electric wire netting.
The utility model discloses a realize through following technical scheme:
a thermal power plant black start system with small hydropower stations comprises a first hydro-generator, a second hydro-generator, a third hydro-generator, a fourth 6kV switch, a first 6kV bus, a second main transformer, a third 35kV switch, a first 35kV bus, a second 35kV bus, a sixth 35kV switch, a third 6kV bus, a fourth 6kV bus, a ninth 6kV switch, a tenth 6kV switch, a first three-winding plant transformer and a first 20kV circuit breaker;
the first hydraulic generator is connected with the first 6kV bus through a first 6kV switch; the second water wheel generator is connected with the first 6kV bus through a third 6kV switch; the third water wheel generator is connected with the second 6kV bus through a fifth 6kV switch; the fourth water wheel generator is connected with the second 6kV bus through a seventh 6kV switch;
two ends of the fourth 6kV switch are respectively connected with the first 6kV bus and the second 6kV bus;
one end of the second main transformer is connected with the second 6kV bus, and the other end of the second main transformer is connected with the second 35kV bus through a second 35kV switch;
one end of the third 35kV switch is connected with the second 35kV bus, and the other end of the third 35kV switch is connected with the first 6kV bus through the first 35kV bus, the fifth 35kV switch, the first 35kV switch and the first main transformer in sequence;
one end of the sixth 35kV switch is connected with the second 35kV bus, and the other end of the sixth 35kV switch is connected with the third 6kV bus through a third 35kV disconnecting link, a first step-down transformer and an eighth 6kV switch in sequence;
one end of the first 20kV circuit breaker is connected with the end of the first generator, the other end of the first 20kV circuit breaker is connected with the high-voltage side of the first three-winding station transformer, the low-voltage side A branch of the first three-winding station transformer is connected with the third 6kV bus through the ninth 6kV switch, and the low-voltage side B branch of the first three-winding station transformer is connected with the fourth 6kV bus through the tenth 6kV switch.
Preferably, the system further comprises a second 6kV switch, a sixth 6kV switch, a fourth 35kV switch, a seventh 35kV switch, a fifth 6kV bus, a sixth 6kV bus, a second third winding station transformer, a second 20kV circuit breaker, a first 400V bus, a second 400V bus, a third 400V switch and a 35kV outgoing T wiring circuit;
one end of the second 6kV switch is connected with the first 6kV bus, and the other end of the second 6kV switch is connected with the first 400V bus through a first double-winding station transformer and a first 400V switch in sequence;
one end of the sixth 6kV switch is connected with the second 6kV bus, and the other end of the sixth 6kV switch is connected with the second 400V bus through a second double-winding station transformer and a second 400V switch in sequence;
one end of the third 400V switch is connected with the first 400V bus, and the other end of the third 400V switch is connected with the second 400V bus;
one end of the fourth 35kV switch is connected with the common point of the first 35kV switch and the fifth 35kV switch, and the other end of the fourth 35kV switch is connected with the 35kV outgoing T-junction circuit through the first 35kV disconnecting link;
one end of the seventh 35kV switch is connected with the common point of the first 35kV switch and the fifth 35kV switch, and the other end of the seventh 35kV switch is connected with the fifth 6kV bus through a second 35kV disconnecting link, a second step-down transformer and an eleventh 6kV switch in sequence;
one end of the second 20kV circuit breaker is connected with the end of the second generator, the other end of the second 20kV circuit breaker is connected with the high-voltage side of the second three-winding station transformer, the low-voltage side A branch of the second three-winding station transformer is connected with the fifth 6kV bus through the twelfth 6kV switch, and the low-voltage side B branch of the second three-winding station transformer is connected with the sixth 6kV bus through the thirteenth 6kV switch.
Further, when the first hydro-generator, the second hydro-generator, the third hydro-generator and the fourth hydro-generator are all the first three-winding service transformer load providing a black start power or participating in AGC frequency modulation, the first 6kV switch, the second 6kV switch, the third 6kV switch, the fifth 6kV switch, the sixth 6kV switch, the seventh 6kV switch, the first 35kV switch, the second 35kV switch, the third 35kV switch, the fifth 35kV switch, the sixth 35kV switch, the second 35kV knife switch, the third 35kV knife switch, the eighth 6kV switch, the ninth 6kV switch, the tenth 6kV switch, the first 400V switch and the second 400V switch are all in a closed state, and the third 400V switch, the fourth 35kV switch, the seventh 35kV switch, the eleventh 6kV switch and the first 20kV circuit breaker are all in an open-to-state.
Further, when the first water-wheel generator, the second water-wheel generator, the third water-wheel generator and the fourth water-wheel generator are all provided with a black starting power supply or participate in AGC frequency modulation by the load of the second three-winding service transformer, the seventh 35kV switch, the second 35kV disconnecting link, the eleventh 6kV switch, the twelfth 6kV switch and the thirteenth 6kV switch are all in a closed state, and the sixth 35kV switch and the third 35kV disconnecting link are all in an open state.
Preferably, when the first hydro-generator and the second hydro-generator provide a black start power for the second three-winding plant transformer load or participate in AGC frequency modulation, and when the third hydro-generator and the fourth hydro-generator provide a black start power for the first three-winding plant transformer load or participate in AGC frequency modulation, the first 6kV switch, the second 6kV switch, the third 6kV switch, the fifth 6kV switch, the sixth 6kV switch, the seventh 6kV switch, the first 35kV switch, the second 35kV switch, the sixth 35kV switch, the seventh 35kV switch, the second 35kV knife switch, the third 35kV knife switch, the eighth 6kV switch, the ninth 6kV switch, the tenth 6kV switch, the eleventh 6kV switch, the twelfth 6kV switch, the thirteenth 6kV switch, the first 400V switch and the second 400V switch are all in a closed state, and the fourth 6kV switch, the ninth 6kV switch, the tenth 6kV switch, the eleventh 6kV switch, the thirteenth 6kV switch, the first 400V switch and the second 400V switch are all in a closed state, The third 35kV switch, the fourth 35kV switch, the fifth 35kV switch, the first 20kV circuit breaker and the second 20kV circuit breaker are all in an off state.
Preferably, when the first three-winding station transformer and the second three-winding station transformer are not in black start, the first hydro-generator, the second hydro-generator, the third hydro-generator and the fourth hydro-generator are all powered by the 35kV outgoing T-junction circuit, the first 6kV switch, the second 6kV switch, the third 6kV switch, the fifth 6kV switch, the sixth 6kV switch, the seventh 6kV switch, the first 35kV switch, the second 35kV switch, the third 35kV switch, the fourth 35kV switch, the fifth 35kV switch, the first 35kV disconnecting link, the ninth 6kV switch, the tenth 6kV switch, the first 20kV circuit breaker, the twelfth 6kV switch, the thirteenth 6kV switch, the second 20kV circuit breaker, the first 400V switch and the second 400V switch are all in a closed state, and the fourth 6kV switch, the sixth 35kV switch, the seventh 35kV circuit breaker, the thirteenth 6kV circuit breaker, the fourth 35kV circuit breaker, the fifth 400V switch and the fourth 35kV circuit breaker are all in a closed state, The second 35kV disconnecting link, the third 35kV disconnecting link, the eighth 6kV switch and the eleventh 6kV switch are all in an off state.
Furthermore, the first water-wheel generator, the second water-wheel generator, the third water-wheel generator and the fourth water-wheel generator all assist the first three-winding service transformer or the second three-winding service transformer to participate in AGC frequency modulation, and power of the first water-wheel generator, the second water-wheel generator, the third water-wheel generator and the fourth water-wheel generator is adjusted and an AGC target instruction is tracked, so that the frequency of the power grid is stabilized.
Compared with the prior art, the utility model discloses following profitable technological effect has:
the utility model provides a novel black start-up system of thermoelectricity makes thermoelectricity unit possess black start-up ability, promotes the safety and stability of electric wire netting, can participate in electric wire netting AGC frequency modulation to increase thermoelectricity unit's operation economic benefits, to different application scenes, switches the operation mode of small-size water and electricity in a flexible way, satisfies the demand of daily safety of electric wire netting, frequency modulation, power supply. When black start the utility model discloses small-size water and electricity wiring is nimble, can realize that thermal power unit utmost point hot-state starts and send out the power for one or two thermal power unit plant system power supplies, for the electric wire netting provides capacious, reliable black starting power supply, alleviates electric wire netting power failure pressure.
Further, the utility model discloses arbitrary section generating line of three winding transformer low pressure sides is by small-size water and electricity power supply, and another section passes through the power supply through three winding transformers, and the investment of reducible primary equipment simplifies the system wiring, reinforcing operation flexibility.
Further, the utility model discloses small-size water and electricity still can see the power out to the electric wire netting through T wiring way, reduces the circuit investment cost, provides high-quality, the green energy of price/performance ratio for the electric wire netting.
Drawings
Fig. 1 is a schematic diagram of the system of the present invention.
Fig. 2 is the utility model discloses first hydraulic generator, second hydraulic generator, third hydraulic generator, fourth hydraulic generator are first three winding station transformer load and provide black start power or participate in AGC frequency modulation schematic diagram.
Fig. 3 is the utility model discloses first hydraulic generator, second hydraulic generator, third hydraulic generator, fourth hydraulic generator are second three winding station transformer load and provide black start power or participate in AGC frequency modulation schematic diagram.
Fig. 4 is the utility model discloses first hydraulic generator, second hydraulic generator provide black start power or participate in the AGC frequency modulation for the transformer load of second three-winding mill, and third hydraulic generator, fourth hydraulic generator provide black start power or participate in AGC frequency modulation schematic diagram for the transformer load of first three-winding mill.
Fig. 5 is the utility model discloses first hydraulic generator, second hydraulic generator, third hydraulic generator, fourth hydraulic generator are 35kV and see off T connection circuit power supply reason picture.
In the figure: a first hydro-generator 1; a second hydro-generator 2; a third hydro-generator 3; a fourth hydro-generator 4; a first 6kV switch 5; a second 6kV switch 6; a third 6kV switch 7; a fourth 6kV switch 8; a fifth 6kV switch 9; a sixth 6kV switch 10; a seventh 6kV switch 11; a first 6kV bus 12; a second 6kV bus 13; a first main transformer 14; a second main transformer 15; a first 35kV switch 16; a second 35kV switch 17; a third 35kV switch 18; a fourth 35kV switch 19; a first 35kV bus 20; a second 35kV bus 21; a fifth 35kV switch 22; a sixth 35kV switch 23; a seventh 35kV switch 24; a first 35kV knife switch 25; a second 35kV knife switch 26; a third 35kV disconnecting link 27; an eighth 6kV switch 28; a third 6kV bus 29; a fourth 6kV bus 30; a ninth 6kV switch 31; a tenth 6kV switch 32; a first step-down transformer 33; a first three-winding service transformer 34; a first 20kV circuit breaker 35; an eleventh 6kV switch 36; a fifth 6kV bus 37; a sixth 6kV bus 38; a second step-down transformer 39; a twelfth 6kV switch 40; a thirteenth 6kV switch 41; a second third winding service transformer 42; a second 20kV circuit breaker 43; a first dual-winding service transformer 44; a second dual-winding service transformer 45; a first 400V switch 46; a second 400V switch 47; a first 400V bus bar 48; a second 400V bus 49; a third 400V switch 50; the 35kV outgoing T-junction line 51.
Detailed Description
The present invention will now be described in further detail with reference to specific examples, which are intended to be illustrative, but not limiting, of the invention.
The utility model discloses can solve the black start-up of thermal power generating unit and frequency modulation problem, utilize the transformer to pass through power supply mode, reduce the primary equipment investment for thermal power generating unit possesses black start-up ability, and the performance has small-size hydroelectric generating unit's natural advantage, participates in thermal power generating unit AGC frequency modulation or sends the power outward, promotes thermal power generating unit's operation flexibility.
The utility model relates to a black start-up system of thermal power plant with small-size water and electricity, including first hydraulic generator, second hydraulic generator, third hydraulic generator, fourth hydraulic generator, first main transformer, second main transformer, first step-down transformer, second step-down transformer, first three winding station transformer, second three winding station transformer, first double winding station transformer, second double winding station transformer, 35kV send out T wiring way; after the thermal power unit sends out the circuit and loses power, the utility model discloses a small-size water and electricity in the thermal power plant starts fast, and small-size water and electricity is the power supply of thermal power plant station power system one section generating line, and another section generating line is passed through the power supply through three winding transformer by connecting small-size water and electricity generating line, and two sections station service generating lines of thermal power plant all resume the power supply, and the unit starts according to the extremely thermal state procedure, and the constant speed, builds the voltage, resumes to losing power system power supply fast; when the transmission line of the thermal power generating unit normally runs, the small-sized water and electricity can assist the thermal power generating unit to participate in AGC frequency modulation or supply power to a power grid through a T-connection line; the utility model provides a novel black start-up system of thermoelectricity makes thermoelectricity unit possess black start-up ability, promotes the safety and stability of electric wire netting, can participate in electric wire netting AGC frequency modulation to increase thermoelectricity unit's operation economic benefits, to different application scenes, the operation mode of nimble small-size water and electricity of switching satisfies the demand of daily safety of electric wire netting, frequency modulation, power supply.
As shown in FIG. 1, the utility model relates to a thermal power plant black start system with small-size water and electricity, including first hydraulic generator 1, second hydraulic generator 2, third hydraulic generator 3, fourth hydraulic generator 4, first 6kV switch 5, third 6kV switch 7, fourth 6kV switch 8, fifth 6kV switch 9, seventh 6kV switch 11, first 6kV generating line 12, second 6kV generating line 13, first main transformer 14, second main transformer 15, first 35kV switch 16, second 35kV switch 17, third 35kV switch 18, first 35kV generating line 20, second 35kV generating line 21, fifth 35kV switch 22, sixth 35kV switch 23, third 35kV disconnecting link 27, eighth 6kV switch 28, third 6kV generating line 29, fourth 6kV generating line 30, ninth 6kV switch 31, tenth 6kV switch 32, first step-down transformer 33 kV switch 33, A first three-winding service transformer 34 and a first 20kV circuit breaker 35; wherein, the first water wheel generator 1 is connected with the first 6kV bus 12 through a first 6kV switch 5, the second water wheel generator 2 is connected with the first 6kV bus 12 through a third 6kV switch 7, the third water wheel generator 3 is connected with the second 6kV bus 13 through a fifth 6kV switch 9, the fourth water wheel generator 4 is connected with the second 6kV bus 13 through a seventh 6kV switch 11, one end of the second main transformer 15 is connected with the second 6kV bus 13, the other end is connected with the second 35kV bus 21 through a second 35kV switch 17, one end of the third 35kV switch 18 is connected with the second 35kV bus 21, the other end is connected with the first 6kV bus 12 through a first 35kV bus 20, a fifth 35kV switch 22, a first 35kV switch 16 and a first 6kV bus 14 in sequence, one end of the sixth 35kV switch 23 is connected with the second 35kV bus 21, the other end in proper order through third 35kV switch 27, first step-down transformer 33, eighth 6kV switch 28 with third 6kV generating line 29 links to each other, first 20kV circuit breaker 35 one end links to each other with first generator terminal, the other end with first three winding house service transformer 34 high-pressure side links to each other, first three winding house service transformer 34 low-voltage side A branch through ninth 6kV switch 31 with third 6kV generating line 29 links to each other, first three winding house service transformer 34 low-voltage side B branch through tenth 6kV switch 32 with fourth 6kV generating line 30 links to each other.
In this embodiment, the system further includes a second 6kV switch 6, a sixth 6kV switch 10, a fourth 35kV switch 19, a seventh 35kV switch 24, a first 35kV disconnecting link 25, a second 35kV disconnecting link 26, an eleventh 6kV switch 36, a fifth 6kV bus 37, a sixth 6kV bus 38, a second step-down transformer 39, a twelfth 6kV switch 40, a thirteenth 6kV switch 41, a second three-winding service transformer 42, a second 20kV circuit breaker 43, a first dual-winding service transformer 44, a second dual-winding service transformer 45, a first 400V switch 46, a second 400V switch 47, a first 400V bus 48, a second 400V bus 49, a third 400V switch 50, and a 35kV outgoing T-junction circuit 51; one end of the second 6kV switch 6 is connected to the first 6kV bus 12, the other end of the second 6kV switch is connected to the first 400V bus 48 through a first double-winding station transformer 44 and a first 400V switch 46 in sequence, one end of the sixth 6kV switch 10 is connected to the second 6kV bus 13, the other end of the sixth 6kV switch is connected to the second 400V bus 49 through a second double-winding station transformer 45 and a second 400V switch 47 in sequence, one end of the third 400V switch 50 is connected to the first 400V bus 48, and the other end of the third 400V switch is connected to the second 400V bus 49; one end of the fourth 35kV switch 19 is connected with the common point of the first 35kV switch 16 and the fifth 35kV switch 22, the other end is connected with the 35kV sending-out T-connection circuit 51 through the first 35kV disconnecting link 25, one end of the seventh 35kV switch 24 is connected with the common point of the first 35kV switch 16 and the fifth 35kV switch 22, the other end is connected with the fifth 6kV bus 37 through a second 35kV disconnecting link 26, a second step-down transformer 39 and an eleventh 6kV switch 36 in sequence, one end of the second 20kV breaker 43 is connected with the end of the second generator, the other end is connected with the high-voltage side of the second three-winding service transformer 42, the low-voltage side a branch of the second three-winding service transformer 42 is connected with the fifth 6kV bus 37 through a twelfth 6kV switch 40, the low-voltage side B branch of the second three-winding station transformer 42 is connected with the sixth 6kV bus 38 through a thirteenth 6kV switch 41.
In the present embodiment, the first hydraulic generator 1, the second hydraulic generator 2, the third hydraulic generator 3, and the fourth hydraulic generator 4 have a rated capacity of 5625kVA, a rated rotational speed of 214.5r/min, a rated excitation voltage of 126V, a rated power of 4500kW, and a rated excitation current of 343A.
In this embodiment, the rated capacities of the first dual-winding service transformer 44 and the second dual-winding service transformer are 315kVA, and the number of the connection group is DY 11; the first main transformer 14 and the second main transformer 15 have a rated capacity of 12500kVA, and the joint group is labeled Ynd 11.
As shown in fig. 2, when the first hydraulic generator 1, the second hydraulic generator 2, the third hydraulic generator 3, and the fourth hydraulic generator 4 are all the first three-winding service transformer 34 load providing black start power or participating in AGC frequency modulation, the first 6kV switch 5, the second 6kV switch 6, the third 6kV switch 7, the fifth 6kV switch 9, the sixth 6kV switch 10, the seventh 6kV switch 11, the first 35kV switch 16, the second 35kV switch 17, the third 35kV switch 18, the fifth 35kV switch 22, the sixth 35kV switch 23, the second 35kV switch 26, the third 35kV switch 27, the eighth 6kV switch 28, the ninth 6kV switch 31, the tenth 6kV switch 32, the first 400V switch 46, and the second 400V switch 47 are all in a closed state, and the third 400V switch 50, the fourth 35kV switch 19, the seventh 35kV switch 24, the tenth 6kV switch 32, the first 400V switch 46, and the second 400V switch 47 are all in a closed state, and the third 400V switch 50, the fourth 35kV switch 19, the seventh 35kV, The eleventh 6kV switch 36 and the first 20kV breaker 35 are both in a disconnected state; the rated voltage of the first hydraulic generator 1, the second hydraulic generator 2, the third hydraulic generator 3 and the fourth hydraulic generator 4 is 6.3kV, the transformation ratio of the first main transformer 14 and the second main transformer 15 is 6.3kV/35kV, the transformation ratio of the first step-down transformer 33 and the second step-down transformer 39 is 35kV/6.3kV, the transformation ratio of the first three-winding station transformer 34 and the second three-winding station transformer 42 is 20kV/6.3kV/6.3kV, and the transformation ratio of the first double-winding station transformer 44 and the second double-winding station transformer 45 is 6.3kV/0.4 kV.
As shown in fig. 3, when the first water-turbine generator 1, the second water-turbine generator 2, the third water-turbine generator 3, and the fourth water-turbine generator 4 are all the second three-winding service transformer 42 load providing a black start power supply or participating in AGC frequency modulation, the seventh 35kV switch 24, the second 35kV disconnecting link 26, the eleventh 6kV switch 36, the twelfth 6kV switch 40, and the thirteenth 6kV switch 41 are all in a closed state, and the sixth 35kV switch 23 and the third 35kV disconnecting link 27 are all in an open state.
As shown in fig. 4, when the first hydro-generator 1 and the second hydro-generator 2 provide black start power for the load of the second three-winding service transformer 42 or participate in AGC frequency modulation, and when the third hydro-generator 3 and the fourth hydro-generator 4 provide black start power for the load of the first three-winding service transformer 34 or participate in AGC frequency modulation, the first 6kV switch 5, the second 6kV switch 6, the third 6kV switch 7, the fifth 6kV switch 9, the sixth 6kV switch 10, the seventh 6kV switch 11, the first 35kV switch 16, the second 35kV switch 17, the sixth 35kV switch 23, the seventh 35kV switch 24, the second 35kV disconnecting link 26, the third 35kV disconnecting link 27, the eighth 6kV switch 28, the ninth 6kV switch 31, the tenth 6kV switch 32, the eleventh 6kV switch 36, the twelfth 6kV switch 40, the thirteenth 6kV switch 41, the third 6kV switch 41, and the third 6kV switch 40, The first 400V switch 46 and the second 400V switch 47 are both in a closed state, and the fourth 6kV switch 8, the third 35kV switch 18, the fourth 35kV switch 19, the fifth 35kV switch 22, the first 20kV circuit breaker 35, and the second 20kV circuit breaker 43 are all in an open state.
As shown in fig. 5, when the first three-winding service transformer 34 and the second three-winding service transformer 42 are not in black start, the first hydro-generator 1, the second hydro-generator 2, the third hydro-generator 3 and the fourth hydro-generator 4 are all supplied with power by the 35kV sending-out T connection circuit 51, the first 6kV switch 5, the second 6kV switch 6, the third 6kV switch 7, the fifth 6kV switch 9, the sixth 6kV switch 10, the seventh 6kV switch 11, the first 35kV switch 16, the second 35kV switch 17, the third 35kV switch 18, the fourth 35kV switch 19, the fifth 35kV switch 22, the first 35kV knife switch 25, the ninth 6kV switch 31, the tenth 6kV switch 32, the first 20kV circuit breaker 35, the twelfth 6kV switch 40, the thirteenth 6kV switch 41, the second 20kV circuit breaker 43, the first 400V switch 46 and the second 400V switch 47 are all in a closed state, the fourth 6kV switch 8, the sixth 35kV switch 23, the seventh 35kV switch 24, the second 35kV disconnecting link 26, the third 35kV disconnecting link 27, the eighth 6kV switch 28 and the eleventh 6kV switch 36 are all in an off state.
In this embodiment, the first hydraulic generator 1, the second hydraulic generator 2, the third hydraulic generator 3, and the fourth hydraulic generator 4 all assist the first three-winding service transformer 34 or the second three-winding service transformer 42 to participate in AGC frequency modulation, and stabilize the power grid frequency by adjusting the power of the first hydraulic generator 1, the second hydraulic generator 2, the third hydraulic generator 3, and the fourth hydraulic generator 4 and tracking an AGC target instruction.
The utility model relates to a black start-up system of thermal power plant with small-size water and electricity, during the use, including following step:
1) sequentially disconnecting the fourth 6kV switch 8, the fourth 35kV switch 19, the seventh 35kV switch 24, the second 35kV disconnecting link 26 and the first 20kV circuit breaker 35, and entering the step 2);
2) sequentially closing the first 6kV switch 5, the second 6kV switch 6, the third 6kV switch 7, the fifth 6kV switch 9 and the sixth 6kV switch 10; a seventh 6kV switch 11, a first 35kV switch 16, a second 35kV switch 17, a third 35kV switch 18, a fifth 35kV switch 22, a sixth 35kV switch 23, a ninth 6kV switch 31, a tenth 6kV switch 32, and go to step 3);
3) adjusting the pressure build-up of the first hydraulic generator 1, the second hydraulic generator 2, the third hydraulic generator 3 and the fourth hydraulic generator 4 to the rated voltage of 6.3kV, and entering the step 4);
4) closing the first 400V switch 46 and the second 400V switch 47, and entering the step 5);
5) closing the eighth 6kV switch 28, supplying power to the third 6kV bus 29 and the fourth 6kV bus 30 by the first hydraulic generator 1, the second hydraulic generator 2, the third hydraulic generator 3 and the fourth hydraulic generator 4 in a load manner, and entering the step 6);
6) igniting, impulse rotating, constant speed and voltage building are carried out on a first generator accessed by the first three-winding factory transformer 34, after the voltage building of the first generator reaches rated voltage, a grid-connected switch is closed, a line is charged, a power supply is provided for a power grid, and the step 7) is carried out;
7) and ending the black start of the first generator accessed by the first three-winding service transformer 34.
In this embodiment, the voltages of the first 35kV bus 20 and the second 35kV bus 21 in the step 3) are 35 kV; the voltage of the first 400V bus 48 and the second 400V bus 49 in the step 4) is 400V; the voltages of the third 6kV bus 29 and the fourth 6kV bus 30 in the step 5) are 6.3 kV.
The above, only the utility model discloses a preferred embodiment, it is not right the utility model discloses a do any restriction, all according to the utility model discloses any simple modification, change and the equivalent structure change of technical essence to doing above embodiment all still belong to the utility model discloses technical scheme's within the scope of protection.

Claims (7)

1. A black start system with small hydropower for a thermal power plant is characterized by comprising a first water wheel generator (1), a second water wheel generator (2), a third water wheel generator (3), a fourth water wheel generator (4), a fourth 6kV switch (8), a first 6kV bus (12), a second 6kV bus (13), a second main transformer (15), a third 35kV switch (18), a first 35kV bus (20), a second 35kV bus (21), a sixth 35kV switch (23), a third 6kV bus (29), a fourth 6kV bus (30), a ninth 6kV switch (31), a tenth 6kV switch (32), a transformer (34) for a first plant winding and a first 20kV circuit breaker (35);
the first hydro-generator (1) is connected with the first 6kV bus (12) through a first 6kV switch (5); the second water wheel generator (2) is connected with the first 6kV bus (12) through a third 6kV switch (7); the third water wheel generator (3) is connected with the second 6kV bus (13) through a fifth 6kV switch (9); the fourth water wheel generator (4) is connected with the second 6kV bus (13) through a seventh 6kV switch (11);
two ends of the fourth 6kV switch (8) are respectively connected with a first 6kV bus (12) and a second 6kV bus (13);
one end of the second main transformer (15) is connected with the second 6kV bus (13), and the other end of the second main transformer is connected with the second 35kV bus (21) through a second 35kV switch (17);
one end of the third 35kV switch (18) is connected with the second 35kV bus (21), and the other end of the third 35kV switch is connected with the first 6kV bus (12) through a first 35kV bus (20), a fifth 35kV switch (22), a first 35kV switch (16) and a first main transformer (14) in sequence;
one end of the sixth 35kV switch (23) is connected with the second 35kV bus (21), and the other end of the sixth 35kV switch is connected with the third 6kV bus (29) through a third 35kV disconnecting link (27), a first step-down transformer (33) and an eighth 6kV switch (28) in sequence;
first 20kV circuit breaker (35) one end links to each other with first generator terminal, the other end with first three winding house service transformer (34) high-pressure side links to each other, first three winding house service transformer (34) low pressure side A branch through ninth 6kV switch (31) with third 6kV generating line (29) link to each other, first three winding house service transformer (34) low pressure side B branch through tenth 6kV switch (32) with fourth 6kV generating line (30) link to each other.
2. The black start system of a thermal power plant with small hydropower according to claim 1, further comprising a second 6kV switch (6), a sixth 6kV switch (10), a fourth 35kV switch (19), a seventh 35kV switch (24), a fifth 6kV bus (37), a sixth 6kV bus (38), a second three-winding service transformer (42), a second 20kV circuit breaker (43), a first 400V bus (48), a second 400V bus (49), a third 400V switch (50), and a 35kV outgoing T-connection (51);
one end of the second 6kV switch (6) is connected with the first 6kV bus (12), and the other end of the second 6kV switch is connected with the first 400V bus (48) through a first double-winding station transformer (44) and a first 400V switch (46) in sequence;
one end of the sixth 6kV switch (10) is connected with the second 6kV bus (13), and the other end of the sixth 6kV switch is connected with the second 400V bus (49) through a second double-winding station transformer (45) and a second 400V switch (47) in sequence;
one end of the third 400V switch (50) is connected with the first 400V bus (48), and the other end of the third 400V switch is connected with the second 400V bus (49);
one end of the fourth 35kV switch (19) is connected with the common point of the first 35kV switch (16) and the fifth 35kV switch (22), and the other end of the fourth 35kV switch is connected with the 35kV sending-out T-junction circuit (51) through a first 35kV disconnecting link (25);
one end of the seventh 35kV switch (24) is connected with a common point of the first 35kV switch (16) and the fifth 35kV switch (22), and the other end of the seventh 35kV switch is connected with the fifth 6kV bus (37) through a second 35kV disconnecting link (26), a second step-down transformer (39) and an eleventh 6kV switch (36) in sequence;
second 20kV circuit breaker (43) one end links to each other with the second generator terminal, the other end with second three winding house transformer (42) high-pressure side links to each other, second three winding house transformer (42) low pressure side A branch through twelfth 6kV switch (40) with fifth 6kV generating line (37) link to each other, second three winding house transformer (42) low pressure side B branch through thirteenth 6kV switch (41) with sixth 6kV generating line (38) link to each other.
3. The thermal power plant black start system with small hydropower of claim 2, wherein the first hydro-generator (1), the second hydro-generator (2), the third hydro-generator (3) and the fourth hydro-generator (4) are respectively provided with a black start power supply or participate in AGC frequency modulation when the first three-winding plant transformer (34) is loaded, and the first 6kV switch (5), the second 6kV switch (6), the third 6kV switch (7), the fifth 6kV switch (9), the sixth 6kV switch (10), the seventh 6kV switch (11), the first 35kV switch (16), the second 35kV switch (17), the third 35kV switch (18), the fifth 35kV switch (22), the sixth 35kV switch (23), the second 35kV switch (26), the third 35kV switch (27), the eighth 6kV switch (28), The ninth 6kV switch (31), the tenth 6kV switch (32), the first 400V switch (46) and the second 400V switch (47) are all in a closed state, and the third 400V switch (50), the fourth 35kV switch (19), the seventh 35kV switch (24), the eleventh 6kV switch (36) and the first 20kV circuit breaker (35) are all in an open state.
4. The thermal power plant black start system with small hydropower according to claim 3, wherein the first water-turbine generator (1), the second water-turbine generator (2), the third water-turbine generator (3) and the fourth water-turbine generator (4) are all in a closed state of the seventh 35kV switch (24), the second 35kV switch (26), the eleventh 6kV switch (36), the twelfth 6kV switch (40) and the thirteenth 6kV switch (41) when the second three-winding plant transformer (42) is loaded to provide black start power or participate in AGC frequency modulation, and the sixth 35kV switch (23) and the third 35kV switch (27) are all in an open state.
5. The thermal power plant black start system with small hydropower according to claim 2, wherein the first and second water-turbine generators (1, 2) provide black start power for the second three-winding service transformer (42) load or participate in AGC frequency modulation, and the first and fourth water-turbine generators (5, 6kV, 7, 6kV, 9, 10, 11, 35kV, 16, 17, 23, 35kV, 24, 26 and the third and fourth water-turbine generators (3, 4) provide black start power for the first three-winding service transformer (34) load or participate in AGC frequency modulation, The third 35kV knife switch (27), the eighth 6kV switch (28), the ninth 6kV switch (31), the tenth 6kV switch (32), the eleventh 6kV switch (36), the twelfth 6kV switch (40), the thirteenth 6kV switch (41), the first 400V switch (46) and the second 400V switch (47) are all in a closed state, and the fourth 6kV switch (8), the third 35kV switch (18), the fourth 35kV switch (19), the fifth 35kV switch (22), the first 20kV breaker (35) and the second 20kV breaker (43) are all in an open state.
6. The thermal power plant black start system with small hydropower according to claim 2, wherein the first three-winding plant transformer (34) and the second three-winding plant transformer (42) are all powered by the 35kV outgoing T-junction line (51) when not performing black start, and the first 6kV switch (5), the second 6kV switch (6), the third 6kV switch (7), the fifth 6kV switch (9), the sixth 6kV switch (10), the seventh 6kV switch (11), the first 35kV switch (16), the second 35kV switch (17), the third 35kV switch (18), the fourth 35kV switch (19), the fifth 35kV switch (22), the first 35kV knife switch (25), The ninth 6kV switch (31), the tenth 6kV switch (32), the first 20kV breaker (35), the twelfth 6kV switch (40), the thirteenth 6kV switch (41), the second 20kV breaker (43), the first 400V switch (46) and the second 400V switch (47) are all in a closed state, and the fourth 6kV switch (8), the sixth 35kV switch (23), the seventh 35kV switch (24), the second 35kV knife switch (26), the third 35kV knife switch (27), the eighth 6kV switch (28) and the eleventh 6kV switch (36) are all in an open state.
7. The thermal power plant black start system with small hydropower according to claim 4, wherein the first hydraulic generator (1), the second hydraulic generator (2), the third hydraulic generator (3) and the fourth hydraulic generator (4) are all used for assisting the first three-winding service transformer (34) or the second three-winding service transformer (42) to stabilize the power grid frequency by adjusting the power of the first hydraulic generator (1), the second hydraulic generator (2), the third hydraulic generator (3) and the fourth hydraulic generator (4) and tracking an AGC target instruction when participating in AGC frequency modulation.
CN202022695454.9U 2020-11-19 2020-11-19 Black start-up system of thermal power plant with small-size water and electricity Active CN213937452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022695454.9U CN213937452U (en) 2020-11-19 2020-11-19 Black start-up system of thermal power plant with small-size water and electricity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022695454.9U CN213937452U (en) 2020-11-19 2020-11-19 Black start-up system of thermal power plant with small-size water and electricity

Publications (1)

Publication Number Publication Date
CN213937452U true CN213937452U (en) 2021-08-10

Family

ID=77170951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022695454.9U Active CN213937452U (en) 2020-11-19 2020-11-19 Black start-up system of thermal power plant with small-size water and electricity

Country Status (1)

Country Link
CN (1) CN213937452U (en)

Similar Documents

Publication Publication Date Title
US11462914B2 (en) Method for black-starting an electrical grid
CN102694382B (en) Method and arrangement for controlling an operation of an electric energy production facility during a disconnection to a utility grid
JP7419397B2 (en) Methods for blackstarting the electrical grid
CN113852141B (en) Combined wind-solar-energy-storage thermal power plant black start system and method with FCB function
WO2024001673A1 (en) Thermal power energy storage black start system
CN111416389A (en) Backpressure machine switching system
CN109742809A (en) A kind of multi-source complementation accumulation energy type power plant emergency power supply system and its control method
CN215419599U (en) Black start system of new energy combined thermal generator set
CN113541137A (en) Black start system of new energy combined thermal generator set
CN213937452U (en) Black start-up system of thermal power plant with small-size water and electricity
CN209375151U (en) A kind of multi-source complementation accumulation energy type power plant emergency power supply system
CN112332455A (en) Hydropower station black start system and method with double-voltage-level wiring
CN117353386A (en) Black start system and method based on diesel generator coupled combustion engine
CN113236525B (en) Method for transforming steam-driven water-feeding pump into double-fed motor-driven water-feeding pump and starting method
CN105490308A (en) Middle-high-voltage grid-connected system and middle-high-voltage grid-connected power generation system
CN109004678A (en) A kind of multipotency combined power plant black starting-up distribution system and control method
CN112311012A (en) Black start system and method for 220kV voltage-class internal and external bridge connection non-high-rise factory substation
CN112311011A (en) Thermal power plant black start system with small hydropower and method
CN114825596A (en) Stand-by power supply system for thermal power electronic direct-hanging energy storage plant
CN210123906U (en) Electric main wiring structure of distributed energy power station
CN112311013A (en) 110kV system assisted 500kV system thermal power generating unit black start system and method
CN114123210A (en) Transient over-current control method of flexible loop closing
CN208890393U (en) A kind of multipotency combined power plant black starting-up distribution system
CN108767976B (en) Power supply method for phosphate fertilizer enterprise to operate in isolated grid by using steam turbine generator when main grid loses power
CN214045053U (en) Black start system of hydropower station with 220kV voltage level internal and external bridge connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant