CN213710467U CN202022437431.8U CN202022437431U CN213710467U CN 213710467 U CN213710467 U CN 213710467U CN 202022437431 U CN202022437431 U CN 202022437431U CN 213710467 U CN213710467 U CN 213710467U
Authority
CN
China
Prior art keywords
foundation trench
sunshade
base groove
construction dust
working surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022437431.8U
Other languages
Chinese (zh)
Inventor
马振龙
刘洋
邢希海
田浩远
张跃明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianyuan Construction Group Co Ltd
Veterans Shandong Construction Group Co Ltd
Original Assignee
Tianyuan Construction Group Co Ltd
Shandong Hongda Real Estate Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianyuan Construction Group Co Ltd, Shandong Hongda Real Estate Co Ltd filed Critical Tianyuan Construction Group Co Ltd
Priority to CN202022437431.8U priority Critical patent/CN213710467U/en
Application granted granted Critical
Publication of CN213710467U publication Critical patent/CN213710467U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a dust-settling device, in particular to a foundation trench construction dust-settling device, which comprises two slide rails respectively arranged at the two sides of a foundation trench along the length direction of the foundation trench and a sunshade arranged on the two slide rails in a sliding way; the sunshade comprises an upright post, an arched beam and tarpaulin, wherein spray fans with outlets facing the base groove are respectively arranged below the arched beam and on the inner side of the upright post; the sunshades are arranged above the working surface in one-to-one correspondence with the working surface of the base groove. The utility model arranges the slide rails on the two sides of the base groove, and then arranges the sunshade on the slide rails, the sunshade slides along the working surface of the base groove, and workers who construct on the working surface can be prevented from being directly irradiated by sunlight; the sunshade is also provided with a spray fan facing the base groove, the spray fan can suppress dust generated in the construction process, and meanwhile, the spray fan blows fog-containing air with the temperature lower than the ambient temperature to workers, so that the heatstroke prevention and cooling effect is achieved, and the sunshade is a green building construction technology for building engineering.

Description

Foundation trench construction dust device
Technical Field
The utility model relates to a dust device especially relates to a foundation trench construction dust device.
Background
The foundation trench construction is a common open cut construction process in civil engineering operation, and comprises construction foundation construction, underground diaphragm wall construction, subway construction, underground pipeline laying, canal construction and other various civil engineering operations, which all involve foundation trench construction, and the construction process is usually shallow earthwork excavation, support system building, deep earthwork excavation, and lining pouring, and the earthwork amount to be excavated is very large.
A typical foundation trench earth excavation process is as follows: excavating shallow earthwork by a large excavator positioned on the ground; then digging deep earthwork by a small excavator positioned in the foundation trench, and lifting the earthwork out by a crane; and (5) leveling the earthwork with the thickness of 0.3 m at the bottom layer by adopting manual excavation. There are, of course, also relatively shallow foundation trenches that can be excavated all the time using an excavator located above ground, but in any case the bottom of the foundation trench needs to be manually leveled.
Excavation of foundation trench earthwork is an open-air work with high labor intensity and serious dust emission, and workers are easy to get heatstroke.
When an excavator positioned on the ground is used for excavating, the labor intensity is relatively low, the heatstroke prevention is easy, and water can be directly sprayed to the excavating tunnel face for dust prevention; however, when earth excavation is performed on the deep layer of the foundation trench, labor intensity is high, and dust prevention is not easy to perform. In addition, the construction of the foundation pit supporting system and the process of pouring the lining also have great labor intensity.
SUMMERY OF THE UTILITY MODEL
The utility model provides a foundation trench construction dust device.
The technical problem to be solved is that: the deep earthwork excavation work of the foundation trench, the construction of a foundation trench supporting system and the dust raising in the pouring and lining process are not easy to control.
In order to solve the technical problem, the utility model adopts the following technical scheme:
a foundation trench construction dust-settling device comprises two slide rails which are respectively arranged on two sides of a foundation trench along the length direction of the foundation trench, and a sunshade which is arranged on the two slide rails in a sliding manner;
the sunshade comprises an upright post arranged on the sliding rail in a sliding way, an arched beam erected on the upright post and tarpaulin covered on the arched beam, wherein spray fans with outlets facing the base groove are respectively arranged below the arched beam and on the inner side of the upright post, and the spray fans are communicated with a water supply network through pipelines;
the sunshade and the working surface of the base groove are arranged above the working surface in a one-to-one correspondence manner.
Furthermore, the arched girders are truss girders and are arranged at intervals along the length direction of the slide rails, and two ends of each truss girder are erected on the two slide rails through upright posts respectively; the slide rail is a channel steel with an upward opening, and the lower end of the upright post is arranged in the channel steel opening in a sliding manner; the upper ends of the stand columns positioned on the same side of the base groove are respectively and fixedly connected with a through long connecting rod parallel to the slide rail.
Furthermore, the spraying fans are arranged at intervals along the length directions of the upright posts and the arched beams, and the distance between every two adjacent spraying fans is not more than two meters.
Furthermore, a cross brace is arranged between the adjacent stand columns positioned on the same side of the base groove, and the cross brace is fixedly connected with the two adjacent stand columns respectively.
Furthermore, the lower end of the upright post is anchored with a spherical end, and the inner surface of the slide rail is coated with a Teflon coating.
Further, the lower end of the upright post is provided with a wheel, and the wheel is rotatably connected with the upright post through a sealing bearing.
Further, the slide rail is fixedly connected with a supporting structure of the foundation trench.
The utility model relates to a foundation trench construction dust device compares with prior art, has following beneficial effect:
in the utility model, the slide rails are arranged on the two sides of the base groove, and then the sunshade is arranged on the slide rails, the sunshade slides along the working surface of the base groove, so that workers who construct on the working surface can be prevented from being directly irradiated by sunlight; the sunshade is also provided with a spray fan facing the base groove, the spray fan can suppress dust generated in the construction process so as not to diffuse outwards, and meanwhile, the spray fan blows fog-containing air with the temperature lower than the ambient temperature to workers, so that the effect of heatstroke prevention and cooling is achieved.
Drawings
Fig. 1 is a schematic structural view of a foundation trench construction dust-settling device of the utility model;
the device comprises a sliding rail 1, an arched beam 21, an upright column 22, a spherical end 221, a through long connecting rod 23, a shear support 24, a tarpaulin 25 and a spray fan 3.
Detailed Description
As shown in fig. 1, a foundation trench construction dust-settling device comprises two slide rails 1 which are respectively arranged at two sides of a foundation trench along the length direction of the foundation trench, and a sunshade which is slidably arranged on the two slide rails 1;
the sunshade comprises an upright post 22 arranged on the sliding rail 1 in a sliding way, an arch beam 21 erected on the upright post 22 and tarpaulin 25 covered on the arch beam 21, wherein spray fans 3 with outlets facing to the base groove are respectively arranged below the arch beam 21 and on the inner side of the upright post 22, and the spray fans 3 are communicated with a water supply network through pipelines; the atomizing fan 3 is a common outdoor labor protection cooling article, fine water mist is sprayed out through an atomizing nozzle, then the fan blows the water mist to workers in the labor, the air containing fine mist drops is kept at the wet bulb temperature which is lower than the air temperature, and therefore the heatstroke prevention cooling effect is achieved. Meanwhile, air containing fog drops can be adhered with dust, and the effect of dust fall is achieved.
The sunshade and the working surface of the base groove are arranged above the working surface in a one-to-one correspondence manner. Because the foundation ditch is interior for the construction progress, probably need two-way or even multidirectional construction, have a plurality of working faces, for heatstroke prevention cooling and dust fall, all should set up the sunshade on every working face.
The arched beams 21 are truss beams and are arranged at intervals along the length direction of the slide rails 1, and two ends of each truss beam are respectively erected on the two slide rails 1 through upright posts 22; the slide rail 1 is a channel steel with an upward opening, and the lower end of the upright post 22 is arranged in the channel steel opening in a sliding manner; the upper ends of the upright posts 22 positioned at the same side of the base groove are respectively and fixedly connected with a through long connecting rod 23 parallel to the slide rail 1. The truss girder is a light steel truss girder, has higher strength than a ceiling of a conventional awning, and can meet the requirements of hoisting the spray fan 3 and the water pipe. The wind end plates can be arranged at the two ends of the channel steel to prevent the awning from being separated from the two ends of the slide rail 1.
The spraying fans 3 are arranged at intervals along the length direction of the upright posts 22 and the arched beams 21, and the distance between two adjacent spraying fans 3 is not more than two meters. If the distance is too large, dust may overflow from the gap.
And a cross brace 24 is arranged between the adjacent upright posts 22 positioned on the same side of the base groove, and the cross brace 24 is fixedly connected with the two adjacent upright posts 22 respectively so as to enhance the rigidity of the whole sunshade and prevent the sunshade from deforming.
The spherical end 221 is anchored at the lower end of the upright post 22, the teflon coating is coated on the inner surface of the slide rail 1, and the wheel is not arranged at the lower end of the upright post 22, so that various impurities can enter the slide rail 1 to influence the movement of the wheel in the construction process of a construction site, and if the wheel is adopted, the wheel with a larger diameter is used, the wheel shaft of the wheel is higher than the slide rail 1, and the bearing on the wheel shaft is a sealed bearing.
The slide rail 1 is fixedly connected with the supporting structure of the foundation trench to strengthen the supporting structure of the foundation trench and prevent the slide rail 1 from moving randomly.
The utility model relates to a foundation trench construction dust device, its use includes following step:
the method comprises the following steps: after earth excavation of a shallow layer of the foundation trench and construction of a supporting system are finished, installing sliding rails 1 on two sides of the foundation trench and connecting the sliding rails with the supporting system of the foundation trench;
step two: building a sunshade, and connecting each spray fan 3 with a water supply pipe network;
step three: the spraying fan 3 is powered on, a switch of the water supply pipe network is opened, and the sunshade is pushed to move along with the working surface in the foundation pit.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.

Claims (7)

1. The utility model provides a foundation trench construction dust device which characterized in that: comprises two slide rails (1) which are respectively arranged at two sides of a base groove along the length direction of the base groove, and a sunshade which is arranged on the two slide rails (1) in a sliding way;
the sunshade comprises upright posts (22) arranged on the sliding rails (1) in a sliding manner, an arch beam (21) erected on the upright posts (22), and tarpaulin (25) covered on the arch beam (21), wherein spraying fans (3) with outlets facing to the base groove are respectively arranged below the arch beam (21) and on the inner sides of the upright posts (22), and the spraying fans (3) are communicated with a water supply network through pipelines;
the sunshade and the working surface of the base groove are arranged above the working surface in a one-to-one correspondence manner.
2. The foundation trench construction dust fall device according to claim 1, characterized in that: the arched beams (21) are truss beams and are arranged at intervals along the length direction of the sliding rails (1), and two ends of each truss beam are erected on the two sliding rails (1) through upright columns (22) respectively; the sliding rail (1) is a channel steel with an upward opening, and the lower end of the upright post (22) is arranged in the channel steel opening in a sliding manner; the upper ends of the upright posts (22) positioned at the same side of the base groove are respectively and fixedly connected with a through long connecting rod (23) parallel to the sliding rail (1).
3. The foundation trench construction dust fall device according to claim 2, characterized in that: the spraying fans (3) are arranged at intervals along the length directions of the upright columns (22) and the arched beams (21), and the distance between every two adjacent spraying fans (3) is not more than two meters.
4. The foundation trench construction dust fall device according to claim 2, characterized in that: and a cross brace (24) is arranged between the adjacent upright columns (22) positioned on the same side of the base groove, and the cross brace (24) is fixedly connected with the two adjacent upright columns (22) respectively.
5. The foundation trench construction dust fall device according to claim 2, characterized in that: the lower end of the upright post (22) is anchored with a spherical end (221), and the inner surface of the sliding rail (1) is coated with a Teflon coating.
6. The foundation trench construction dust fall device according to claim 2, characterized in that: the lower end of the upright post (22) is provided with a wheel, and the wheel is rotatably connected with the upright post (22) through a sealing bearing.
7. The foundation trench construction dust fall device according to any one of claims 1 to 6, characterized in that: the slide rail (1) is fixedly connected with a supporting structure of the foundation trench.
CN202022437431.8U 2020-10-28 2020-10-28 Foundation trench construction dust device Active CN213710467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022437431.8U CN213710467U (en) 2020-10-28 2020-10-28 Foundation trench construction dust device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022437431.8U CN213710467U (en) 2020-10-28 2020-10-28 Foundation trench construction dust device

Publications (1)

Publication Number Publication Date
CN213710467U true CN213710467U (en) 2021-07-16

Family

ID=76800764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022437431.8U Active CN213710467U (en) 2020-10-28 2020-10-28 Foundation trench construction dust device

Country Status (1)

Country Link
CN (1) CN213710467U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116556524A (en) * 2023-06-16 2023-08-08 青岛城建集团有限公司 Municipal engineering multifunctional mobile canopy
CN118634599A (en) * 2024-08-15 2024-09-13 洛阳绿筑建筑材料有限公司 A spray dust reduction device for concrete production
CN120586556A (en) * 2025-06-18 2025-09-05 安徽权鹏建筑有限公司 A dust suppression device for municipal engineering foundation pit construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116556524A (en) * 2023-06-16 2023-08-08 青岛城建集团有限公司 Municipal engineering multifunctional mobile canopy
CN118634599A (en) * 2024-08-15 2024-09-13 洛阳绿筑建筑材料有限公司 A spray dust reduction device for concrete production
CN118634599B (en) * 2024-08-15 2024-12-20 洛阳绿筑建筑材料有限公司 Concrete production sprays dust device
CN120586556A (en) * 2025-06-18 2025-09-05 安徽权鹏建筑有限公司 A dust suppression device for municipal engineering foundation pit construction

Similar Documents

Publication Publication Date Title
CN213710467U (en) Foundation trench construction dust device
CN102704957B (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN103452561B (en) Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side
CN205776249U (en) A kind of combined inner supporting structure
CN105888703A (en) Method for constructing super-shallow-burial subway station under transverse canopy erected inside micro pilot tunnel
CN101086209A (en) Shield tunneling and shallow tunneling combined construction method for building underground station
CN205134331U (en) Foundation ditch excavation bearing structure
CN108277818A (en) Basement top-down method Combined tower crane foundation structure and construction method
CN110230507A (en) A kind of cabinet frame caunches engineering method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN104653188B (en) A kind of large-diameter shield that arranges in tunneling air channel receives and the method for starting well
CN110486036A (en) A Construction Method of Enlarged Arch Feet Initial Support Arch Covering Method
CN205100989U (en) Utilize oblique access structure of subway access & exit double as construction
JP4317322B2 (en) Arch support structure
CN108361037B (en) A rapid construction method and equipment for a shaft
CN104234447A (en) Tool-type suspension staircase for deep foundation pit
CN214832708U (en) Fully automatic mobile subway foundation pit protection greenhouse
CN115354694A (en) Super high-rise full-reverse construction method
CN207111142U (en) Temporary supporting device for laneway tunneling
CN209620682U (en) A kind of electronic steel structure rain-proof shelter of packaged type
CN104878763A (en) Main building basement support structure with podium
CN109854250B (en) Construction method for loess tunnel wall-adhering hole
CN204304374U (en) For laying the cable passage of transformer station's outlet high-tension cable
Kagan Management, mechanization and automation of work in the construction of high-rise buildings
CN108978709B (en) Urban comprehensive pipe gallery branch construction method in space-limited environment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province

Patentee after: TIANYUAN CONSTRUCTION GROUP Co.,Ltd.

Country or region after: China

Patentee after: Veterans (Shandong) Construction Group Co.,Ltd.

Address before: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province

Patentee before: TIANYUAN CONSTRUCTION GROUP Co.,Ltd.

Country or region before: China

Patentee before: SHANDONG HONGDA REAL ESTATE Co.,Ltd.