CN213449387U - a scaffold - Google Patents

a scaffold Download PDF

Info

Publication number
CN213449387U
CN213449387U CN202021405701.0U CN202021405701U CN213449387U CN 213449387 U CN213449387 U CN 213449387U CN 202021405701 U CN202021405701 U CN 202021405701U CN 213449387 U CN213449387 U CN 213449387U
Authority
CN
China
Prior art keywords
horizontal
lock
rods
vertical
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021405701.0U
Other languages
Chinese (zh)
Inventor
易文龙
陈禄森
陈系阳
王强
于明韬
罗沐春
彭安明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Guanglian Expressway Investment Development Co ltd
CCCC First Highway Engineering Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
Cccc Guanglian Expressway Investment Development Co ltd
CCCC First Highway Engineering Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Guanglian Expressway Investment Development Co ltd, CCCC First Highway Engineering Co Ltd, Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Cccc Guanglian Expressway Investment Development Co ltd
Priority to CN202021405701.0U priority Critical patent/CN213449387U/en
Application granted granted Critical
Publication of CN213449387U publication Critical patent/CN213449387U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型公开了一种脚手架,包括多根多根立杆、纵向水平杆、横向水平杆,所述多根立杆顶端固定连接套筒,所述多根立杆底端和套筒筒身中部均开设有螺孔,所述套筒筒身外壁固定连接安全扣,所述多根立杆杆身上部与下部均固定连接十字锁架,所述两个纵向相邻的多根立杆杆身上的十字锁架之间固定连接多根纵向水平杆,所述横向相邻的十字锁架之间固定连接多根横向水平杆,所述十字锁架与多根纵向水平杆和横向水平杆之间使用锁销固定连接,所述相邻两个多根纵向水平杆之间设置挡板,所述相邻多根立杆之间设置剪刀撑。本实用新型公开了一种脚手架,该脚手架架构简单,结构牢固,便于操作。

Figure 202021405701

The utility model discloses a scaffold, which comprises a plurality of vertical rods, a longitudinal horizontal rod and a horizontal horizontal rod. The tops of the plurality of vertical rods are fixedly connected to a sleeve, and the bottom ends of the plurality of vertical rods and the middle of the sleeve barrel are provided with There are screw holes, the outer wall of the sleeve barrel is fixedly connected to the safety buckle, the upper and lower parts of the multiple vertical rods are fixedly connected to the cross lock frame, and the cross lock frames on the two longitudinally adjacent multiple vertical rods A plurality of vertical horizontal rods are fixedly connected between them, and a plurality of horizontal horizontal rods are fixedly connected between the horizontally adjacent cross lock frames, and the cross lock frame is fixed with a plurality of vertical horizontal rods and horizontal horizontal rods using lock pins. Connection, baffles are arranged between the two adjacent vertical horizontal rods, and scissor braces are arranged between the adjacent vertical rods. The utility model discloses a scaffold, which is simple in structure, firm in structure and easy to operate.

Figure 202021405701

Description

Scaffold
Technical Field
The utility model relates to a building tool field especially relates to a scaffold frame.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
The existing scaffold can not deal with a flexible and changeable building environment, a plurality of workers are needed to build the scaffold together, and manpower and time are wasted.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a scaffold.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a scaffold, includes many pole settings, many pole setting top fixed connection sleeves, the screw has all been seted up at many pole setting bottoms and sleeve stack shell middle parts, sleeve stack shell outer wall fixed connection safety is detained, many pole setting pole body upper portions and the equal fixed connection cross lock frame in lower part, vertical adjacent two many vertical horizon bars of fixed connection between the epaxial cross lock frame of pole setting pole body, many horizontal horizon bars of fixed connection between the horizontal adjacent cross lock frame, use lockpin fixed connection, adjacent two between cross lock frame and many vertical horizon bars and the horizontal horizon bar set up the baffle between the vertical horizon bar, and many are adjacent set up the bridging between the pole setting, many horizontal horizon bars set up scaffold wall key with the one side of wall contact.
As a further description of the above technical solution:
the structure of the plurality of longitudinal horizontal rods is the same as that of the plurality of transverse horizontal rods, each longitudinal horizontal rod comprises a lock hole, a straight lock and a rod body, the two ends of each rod body are fixedly connected with the straight locks, and the lock holes are formed in the middle of the straight locks and penetrate through the lock bodies.
As a further description of the above technical solution:
the cross lock frame comprises a lock rod, a through hole and a frame body, wherein the through hole is formed in the middle of the lock rod, and the lock rod is fixedly connected to the frame body.
As a further description of the above technical solution:
the straight lock is fixed on the frame body of the cross lock frame by using a lock pin, and the lock pin penetrates through a lock hole of the straight lock and a through hole on the frame body of the cross lock frame.
As a further description of the above technical solution:
the plurality of longitudinal horizontal rods and the plurality of transverse horizontal rods mutually form a vertical angle.
As a further description of the above technical solution:
the sleeve is fixedly connected with the bottom of the upright rod through a bolt, and the bolt penetrates through the bottom end of the upright rod and a screw hole of the sleeve body.
As a further description of the above technical solution:
and a nut is connected to the lower end of the bolt through threads.
The utility model discloses following beneficial effect has:
the utility model provides a pair of scaffold, simple and convenient when buildding uses the mode of sleeve and bolted connection for fixed more simple, the level bar straight lock makes the framework simple firm with cross lock frame scarf joint, can be more swiftly convenient, labour saving and time saving when buildding.
Drawings
Fig. 1 is a front sectional view of a scaffold according to the present invention;
fig. 2 is a side view of a scaffold according to the present invention;
fig. 3 is an enlarged cross-sectional view taken at a in fig. 2 according to the present invention;
fig. 4 is a cross lock frame structure diagram provided by the utility model.
Illustration of the drawings:
1. erecting a rod; 2. a sleeve; 3. a safety buckle; 4. a bolt; 5. a nut; 6. a lock pin; 7. a longitudinal horizontal bar; 8. a baffle plate; 9. a scissor support; 10. a cross lock frame; 11. a screw hole; 12. a transverse horizontal bar; 13. A scaffold wall connecting key; 101. a lock lever; 102. a through hole; 103. a frame body; 701. a lock hole; 702. directly locking; 703. a horizontal shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides an embodiment: the utility model provides a scaffold, includes many pole settings 1, many 1 top fixed connection sleeves of pole setting 2, and screw 11 has all been seted up at 1 bottom of many pole settings and 2 stack shell middle parts of sleeve, and 2 stack shell outer wall fixed connection safety of sleeve detain 3, many 1 pole body upper portions of pole setting and the equal fixed connection cross lock frame 10 in lower part, vertical adjacent two many vertical horizontal poles 7 of fixed connection between the cross lock frame 10 on the 1 pole body of pole setting, many horizontal poles 12 of fixed connection between the horizontal adjacent cross lock frame 10, use lockpin 6 fixed connection between cross lock frame 10 and many vertical horizontal poles 7 and the horizontal pole 12, adjacent two set up baffle 8 between the vertical horizontal pole 7, many adjacent set up bridging 9 between the pole setting 1, many horizontal poles 12 and the one side of wall contact set up scaffold and link wall key 13.
The structure of the plurality of longitudinal horizontal rods 7 and the structure of the transverse horizontal rods 12 are the same, each longitudinal horizontal rod 7 comprises a lock hole 701, a straight lock 702, a horizontal rod body 703, two ends of each horizontal rod body 703 are fixedly connected with the straight lock 702, each lock hole 701 is arranged in the middle of the corresponding straight lock 702 and penetrates through the corresponding lock body, the cross-shaped lock frame 10 comprises a lock rod 101, a through hole 102 and a frame body 103, the through hole 102 is arranged in the middle of the lock rod 101, the lock rod 101 is fixedly connected onto the frame body 103, the straight lock 702 is fixed onto the frame body 103 of the cross-shaped lock frame 10 through a lock pin 6, the lock pin 6 penetrates through the lock hole 701 of the straight lock 702 and the through hole 102 in the frame body 103 of the cross-shaped lock frame 10, the plurality of longitudinal horizontal rods 7 and the plurality of transverse horizontal rods 12 form a vertical angle, the sleeve 2 and the bottom of the vertical rod 1 are.
The working principle is as follows: when the scaffold is built, the bottom of the vertical rod 1 is inserted into the top sleeve 2 and fixed by the bolt 4 and the nut 5, the vertical horizontal rod 7 and the horizontal rod 12 are embedded on the frame body 103 of the cross lock frame 10 on the rod body of the vertical rod 1 through the straight lock 702 and then fixed by the lock pin 6, the baffle 8 is erected between two adjacent vertical horizontal rods 7, and a layer is built simply and quickly.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1.一种脚手架,包括多根立杆(1),其特征在于:所述多根立杆(1)顶端固定连接套筒(2),所述多根立杆(1)底端和套筒(2)筒身中部均开设有螺孔(11),所述套筒(2)筒身外壁固定连接安全扣(3),所述多根立杆(1)杆身上部与下部均固定连接十字锁架(10),纵向相邻的两根所述立杆(1)杆身上的十字锁架(10)之间固定连接多根纵向水平杆(7),所述横向相邻的十字锁架(10)之间固定连接多根横向水平杆(12),所述十字锁架(10)与多根纵向水平杆(7)和横向水平杆(12)之间使用锁销(6)固定连接,相邻两个所述纵向水平杆(7)之间设置挡板(8),多根相邻所述立杆(1)之间设置剪刀撑(9),所述多根横向水平杆(12)与墙壁接触的一面设置脚手架连墙键(13)。1. A scaffold comprising a plurality of vertical rods (1), characterized in that: the top of the plurality of vertical rods (1) is fixedly connected to a sleeve (2), the bottom end of the plurality of vertical rods (1) and the sleeve (2) ) The middle part of the barrel is provided with a screw hole (11), the outer wall of the sleeve (2) is fixedly connected to the safety buckle (3), and the upper and lower parts of the plurality of vertical rods (1) are fixedly connected to the cross lock frame (10), a plurality of longitudinal horizontal rods (7) are fixedly connected between the cross lock frames (10) on the body of the two vertically adjacent vertical rods (1), and the cross lock frames (10) adjacent to each other in the horizontal direction are fixedly connected. ) are fixedly connected with a plurality of horizontal horizontal rods (12), and the cross lock frame (10) is fixedly connected with the plurality of vertical horizontal rods (7) and the horizontal horizontal rods (12) by means of locking pins (6). A baffle plate (8) is arranged between two adjacent vertical horizontal bars (7), a scissor brace (9) is arranged between a plurality of adjacent vertical bars (1), and a plurality of horizontal horizontal bars (12) are arranged. The side in contact with the wall is provided with a scaffolding wall key (13). 2.根据权利要求1所述的一种脚手架,其特征在于:所述多根纵向水平杆(7)、横向水平杆(12)结构相同,所述纵向水平杆(7)包括锁孔(701)、直锁(702)、水平杆身(703),所述水平杆身(703)两端固定连接直锁(702),所述锁孔(701)设置在直锁(702)中部并贯穿锁身。2. A scaffold according to claim 1, characterized in that: the plurality of longitudinal horizontal rods (7) and the horizontal horizontal rods (12) have the same structure, and the longitudinal horizontal rods (7) comprise lock holes (701) ), a straight lock (702), a horizontal shaft (703), the two ends of the horizontal shaft (703) are fixedly connected to the straight lock (702), and the locking hole (701) is arranged in the middle of the straight lock (702) and penetrates through locked. 3.根据权利要求1所述的一种脚手架,其特征在于:所述十字锁架(10)包括锁杆(101)、通孔(102)、架身(103),所述通孔(102)设置在锁杆(101)中部,所述锁杆(101)固定连接在架身(103)上。3. A scaffold according to claim 1, characterized in that: the cross lock frame (10) comprises a lock rod (101), a through hole (102), a frame body (103), and the through hole (102) ) is arranged in the middle of the locking rod (101), and the locking rod (101) is fixedly connected to the frame body (103). 4.根据权利要求2所述的一种脚手架,其特征在于:所述直锁(702)使用锁销(6)固定在十字锁架(10)的架身(103)上,所述锁销(6)贯穿直锁(702)的锁孔(701)和十字锁架(10)的架身(103)上的通孔(102)。4. A scaffold according to claim 2, characterized in that: the straight lock (702) is fixed on the frame (103) of the cross-lock frame (10) by using a lock pin (6), and the lock pin (6) Go through the lock hole (701) of the straight lock (702) and the through hole (102) on the frame body (103) of the cross lock frame (10). 5.根据权利要求1所述的一种脚手架,其特征在于:所述多根纵向水平杆(7)、多根横向水平杆(12)之间互成垂直角度。5 . The scaffold according to claim 1 , wherein the plurality of vertical horizontal rods ( 7 ) and the plurality of horizontal horizontal rods ( 12 ) form a vertical angle with each other. 6 . 6.根据权利要求1所述的一种脚手架,其特征在于:所述套筒(2)与立杆(1)底部通过螺栓(4)固定连接,所述螺栓(4)贯穿立杆(1)底端和套筒(2)筒身的螺孔(11)。6. A scaffold according to claim 1, characterized in that: the sleeve (2) and the bottom of the vertical rod (1) are fixedly connected by bolts (4), and the bolts (4) penetrate the vertical rod (1) ) bottom end and the screw hole (11) of the sleeve (2) barrel. 7.根据权利要求6所述的一种脚手架,其特征在于:所述螺栓(4)下端螺纹处连接有螺母(5)。7 . The scaffold according to claim 6 , wherein a nut ( 5 ) is connected to the thread at the lower end of the bolt ( 4 ). 8 .
CN202021405701.0U 2020-07-16 2020-07-16 a scaffold Active CN213449387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021405701.0U CN213449387U (en) 2020-07-16 2020-07-16 a scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021405701.0U CN213449387U (en) 2020-07-16 2020-07-16 a scaffold

Publications (1)

Publication Number Publication Date
CN213449387U true CN213449387U (en) 2021-06-15

Family

ID=76306189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021405701.0U Active CN213449387U (en) 2020-07-16 2020-07-16 a scaffold

Country Status (1)

Country Link
CN (1) CN213449387U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882640A (en) * 2021-10-15 2022-01-04 中国十七冶集团有限公司 Splicing type construction engineering construction method with high stability

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882640A (en) * 2021-10-15 2022-01-04 中国十七冶集团有限公司 Splicing type construction engineering construction method with high stability

Similar Documents

Publication Publication Date Title
CN213449387U (en) a scaffold
CN106939690A (en) The anti-load-bearing scaffold that inclines of one kind
CN217840861U (en) Multi-angle template jacking bracket
CN209040598U (en) Auxiliary unloading device for replacement of shear wall concrete by support-free method
CN215858986U (en) Crane beam operation cage
CN215055225U (en) A scaffolding for construction with fast splicing function
CN108385526A (en) A kind of pier stud reinforcing bar security protection integration sizing moulding bed
CN211850938U (en) Frame structure of assembled material transferring platform
CN217028024U (en) High-rise embracing column wall connecting piece
CN216042477U (en) Scaffold
CN104878700A (en) Truss formwork
CN210316448U (en) Foldable scaffold
CN214831971U (en) A splicing device for bridge columns and tie beams
CN205224557U (en) Lift scaffold pole setting connection structure
CN203807949U (en) Assembly type overwater pier body construction support
CN106245615A (en) A kind of block assembly auxiliary mould
CN213626715U (en) Be used for building engineering construction steel bar support
CN215519315U (en) Vertical connecting piece of prefabricated wall body
CN109594760B (en) Interior crowded pole bench equipment platform of embracing
CN207673002U (en) A kind of wall hole stays the mould structure set
CN210508307U (en) Scaffold for building engineering
CN223202703U (en) A telescopic scaffolding footboard
CN213837689U (en) Civil construction is with bracing securing device of full hall frame
CN214785897U (en) Mount for construction
CN218714826U (en) Outer wall scaffold