CN213597288U - Balcony superimposed sheet - Google Patents

Balcony superimposed sheet Download PDF

Info

Publication number
CN213597288U
CN213597288U CN202022053672.2U CN202022053672U CN213597288U CN 213597288 U CN213597288 U CN 213597288U CN 202022053672 U CN202022053672 U CN 202022053672U CN 213597288 U CN213597288 U CN 213597288U
Authority
CN
China
Prior art keywords
straight
slab
balcony
composite
straight plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022053672.2U
Other languages
Chinese (zh)
Inventor
杜杏
苏峰
张天宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengjun Building Materials Technology Hebei Co ltd
Original Assignee
Hengjun Building Materials Technology Hebei Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengjun Building Materials Technology Hebei Co ltd filed Critical Hengjun Building Materials Technology Hebei Co ltd
Priority to CN202022053672.2U priority Critical patent/CN213597288U/en
Application granted granted Critical
Publication of CN213597288U publication Critical patent/CN213597288U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a balcony superimposed sheet belongs to the building structure field, and is great to the volume of integral prefabricated coincide balcony board, and weight is heavy, and the problem of transportation difficulty provides following technical scheme, and the technical essential of this application includes a plurality of coincide components, the coincide component includes a plurality of end to end's coincide daughter boards, and is adjacent coincide daughter board fixed connection. The application has the advantages of convenient transportation and light weight.

Description

Balcony superimposed sheet
Technical Field
The application relates to the field of building structures, in particular to balcony superimposed sheet.
Background
The balcony component is applied to the proportion great in residential building, for the balcony installation facility and reliably be connected with the main part, prefabricated balcony generally uses board-like coincide technique, and prefabricated coincide balcony board component mainly includes prefabricated balcony roof beam and prefabricated superimposed sheet and constitutes.
The prefabricated coincide balcony slab that has now is mostly integral prefabrication, through pouring the prefabricated coincide balcony slab of monoblock in great mould inside to the maintenance shaping, then the position of hoist handling to installation is passed through to the prefabricated coincide balcony slab after will maintaining the shaping. Because the volume of integral prefabricated coincide balcony slab is great, and weight is heavy, needs great hoist just can realize the transportation to the coincide balcony slab when transporting prefabricated coincide balcony slab, and the quantity of the coincide balcony slab that transports at every turn is certain to be not convenient for realize the transportation to the coincide balcony slab, increase installation cost.
SUMMERY OF THE UTILITY MODEL
To the not enough of prior art existence, the utility model aims to provide a balcony superimposed sheet, it has convenient transportation, light in weight's advantage.
The technical purpose of the application is realized by the following technical scheme:
the utility model provides a balcony superimposed sheet, includes a plurality of coincide components, the coincide component includes a plurality of end to end's coincide daughter board, and is adjacent coincide daughter board fixed connection.
Through adopting above-mentioned technical scheme, constitute the balcony superimposed sheet through a plurality of coincide components, realize the split to integral balcony superimposed sheet, it is less to be a plurality of volumes with integral balcony superimposed sheet split, the coincide daughter board that weight is lighter, need not through great hoist handling balcony superimposed sheet, be convenient for realize the transportation to the balcony superimposed sheet, and simultaneously, because the volume of coincide daughter board is less, weight is lighter, can be through piling up together a plurality of coincide daughter boards when the transportation, realize the transportation of disposable to more coincide daughter board, thereby practice thrift the cost of transportation, convenient transportation.
The application is further configured to: the lamination daughter board includes that the upper and lower setting just isometric isopachous straight board one and straight board two, straight board one and straight board two form ascending spread groove one and downward spread groove two respectively along length direction looks wrong setting between them.
Through adopting above-mentioned technical scheme, the coincide daughter board is by the concatenation of straight board one and straight board two, can form and supply adjacent coincide daughter board lapped spread groove one and spread groove two, for directly seting up spread groove one and spread groove two on the coincide daughter board, save the preparation technology, convenient operation.
The application is further configured to: and a bonding layer is arranged between the first straight plate and the second straight plate.
Through adopting above-mentioned technical scheme, realize the fixed connection between straight board one and the straight board two.
The application is further configured to: the connecting rod is arranged at the superposition position of the first straight plate and the second straight plate, the end part of the connecting rod is provided with a clamping block, the clamping block is arranged below the second straight plate, and the clamping block is in threaded connection with the connecting rod. Through adopting above-mentioned technical scheme, connect straight board one and straight board two through the connecting rod, further increase the joint strength between straight board one and the straight board two to improve the anti bending strength of coincide daughter board.
The application is further configured to: the fixing rod is fixedly arranged inside the first straight plate, a through hole for the connecting rod to penetrate through is formed in the fixing rod, the connecting rod is in threaded connection with the fixing rod, and the upper end of the fixing rod and the upper end face of the first straight plate are located in the same plane.
Through adopting above-mentioned technical scheme, be convenient for keep the roughness on balcony superimposed sheet surface.
The application is further configured to: and a rotating groove is formed in one side, facing the upper surface of the straight plate, of the connecting rod.
Through adopting above-mentioned technical scheme, can rotate through instrument drive connecting rod to realize the connecting rod and press from both sides threaded connection between the tight piece.
The application is further configured to: the overlapping member is provided with a hanging ring.
By adopting the technical scheme, the lifting ring is arranged, so that the straight plate I can be conveniently lifted and transported.
The application is further configured to: the hanging ring is detachably connected with the overlapped component.
Through adopting above-mentioned technical scheme for the setting of rings does not hinder the overlap joint between the straight board one and the straight board two.
The application is further configured to: the hanging ring is in threaded connection with the fixed rod.
Through adopting above-mentioned technical scheme, realize rings and the dismantlement of straight board one and connect.
The application is further configured to: the overlapping member is provided with a connecting reinforcement.
Through adopting above-mentioned technical scheme, improve the joint strength of coincide component.
In summary, the present application has the following beneficial effects:
firstly, the integral balcony composite slab is split into a plurality of composite sub-slabs which are small in size and light in weight, and due to the fact that the composite sub-slabs are small in size and light in weight, the plurality of composite sub-slabs can be stacked together during transportation, transportation of a plurality of composite sub-slabs can be achieved at one time, and therefore transportation cost is saved, and transportation is facilitated;
secondly, the first connecting groove and the second connecting groove are formed by splicing the first straight plate and the second straight plate, and compared with the method that the first connecting groove and the second connecting groove are directly formed on the laminated sub-plate, the manufacturing process is saved, and the operation is convenient;
thirdly, through the arrangement of the connecting rod and the bonding layer, the connecting strength between the first straight plate and the second straight plate is increased, and the bending strength of the laminated sub-plate is improved;
fourthly, through setting up rings, be convenient for realize the hoist and mount and the transportation to coincide component, convenient transportation.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a schematic structural view of a folding member according to an embodiment of the present application;
FIG. 3 is a top view of FIG. 2;
fig. 4 is a sectional view taken along line a-a in fig. 3.
In the figure, 1, balcony superimposed slab; 11. a superimposed member; 111. overlapping the daughter boards; 1111. a first straight plate; 1112. a second straight plate; 2. connecting reinforcing steel bars; 31. connecting a first connecting groove; 32. connecting groove two; 4. a bonding layer; 51. a connecting rod; 511. a rotating groove; 52. a clamping block; 53. fixing the rod; 531. a through hole; 6. a hoisting ring; 61. hanging a ring; 62. a boom.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
With reference to fig. 1 and 2, for the balcony composite slab 1 disclosed in the present application, the balcony composite slab includes a plurality of composite members 11, the plurality of composite members 11 are arranged side by side along the length direction of the wall, and the plurality of composite members 11 form the balcony composite slab 1 through concrete integral casting between the adjacent composite members 11.
With reference to fig. 1 and 2, the overlapped component 11 includes a plurality of overlapped sub-boards 111 connected end to end, the overlapped sub-boards 111 are arranged side by side, and the arrangement direction of the overlapped sub-boards 111 is perpendicular to the length direction of the wall. The adjacent overlapped sub-boards 111 are integrally cast and formed through concrete, and fixed connection between the adjacent overlapped sub-boards 111 is achieved. Through splitting the integral balcony superimposed sheet 1 into a plurality of superimposed daughter boards 111, the transportation of superimposed daughter boards 111 is convenient to realize.
Referring to fig. 2, the overlapped sub-board 111 comprises a first straight board 1111 and a second straight board 1112 which are vertically arranged and have equal length and equal width, the first straight board 1111 is horizontally arranged, the second straight board 1112 is horizontally arranged, the first straight board 1111 and the second straight board 1112 are prefabricated firstly, connecting steel bars 2 are pre-laid in the first straight board 1111 and the second straight board 1112, the connecting steel bars 2 are transversely arranged in the first straight board 1111 and the second straight board 1112, the end parts of the connecting steel bars 2 extend to the outer parts of the first straight board 1111 and the second straight board 1112, and after the first straight board 1111 and the second straight board 1112 are prefabricated and formed, a lifting appliance is connected with the connecting steel bars 2 outside the first straight board 1111 and the connecting steel bars 2 outside the second straight board 1112 to realize lifting of the first straight board 1111 and the second straight board 1112, so that the first straight board 1111 and the second straight board 1112 are transported to a construction site; or a plurality of the first straight plates 1111 can be stacked from top to bottom, and then the plurality of the first straight plates 1111 are simultaneously hoisted to a construction site through a hoisting tool; the first straight plate 1111 and the second straight plate 1112 are spliced into the superposed sub-plates 111 after being conveyed to a construction site, and when the adjacent superposed sub-plates 111 are spliced, the connecting steel bars 2 of the adjacent superposed sub-plates 111 are fixedly connected through binding, and then the joints between the adjacent superposed sub-plates 111 are filled with concrete.
Referring to fig. 2, the first straight plate 1111 and the second straight plate 1112 are arranged in a staggered manner along the length direction of the first straight plate 1111 and the second straight plate 1112 to form a first upward connecting groove 31 and a second downward connecting groove 32, respectively, and adjacent sub-laminated plates 111 are connected in an overlapping manner through the first connecting groove 31 and the second connecting groove 32.
Referring to fig. 2, a bonding layer 4 is arranged between the first straight plate 1111 and the second straight plate 1112, the bonding layer 4 is a double-sided self-adhesive layer, one side of the bonding layer 4 is fixedly bonded with the lower surface of the first straight plate 1111, and the other side of the bonding layer 4 is fixedly bonded with the upper surface of the second straight plate 1112, during installation, the first straight plate 1111 and the second straight plate 1112 are connected through the bonding layer 4, so that the first straight plate 1111 and the second straight plate 1112 are stacked up and down to form a first connecting groove 31 and a second connecting groove 32.
With reference to fig. 3 and 4, a connecting rod 51 is disposed at the overlapping position of the first straight plate 1111 and the second straight plate 1112, and the connecting rod 51 penetrates through the overlapping position of the first straight plate 1111 and the second straight plate 1112 to realize the fixed connection between the first straight plate 1111 and the second straight plate 1112 and enhance the connection strength between the first straight plate 1111 and the second straight plate 1112.
Referring to fig. 4, the connecting rod 51 is perpendicular to the first straight plate 1111, the connecting rod 51 is perpendicular to the second straight plate 1112, the length of the connecting rod 51 is smaller than the distance between the upper surface of the first straight plate 1111 and the lower surface of the second straight plate 1112, the connecting rod 51 is provided with a rotating groove 511 at one end of the connecting rod 51 close to the upper surface of the first straight plate 1111, the rotating groove 511 may be a straight groove, and the rotating groove 511 may also be a cross groove, so as to facilitate the rotation of the connecting rod 51.
Referring to fig. 4, the lower end of the connecting rod 51 is provided with a clamping block 52, the clamping block 52 is fixedly mounted on the lower surface of the second straight plate 1112, the upper end surface of the clamping block 52 abuts against the lower surface of the second straight plate 1112, and the clamping block 52 and the second straight plate 1112 are integrally cast and molded. The center of the clamping block 52 is provided with a threaded hole, the outer wall of the connecting rod 51 is provided with an external thread matched with the threaded hole of the clamping block 52, and the end part of the connecting rod 51 penetrates through the first straight plate 1111 and the second straight plate 1112 in sequence and is in threaded connection with the clamping block 52.
Referring to fig. 4, a fixing rod 53 is arranged at the overlapping position of the first straight plate 1111 and the connecting rod 51, the fixing rod 53 is arranged in a cylindrical shape, the fixing rod 53 is embedded inside the first straight plate 1111, the fixing rod 53 is fixedly connected with the first straight plate 1111, the axis of the fixing rod 53 is overlapped with the axis of the connecting rod 51, and the upper end of the fixing rod 53 and the upper end surface of the first straight plate 1111 are in the same plane.
Referring to fig. 4, the fixing rod 53 is provided with a through hole 531 for the connecting rod 51 to pass through along the axial direction thereof, the axis of the through hole 531 coincides with the axis of the connecting rod 51, the inner peripheral wall of the through hole 531 is provided with an internal thread matched with the connecting rod 51, the connecting rod 51 is in threaded connection with the fixing rod 53, and after the lower end of the connecting rod 51 is in threaded connection with the clamping block 52, an installation space is reserved between the upper end face of the connecting rod 51 and the upper end face of the fixing rod 53.
Referring to fig. 4, the overlapping member 11 is provided with a hanging ring 6, and the hanging ring 6 is detachably coupled to the overlapping member 11.
Rings 6 includes and hangs circle 61 and jib 62, hangs circle 61 and jib 62 integrated into one piece setting, and jib 62 is vertical setting, and jib 62 axis and connecting rod 51 axis coincidence during the handling, peg graft in installation space's inside with the lower extreme of jib 62, and the lower extreme outer wall of jib 62 be provided with the internal thread of the inner peripheral wall adaptation of dead lever 53 for jib 62 and dead lever 53 threaded connection.
The implementation principle of the embodiment is as follows: binding connecting steel bars 2 of the prefabricated balcony composite slab 1 in a prefabricated mould; then concrete is poured in the prefabricated mould, a first straight plate 1111 is formed after the concrete in the prefabricated mould is solidified, the steps are repeated, the first straight plates 1111 and the second straight plates 1112 are poured, the first straight plates 1111 and the second straight plates 1112 are equal in length and width, the first straight plates 1111 and the second straight plates 1112 are stacked from top to bottom, and the first straight plates 1111 and the second straight plates 1112 are simultaneously transported to a construction site through a lifting appliance.
Then, the first straight plate 1111 and the second straight plate 1112 are arranged up and down on site, one side of the adhesive layer 4 is fixedly adhered to the lower surface of the first straight plate 1111, the other side of the adhesive layer is fixedly adhered to the upper surface of the second straight plate 1112, when the device is installed, the first straight plate 1111 and the second straight plate 1112 are connected through the adhesive layer 4, the first straight plate 1111 and the second straight plate 1112 are overlapped up and down to form a first connecting groove 31 and a second connecting groove 32, then the lower end of the connecting rod 51 penetrates through the fixing rod 53, the first straight plate 1111 and the second straight plate 1112 in sequence and then is in threaded connection with the clamping block 52, the fixed connection between the first straight plate 1111 and the second straight plate 1112 is realized under the action of the connecting rod 51, the superposed sub-plate 111 is formed through the first straight plate 1111 and the second straight plate 1112, after the connecting rod 51 is installed inside the first straight plate 1111 and the second straight plate 1112, an installation space is reserved between the upper end surface of the connecting rod 51, then, the superposed daughter board 111 is lifted to a position to be installed through a lifting appliance; the plurality of laminated sub-boards 111 are arranged side by side and then the joints of the adjacent laminated sub-boards 111 are filled with concrete for caulking and leveling, so that the plurality of laminated sub-boards 111 constitute the balcony laminated slab 1. It is less with 1 split of integral balcony superimposed sheet to be a plurality of volumes, and weight is lighter superimposed sheet 111, need not through great hoist handling balcony superimposed sheet 1, is convenient for realize the transportation to balcony superimposed sheet 1, and simultaneously, because superimposed sheet 111's volume is less, weight is lighter, can be through piling up together a plurality of superimposed sheet 111 when the transportation, realizes once only the transportation to more superimposed sheet 111 to practice thrift the cost of transportation, convenient transportation.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The balcony composite slab is characterized by comprising a plurality of composite components (11), wherein each composite component (11) comprises a plurality of composite sub-slabs (111) connected end to end, and the composite sub-slabs (111) are fixedly connected.
2. A balcony laminated slab (1) according to claim 1, wherein the laminated sub-slab (111) comprises a first straight slab (1111) and a second straight slab (1112) which are vertically arranged and have equal length and equal width, and the first straight slab (1111) and the second straight slab (1112) are arranged in a staggered manner along the length direction of the first straight slab (1111) and the second straight slab (1112) to form a first upward connecting groove (31) and a second downward connecting groove (32), respectively.
3. Balcony composite slab (1) according to claim 2, characterised in that an adhesive layer (4) is arranged between the first straight panel (1111) and the second straight panel (1112).
4. A balcony composite slab (1) according to claim 2, characterized in that a connecting rod (51) is arranged at the overlapping position of the first straight plate (1111) and the second straight plate (1112), a clamping block (52) is arranged at the end of the connecting rod (51), the clamping block (52) is arranged below the second straight plate (1112), and the clamping block (52) and the connecting rod (51) are in threaded connection.
5. A balcony composite slab (1) according to claim 4, characterized in that the fixing rod (53) is fixed inside the first straight plate (1111), the fixing rod (53) is provided with a through hole (531) for the connection rod (51) to pass through, the connection rod (51) and the fixing rod (53) are in threaded connection, and the upper end of the fixing rod (53) and the upper end surface of the first straight plate (1111) are in the same plane.
6. A balcony composite slab (1) according to claim 5, characterised in that the side of the connecting rod (51) facing the upper surface of the first straight panel (1111) is provided with a turning groove (511).
7. Balcony composite slab (1) according to claim 6, characterised in that the composite element (11) is provided with hanging rings (6).
8. Balcony composite slab (1) according to claim 7, characterised in that the hanging ring (6) and the composite member (11) are detachably connected.
9. Balcony composite slab (1) according to claim 8, characterised in that the hanging ring (6) and the fixing rod (53) are screwed.
10. Balcony laminate (1) according to claim 1, characterised in that the laminate (11) is provided with connecting reinforcement (2).
CN202022053672.2U 2020-09-18 2020-09-18 Balcony superimposed sheet Active CN213597288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022053672.2U CN213597288U (en) 2020-09-18 2020-09-18 Balcony superimposed sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022053672.2U CN213597288U (en) 2020-09-18 2020-09-18 Balcony superimposed sheet

Publications (1)

Publication Number Publication Date
CN213597288U true CN213597288U (en) 2021-07-02

Family

ID=76587541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022053672.2U Active CN213597288U (en) 2020-09-18 2020-09-18 Balcony superimposed sheet

Country Status (1)

Country Link
CN (1) CN213597288U (en)

Similar Documents

Publication Publication Date Title
CN108661225B (en) But height-adjusting's precast concrete coincide floor
CN108222270B (en) Assembling construction building method of prefabricated building
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CN213597288U (en) Balcony superimposed sheet
CN214034901U (en) Portable superimposed sheet strutting arrangement
CN112252560A (en) Novel composite floor slab for building and construction method thereof
CN108301546A (en) A kind of big module overlapping contignation of the assembled with plane girder temporary support
CN109695289B (en) Crack-resistant prefabricated superposed balcony slab and construction method thereof
CN108999324B (en) Laminated slab assembling structure and construction method thereof
CN217711299U (en) Superimposed sheet mosaic structure
CN216948997U (en) Lapping structure between laminated plates
CN112282164B (en) Light composite floor slab structure and construction method thereof
CN213509181U (en) Precast concrete superimposed sheet with machine-made sand
CN213449071U (en) Whole-room prefabricated composite floor slab of common concrete of steel bar truss
CN113958050A (en) Integrated connecting structure for bottom plate and top plate of thin bottom plate of prestressed laminated slab and construction method
CN104131709B (en) The detachable rigidity aggrandizement apparatus of superimposed sheet
CN111042413A (en) Assembly type laminated plate anchoring structure convenient to construct and connecting method thereof
CN213741569U (en) Prefabricated concrete assembled high support
CN217557870U (en) Assembled integral water pool with laminated plate type structure
CN214884339U (en) Modular assembly type building component
CN216840057U (en) Wall frame structure
CN221298320U (en) Sandwich wallboard and connection structure thereof
CN215630834U (en) Prefabricated external wall
CN217500723U (en) Prefabricated superimposed sheet piece structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant