CN2134381Y - Spiral unloader - Google Patents
Spiral unloader Download PDFInfo
- Publication number
- CN2134381Y CN2134381Y CN 92200286 CN92200286U CN2134381Y CN 2134381 Y CN2134381 Y CN 2134381Y CN 92200286 CN92200286 CN 92200286 CN 92200286 U CN92200286 U CN 92200286U CN 2134381 Y CN2134381 Y CN 2134381Y
- Authority
- CN
- China
- Prior art keywords
- spiral
- dolly
- unloading
- spiral group
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Handcart (AREA)
Abstract
The utility model relates to a wagon shaker used for train bulk cargoes in a quay or a freight yard, belonging to the handling machinery. For instance, the utility model can be used for unloading coals and construction materials. The utility model is composed of a drag guide type trolley and a totally enclosed overload protection type spiral group box-shaped double main beam cantilever gantry crane wabbler mechanism. The utility model which has the advantages of simple structure and low cost relieves the repairing workers' labor intensity.
Description
The utility model belongs to loading-unload machine, is the harbour goods yard train bulk freight interior machinery of unloading.As unload coal, building materials etc.
Original spiral unloading machine (see figure 1) is made up of truss-like portal frame (10), double helix group (4), two wabble mechanism (2), two lift system (5), two balladeur train (1) and angle iron sliding line current collector (3), stop line (6), tunnel funnel (7) tunnel belt feeder (8), car unloader operating unit (9), operator's compartment (11).
During car unloading operation, start operating unit (9), train one end of parking from stop line (6) begins to unload, and at first opens the train door of tunnel one side, again by following procedure operation:
1) starting wabble mechanism (2) aligns car position with spiral group (4) and prepares to unload.
2) starting lift system (5) drops to till the material appropriate depth (determining according to the speed of unloading) spiral group (4) in the compartment in.
3) by the direction starting operation mechanism (9) of unloading, it is out of service to run to the compartment other end, and this moment, the ground floor material was unloaded light.
4) starting wabble mechanism (2) makes spiral group (4) reverse, and decline spiral group (4) appropriate depth to the material.
5) starting operation mechanism (9), to the compartment initial end, second layer material unloaded to tunnel belt feeder (8) by tunnel funnel (7) and transported this moment.
Material in the car is unloaded light for so reciprocal operation, fractional layer so that till unsnatching whole trains, for adapting to the needs of the two stop line operations of single tunnel belt feeder, car unloader has two cover balladeur trains, spiral group, lift system etc.Behind the material that unloads light one side stop line train, unload the material of train on the opposite side stop line again by the aforesaid operations program with another set of unloading unit.
The spiral group transmission device (see figure 2) of original spiral unloading machine, in order to adapt to the condition of unloading in two stop line list tunnels, spiral group (4) is made symmetric form two covers, every cover is by left and right sides screw shaft 4-1,4-11, driven sprocket 4-2, messenger chain 4-3, drive sprocket 4-4, long pass moving axis 4-5, electrical motor 4-6, sprocket wheel plunging joint 4-7, change gear 4-8, compositions such as short pass moving axis 4-9, retarder 4-10.
Electrical motor 4-6, through retarder 4-10, the one side by the drive sprocket 4-4 on the long pass moving axis 4-5 by messenger chain 4-3, drive driven sprocket 4-2, right-hand screw axle 4-1 is rotated unload, its opposite side is through change gear 4-8, by the drive sprocket on the short pass moving axis 4-9, drive driven sprocket by messenger chain, left-hand screw axle 4-11 is oppositely unloaded.
The wabble mechanism (see figure 3) of original car unloader
By electrical motor 2-9, sprocket wheel plunging joint 2-8, worm reducer 2-7, drive miniature gears 2-6, big gear wheel 2-5, drive driven wheel 2-3 and quadrant gear 2-2 engagement by transmission shaft 2-4.Wabble mechanism links to each other with balladeur train by hanger 2-10, and suspension bracket 2-1 links to each other with the spiral group by bearing pin, and sector shaft is fixed on the chassis 2-11 of spiral group.
The action of wabble mechanism is by electrical motor 2-9, sprocket wheel plunging joint 2-8, worm reducer 2-7, miniature gears 2-6, big gear wheel 2-5, driven wheel 2-3, makes the quadrant gear that is engaged with drive the spiral group and realizes rocking motion.
Original spiral unloading machine has following shortcoming:
1, owing to adopt the gate-type truss structure, and two groups of balladeur trains need the workman in stop line when being installed on the trusses maintenance, not only inconvenience but also dangerous.After the balladeur train wearing and tearing, the integral structure balladeur train is scrapped replacing, not only waste raw MAT'L but also increase maintenance capacity.
2, the spiral group is the open type transmission, and is dangerous, and driving efficiency is low, poor lubrication, life-span is short, and sprocket wheel, messenger chain are to move and be embedded in to rotate in the material under exposed chain rupture, sprocket wheel broken teeth often to occur, even easy off-axis, fall in the material, often cause engine-damaged accident to the other side.The influence that is subjected to freeze in working depth, impurity and winter material owing to the spiral group in addition, drive motor often are in to move under the overload condition and cause electrical motor to burn, and cause stopping accident.
3, wabble mechanism is to adopt direct motor drive, drive quadrant gear through reductor and reach the purpose of waving, and mechanism's complexity, the cost height wastes energy, and the fault rate height uses maintenance inconvenient.
In order to overcome the shortcoming of original technology, the purpose of this utility model be designed to totally-enclosed, overload protection, the two kingpost cantalever mechanisms of box.Wabble mechanism is the gravitional force that utilizes spiral group itself, drive rocking carrier by lift system and reach wiggly purpose, for adapting to two stop line operations, design drives a cover unloading unit by traction-type dolly level moving machinery, and (move on two girders comprising balladeur train, rocking carrier, spiral group and lift system, the slideway on the balladeur train vertically slides on the guide wheel on the traction-type dolly.Thereby design a kind of simple in structurely, reduce maintenance, and easy to maintenance, energy savings, raw MAT'L, safe in operation, reliable, the spiral unloading machine that efficient is high.
The utility model is to realize by following measure:
Spiral unloading machine is made up of door frame, balladeur train, spiral group, wabble mechanism etc., it is characterized in that: 1) door frame is made the two kingpost cantalever structures of box; 2) be connected with rocking carrier by the totally-enclosed overload protection type spiral group of a cover, rocking carrier is connected with balladeur train by bearing pin, and balladeur train is vertically to slide on the guide wheel that is fixed on the traction-type dolly, and the traction-type dolly is level run on two girders; 3) wabble mechanism is to drive and can constitute by wiggly rocking carrier by being fixed on the cover of two on traction-type dolly lift system.
Spiral group of the present utility model is to be linked to each other with chain-wheel box by bear box by motor drives hydraulic coupler, retarder, drives helicallobe then and rotates.Running part is totally-enclosed, guarantees good lubricating.
Wabble mechanism of the present utility model is to flexibly connect and fixed pulley group by being fixed on the lift system on the traction-type dolly and be fixed on running block, steel rope up-and-down movement on the rocking carrier by bearing pin and balladeur train, spiral group, utilize gravitional force to make spiral group wigwag motion, by the different angles of waving, realize the purpose that different driving surfaces is unloaded, when waving angle at 0 °-14 °, the degree of depth of unloading of two helicallobes on the spiral group can reach 0.2-0.8 rice.When waving angle at ± 14 °-± 17 °, scraper plate reaches and position contacting at the bottom of the car, unload at the end clearly this moment, wabble mechanism can reach the purpose of control productive capacity and clear car, the action of waving does not need to be provided with separately actuating devices such as electrical motor, but descend by a side lift system, utilize the gravitional force of spiral group itself, turn an angle by rocking carrier.The spiral group is again to oppositely waving when the opposite side lift system descends.The spiral group is promoted or decline when two groups of lift systems promote when descending simultaneously, adjust the degree of depth of unloading.The setting angle indicating device can be observed and angle is waved in adjustment at any time on rocking carrier.
The utility model design-calculated traction-type dolly driver train, be by electrical motor through load limiting type of constant filling fluid coupling, retarder, drg drive can positive and negative rotation reel, steel rope middle part be fixed on the reel middle part, steel rope one end is after being installed in the running block on the trolley frame, be fixed on the tensioner, the other end of steel rope is through idler pulley, sheave horizontal trolley group, and after walking around another movable pulley on the trolley frame, be fixed on another tensioner.Rope trolley back and forth operation on two girders when reel rotates anyway.Can be accurately during operation on stop line the location unloading unit can be run to two kingpost cantalever ends again and carry out M R.
Advantage of the present utility model:
1) because door frame adopts the two kingpost cantalever mechanisms of box, drives cover unloading unit level run on two girders by the traction-type dolly.Can realize that two stop lines are unloaded does not need to process left and right sides helicallobe and only needs the electrical appliance control rotating, also can carry out maintenance at two kingpost cantalever ends.Reduced cost, easy to maintenance, guarantee safety.
2) because spiral group running part is taked full-closed structure, and load limiting type of constant filling fluid coupling has been installed, thoroughly solved because overload is burnt problems such as electrical motor, sprocket wheel broken teeth, chain rupture bar and disconnected screw shaft, thereby improved efficient, guaranteed the lubricated maintenance that reduced, save raw MAT'L, alleviated the labour intensity of field worker.
3) reasonable use the gravitional force of spiral group, realize waving purpose by rocking carrier swing certain angle.Simple in structure, reliable, reduced cost, saved the energy, it is clean to unload, and has alleviated clear car working strength of workers greatly.
4) owing to adopt the traction-type drive car, make dolly that stop position accurately be arranged.Dolly is not subjected to the influence of the horizontal thrust of helicallobe, guarantees that spiral group and train railway carriage accurately align, and operation is steady.Accompanying drawings is as follows:
Fig. 1: original spiral unloading machine structural representation.
Fig. 2: original spiral unloading machine spiral group transmission scheme drawing.
Fig. 3: original spiral unloading machine wabble mechanism scheme drawing.
Fig. 4: the utility model spiral unloading machine structural representation.
Fig. 5 Fig. 6: the utility model spiral unloading machine spiral group is faced, birds-eye view.
Fig. 7: the utility model spiral unloading machine unloading unit assembly drawing.
Fig. 8: the utility model car unloader traction-type wheeling mechanism arrangement plan.
Fig. 9: the utility model trolley frame scheme drawing.
Figure 10: the utility model spiral unloading machine main circuit diagram.
See Fig. 4, the utility model is made up of two kingpost cantalever structure door frame (17) driver's cabs (16) of box, lift system (15), balladeur train (14), traction-type wheeling mechanism (13), Electric Appliance Cabinet (12), rocking carrier (24), current collector (23) spiral group (22), traveling mechanism of the larger traveller (21), stop line (18-1,18-2) tunnel belt feeder (20), funnel (19).This equipment adapts to the needs that two stop lines are unloaded, and the unloading capacity of unloading that is used for harbour, coke-oven plant, dump, three kinds of goods of truck is 600 tons/hour-900 tons/hour.
The program of unloading is as follows:
See Fig. 4, close main supply switch, handle lift system (15) unloading unit (comprising lift system, balladeur train (14), wabble mechanism (24), spiral group (22) etc.) be lifted to from two kingpost cantalever ends and be higher than obstacle 0.5 top, Electric Appliance Cabinet (12) work, starting drive car (13) is prepared railway car one end that unloading unit moves on to stop line (18-1) to unload, starting spiral group (22) adapts the turning to of helicallobe and the service direction of unloading, starting lift system (13) makes the rocking carrier work of wabble mechanism (24), when spiral group (22) is reduced in the car appropriate depth in the material, by the direction starting traveling mechanism of the larger traveller (21) of unloading.The blade of spiral group this moment (22) is discharged into material side door in the compartment on the tunnel belt feeder (20) by funnel (19).It is out of service when cart runs to the compartment other end, the ground floor material is unsnatched in the compartment at this moment, starting and decline opposite side lift system (15) make spiral group (22) to the backhaul direction of unloading by rocking carrier (24), the degree of depth that spiral group this moment (22) decline is 0.34 meter, adjust the decline degree of depth, starting traveling mechanism of the larger traveller (21) counter-rotating begins to carry out second layer material from compartment other end return and unloads.Back and forth till unload light.After the last full train of stop line (18-1) unloaded light, starting traction-type dolly driver train (13) drove the car position that unloading unit is moved horizontally to stop line (18-2), repeats car unloading operation.Empties train is left, and heavy haul train advances stop line (18-1) again.So continuous car unloading operation.After stopping car unloading operation, unloading unit is moved to the cantilever end of door frame (17), the spiral group is placed on the ground total electric switch of leaving behind.
See that Fig. 5 Fig. 6 is spiral group front elevation of the present utility model and birds-eye view.
The spiral group be spiral unloading machine unload thing mechanism, it is by electrical motor (22-4), drive hydraulic coupler (22-5), connection reducer (22-6), sprocket wheel plunging joint (22-7), bear box (22-8), chain-wheel box (22-1) connects sprocket wheel drive spiral group blade (22-2) rotation unloads material, and the scraper plate that is in operation (22-3) is used as clear car operation.
Fig. 7 is a unloading unit of the present utility model:
It is made up of balladeur train (14), two groups of lift system (15) wabble mechanism (24) spiral groups (22) that are fixed on the traction-type dolly (13).Lift system is made up of retarder (15-1), steel rope (15-3), fixed pulley group (15-2), running block (15-4).
Triangle slideway on the balladeur train (14) is to make unloading unit along the guide wheel on the trolley frame (13-11), slides up and down by lift system.Lift system (15) makes scraper plate (22-3) spiral group blade (22-2) rising, decline, wigwag motion in rocking carrier (24-2), the spiral group by retarder (15-1), steel rope (15-3), fixed pulley group (15-2), movable pulley (15-4).When the reel of two groups of lift systems is involved in steel rope simultaneously, unloading unit rises, and when emitting steel rope (15-3) simultaneously, unloading unit descends, and two cover lift systems are when descending respectively, and rocking carrier utilizes the gravitional force of spiral group by waving axle (24-1) wigwag motion.When car unloading operation, lift system shakes the spiral group to scraper plate bottom and spiral group blade (22-2) bottom on same horizontal surface, and (both two screw shaft lines became 14 ° with the horizontal plane angle) extreme depth of unloading at this moment is 0.8 meter.When scraper plate is made cleaning work, scraper plate (22-3) can be shaken at the bottom of the contact car, forbid when being 2 centimetres of car unloading operations at the bottom of the spiral group blade pitch car at the bottom of the helicallobe collision car.
Fig. 8 is the utility model wheeling mechanism, and its function is, the operation by dolly moves to two stop lines to unloading unit and carries out car unloading operation.Unload and move to cantilever end after finishing and wait to unload or keep in repair.
Wheeling mechanism by electrical motor (13-1), load limiting type of constant filling fluid coupling (13-2), retarder (13-3), drg (13-4), reel (13-5) fixed pulley group (13-8), running block (13-7), trolley frame (13-10), steel wire rope stretching device (13-6) with (13-9) and guide wheel (13-11), road wheel (13-12), horizontal wheel (13-13) form.
Trolley travelling transfers realization anyway by reel.The steel rope middle part is fixed with the steel rope pressing plate with the reel middle part, after steel rope one end is walked around a pulley of running block (13-7) by reel (13-5), end is fixed on the tightening device (13-6), the steel rope other end is laid out through after the fixed pulley group (13-8) by the reel other end, walk around another pulley of running block (13-7) again, last end is fixed on the tightening device (13-9).When reel rotated, steel rope one end was involved in reel, and the other end is emitted by reel, thereby dolly is back and forth moved.
Trolley frame figure of the present utility model shown in Figure 9, it is made up of vehicle frame (13-10), road wheel (13-12), guide wheel (13-11) and horizontal wheel (13-13) etc.By shown in Figure 4, unloading unit all is installed on the trolley frame, sees that the balladeur train (14) among Fig. 7 slides up and down along guide wheel (13-11), and every dolly of guide wheel (13-11) is installed 16 covers altogether.Horizontal wheel (13-13) is for dolly normally being walked along girder, preventing the device that dolly rotates around vertical axis.
Main circuit diagram of the present utility model shown in Figure 10.
DL--30KW
Dd--18.5KW×2
Dx--4KW
' ' total volume 88KW
Claims (5)
1, a kind of spiral unloading machine is made up of door frame, balladeur train, spiral group, wabble mechanism, it is characterized in that: the truss on (1) door frame is made the two kingpost cantalever structures of box; (2) by a cover totally-enclosed overload protection type spiral group and rocking carrier flexible connection, be connected with balladeur train by bearing pin, the slideway on the balladeur train contacts with guide wheel on the traction-type dolly of two girder walking in a horizontal state again; (3) wabble mechanism drives and can form by wiggly rocking carrier by being fixed on the cover of two on dolly lift system,
2, spiral unloading machine according to claim 1 is characterized in that the spiral group is to be connected with hydraulic coupler, retarder by electrical motor, links to each other with the chain-wheel box that helicallobe is installed by bear box,
3, according to claims 1 described spiral unloading machine, it is characterized in that wabble mechanism is to flexibly connect by balladeur train, spiral group, and be fixed on the running block on the rocking carrier and utilize gravitional force that the wiggly rocking carrier of spiral group is formed by steel rope, the running block that is fixed on lift system on the traction-type dolly
4, spiral unloading machine according to claim 1 is characterized in that: the traction-type dolly is made up of balladeur train, spiral group, wabble mechanism, lift system in the mechanism of unloading of two girder level runs.
5, according to claim 1 and 3 described spiral unloading machines, it is characterized in that the traction-type dolly is made up of electrical motor, load limiting type of constant filling fluid coupling, drg and reel that can rotating, the steel rope middle part is fixed together with the reel middle part, steel rope one end is laid out behind running block on the dolly by reel, be fixed on the tensioner, the steel rope other end is fixed on another tensioner after idler pulley, sheave, horizontal trolley are installed in running block on the dolly
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 92200286 CN2134381Y (en) | 1992-01-06 | 1992-01-06 | Spiral unloader |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 92200286 CN2134381Y (en) | 1992-01-06 | 1992-01-06 | Spiral unloader |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2134381Y true CN2134381Y (en) | 1993-05-26 |
Family
ID=33761023
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 92200286 Expired - Fee Related CN2134381Y (en) | 1992-01-06 | 1992-01-06 | Spiral unloader |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2134381Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1295122C (en) * | 2004-08-13 | 2007-01-17 | 阎国俊 | Spiral unloading device |
| CN104944176A (en) * | 2014-05-28 | 2015-09-30 | 冯世英 | Centrifugal car unloading machine |
| CN106743784A (en) * | 2016-12-01 | 2017-05-31 | 中冶东方工程技术有限公司 | A kind of automobile receives unloading system and method |
| CN108516358A (en) * | 2018-03-19 | 2018-09-11 | 中国神华能源股份有限公司 | Spiral arm anti-fall device and screw unloader |
| CN111332951A (en) * | 2020-03-11 | 2020-06-26 | 焦瑞敏 | Intelligent fuel loading and unloading control system and control method |
-
1992
- 1992-01-06 CN CN 92200286 patent/CN2134381Y/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1295122C (en) * | 2004-08-13 | 2007-01-17 | 阎国俊 | Spiral unloading device |
| CN104944176A (en) * | 2014-05-28 | 2015-09-30 | 冯世英 | Centrifugal car unloading machine |
| CN104944176B (en) * | 2014-05-28 | 2017-03-22 | 冯世英 | Centrifugal car unloading machine |
| CN106743784A (en) * | 2016-12-01 | 2017-05-31 | 中冶东方工程技术有限公司 | A kind of automobile receives unloading system and method |
| CN108516358A (en) * | 2018-03-19 | 2018-09-11 | 中国神华能源股份有限公司 | Spiral arm anti-fall device and screw unloader |
| CN111332951A (en) * | 2020-03-11 | 2020-06-26 | 焦瑞敏 | Intelligent fuel loading and unloading control system and control method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103303692B (en) | A kind of automation both arms frame mixed-windrowed locomotive efficiently | |
| CN102912726A (en) | Combined type multifunctional bridge inspection trolley | |
| CN205312909U (en) | Two roof beam double small car bridge crane | |
| CN110817491B (en) | Intelligent coal leveling device for coal loading | |
| CN112253158A (en) | Full-coal roadway cross shaft tunneling machine, control method and application | |
| CN1025780C (en) | Spiral car unloader | |
| CN211619404U (en) | Railway bulk grain transportation and loading equipment | |
| CN209871807U (en) | Two-degree-of-freedom railway open wagon material leveling device | |
| CN218289681U (en) | Integrated intelligent crawler full-moving car loader | |
| CN116495501A (en) | A kind of train container unloading system and unloading method | |
| CN100450902C (en) | Bulk material loading and anloading method and tracting bucket wheel material stacking and taking machine | |
| CN111301991B (en) | Coal cleaning equipment at the bottom of the main conveyor belt | |
| CN207030464U (en) | Semi-door type scratch board reclaimer | |
| CN109850588A (en) | A kind of efficient semi portal double-row type scraper reclaimer | |
| CN216889104U (en) | Mining spanning mine car loader capable of moving automatically | |
| CN204549488U (en) | A kind of self-driving formula Multifunction bulk grain binning machine | |
| CN219669586U (en) | Train container unloading system | |
| CN111348443A (en) | A crawler walking scraper reclaimer | |
| CN217650227U (en) | Automatic change and go up and down to throw material platform | |
| CN2908437Y (en) | Multi-tooth pick-up shovel type coal conveyer | |
| CN2170377Y (en) | Mine car conveyer | |
| CN202881905U (en) | Novel long slope repairing machine | |
| CN211140881U (en) | Metal filing lifting, overturning and discharging mechanism | |
| CN101892619A (en) | Inductive plate paving vehicle | |
| CN211452872U (en) | A new type of industrial test bench for vertical buried scraper reclaiming system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |