CN213772764U - Assembled abrupt slope roadbed structure - Google Patents

Assembled abrupt slope roadbed structure Download PDF

Info

Publication number
CN213772764U
CN213772764U CN202022526229.2U CN202022526229U CN213772764U CN 213772764 U CN213772764 U CN 213772764U CN 202022526229 U CN202022526229 U CN 202022526229U CN 213772764 U CN213772764 U CN 213772764U
Authority
CN
China
Prior art keywords
anchor
ground
assembled
retaining plate
fender apron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022526229.2U
Other languages
Chinese (zh)
Inventor
聂永涛
徐立新
钱森
胡毓浩
施有朋
富宇杰
李强强
王帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongzi Transportation Technology Co ltd
Original Assignee
Zhejiang Zhongzi Transportation Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongzi Transportation Technology Co ltd filed Critical Zhejiang Zhongzi Transportation Technology Co ltd
Priority to CN202022526229.2U priority Critical patent/CN213772764U/en
Application granted granted Critical
Publication of CN213772764U publication Critical patent/CN213772764U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型公开了一种装配化的陡坡路基结构,包括地梁、地锚、挡土板、拉锚系统、路基填料和排水系统,地梁沿路线方向布置于道路边线坡脚处,地梁上预留有挡土板安装所需的凹槽,地锚打入陡坡基岩中,其外端与地梁固定连接,所述挡土板设置在道路边缘处,其底部插入地梁的凹槽中,其上部利用拉锚系统固定,所述拉锚系统主要由连接杆、套筒及注浆锚杆组成,拉锚系统置于路面结构层下端;本实用新型具有结构简单、稳定安全、施工便捷、成本低等优点,达到了装配化施工,易于推广应用。

Figure 202022526229

The utility model discloses an assembled steep-slope subgrade structure, comprising ground beams, ground anchors, earth retaining plates, anchorage systems, roadbed fillers and a drainage system. The grooves required for the installation of the retaining plate are reserved on the ground anchor, and the ground anchor is driven into the bedrock of the steep slope, and its outer end is fixedly connected with the ground beam. In the groove, its upper part is fixed by a pull anchor system, the pull anchor system is mainly composed of a connecting rod, a sleeve and a grouting anchor rod, and the pull anchor system is placed at the lower end of the pavement structure layer; the utility model has the advantages of simple structure, stability and safety, With the advantages of convenient construction and low cost, it has achieved assembly construction and is easy to popularize and apply.

Figure 202022526229

Description

Assembled abrupt slope roadbed structure
Technical Field
The utility model relates to an abrupt slope roadbed structure of assemblization.
Background
The steep slope roadbed refers to a road embankment constructed on a steep slope (the ground cross slope exceeds 1:2.5) section or an unstable mountain slope, and is a common roadbed form in the construction of mountain highways.
Because the ground transverse slope is steep, the change of the geological conditions of the basement topography is large, and the steep slope roadbed is easy to generate integral instability or slide damage along the slope or the weak layer zone under the action of load, water and the like.
Aiming at the damage mode of the steep slope subgrade, a corresponding effective treatment design is needed, usually, an anti-skid retaining wall, a reinforcing pile and the like are needed to support and stop and receive the slope, but the anti-skid retaining wall has high requirements on the bearing capacity of the foundation, the reinforcing pile is high in construction difficulty, the slope body is easy to disturb by blasting excavation, the reinforcing cost is high, and the construction period is long. Therefore, the method has important significance in providing a novel low-cost and assembled steep slope roadbed structure.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide an overall structure is light-duty, need not to use the reinforcement stake, and is with low costs, through adopting prefabricated concatenation to realize the prefabricated ization, the convenient high efficiency of construction, destroys little to original ecological vegetation in the construction, and green easily popularizes and applies, has practicality and uses the abrupt slope roadbed structure of the assembly of extensive.
In order to solve the above problem, the utility model adopts the following technical scheme:
the utility model provides an abrupt slope roadbed structure of assemblization, includes grade beam, earth anchor, keeps off the native board, draws anchor system, roadbed packing and drainage system, and the grade beam is arranged in road sideline toe department along the route direction, reserves the required recess of fender board installation on the grade beam, and during the abrupt slope basement rock was squeezed into to the earth anchor, its outer end and grade beam fixed connection, keep off the native board setting in road edge, during the recess of grade beam was inserted to its bottom, its upper portion utilized draws anchor system fixed, draw anchor system mainly comprises connecting rod, sleeve and slip casting stock, draws anchor system to arrange the road surface structure layer lower extreme in.
Preferably, the roadbed filling material is filled inside the retaining plate, and the roadbed filling material is made of bubble concrete or bubble concrete blocks, and the light filling body can reduce the pressure on the retaining plate.
Preferably, the ground beam is of a reinforced concrete cast-in-place structure, the soil retaining plate is of a reinforced concrete prefabricated assembly structure, and the lower portion of the ground beam is connected with the ground anchor through a built-in anchor head.
Preferably, the retaining plate is provided with an anchor head, the upper part of the retaining plate is anchored and fixed with the anchor pulling system, and the grouting anchor rod is a mortar grouting anchor rod.
Preferably, the whole Z type structure that is of fender apron, fender apron are the polylith, and the concatenation mode between the fender apron is assembled for the Z type, be equipped with the screw on the fender apron, the bolt passes the screw and carries out fixed connection to adjacent fender apron.
Preferably, the drainage system comprises a drainage ditch and a drain pipe, the drainage ditch is arranged on the outer side of the ground beam, the lower end of the soil blocking plate is provided with a drain hole, and the drain pipe is arranged in the drain hole; the water inside the retaining plate is discharged through the drainage holes, and the water outside is discharged through the drainage ditch.
The utility model has the advantages that: overall structure is light-duty, need not to use the reinforcing pile, and is with low costs, through adopting prefabricated concatenation to realize the prefabricated, and the construction is convenient high-efficient, and it is little to original ecological vegetation destruction in the construction, green easily popularizes and applies, has the universality of practicality and use.
Drawings
In order to illustrate the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings used in the description of the embodiments or the prior art will be briefly described below, but the protection scope of the present invention is not limited thereto.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the installation of the retaining plate of the present invention;
FIG. 3 is a schematic view of the retaining plate structure of the present invention;
FIG. 4 is an enlarged schematic view of A-A of the present invention;
the concrete comprises a ground beam 1, a ground anchor 2, a ground line 3, a drainage ditch 4, a soil retaining plate 5, an anchor head 6, a connecting rod 7, roadbed filling 8, a step 9, a pavement structure layer 10, a screw hole 11, a water drainage hole 12, a water drainage pipe 13, a sleeve 14, a grouting anchor rod 15 and a bolt 16.
Detailed Description
Referring to fig. 1 to 4, an assembled steep slope roadbed structure comprises a ground beam 1, ground anchors 2, soil retaining plates 5, anchor pulling systems, roadbed fillers 8 and a drainage system, wherein the ground beam 1 is arranged at the slope toe of a side line of a road along the direction of the line, the ground beam 1 is reserved with grooves required for installing the soil retaining plates 5, the ground anchors 2 are driven into a steep slope bedrock, the outer ends of the ground anchors are fixedly connected with the ground beam 1, the soil retaining plates 5 are arranged at the edge of the road, the bottoms of the soil retaining plates are inserted into the grooves of the ground beam 1, the upper parts of the soil retaining plates are fixed by the anchor pulling systems, the anchor pulling systems mainly comprise connecting rods 7, sleeves 14 and grouting anchor rods 15, and the anchor pulling systems are arranged at the lower end of a road surface structure layer 10.
Further, the roadbed filling 8 is filled inside the retaining plate 5, and the roadbed filling 8 is a light filling body such as bubble concrete, bubble concrete blocks or other filling materials.
Further, the ground beam 1 is a reinforced concrete cast-in-place structure, the soil retaining plate 5 is a reinforced concrete prefabricated assembly structure, and the lower portion of the ground beam 1 is connected with the ground anchor 2 through a built-in anchor head or a steel bar binding connection or in other modes to form a force transmission supporting structure.
Further, be equipped with anchor head 6 on the fender board 5, the upper portion and the anchor system of drawing of fender board 5 anchor are fixed, slip casting stock 15 is mortar slip casting stock.
Further, the whole Z type structure that is of fender board 5, fender board 5 are the polylith, and the concatenation mode between the fender board 5 is assembled for the Z type, be equipped with screw 11 on the fender board 5, bolt 16 passes screw 11 and carries out fixed connection to adjacent fender board 5, has made things convenient for the assembly of fender board, makes adjacent fender board form overall structure, with draw anchor system connection back, forms upper portion bearing structure, resists the soil pressure of road surface structural layer 10 load and road bed filler 8 jointly, plays better supporting role.
Further, the drainage system comprises a drainage ditch 4 and a drain pipe 13, wherein the drainage ditch 4 is arranged on the outer side of the ground beam 1, the lower end of the soil blocking plate 5 is provided with a drain hole 12, and the drain pipe 13 is arranged in the drain hole 12.
Further, the ground anchor is of a grouting anchor rod or anchor cable structure, the length of the ground anchor is not less than 8m, the ground anchor is arranged in the steep slope foundation, and the outer end of the ground anchor is connected with a built-in anchor head of the ground beam in a tensioning and anchoring mode; specifically, one end of the ground anchor is arranged at an angle with the ground beam, preferably 60-90 degrees; the length of the ground anchor is not less than 8m, so that a better anchoring effect can be achieved.
Further, the anchor pulling system is horizontally arranged, horizontal force system transmission is carried out through the connecting rod, specifically, the outer side of the connecting rod is fixedly anchored with a pre-buried anchor head of the earth retaining plate, the inner side of the connecting rod is connected with a grouting anchor rod for driving into a foundation soil body of an abrupt slope through a sleeve, the connecting rod can adopt rod bodies such as reinforcing steel bars or steel strands, but the connecting rod needs to be subjected to anti-corrosion treatment, the grouting anchor rod is a common mortar grouting anchor rod, the length of the grouting anchor rod is not less than 6m, and therefore large bearing capacity can be provided.
Further, the width of the retaining plate is 1-2 m, and the thickness of the retaining plate is selected correspondingly according to the height; when the setting plate width of the retaining plate is 1-2 m, namely the width of each unit retaining plate is 1-2 m; when the height of the retaining plate is 1-3 m, the preferable plate thickness is not less than 15 cm; when the height of the retaining plate is 4-7 m, the preferable plate thickness is not less than 20 cm; when the height of the retaining plate is 8-10 m and the preferable plate thickness is not less than 30cm, the retaining plate can be ensured to have enough strength and rigidity to have stronger supporting effect on the roadbed filling. Wherein the plate height is determined by the filling height of the steep slope roadbed.
Furthermore, for road sections with the filling height of the steep slope roadbed being greater than 4m, two rows of anchor pulling systems and two rows of positioning and fixing connecting bolts need to be arranged, correspondingly, two rows of pre-embedded anchor heads and two rows of reserved screw holes need to be reserved on the soil retaining plate and are arranged at the middle part and the upper part of the soil retaining plate, and therefore the whole structure can be better reinforced and stabilized.
The utility model discloses need earlier excavate step 9 on original ground line 3 before filling, alleviate the pressure that the fender board bore through the step effect.
The utility model has the advantages that:
1. the ground beam is the foundation of the whole structure system, the groove at the top is used for fixing the lower part of the soil retaining plate, and the lower part is connected with the ground anchor to form an integral structure, so that the functions of fixing the soil retaining plate and reinforcing the slope toe are achieved;
2. the ground anchor is arranged in slope toe bedrock of the steep slope subgrade and interacts with the slope bedrock to transmit the acting force on the ground beam to the slope body on one hand and transmit the bearing capacity of the slope body to the structure body of the steep slope subgrade on the other hand;
3. the soil retaining plate is a prefabricated assembled soil retaining structure and transmits the soil pressure of the roadbed filling to the ground beam;
4. the anchor pulling system is a stressed support body at the upper part of the steep slope roadbed structure and provides horizontal resistance for the soil retaining plate;
5. the light filling material can reduce the acting force on the retaining plate on one hand and reduce the uneven settlement of the steep slope roadbed on the other hand;
6. the drainage system is arranged on the outer side of the ground beam at the toe, wherein the water drain pipe is used for draining water in the slope body and at the filling and digging junction, and the drainage ditch is used for draining gathered surface water so as to prevent the toe from being washed away from influencing the stability of the structure;
7. the integral structure is light and reasonable in stress, reinforcing piles are not required to be used, the cost is low, the prefabricated splicing process is adopted to realize assembly, the construction is convenient and efficient, and the damage to original ecological vegetation in the construction is small, so that the ecological vegetation is green and environment-friendly.
The above is only the specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.

Claims (6)

1. The utility model provides an abrupt slope roadbed structure of prefabricated which characterized in that: including grade beam, earth anchor, fender apron, anchor system, road bed filler and drainage system, the grade beam is arranged in road sideline toe department along the route direction, reserves on the grade beam and keeps off the required recess of fender apron installation, and during the steep slope bedrock was squeezed into to the earth anchor, its outer end and grade beam fixed connection, fender apron sets up in road edge, and during the recess of grade beam was inserted to its bottom, its upper portion utilized anchor system fixed, anchor system mainly comprises connecting rod, sleeve and slip casting stock, and the anchor system arranges the road surface structural layer lower extreme in.
2. An assembled steep slope roadbed structure according to claim 1, wherein: the roadbed filler is filled on the inner side of the retaining plate, and the roadbed filler is made of bubble concrete or bubble concrete building blocks.
3. An assembled steep slope roadbed structure according to claim 1, wherein: the ground beam is of a reinforced concrete cast-in-place structure, the soil retaining plate is of a reinforced concrete prefabricated assembly structure, and the lower portion of the ground beam is connected with the ground anchor through a built-in anchor head.
4. An assembled steep slope roadbed structure according to claim 1, wherein: the soil retaining plate is provided with an anchor head, the upper part of the soil retaining plate is anchored and fixed with the anchor pulling system, and the grouting anchor rod is a mortar grouting anchor rod.
5. An assembled steep slope roadbed structure according to claim 1, wherein: the whole Z type structure that is of fender apron, fender apron are the polylith, and the concatenation mode between the fender apron is assembled for the Z type, be equipped with the screw on the fender apron, the bolt passes the screw and carries out fixed connection to adjacent fender apron.
6. An assembled steep slope roadbed structure according to claim 1, wherein: the drainage system comprises a drainage ditch and a water drain pipe, the drainage ditch is arranged on the outer side of the ground beam, a water drain hole is formed in the lower end of the soil retaining plate, and the water drain pipe is arranged in the water drain hole.
CN202022526229.2U 2020-11-05 2020-11-05 Assembled abrupt slope roadbed structure Expired - Fee Related CN213772764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022526229.2U CN213772764U (en) 2020-11-05 2020-11-05 Assembled abrupt slope roadbed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022526229.2U CN213772764U (en) 2020-11-05 2020-11-05 Assembled abrupt slope roadbed structure

Publications (1)

Publication Number Publication Date
CN213772764U true CN213772764U (en) 2021-07-23

Family

ID=76913592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022526229.2U Expired - Fee Related CN213772764U (en) 2020-11-05 2020-11-05 Assembled abrupt slope roadbed structure

Country Status (1)

Country Link
CN (1) CN213772764U (en)

Similar Documents

Publication Publication Date Title
CN201125354Y (en) Steep hill road bed branch block reinforced structure
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN107250460B (en) Precast block retaining wall method for preventing landslide
CN102619150A (en) Anchored roadbed widening method
CN102444405B (en) Anti-slide pile and frame arch combined structure and construction method
CN104452784B (en) Composite bolt pile used for slope strengthening and construction technique of composite bolt pile
CN111411637A (en) High and steep terrain foam concrete light embankment structure and construction method
CN113308953B (en) Construction method for widening embankment by utilizing foam concrete of existing retaining wall
CN111455831A (en) Ultra-high composite reinforced soil abutment combined with prestressed anchor cable and its construction method
KR20090130637A (en) Backfill reinforcement structure of rigid structure and construction method
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN109371989A (en) A combined support structure suitable for slope stabilization support and its construction method
CN110939142A (en) Subgrade structures for slopes
KR101077949B1 (en) Block for reinforcement and construction method
CN111705576A (en) A steep-slope and high-fill roadbed structure using high-density EPS fillers
KR101117924B1 (en) Complex riverside facility and construction method
CN111441789A (en) Foam concrete transition structure and construction method for bridge-tunnel connection in high and steep terrain
CN108487234B (en) Construction method of cast-in-situ pile plate type platform wall
CN222758947U (en) Light supporting and retaining structure suitable for rocky high-steep slope roadbed
CN213772764U (en) Assembled abrupt slope roadbed structure
CN113430870A (en) Roadbed structure for green reinforcement treatment of newly-built railway karst foundation and construction method thereof
CN217399721U (en) A kind of support structure in soft soil area
CN206721594U (en) A kind of Reinforced embankment anchor structure and embankment
CN212130501U (en) Foam concrete transition structure for bridge-tunnel connection in high and steep terrain
CN211571780U (en) Rib plate type retaining wall structure for combined support of anchor rods and anchor cables

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210723