CN213926775U - A prefabricated steel concrete column and steel beam connecting node - Google Patents

A prefabricated steel concrete column and steel beam connecting node Download PDF

Info

Publication number
CN213926775U
CN213926775U CN202022597216.4U CN202022597216U CN213926775U CN 213926775 U CN213926775 U CN 213926775U CN 202022597216 U CN202022597216 U CN 202022597216U CN 213926775 U CN213926775 U CN 213926775U
Authority
CN
China
Prior art keywords
steel
column
concrete column
steel beam
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022597216.4U
Other languages
Chinese (zh)
Inventor
王连广
赵莹
周文君
王帅
宋春雨
左一然
韩宜铮
郝玉峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin University of Architecture and Technology
Original Assignee
Jilin University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin University of Architecture and Technology filed Critical Jilin University of Architecture and Technology
Priority to CN202022597216.4U priority Critical patent/CN213926775U/en
Application granted granted Critical
Publication of CN213926775U publication Critical patent/CN213926775U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

一种预制型钢混凝土柱与钢梁连接节点,属于钢框架结构技术领域。所述预制型钢混凝土柱与钢梁连接节点,包括型钢混凝土柱以及与型钢混凝土柱连接的1‑4个钢梁,所述型钢混凝土柱与钢梁的连接件可拆卸连接;所述预制型钢混凝土柱与钢梁连接节点的施工工艺,包括如下步骤:制作型钢混凝土柱、制作连接件、制作钢梁和安装组件。所述预制型钢混凝土柱与钢梁连接节点提高了整体结构的抗震性和稳定性,加快了施工速度,降低了施工成本。

Figure 202022597216

A prefabricated steel concrete column and a steel beam connecting node belong to the technical field of steel frame structures. The connection nodes between the prefabricated steel concrete columns and the steel beams include the shaped steel concrete columns and 1-4 steel beams connected to the shaped steel concrete columns, and the connecting pieces of the shaped steel concrete columns and the steel beams are detachably connected; the prefabricated steel concrete columns are connected detachably. The construction process of the connection node between the column and the steel beam includes the following steps: making a shaped steel concrete column, making a connecting piece, making a steel beam and installing a component. The connection node between the prefabricated steel concrete column and the steel beam improves the seismic resistance and stability of the overall structure, accelerates the construction speed, and reduces the construction cost.

Figure 202022597216

Description

Prefabricated section steel concrete column and girder steel connected node
Technical Field
The utility model relates to a steel frame construction technical field, in particular to prefabricated shaped steel concrete column and girder steel connected node.
Background
The steel frame structure is a structure mainly formed by connecting steel members (steel beams and steel columns), and is one of the main building structure forms at present. Compared with a reinforced concrete frame structure, the steel frame structure has the characteristics of light self weight, good anti-seismic performance, short construction period and the like, and is widely applied to large-span and high-rise buildings. When the stress analysis of the whole structure is carried out, the structural form of the beam-column joint has direct influence on the strength and the rigidity of the joint and the stability and the shock resistance of the whole structure, and also has indirect influence on the construction progress and the construction cost, so the design of the beam-column joint is very important. Practical application finds that a large number of brittle fracture occurs at beam-column connecting nodes of a steel frame building, so that plastic deformation of main structural components of the structure is not completely developed, and the whole structure loses bearing capacity due to brittle failure, so that life and property losses are not negligible. In addition, according to the design requirement of 'strong column and weak beam', the actual bending bearing capacity of the column end is greater than that of the beam end. The steel has good ductility, light dead weight and good earthquake resistance, but is easy to generate larger horizontal displacement and has poor fireproof performance. In order to improve the bearing capacity of the steel column, the section area of the steel column is often increased, but the available area in a house is influenced by the overlarge section of the column.
At present, the assembled building is widely popularized and developed at home and abroad, and the characteristics of light weight and high strength of a steel structure are perfectly fit with the development concept of the assembled building. The assembly type building transfers most of work to a factory, structural members are produced in a factory, and meanwhile, on-site mechanical hoisting and splicing are carried out, so that the construction environment is improved, the construction error is reduced, and the installation and construction efficiency is improved. The assembled steel frame structure overcomes the influence of welding seams, and parts connected by beam-column joints are directly assembled on a construction site through batch production in a factory. The mode improves the construction speed, is convenient for the disassembly of the components, can reutilize the disassembled steel, and is a very environment-friendly construction mode. The section steel concrete column is a combined structure with section steel configured in the concrete, and is divided into a solid-web type and a hollow-web type according to different forms of the configured section steel. The steel reinforced concrete column has the advantages of high bearing capacity, high rigidity, strong fireproof performance and the like, fully utilizes the bearing capacity of two materials through the synergistic effect of steel and concrete, and has excellent earthquake-resistant performance. Because the section steel concrete column has the characteristics of high bearing capacity and high rigidity, the section area of the column body of the section steel concrete column is smaller than that of the steel column under the condition of ensuring the same strength, and the indoor use area is enlarged. In addition, because the section steel is wrapped by concrete, the section steel is not easy to corrode and has good fireproof performance. The existing connection mode is mainly used for connecting the steel beam and the steel column, and the research on the prefabricated section steel concrete column and the steel beam node is very rare.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem that prior art exists, the utility model provides a prefabricated shaped steel concrete post and girder steel connected node, it has improved overall structure's shock resistance and stability for construction speed has reduced construction cost.
In order to realize the purpose, the technical scheme of the utility model is that:
a prefabricated section steel concrete column and steel beam connecting node comprises a section steel concrete column and 1-4 steel beams connected with the section steel concrete column;
the steel reinforced concrete column is pre-embedded with a plurality of column pre-embedded bolts and 1-4 column pre-embedded steel plates, the column pre-embedded steel plates are positioned outside the steel reinforced concrete column, and the column pre-embedded bolts penetrate through the column pre-embedded steel plates and extend out of the steel reinforced concrete column;
the steel beam is provided with connecting pieces corresponding to the column embedded bolts, and the connecting pieces are angle steels arranged above and below the steel beam or flange plates arranged at the end part of the steel beam;
the column embedded bolt of the profile steel concrete column is detachably connected with the connecting piece of the steel beam.
Further, when the connecting piece is the angle steel that sets up in girder steel top and below, the concrete arrangement mode that the post buried bolt of shaped steel concrete column can be dismantled with the connecting piece of girder steel and be connected does: the column embedded bolts are arranged along the circumferential direction of the steel reinforced concrete column and are respectively positioned above and below the steel beam; the angle steel is provided with two, the top flange and the bottom flange of girder steel are equallyd divide and are passed through bolted connection with the horizontal limb of angle steel respectively, the perpendicular limb of angle steel is provided with the reservation bolt hole that corresponds with post buried bolt, post buried bolt passes the reservation bolt hole of angle steel to screw up through the nut.
Further, when the connecting piece is set up in the flange board of girder steel tip, the concrete arrangement mode that the post buried bolt of shaped steel concrete column can be dismantled with the connecting piece of girder steel and be connected does: the column embedded bolts are arranged along the circumferential direction of the steel reinforced concrete column and are respectively positioned above, in the middle and below the steel beam; the end of the steel beam is fixedly connected with a flange plate, the flange plate is provided with reserved bolt holes corresponding to the column embedded bolts, and the column embedded bolts penetrate through the reserved bolt holes of the flange plate and are screwed up through nuts.
Furthermore, the steel beam is an I-shaped steel beam or a cross-shaped steel beam.
A prefabricated section steel concrete column and steel beam connecting node comprises a section steel concrete column and 1-4 steel beams connected with the section steel concrete column;
the steel plate outer ring sleeves are embedded in the steel-reinforced concrete column and comprise transverse steel plates which are respectively positioned above and below the steel beam, and the transverse steel plates are fixedly connected with a web plate and a flange of the column built-in section steel of the steel-reinforced concrete column;
the steel beam end part and the steel plate outer ring sleeve are correspondingly provided with reserved bolt holes, and the steel plate outer ring sleeve of the profile steel concrete column is detachably connected with the steel beam through the corresponding reserved bolt holes.
Further, the reserved bolt holes in the end portion of the steel beam are respectively located on the upper flange and the lower flange of the steel beam, and the steel plate outer ring sleeve is connected with the steel beam through bolts.
Furthermore, the transverse cross-sectional area of the steel plate outer ring sleeve is larger than that of the steel reinforced concrete column.
Furthermore, the steel beam is an I-shaped steel beam or a cross-shaped steel beam.
A construction process for connecting nodes of prefabricated section steel concrete columns and steel beams comprises the following steps:
s1, manufacturing an assembly:
s1.1, manufacturing a steel reinforced concrete column:
selecting column built-in section steel according to design requirements, welding a plurality of studs on the outer side surface of a flange of the column built-in section steel, and positioning and fixing the column built-in section steel; manufacturing a template and a steel bar framework, wherein the steel bar framework comprises column longitudinal steel bars and column stirrups; according to the design position, arranging the column embedded bolt on the template, enabling the column embedded bolt to penetrate through the preformed hole of the column embedded steel plate, and fixing the column embedded steel plate on the periphery of the outer side of the template; pouring concrete in the template to form a prefabricated section steel concrete column;
s1.2, manufacturing a connecting piece:
when the connecting piece is an angle steel, the horizontal limb and the vertical limb of the angle steel are both provided with reserved bolt holes, wherein the reserved bolt holes of the vertical limb are aligned with the column embedded bolts, and the reserved bolt holes of the horizontal limb are aligned with the reserved bolt holes of the steel beam flange;
when the connecting piece is a flange plate, the flange plate is provided with a reserved bolt hole for aligning the column embedded bolt;
s1.3, manufacturing a steel beam:
when the connecting piece is an angle steel, the upper flange and the lower flange of the steel beam are provided with reserved bolt holes corresponding to the horizontal limbs of the angle steel respectively, and the upper flange and the lower flange of the steel beam are connected with the angle steel through bolts respectively to form a prefabricated steel beam;
when the connecting piece is a flange plate, the flange plate is welded with the end part of the steel beam to form a prefabricated steel beam;
s2, mounting the assembly:
and hoisting the steel beam with the connecting piece to the joint of the steel reinforced concrete column, penetrating the column embedded bolt of the steel reinforced concrete column into the reserved bolt hole of the steel beam connecting piece, and screwing the column embedded bolt through the nut.
A construction process for connecting nodes of prefabricated section steel concrete columns and steel beams comprises the following steps:
step 1, manufacturing a component:
step 1.1, manufacturing a steel plate outer ring sleeve:
selecting column built-in section steel according to design requirements, and welding a plurality of studs on the outer side surface of the flange of the column built-in section steel; welding transverse steel plates on a web plate and a flange of the section steel arranged in the column, and arranging reserved bolt holes on the transverse steel plates to finish the manufacture of an outer ring sleeve of the steel plates;
step 1.2, manufacturing the section steel concrete column:
after the steel plate outer ring sleeve is manufactured, a template and a steel reinforcement framework are manufactured, wherein the steel reinforcement framework comprises column longitudinal steel reinforcements and column stirrups; pouring concrete in the template to form a prefabricated section steel concrete column;
step 1.3, manufacturing a steel beam:
according to design requirements, reserved bolt holes corresponding to the transverse steel plates are arranged on an upper flange and a lower flange of the end part of the steel beam to form a prefabricated steel beam;
step 2, mounting the assembly:
and hoisting the steel beam to the steel plate outer ring sleeve of the steel reinforced concrete column, enabling the reserved bolt holes of the steel plate outer ring sleeve to correspond to the reserved bolt holes of the steel beam, penetrating the bolts through the corresponding reserved bolt holes, and screwing the bolts through nuts.
The utility model has the advantages that:
1) the prefabricated section steel concrete column is used for replacing the steel column in the node, on the basis of ensuring the rigidity and the strength of the node, the bearing capacity and the fire resistance of the column body are improved, the shock resistance and the stability of the whole structure are improved, and under the condition of ensuring the same strength, the section area of the column body of the section steel concrete column is smaller than that of the steel column, so that the construction speed is accelerated to a certain extent, and the construction cost is reduced;
2) the utility model discloses a connection method of prefabricated shaped steel concrete post and girder steel is connected to angle steel, steel sheet or steel sheet outer ring cover, makes connected node not only have stronger rigidity and intensity, and has higher bearing capacity and refractiveness, has improved overall structure's shock resistance and stability simultaneously for construction speed, reduction of erection time, save the cost and to environmental friendly.
Additional features and advantages of the invention will be set forth in part in the detailed description which follows.
Drawings
Fig. 1 is a front view of a connection node of a prefabricated steel reinforced concrete column and a steel beam provided by a first embodiment of the present invention;
FIG. 2 is a cross-sectional view taken along line A-A of FIG. 1 in accordance with the present invention;
FIG. 3 is a schematic structural view of a steel reinforced concrete column according to an embodiment of the present invention;
fig. 4 is a schematic structural view of a steel beam according to an embodiment of the present invention;
fig. 5 is a front view of a connection node between a prefabricated steel reinforced concrete column and a steel beam when the steel beam provided by the second embodiment of the present invention is an i-shaped steel beam;
fig. 6 is a cross-sectional view taken along line B-B of fig. 5 in accordance with the present invention;
fig. 7 is a cross-sectional view taken along line i-i of fig. 5 in accordance with the present invention;
fig. 8 is a front view of a connection node between a prefabricated steel reinforced concrete column and a steel beam when the steel beam provided by the second embodiment of the present invention is a cross-shaped steel beam;
fig. 9 is a cross-sectional view taken along line i-i of fig. 8 in accordance with the present invention;
FIG. 10 is a schematic structural view of a steel reinforced concrete column according to a second embodiment of the present invention;
fig. 11 is a schematic structural view of a steel beam provided in the second embodiment of the present invention;
fig. 12 is a front view of a connection node of a prefabricated steel reinforced concrete column and a steel beam provided by the third embodiment of the present invention;
fig. 13 is a cross-sectional view of fig. 12 in accordance with the present invention;
FIG. 14 is a schematic structural view of a steel reinforced concrete column provided in the third embodiment of the present invention;
fig. 15 is a schematic front view of a steel beam provided in the third embodiment of the present invention;
fig. 16 is a cross-sectional view ii-ii of fig. 15 in accordance with the present invention;
fig. 17 is a schematic top view of a steel beam according to a third embodiment of the present invention;
fig. 18 is a sectional view taken along line iii-iii of fig. 17 according to the present invention.
Reference numerals in the drawings of the specification include:
the steel-concrete column comprises 1-section steel concrete column, 2-steel beam, 3-column built-in section steel, 4-stud, 5-column embedded bolt, 6-column embedded steel plate, 7-beam preset bolt, 8-column longitudinal steel bar, 9-concrete, 10-angle steel, 11-flange plate, 12-steel plate outer ring sleeve and 13-column stirrup.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "vertical", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, unless otherwise specified and limited, it is to be noted that the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, mechanically or electrically connected, or may be connected between two elements through an intermediate medium, or may be directly connected or indirectly connected, and specific meanings of the terms may be understood by those skilled in the art according to specific situations.
In order to solve the problems in the prior art, as shown in fig. 1 to 18, the utility model provides a prefabricated steel reinforced concrete column and steel beam connecting node, which comprises a steel reinforced concrete column and 1 to 4 steel beams connected with the steel reinforced concrete column;
the steel reinforced concrete column is pre-embedded with a plurality of column pre-embedded bolts and 1-4 column pre-embedded steel plates, the column pre-embedded steel plates are positioned outside the steel reinforced concrete column, and the column pre-embedded bolts penetrate through the column pre-embedded steel plates and extend out of the steel reinforced concrete column;
the steel beam is provided with connecting pieces corresponding to the column embedded bolts, and the connecting pieces are angle steels arranged above and below the steel beam or flange plates arranged at the end part of the steel beam;
the column embedded bolt of the profile steel concrete column is detachably connected with the connecting piece of the steel beam.
The connecting piece is for setting up in the angle steel of girder steel top and below, and the concrete arrangement mode that the post embedded bolt of shaped steel concrete column can be dismantled with the connecting piece of girder steel and be connected does: the column embedded bolts are arranged along the circumferential direction of the steel reinforced concrete column and are respectively positioned above and below the steel beam; the angle steel is provided with two, and the top flange and the bottom flange of girder steel are equallyd divide and are passed through bolted connection with the horizontal limb of angle steel respectively, and the perpendicular limb of angle steel is provided with the reservation bolt hole that corresponds with post embedded bolt, and post embedded bolt passes the reservation bolt hole of angle steel to screw up through the nut.
The connecting piece is when setting up in the flange board of girder steel tip, and the concrete arrangement mode that the connection can be dismantled to the connecting piece of the pre-buried bolt of post of shaped steel concrete column and girder steel is: the column embedded bolts are arranged along the circumferential direction of the steel reinforced concrete column and are respectively positioned above, in the middle and below the steel beam; the end of the steel beam is fixedly connected with a flange plate, the flange plate is provided with reserved bolt holes corresponding to the column embedded bolts, and the column embedded bolts penetrate through the reserved bolt holes of the flange plate and are screwed up through nuts.
The utility model discloses in, the girder steel is I-shaped girder steel or cross girder steel, and the quantity of the pre-buried steel sheet of post equals with the quantity of girder steel.
A prefabricated section steel concrete column and steel beam connecting node comprises a section steel concrete column and 1-4 steel beams connected with the section steel concrete column;
the steel plate outer ring sleeves are embedded in the profile steel concrete column and comprise transverse steel plates which are respectively positioned above and below the steel beam, and the transverse steel plates are fixedly connected with a web plate and a flange of the column built-in profile steel of the profile steel concrete column;
the steel beam end part and the steel plate outer ring sleeve are correspondingly provided with reserved bolt holes, and the steel plate outer ring sleeve of the profile steel concrete column is detachably connected with the steel beam through the corresponding reserved bolt holes.
The reserved bolt holes at the end parts of the steel beams are respectively positioned on the upper flange and the lower flange of the steel beams, and the steel plate outer ring sleeves are connected with the steel beams through bolts.
The transverse cross-sectional area of the steel plate outer ring sleeve is larger than that of the steel reinforced concrete column.
A construction process for connecting nodes of prefabricated section steel concrete columns and steel beams comprises the following steps:
s1, manufacturing an assembly:
s1.1, manufacturing a steel reinforced concrete column:
selecting column built-in section steel according to design requirements, welding a plurality of studs on the outer side surface of a flange of the column built-in section steel, and positioning and fixing the column built-in section steel; manufacturing a template and a steel bar framework, wherein the steel bar framework comprises column longitudinal steel bars and column stirrups; according to the design position, arranging the column embedded bolt on the template, enabling the column embedded bolt to penetrate through the preformed hole of the column embedded steel plate, and fixing the column embedded steel plate on the periphery of the outer side of the template; pouring concrete in the template to form a prefabricated section steel concrete column;
s1.2, manufacturing a connecting piece:
when the connecting piece is an angle steel, the horizontal limb and the vertical limb of the angle steel are both provided with reserved bolt holes, wherein the reserved bolt holes of the vertical limb are aligned with the column embedded bolts, and the reserved bolt holes of the horizontal limb are aligned with the reserved bolt holes of the steel beam flange;
when the connecting piece is a flange plate, the flange plate is provided with a reserved bolt hole for aligning the column embedded bolt;
s1.3, manufacturing a steel beam:
when the connecting piece is an angle steel, the upper flange and the lower flange of the steel beam are provided with reserved bolt holes corresponding to the horizontal limbs of the angle steel respectively, and the upper flange and the lower flange of the steel beam are connected with the angle steel through bolts respectively to form a prefabricated steel beam;
when the connecting piece is a flange plate, the flange plate is welded with the end part of the steel beam to form a prefabricated steel beam;
s2, mounting the assembly:
and hoisting the steel beam with the connecting piece to the joint of the steel reinforced concrete column, penetrating the column embedded bolt of the steel reinforced concrete column into the reserved bolt hole of the steel beam connecting piece, and screwing the column embedded bolt through the nut.
The utility model discloses when in actual use, also can be connected angle steel and the pre-buried bolted connection of post of shaped steel concrete column earlier at the scene, pass through the bolt with angle steel and girder steel again and be connected, in this embodiment, the preferred I-shaped steel that is of the built-in shaped steel of post.
A construction process for connecting nodes of prefabricated section steel concrete columns and steel beams comprises the following steps:
step 1, manufacturing a component:
step 1.1, manufacturing a steel plate outer ring sleeve:
selecting column built-in section steel according to design requirements, and welding a plurality of studs on the outer side surface of the flange of the column built-in section steel; welding transverse steel plates on a web plate and a flange of the section steel arranged in the column, and arranging reserved bolt holes on the transverse steel plates to finish the manufacture of an outer ring sleeve of the steel plates;
step 1.2, manufacturing the section steel concrete column:
after the steel plate outer ring sleeve is manufactured, a template and a steel reinforcement framework are manufactured, wherein the steel reinforcement framework comprises column longitudinal steel reinforcements and column stirrups; pouring concrete in the template to form a prefabricated section steel concrete column;
step 1.3, manufacturing a steel beam:
according to design requirements, reserved bolt holes corresponding to the transverse steel plates are arranged on an upper flange and a lower flange of the end part of the steel beam to form a prefabricated steel beam;
step 2, mounting the assembly:
and hoisting the steel beam to the steel plate outer ring sleeve of the steel reinforced concrete column, enabling the reserved bolt holes of the steel plate outer ring sleeve to correspond to the reserved bolt holes of the steel beam, penetrating the bolts through the corresponding reserved bolt holes, and screwing the bolts through nuts.
Example one
As shown in fig. 1 to 4, a prefabricated steel reinforced concrete column and steel beam connection node comprises a steel reinforced concrete column 1 and 1 to 4 steel beams 2 connected with the steel reinforced concrete column 1;
the steel reinforced concrete column 1 is pre-embedded with a plurality of column pre-embedded bolts 5 and 1-4 column pre-embedded steel plates 6, the column pre-embedded steel plates 6 are positioned outside the steel reinforced concrete column 1, and the column pre-embedded bolts 5 penetrate through the column pre-embedded steel plates 6 and extend out of the steel reinforced concrete column 1;
the steel beam 2 is provided with connecting pieces corresponding to the column embedded bolts 5, and the connecting pieces are angle steels 10 arranged above and below the steel beam 2;
the post embedded bolt 5 of shaped steel concrete column 1 can be dismantled with the connecting piece of girder steel 2 and be connected, and concrete arrangement mode is: the column embedded bolts 5 are arranged along the circumferential direction of the steel reinforced concrete column 1 and are respectively positioned above and below the steel beam 2; angle steel 10 is provided with two, and the top flange and the bottom flange of girder steel 2 are equallyd divide and are passed through bolted connection with the horizontal limb of angle steel 10 respectively, and the vertical limb of angle steel 10 is provided with the reservation bolt hole that corresponds with post buried bolt 5, and post buried bolt 5 passes angle steel 10's reservation bolt hole to screw up through the nut.
In this embodiment, the upper flange and the lower flange of the steel beam 2 are provided with reserved bolt holes corresponding to the horizontal limbs of the angle steel 10, so that the steel beam 2 and the angle steel 10 can be assembled and transported to the site in a factory in practical use, the steel beam 2 and the angle steel 10 are also assembled on the site, the steel beam 2 and the angle steel 10 are connected by bolts when assembled, and the bolts are preferably preset bolts 7 for the beam. In this embodiment, the steel beam 2 is an i-shaped steel beam.
In this embodiment, a construction process for a prefabricated section steel concrete column and steel beam connection node includes the following steps:
s1, manufacturing an assembly:
s1.1, manufacturing a steel reinforced concrete column 1:
selecting column built-in section steel 3 according to design requirements, welding a plurality of studs 4 on the outer side surface of the flange of the column built-in section steel 3, and positioning and fixing the column built-in section steel 3; manufacturing a template and a steel bar framework, wherein the steel bar framework comprises column longitudinal steel bars 8 and column stirrups 13; arranging the column embedded bolt 5 on the template according to the designed position, enabling the column embedded bolt 5 to penetrate through a preformed hole of the column embedded steel plate 6, and fixing the column embedded steel plate 6 on the periphery of the outer side of the template; pouring concrete 9 in the template to form a prefabricated section steel concrete column 1;
s1.2, manufacturing a connecting piece:
the connecting piece is an angle steel 10, and the horizontal limb and the vertical limb of the angle steel 10 are both provided with reserved bolt holes, wherein the reserved bolt holes of the vertical limb are aligned with the column embedded bolts 5, and the reserved bolt holes of the horizontal limb are aligned with the reserved bolt holes of the flange of the steel beam 2;
s1.3, manufacturing a steel beam 2:
arranging reserved bolt holes corresponding to horizontal limbs of the angle steel 10 respectively on an upper flange and a lower flange of the steel beam 2, and connecting the upper flange and the lower flange of the steel beam 2 with the angle steel 10 through bolts respectively to form a prefabricated steel beam 2;
s2, mounting the assembly:
the girder steel 2 that will have the connecting piece is hoisted to the junction of shaped steel concrete column 1, penetrates the reservation bolt hole of girder steel 2 connecting piece with the post buried bolt 5 of shaped steel concrete column 1 to screw up through the nut.
The utility model discloses when in actual use, also can be connected angle steel 10 and the pre-buried bolt 5 of post of shaped steel concrete column 1 earlier at the scene, be connected angle steel 10 and girder steel 2 through the bolt again, in this embodiment, the post embeds the preferred I-shaped steel that is preferred of shaped steel 3.
Example two
As shown in fig. 5 to 11, a prefabricated steel reinforced concrete column and steel beam connection node comprises a steel reinforced concrete column 1 and 1 to 4 steel beams 2 connected with the steel reinforced concrete column 1;
the steel reinforced concrete column 1 is pre-embedded with a plurality of column pre-embedded bolts 5 and 1-4 column pre-embedded steel plates 6, the column pre-embedded steel plates 6 are positioned outside the steel reinforced concrete column 1, and the column pre-embedded bolts 5 penetrate through the column pre-embedded steel plates 6 and extend out of the steel reinforced concrete column 1;
the steel beam 2 is provided with a connecting piece corresponding to the column embedded bolt 5, and the connecting piece is a flange plate 11 arranged at the end part of the steel beam 2;
the post embedded bolt 5 of shaped steel concrete column 1 can be dismantled with the connecting piece of girder steel 2 and be connected, and concrete arrangement mode is: the column embedded bolts 5 are arranged along the circumferential direction of the steel reinforced concrete column 1 and are respectively positioned above, in the middle and below the steel beam 2; the end of girder steel 2 has linked firmly flange plate 11, and flange plate 11 is provided with the reservation bolt hole that corresponds with post buried bolt 5, and post buried bolt 5 passes flange plate 11 reservation bolt hole to screw up through the nut.
In this embodiment, the steel beam 2 is an i-shaped steel beam or a cross-shaped steel beam.
In this embodiment, a construction process for a prefabricated section steel concrete column and steel beam connection node includes the following steps:
s1, manufacturing an assembly:
s1.1, manufacturing a steel reinforced concrete column 1:
selecting column built-in section steel 3 according to design requirements, welding a plurality of studs 4 on the outer side surface of the flange of the column built-in section steel 3, and positioning and fixing the column built-in section steel 3; manufacturing a template and a steel bar framework, wherein the steel bar framework comprises column longitudinal steel bars 8 and column stirrups 13; arranging the column embedded bolt 5 on the template according to the designed position, enabling the column embedded bolt 5 to penetrate through a preformed hole of the column embedded steel plate 6, and fixing the column embedded steel plate 6 on the periphery of the outer side of the template; pouring concrete 9 in the template to form a prefabricated section steel concrete column 1;
s1.2, manufacturing a connecting piece:
the connecting piece is a flange plate 11, and the flange plate 11 is provided with a reserved bolt hole aligned with the column embedded bolt 5;
s1.3, manufacturing a steel beam 2:
the flange plate 11 is welded with the end part of the steel beam 2 to form a prefabricated steel beam 2;
s2, mounting the assembly:
the girder steel 2 that will have the connecting piece is hoisted to the junction of shaped steel concrete column 1, penetrates the reservation bolt hole of girder steel 2 connecting piece with the post buried bolt 5 of shaped steel concrete column 1 to screw up through the nut.
EXAMPLE III
As shown in fig. 12 to 18, a prefabricated steel reinforced concrete column and steel beam connection node includes a steel reinforced concrete column 1 and 1 to 4 steel beams 2 connected to the steel reinforced concrete column 1;
a steel plate outer ring 12 is embedded in the steel reinforced concrete column 1, the steel plate outer ring 12 comprises transverse steel plates which are respectively positioned above and below the steel beam 2, and the transverse steel plates are fixedly connected with a web plate and a flange of column built-in section steel 3 of the steel reinforced concrete column 1;
the end part of the steel beam 2 corresponds to the steel plate outer ring sleeve 12 and is provided with a reserved bolt hole, and the steel plate outer ring sleeve 12 of the steel reinforced concrete column 1 is detachably connected with the steel beam 2 through the corresponding reserved bolt hole.
In this embodiment, the horizontal steel plates are welded to the web and the flange of the column built-in section steel 3 of the section steel concrete column 1 and the positions above and below the steel beam 2, and the horizontal steel plates above and below the steel beam 2 form the steel plate outer ring 12. The bolt passes through the reserved bolt hole corresponding to the end part of the steel beam 2 and the steel plate outer ring sleeve 12, and the detachable connection of the steel reinforced concrete column 1 and the steel beam 2 is realized.
The reserved bolt holes at the end parts of the steel beams 2 are respectively positioned on the upper flange and the lower flange of the steel beams 2, and the steel plate outer ring sleeves 12 are connected with the steel beams 2 through bolts.
The transverse cross-sectional area of the steel plate outer ring sleeve 12 is larger than that of the steel reinforced concrete column 1. In this embodiment, the outline of horizontal steel sheet is the square to its all around will stretch out shaped steel concrete column 1, be convenient for be connected with girder steel 2.
In this embodiment, a construction process for a prefabricated section steel concrete column and steel beam connection node includes the following steps:
step 1, manufacturing a component:
step 1.1, manufacturing a steel plate outer ring sleeve 12:
selecting column built-in section steel 3 according to design requirements, and welding a plurality of studs 4 on the outer side surface of the flange of the column built-in section steel 3; welding transverse steel plates on the web plate and the flange of the section steel 3 arranged in the column, and arranging reserved bolt holes on the transverse steel plates to finish the manufacture of the steel plate outer ring sleeve 12;
step 1.2, manufacturing a section steel concrete column 1:
after the steel plate outer ring sleeve 12 is manufactured, a template and a steel reinforcement framework are manufactured, wherein the steel reinforcement framework comprises column longitudinal steel bars 8 and column hooping bars 13; pouring concrete 9 in the template to form a prefabricated section steel concrete column 1;
step 1.3, manufacturing a steel beam 2:
according to design requirements, reserved bolt holes corresponding to the transverse steel plates are arranged on the upper flange and the lower flange of the end part of the steel beam 2 to form a prefabricated steel beam 2;
step 2, mounting the assembly:
and hoisting the steel beam 2 to the steel plate outer ring sleeve 12 of the steel reinforced concrete column 1, enabling the reserved bolt holes of the steel plate outer ring sleeve 12 to correspond to the reserved bolt holes of the steel beam 2, penetrating bolts through the corresponding reserved bolt holes, and screwing the bolts through nuts.
In this embodiment, the size of the transverse steel plate is set according to the size of the steel beam 2, the cross-sectional area of the transverse steel plate is larger than that of the steel-reinforced concrete column 1, a template and a steel reinforcement framework are manufactured on the basis of the steel plate outer ring sleeve 12, and concrete 9 is poured in the template. In this embodiment, the steel beam 2 is an i-shaped steel beam 2, and the section steel 3 in the column is preferably an i-shaped section steel.
While embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.

Claims (8)

1. A prefabricated section steel concrete column and steel beam connecting node is characterized by comprising a section steel concrete column and 1-4 steel beams connected with the section steel concrete column;
the steel reinforced concrete column is pre-embedded with a plurality of column pre-embedded bolts and 1-4 column pre-embedded steel plates, the column pre-embedded steel plates are positioned outside the steel reinforced concrete column, and the column pre-embedded bolts penetrate through the column pre-embedded steel plates and extend out of the steel reinforced concrete column;
the steel beam is provided with connecting pieces corresponding to the column embedded bolts, and the connecting pieces are angle steels arranged above and below the steel beam or flange plates arranged at the end part of the steel beam;
the column embedded bolt of the profile steel concrete column is detachably connected with the connecting piece of the steel beam.
2. The prefabricated steel reinforced concrete column and steel beam connection node of claim 1, wherein when the connection member is an angle steel disposed above and below the steel beam, the concrete arrangement mode of the detachable connection between the column embedded bolt of the steel reinforced concrete column and the connection member of the steel beam is as follows: the column embedded bolts are arranged along the circumferential direction of the steel reinforced concrete column and are respectively positioned above and below the steel beam; the angle steel is provided with two, the top flange and the bottom flange of girder steel are equallyd divide and are passed through bolted connection with the horizontal limb of angle steel respectively, the perpendicular limb of angle steel is provided with the reservation bolt hole that corresponds with post buried bolt, post buried bolt passes the reservation bolt hole of angle steel to screw up through the nut.
3. The prefabricated steel reinforced concrete column and steel beam connection node as claimed in claim 1, wherein when the connection member is a flange plate arranged at the end of the steel beam, the concrete arrangement mode of the detachable connection between the column embedded bolt of the steel reinforced concrete column and the connection member of the steel beam is as follows: the column embedded bolts are arranged along the circumferential direction of the steel reinforced concrete column and are respectively positioned above, in the middle and below the steel beam; the end of the steel beam is fixedly connected with a flange plate, the flange plate is provided with reserved bolt holes corresponding to the column embedded bolts, and the column embedded bolts penetrate through the reserved bolt holes of the flange plate and are screwed up through nuts.
4. The prefabricated steel reinforced concrete column and steel beam connection node of claim 1, wherein the steel beam is an i-shaped steel beam or a cross-shaped steel beam.
5. A prefabricated section steel concrete column and steel beam connecting node is characterized by comprising a section steel concrete column and 1-4 steel beams connected with the section steel concrete column;
the steel plate outer ring sleeves are embedded in the steel-reinforced concrete column and comprise transverse steel plates which are respectively positioned above and below the steel beam, and the transverse steel plates are fixedly connected with a web plate and a flange of the column built-in section steel of the steel-reinforced concrete column;
the steel beam end part and the steel plate outer ring sleeve are correspondingly provided with reserved bolt holes, and the steel plate outer ring sleeve of the profile steel concrete column is detachably connected with the steel beam through the corresponding reserved bolt holes.
6. The prefabricated steel reinforced concrete column and steel beam connection node as claimed in claim 5, wherein the reserved bolt holes at the end parts of the steel beam are respectively positioned on the upper flange and the lower flange of the steel beam, and the steel plate outer ring sleeve is connected with the steel beam through bolts.
7. The prefabricated section steel concrete column and steel beam connection node of claim 5, wherein a transverse cross-sectional area of the steel plate outer collar is larger than a transverse cross-sectional area of the section steel concrete column.
8. The prefabricated steel reinforced concrete column and steel beam connection node of claim 5, wherein the steel beam is an I-shaped steel beam or a cross-shaped steel beam.
CN202022597216.4U 2020-11-11 2020-11-11 A prefabricated steel concrete column and steel beam connecting node Expired - Fee Related CN213926775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022597216.4U CN213926775U (en) 2020-11-11 2020-11-11 A prefabricated steel concrete column and steel beam connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022597216.4U CN213926775U (en) 2020-11-11 2020-11-11 A prefabricated steel concrete column and steel beam connecting node

Publications (1)

Publication Number Publication Date
CN213926775U true CN213926775U (en) 2021-08-10

Family

ID=77168638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022597216.4U Expired - Fee Related CN213926775U (en) 2020-11-11 2020-11-11 A prefabricated steel concrete column and steel beam connecting node

Country Status (1)

Country Link
CN (1) CN213926775U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267577A (en) * 2020-11-11 2021-01-26 吉林建筑科技学院 Prefabricated section steel concrete column and steel beam connecting node and construction process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267577A (en) * 2020-11-11 2021-01-26 吉林建筑科技学院 Prefabricated section steel concrete column and steel beam connecting node and construction process thereof

Similar Documents

Publication Publication Date Title
CN110792165B (en) Prefabricated assembly type concrete beam column joint connecting device and method
CN108277889B (en) A fast connection structure and method between prefabricated steel concrete columns
CN213297357U (en) Concrete column-H steel beam-steel support-π combined middle column middle node
CN111962948A (en) A kind of concrete-filled steel tubular column-H-shaped steel beam-steel support-π-shaped connecting piece combined side column bottom node and method
CN112267577A (en) Prefabricated section steel concrete column and steel beam connecting node and construction process thereof
CN104631629A (en) Assembling type frame structure
CN114164952A (en) Assembled shaped steel concrete column-shaped steel concrete beam node of inside and outside steel sleeve in area
CN103306376A (en) Assembled concrete-filled steel tube composite-column-steel reinforced concrete beam node
CN112922237A (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN213926775U (en) A prefabricated steel concrete column and steel beam connecting node
CN205369544U (en) Assembled circular steel tube concrete dysmorphism post side column nodal connection structure
CN111962951A (en) A kind of concrete-filled steel tubular column-H-shaped steel beam-steel support-π-shaped connecting piece combined corner column bottom node and method
CN113136948B (en) An assembled concrete beam-column mortar anchor connection structure with shear keys and an assembly method
CN207919737U (en) A kind of assembled steel-Combined concrete frame structure
KR102461223B1 (en) Prefabricated module for composite hollow wall and composite hollow wall using the same
CN212927239U (en) A CFST column-H steel beam-support-π-shaped combined corner column bottom node
CN219671637U (en) H-shaped steel beam structure system of assembled special-shaped concrete column
CN205369546U (en) Assembled circular steel tube concrete dysmorphism post center pillar nodal connection structure
CN113863494A (en) Prefabricated concrete beam-column connection node and installation method thereof
CN118441799A (en) Vertical connection structure of precast concrete column and construction method
CN213539881U (en) A kind of concrete filled steel tubular column H-beam supporting π-shaped combined central column bottom node
CN213539882U (en) A CFST column H steel beam supports the middle node of the π-shaped connecting side column
CN113431187B (en) Layered assembly type beam column node
CN2385010Y (en) External mounted square steel tube concrete beam and column connecting node
CN214034062U (en) Connection node of assembled concrete beam column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210810

CF01 Termination of patent right due to non-payment of annual fee