CN213742223U - Elevator shaft operating frame - Google Patents

Elevator shaft operating frame Download PDF

Info

Publication number
CN213742223U
CN213742223U CN202022614746.5U CN202022614746U CN213742223U CN 213742223 U CN213742223 U CN 213742223U CN 202022614746 U CN202022614746 U CN 202022614746U CN 213742223 U CN213742223 U CN 213742223U
Authority
CN
China
Prior art keywords
frame
elevator shaft
protection
shaft operating
protection frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022614746.5U
Other languages
Chinese (zh)
Inventor
夏帅
谭波
骆志勇
苏鹏
巢中一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Xingwang Construction Co ltd
Original Assignee
Hunan Xingwang Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Xingwang Construction Co ltd filed Critical Hunan Xingwang Construction Co ltd
Priority to CN202022614746.5U priority Critical patent/CN213742223U/en
Application granted granted Critical
Publication of CN213742223U publication Critical patent/CN213742223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of construction and specifically relates to an elevartor shaft handling frame is related to, including main body frame, can dismantle on the main body frame and be connected with operation platform, the operation platform lower extreme is provided with the protection frame, elevartor shaft shear force wall in the operation platform lower extreme is provided with the connecting piece, the connection can be dismantled on the shear force wall through the connecting piece to the protection frame, be provided with protector on the protection frame. This application has the effect of the degree of safety of increase workman's construction in high-rise elevator well.

Description

Elevator shaft operating frame
Technical Field
The application relates to the field of elevator shaft construction technology, in particular to an elevator shaft operating frame.
Background
The elevator shaft is a shaft for installing an elevator, the size of the shaft is determined according to the type selection of the elevator, an elevator track and a counterweight track are installed on the wall of the shaft, an elevator door is installed in a reserved door opening, and an elevator machine room is arranged at the top of the shaft. When the plastering and whitewashing are carried out on the elevator shaft and equipment is installed, an elevator operating frame needs to be installed for construction operation.
In view of the above-mentioned related technologies, the inventor thinks that the frame body is continuously deformed and distorted as the construction floor increases, and is very easy to cause safety accidents such as high falling and collapse, and the like, resulting in worker injury.
SUMMERY OF THE UTILITY MODEL
In order to increase the degree of safety of workman's construction in high-rise elevator well, this application provides an elevator shaft handling frame.
The application provides a pair of elevartor shaft handling frame adopts following technical scheme:
the utility model provides an elevator shaft handling frame, includes main body frame, can dismantle on the main body frame and be connected with operation platform, the operation platform lower extreme is provided with the protection frame, elevator shaft shear force wall in the operation platform lower extreme is provided with the connecting piece, the connection can be dismantled on the shear force wall through the connecting piece to the protection frame, be provided with protector on the protection frame.
Through adopting above-mentioned technical scheme, connect the protection frame through the connecting piece on the shear force wall of elevartor shaft, install protector on the protection frame, build main body frame, install operation platform on main body frame, the workman carries out the during operation on operation platform, if operation platform takes place to collapse, protector can protect the workman that the workman falls, prevents that the workman from falling from too high position, protects the construction safety of workman in the elevartor shaft.
Optionally, the protection device includes an interception net, the interception net is fixedly connected to the protection frame, and a collection layer is arranged at the lower end of the interception net.
Through adopting above-mentioned technical scheme, with the edge joint of interception net on the protection frame, work is the major possession device that drops on work platform and is intercepted by the interception net, prevents that major possession device whereabouts from pounding lower part workman and equipment, and less material sees through the interception net and is collected by the collection layer to the buffering through the interception net reduces the power of whereabouts when the whereabouts, except can preventing that the workman high altitude from falling also can prevent the high altitude from falling the thing, makes the work progress safer.
Optionally, the collecting layer comprises a collecting plate, a clamping groove is formed in the lower end of the protecting frame, the collecting plate is horizontally clamped in the clamping groove, a cleaning piece is arranged on the protecting frame, and construction waste on the upper end of the collecting plate is removed by the cleaning piece.
Through adopting above-mentioned technical scheme, during the installation, push the joint with the collecting plate level in the joint groove, when piling up too much debris on the collecting plate, clear away the construction waste through the clearance piece on the protection frame, make it intercept more impurity better, be convenient for long-term the use.
Optionally, the clearance piece includes the push rod, push rod lower extreme butt is in on the collecting plate, push rod one end fixedly connected with carriage release lever, the carriage release lever is followed the length direction setting of collecting plate, carriage release lever sliding connection be in on the protection frame, ladder door opening is worn to establish by carriage release lever one end.
Through adopting above-mentioned technical scheme, the workman draws the carriage release lever, and the carriage release lever drives the push rod and removes to the lift-cabin door opening part, and the material on the push rod will the collecting plate pushes away to the opening, and the workman carries out unified clearance, has made things convenient for workman's operation.
Optionally, the lower end of the protection frame is provided with a movable groove, and the movable rod is slidably clamped in the movable groove.
Through adopting above-mentioned technical scheme, during the installation, the carriage release lever joint slides in the shifting chute, prevents the horizontal skew of carriage release lever, makes its more stable that removes.
Optionally, the connecting piece includes a plurality of embedded blocks, embedded block fixed connection is on the lateral wall of shear force wall, the protection frame can dismantle the connection and be in on the embedded block.
Through adopting above-mentioned technical scheme, the buried piece is fixed a position in advance pre-buried in the shear force wall, and the protection frame directly carries out erection joint with the buried piece when the installation, has simplified the process of installation, makes things convenient for the workman to carry out the installation operation.
Optionally, the protection frame comprises a plurality of cross bars, and the cross bars are detachably connected.
Through adopting above-mentioned technical scheme, when installing the protection frame, can be earlier interconnect reconnection between the horizontal pole.
Optionally, a layer of protective frame is arranged between every two layers of the operation platforms.
Through adopting above-mentioned technical scheme, operation platform and protection frame interval set up, make every layer of operation platform's workman when carrying out the operation, can both obtain the safety guarantee, make the construction process security higher.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the protective frame is connected to the shear wall through a connecting piece, the protective device is installed on the protective frame, the main body frame is well built, the operation platform is installed on the main body frame, when workers work on the operation platform, if the operation platform collapses, the protective device can protect workers falling from the working platform, the workers are prevented from falling from an overhigh position, and the construction safety of the workers in the elevator shaft is protected;
2. the embedded block is positioned in advance and embedded in the shear wall, and the protective frame is directly installed and connected with the embedded block when being installed, so that the installation process is simplified, and the installation operation of workers is facilitated.
Drawings
Fig. 1 is a schematic view of the overall structure of an elevator shaft operating frame according to the present application.
Fig. 2 is a cross-sectional view of the handling frame of fig. 1.
Fig. 3 is a partial cross-sectional view of the collector layer of fig. 2.
Description of reference numerals: 1. a main body frame; 2. an operation platform; 3. a protective frame; 31. a clamping groove; 32. a moving groove; 33. a cross bar; 34. connecting sheets; 4. a guard; 41. an intercepting net; 411. a circular shaft; 42. a collection layer; 421. a collection plate; 422. cleaning the workpiece; 4221. a push rod; 4222. a travel bar; 5. a connecting member; 51. and (6) embedding blocks.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses an elevator shaft operating frame, which refers to fig. 1 and 2 and comprises a main body frame 1, wherein two ends of the main body frame 1 are connected to a shear wall through bolts, and the main body frame 1 is connected with an operation platform 2 horizontally arranged on the surface through bolts; a connecting piece 5 is arranged on the shear wall at the lower end of the working platform 2, and a protective frame 3 is connected through the connecting piece 5; the protective frame 3 comprises a plurality of cross rods 33 and connecting pieces 34, and the cross rods 33 and the connecting pieces 34 are connected together through bolts to form a square protective frame 3; the guard is additionally provided with a guard 4.
Referring to fig. 1 and 2, the connecting member 5 includes embedded blocks 51 embedded in the shear wall, the penetrating ends of the embedded blocks 51 are connected with the cross bars 33 through bolts, the cross bars 33 are supported by the embedded parts, and the cross bars 33 are connected with each other in a surrounding manner. A layer of protective frame 3 is arranged between every two layers of the operation platforms 2, so that the safety of constructors on every operation platform 2 is ensured.
Referring to fig. 2, the protection device 4 comprises an intercepting net 41, the intercepting net 41 is composed of a net body, a side rope, a tether and a rib rope, a round shaft 411 is wound on the edge end of the intercepting net, two ends of the round shaft 411 are connected to a protection frame through bolts, and the intercepting net is fixed on the protection frame through the round shaft 411; the collecting layer 42 is arranged at the lower end of the intercepting net 41, the intercepting net 41 intercepts larger falling objects, the collecting layer 42 collects smaller falling objects, and the intercepting net 41 buffers the falling objects to reduce impact force when the falling objects fall on the collecting layer 42.
Referring to fig. 2 and 3, the collecting layer 42 includes a collecting plate 421, and the collecting plate 421 is spaced apart from the intercepting net 41 by a vertical distance such that the intercepting net 41 can naturally fall down; protection frame 3 has seted up joint groove 31 in collecting plate 421 both sides, is the level setting with the three-terminal joint of collecting plate 421 in joint groove 31, is provided with clearance piece 422 on the protection frame 3 and is used for clearing up the waste material on the collecting plate 421. The cleaning piece 422 comprises a push rod 4221, the lower end of the push rod 4221 is abutted against the collecting plate 421, and a brush is bonded at the lower end of the push rod 4221 so as to be convenient to clean; one end of the push rod 4221 is connected with a movable rod 4222 through a bolt, the movable rod 4222 is perpendicular to the push rod 4221, a movable groove 32 is formed in the protection frame 3, the sliding rod is connected in the movable groove 32 in a sliding mode, and an opening at one end of the movable groove 32 is used for the push rod 4221 to penetrate out.
The implementation principle of this application embodiment elevator shaft handling frame does: when a worker carries out elevator shaft construction, the main body frame 1 is installed, the operation platform 2 is installed on the frame through bolts, and the protection frame 3 is installed on the embedded block 51, on the lower side of the operation platform 2, of the elevator shaft shear wall through bolts; during the workman is under construction, if the article that drop, great article are intercepted to the interception net 41 on protection frame 3 upper strata, and less thing that drops on collecting plate 421 after interception net 41 buffering, when accumulating the waste material of certain degree, workman's pulling carriage release 4222 drives the article that push rod 4221 will drop and releases collecting plate 421, and when the work platform formula of collapsing takes place, the interception net 41 and the collecting plate 421 of work platform lower extreme can prevent constructor high altitude from falling, protection workman's safety.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an elevator shaft handling frame, includes main body frame (1), can dismantle on main body frame (1) and be connected with operation platform (2), its characterized in that: the lower end of the operation platform (2) is provided with a protection frame (3), the lower end of the operation platform (2) is provided with a connecting piece (5), the protection frame (3) is detachably connected to the shear wall through the connecting piece (5), and a protection device (4) is arranged on the protection frame (3).
2. An elevator shaft operating frame according to claim 1, characterized in that: the protection device (4) comprises an interception net (41), the interception net (41) is fixedly connected to the protection frame (3), and a collection layer (42) is arranged at the lower end of the interception net (41).
3. An elevator shaft operating frame according to claim 2, characterized in that: collect layer (42) including collecting plate (421), joint groove (31) have been seted up to protection frame (3) lower extreme, collecting plate (421) horizontal joint is in joint groove (31), be provided with clearance piece (422) on protection frame (3), the construction waste material of collecting plate (421) upper end is clear away in clearance piece (422).
4. An elevator shaft operating frame according to claim 3, characterized in that: clearance spare (422) include push rod (4221), push rod (4221) lower extreme butt is in on collecting plate (421), push rod (4221) one end fixedly connected with carriage release lever (4222), carriage release lever (4222) are followed the length direction of collecting plate (421) sets up, carriage release lever (4222) sliding connection be in on protection frame (3), the elevator door opening is worn to establish by carriage release lever (4222) one end.
5. An elevator shaft operating frame according to claim 4, characterized in that: a moving groove (32) is formed in the lower end of the protection frame (3), the moving rod (4222) is clamped in the moving groove (32) in a sliding mode, and an opening in one side of the moving groove (32) is used for the push rod (4221) to penetrate out.
6. An elevator shaft operating frame according to claim 1, characterized in that: the connecting piece (5) comprises a plurality of embedded blocks (51), the embedded blocks (51) are fixedly connected to the side wall of the shear wall, and the protective frame (3) is detachably connected to the embedded blocks (51).
7. An elevator shaft operating frame according to claim 6, wherein: the protective frame (3) comprises a plurality of cross rods (33) and connecting pieces (34), and the cross rods (33) are detachably connected with the connecting pieces (34).
8. An elevator shaft operating frame according to claim 1, characterized in that: a layer of protective frame (3) is arranged between every two layers of the operation platforms (2).
CN202022614746.5U 2020-11-12 2020-11-12 Elevator shaft operating frame Active CN213742223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022614746.5U CN213742223U (en) 2020-11-12 2020-11-12 Elevator shaft operating frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022614746.5U CN213742223U (en) 2020-11-12 2020-11-12 Elevator shaft operating frame

Publications (1)

Publication Number Publication Date
CN213742223U true CN213742223U (en) 2021-07-20

Family

ID=76823528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022614746.5U Active CN213742223U (en) 2020-11-12 2020-11-12 Elevator shaft operating frame

Country Status (1)

Country Link
CN (1) CN213742223U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585665A (en) * 2021-07-30 2021-11-02 福建省透堡建筑工程有限公司 Ventilating shaft structure is built in room

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585665A (en) * 2021-07-30 2021-11-02 福建省透堡建筑工程有限公司 Ventilating shaft structure is built in room

Similar Documents

Publication Publication Date Title
CN108534620B (en) Rail guard for mine blasting convenient to concatenation
CN212656515U (en) Adjustable movable scaffold
CN213742223U (en) Elevator shaft operating frame
CN208455651U (en) Anchor formula slope retaining system with fixation kit
CN111021373A (en) Slope reinforcing apparatus for building municipal works
KR100777937B1 (en) Construcion safety working cage with scaffold
CN212271568U (en) Hanging basket capable of preventing falling object from high altitude
CN212671849U (en) Emergency danger-avoiding house device for tunnel face collapse
CN216239867U (en) Building construction safety device
CN216664173U (en) A interim side slope protector for municipal building
CN214834555U (en) Supporting platform with protection function for municipal engineering construction
CN214658688U (en) Efficient creeping formwork equipment for variable cross-section creeping formwork construction
CN210289379U (en) Protective guard for engineering safety
CN212963066U (en) Deep basal pit lithosphere blasting protector
CN211547739U (en) Supporting structure for rope saw static force cutting reinforced concrete inner support
CN214701975U (en) Flexible blasting flyrock protector
CN207878306U (en) A kind of assembled steel case hangar tunnel device suitable for rescue and relief work
CN214330000U (en) Protection structure for preventing falling objects in building construction
CN217326576U (en) Wall slot horizontal protection device is led to ground even wall
CN211873913U (en) Protector for civil engineering
CN214459774U (en) Quick emergency blocking structure based on steel pipe tripod and steel rope net
CN213538706U (en) Movable protection device for dismantling and recovering existing bridge guardrail
CN218322412U (en) Rail guard is used in road and bridge construction
CN217679163U (en) Waist beam protection device for excavation of subway foundation pit
CN213898435U (en) Security protection device for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant