CN213867806U - Municipal works are with pile device - Google Patents

Municipal works are with pile device Download PDF

Info

Publication number
CN213867806U
CN213867806U CN202022147080.7U CN202022147080U CN213867806U CN 213867806 U CN213867806 U CN 213867806U CN 202022147080 U CN202022147080 U CN 202022147080U CN 213867806 U CN213867806 U CN 213867806U
Authority
CN
China
Prior art keywords
pole
pile
rod
outer pole
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022147080.7U
Other languages
Chinese (zh)
Inventor
余恒洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022147080.7U priority Critical patent/CN213867806U/en
Application granted granted Critical
Publication of CN213867806U publication Critical patent/CN213867806U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a municipal works are with pile device relates to pile equipment technical field. The utility model discloses a place at subaerial bottom plate and support, the base is installed at the top of bottom plate, the top of base is fixed with the mount, the one end activity cover that the hinged end was kept away from to pole and interior pole on the mount is equipped with the outer pole, the top of support is fixed with the flexible end of hydro-cylinder and is articulated down and keep away from the one end of interior pole with the outer pole, the stake is installed to the one end that the outer pole was kept away from to interior pole. The utility model discloses according to lever principle, through the arm of force length of extension articulated department one side, just can make just more with the power that articulated department opposite side received, the design of pole and outer pole in the rethread removes outer pole and makes outer pole not deviate from interior pole when removing outer pole, is passing through the shrink of hydro-cylinder this moment to the stake decurrent hammering power of pole one end installation in the messenger is bigger, has made things convenient for the pile of staff to different geographical position, makes for the time of pile.

Description

Municipal works are with pile device
Technical Field
The utility model relates to a pile equipment technical field, concretely relates to municipal works are with pile device.
Background
Piling is a construction method for driving a wooden pile or a stone pile into the ground, and in order to make a foundation of a building firm, piles of various materials are driven, pressed, vibrated or screwed into foundation soil by using special tools, and commonly used piling methods include a hammering method, a vibration method, a water jetting method, a pile pressing method and the like, so that a piling device for municipal engineering is widely used in the piling process.
However, the existing pile driving device has certain limitation when piling by a hammer method, the hardness and softness of soil affected by the environment at different geographical positions also have great difference, and the pile driving force is basically fixed and inconvenient when piling by the hammer method, so that the pile driving force cannot be increased when piling on harder soil, the pile is difficult to drive into the soil, the time for a worker to pile is prolonged, the progress of the whole project is affected, and the pile driving device for municipal engineering is provided for solving the problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: for solving the problem that proposes among the above-mentioned background art, the utility model provides a municipal works are with pile device.
The utility model discloses a realize above-mentioned purpose and specifically adopt following technical scheme:
the utility model provides a municipal works are with pile device, is including placing at subaerial bottom plate and support, the base is installed at the top of bottom plate, the top of base is fixed with the mount, the one end activity cover that the hinged end was kept away from to pole and interior pole in the articulated on the mount is equipped with the outer pole, the top of support is fixed with the flexible end of hydro-cylinder and is kept away from the one end of pole articulated down and with the outer pole, the stake is installed to the one end that the outer pole was kept away from to interior pole.
Further, be formed with on the stake along the bar perforation of vertical direction, the one end activity that outer pole was kept away from to interior pole is run through the bar and is perforated and interior pole on be formed with along interior pole length direction's activity groove, be fixed with gag lever post and gag lever post activity on the fenestrate inner wall of bar and run through the activity groove.
Furthermore, two vertical downward chutes are formed in one end, far away from the end hinged with the inner rod, of the fixing frame, sliding rods are fixed on two sides of the pile column, and the two sliding rods are connected in the corresponding chutes in a sliding mode respectively.
Furthermore, a guide rod is fixed on one side of the base and movably penetrates through the support.
Furthermore, universal auto-lock wheels are installed at the bottom of the bottom plate and the bottom of the support.
The utility model has the advantages as follows:
the utility model discloses according to lever principle, through the arm of force length of extension articulated department one side, just can make just more with the power that articulated department opposite side received, the design of pole and outer pole in the rethread, remove outer pole and make outer pole not deviate from interior pole when removing outer pole, the shrink through the hydro-cylinder this moment to the stake decurrent hammering power of pole one end installation in the messenger is bigger, has made things convenient for the pile of staff to different geographical position, makes for the time of piling, has accelerated the progress of engineering.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
FIG. 3 is a top view of the present invention;
fig. 4 is a sectional view taken along a line a-a of fig. 3 according to the present invention;
reference numerals: 1. a base plate; 2. a support; 3. a base; 4. a fixed mount; 41. a chute; 42. a slide bar; 5. an inner rod; 6. an outer rod; 7. an oil cylinder; 8. a movable groove; 9. a limiting rod; 10. a guide bar; 11. a universal self-locking wheel; 12. and (5) a pile.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "up", and the like indicate the directions or positional relationships based on the directions or positional relationships shown in the drawings, or the directions or positional relationships that the products of the present invention are conventionally placed when used, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element to which the term refers must have a specific direction, be constructed and operated in a specific direction, and thus, should not be construed as limiting the present invention.
As shown in figure 1, the utility model provides a pile driver for municipal works, including bottom plate 1 and support 2 placed on the ground, base 3 is installed at the top of bottom plate 1, the top of base 3 is fixed with mount 4, the mount 4 is articulated with interior pole 5 and the one end movable sleeve that interior pole 5 kept away from the hinged end is equipped with outer pole 6, the top of support 2 is fixed with hydro-cylinder 7 and the flexible end of hydro-cylinder 7 is down and articulated with the one end that outer pole 6 kept away from interior pole 5, the one end that interior pole 5 kept away from outer pole 6 is equipped with stake 12, when using, first move bottom plate 1 and support 2 to the position that needs the pile driving, wherein outer pole 6 is always covered on interior pole 5, when piling ground through stake 12, adopt the lever principle, at first through the setting of hydro-cylinder 7, when the flexible end of hydro-cylinder 7 upwards contracts, can drive one end of outer pole 6 upwards, when one end of the outer rod 6 moves upwards, one end of the inner rod 5 far away from the pile 12 is driven to move upwards, the other end of the inner rod 5 moves downwards, the pile 12 is driven to hammer downwards, the pile 12 is hammered towards the ground, the device is hammered into the ground, the oil cylinder 7 moves in an accelerating mode when being contracted, the base 3 and the fixing frame 4 are used for supporting the inner rod 5, when soil at a piling position is hard, the force applied to the other side of the hinged position can be larger by lengthening the force arm length of one side of the hinged position according to the lever principle, therefore, the support 2 is moved towards the direction far away from the bottom plate 1, the outer rod 6 is far away from the inner rod 5 along with the support 2, the outer rod 6 is not separated from the inner rod 5 when the support 2 is moved, after the outer rod 6 moves to a proper position, the force arm connecting the inner rod 5 and the outer rod 6 is increased, at the moment, the oil cylinder 7 is contracted to drive one end of the inner rod 5 to move upwards in the same method, so that the descending force of the pile 12 installed at the other end of the inner rod 5 is larger, the pile 12 is smashed into the ground, the piling of workers at different geographic positions is facilitated, the piling time is shortened, and the progress of a project is accelerated.
As shown in fig. 4, a mounting manner of a pile 12 on an inner rod 5 is disclosed, a bar-shaped through hole along a vertical direction is formed on the pile 12, one end of the inner rod 5, which is far away from an outer rod 6, movably penetrates through the bar-shaped through hole, a movable groove 8 along a length direction of the inner rod 5 is formed on the inner rod 5, a limiting rod 9 is fixed on an inner wall of the bar-shaped through hole, the limiting rod 9 movably penetrates through the movable groove 8, when one end of the inner rod 5, which is far away from the outer rod 6, moves downwards along the limiting rod 9, and the pile 12 moves downwards along a fixing frame 4 through interference between the movable groove 8 and the limiting rod 9, so that the pile 12 breaks into soil to complete piling work, when one end of the inner rod 5, which is near the outer rod 6, moves downwards, one end of the inner rod 5, which is far away from the outer rod 6, moves upwards, and at the same time the movable groove 8 on the inner rod 5 moves upwards along the limiting rod 9, thereby lifting the pile 12 in preparation for the next stroke.
As shown in fig. 1 and 3, a mounting manner of the pile 12 on the fixing frame 4 is disclosed, two vertical downward sliding grooves 41 are formed in one end of the fixing frame 4 far away from the end hinged to the inner rod 5, sliding rods 42 are fixed on two sides of the pile 12, the two sliding rods 42 are respectively connected in the corresponding sliding grooves 41 in a sliding mode, through the sliding grooves 41 formed in the fixing frame 4, the pile 12 slides in the sliding grooves 41 through the sliding rods 42, and therefore the pile 12 slides along the sliding grooves 41, and the pile 12 is more stable when being hammered downwards.
As shown in fig. 1, in order to make the support 2 more stable when moving relative to the base plate 1, a guide rod 10 is fixed on one side of the base 3 and the guide rod 10 is movably inserted into the support 2, so that the support 2 slides along the guide rod 10 when the support 2 is moved, and the guide rod 10 serves to guide the support 2.
As shown in fig. 2, in order to facilitate the movement of the whole device, universal self-locking wheels 11 are mounted on the bottom of the bottom plate 1 and the bottom of the bracket 2. The universal self-locking wheels 11 are arranged at the bottoms of the bottom plate 1 and the support 2, the bottom plate 1 and the support 2 are convenient to move through the rolling of the universal self-locking wheels 11, and the bottom plate 1 and the support 2 are relatively stable on the ground through the self-locking performance of the universal self-locking wheels 11.

Claims (5)

1. The utility model provides a municipal works are with pile device, a serial communication port, including placing bottom plate (1) and support (2) subaerial, base (3) are installed at the top of bottom plate (1), the top of base (3) is fixed with mount (4), it is equipped with outer pole (6) to articulate the one end activity cover that articulated end was kept away from in pole (5) and interior pole (5) on mount (4), the flexible end that the top of support (2) was fixed with hydro-cylinder (7) and hydro-cylinder (7) is articulated down and the one end of keeping away from interior pole (5) with outer pole (6), stake (12) are installed to the one end that outer pole (6) were kept away from in interior pole (5).
2. The piling device for the municipal engineering according to claim 1, wherein a bar-shaped through hole is formed in the pile (12) in the vertical direction, one end of the inner rod (5) far away from the outer rod (6) movably penetrates through the bar-shaped through hole, a movable groove (8) is formed in the inner rod (5) in the length direction of the inner rod (5), and a limiting rod (9) is fixed on the inner wall of the bar-shaped through hole and the limiting rod (9) movably penetrates through the movable groove (8).
3. The piling device for the municipal engineering according to claim 1, wherein two vertical downward sliding grooves (41) are formed in one end of the fixing frame (4) away from the end hinged to the inner rod (5), sliding rods (42) are fixed to two sides of the pile column (12), and the two sliding rods (42) are respectively slidably connected in the corresponding sliding grooves (41).
4. Piling device for municipal engineering according to claim 1, characterised in that a guide rod (10) is fixed to one side of the base (3) and the guide rod (10) is movably inserted into the support (2).
5. Piling device for municipal engineering according to claim 1, characterised in that the bottom of the floor (1) and the bottom of the stand (2) are fitted with self-locking universal wheels (11).
CN202022147080.7U 2020-09-24 2020-09-24 Municipal works are with pile device Expired - Fee Related CN213867806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022147080.7U CN213867806U (en) 2020-09-24 2020-09-24 Municipal works are with pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022147080.7U CN213867806U (en) 2020-09-24 2020-09-24 Municipal works are with pile device

Publications (1)

Publication Number Publication Date
CN213867806U true CN213867806U (en) 2021-08-03

Family

ID=77050128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022147080.7U Expired - Fee Related CN213867806U (en) 2020-09-24 2020-09-24 Municipal works are with pile device

Country Status (1)

Country Link
CN (1) CN213867806U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215058A (en) * 2021-12-14 2022-03-22 四川中核艾瑞特工程检测有限公司 Piling tool and method for detecting foundation pile in narrow space

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215058A (en) * 2021-12-14 2022-03-22 四川中核艾瑞特工程检测有限公司 Piling tool and method for detecting foundation pile in narrow space

Similar Documents

Publication Publication Date Title
CN111810051B (en) Piling mechanism with excavating function for constructional engineering and working method
CN104912076B (en) A static pile press complete machine is planted in a kind of reaming
CN213867806U (en) Municipal works are with pile device
US6305480B1 (en) Post driving and earth boring machine
CN211306209U (en) Percussion drill roof drilling device
CN210482297U (en) Small-size pile driver
JP3031806B2 (en) Ground survey equipment
CN215104771U (en) A plant muscle perforating device for bridge construction
CN211598518U (en) Novel probing device for geotechnical engineering investigation
CN214786555U (en) Railing base is prevented to instrument formula
CN212317869U (en) Static hydraulic pile machine additionally provided with drill tower base
CN210368959U (en) Side pile device structure of static pressure pile machine
CN220150332U (en) Pre-buried formula foundation ditch supporting construction for civil engineering
CN212427096U (en) Piling device for building construction
CN214562027U (en) Environment-friendly punching and installing multipurpose device for building
CN214687304U (en) Secondary structure bar planting perforating device
CN221276598U (en) Building pile driving device
CN215714520U (en) Highway compactness test detection equipment
US9677340B1 (en) High speed precision guide device for creating holes for piles or other support members
CN214869061U (en) Perforating device for construction
CN114215320B (en) Ground scaffold structure for ultra-high steep rock slope
CN215052861U (en) Foundation leveling device for building engineering technology
CN219795161U (en) Soil cleaning structure for pile driver
CN214005640U (en) Foundation bearing capacity detection device
KR102681867B1 (en) Ascent and descent device of the core drill

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210803