CN213415573U - High-rise green building construction discharge apparatus - Google Patents
High-rise green building construction discharge apparatus Download PDFInfo
- Publication number
- CN213415573U CN213415573U CN202021876140.2U CN202021876140U CN213415573U CN 213415573 U CN213415573 U CN 213415573U CN 202021876140 U CN202021876140 U CN 202021876140U CN 213415573 U CN213415573 U CN 213415573U
- Authority
- CN
- China
- Prior art keywords
- bracket
- lifting
- double
- building construction
- conveying mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 13
- 230000007246 mechanism Effects 0.000 claims abstract description 31
- 230000007306 turnover Effects 0.000 claims abstract description 13
- 238000007599 discharging Methods 0.000 claims 3
- 239000000463 material Substances 0.000 description 17
- 230000005540 biological transmission Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A high-rise green building construction unloading device comprises a lifting frame, wherein a lifting turnover mechanism is arranged in the lifting frame, and the lifting turnover mechanism lifts and turns a charging box; the lifting turnover mechanism comprises a double-row chain conveying mechanism, the double-row chain conveying mechanism is driven by a motor, a bracket is connected with the double-row chain conveying mechanism, first travelling wheels are mounted at two ends of the bracket, which are connected with chains in the double-row chain conveying mechanism, the first travelling wheels are arranged on a straight slide rail in a sliding manner, second travelling wheels are mounted above the bracket, which deviate from the first travelling wheels, and the second travelling wheels are arranged in a bent slide rail with the upper end bent outwards in a sliding manner; and an inserting rod is arranged on one side of the bracket, which is far away from the second travelling wheel, and the inserting rod is inserted into the charging box. The utility model provides a pair of high-rise green building construction discharge apparatus can stretch out from the crane automatically and unload, saves intensity of labour.
Description
Technical Field
The utility model relates to a platform of unloading, especially a high-rise green building construction discharge apparatus.
Background
The unloading platform is a temporary operation platform and an operation frame which are usually erected on a construction site and are generally used for material turnover. But present platform of unloading all has the problem of being not convenient for to the material uninstallation, needs the manual work to enter into the crane inside and pulls out the material from inside, has work efficiency low, has the problem of potential safety hazard.
Disclosure of Invention
The utility model aims to solve the technical problem that a high-rise green building construction discharge apparatus is provided, can conveniently carry out automatic discharge, need not the manual work and pulls out in entering into the crane, reduce intensity of labour, raise the efficiency.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
a high-rise green building construction unloading device comprises a lifting frame, wherein a lifting turnover mechanism is arranged in the lifting frame, and the lifting turnover mechanism lifts and turns a charging box;
the lifting turnover mechanism comprises a double-row chain conveying mechanism, the double-row chain conveying mechanism is driven by a motor, a bracket is connected with the double-row chain conveying mechanism, first travelling wheels are mounted at two ends of the bracket, which are connected with chains in the double-row chain conveying mechanism, the first travelling wheels are arranged on a straight slide rail in a sliding manner, second travelling wheels are mounted above the bracket, which deviate from the first travelling wheels, and the second travelling wheels are arranged in a bent slide rail with the upper end bent outwards in a sliding manner; and an inserting rod is arranged on one side of the bracket, which is far away from the second travelling wheel, and the inserting rod is inserted into the charging box.
The lifting frame comprises a supporting base plate, longitudinal supporting beams are arranged on the periphery of the supporting base plate, guardrails are arranged between the longitudinal supporting beams on the left end face, the right end face and the rear end face, a baffle is hinged between the longitudinal supporting beams on the front end face, and the other side of the baffle is locked through a hasp.
And a plurality of lifting lugs are installed on the lifting frame.
The inner bottom plate of the charging box is provided with a buffer plate, the lower end of the buffer plate is fixedly provided with a plurality of guide posts, the guide posts are slidably sleeved in sleeves of the inner bottom plate, the guide posts and the sleeves form telescopic posts, and springs are sleeved on the telescopic posts.
The utility model relates to a high-rise green building construction discharge apparatus has following technological effect: through the chain transmission mechanism of installation short distance in the crane and the bracket that removes along with chain transmission mechanism, the bracket passes through straight slide rail, curved slide rail adjustment orbit to make the charging box outwards overturn and unload after moving a short distance to the crane top. Therefore, in the hoisting process, the charging box is positioned at the lower part of the lifting frame and can be shielded by the guardrail and the baffle plate, so that safety accidents caused by falling of materials are avoided; after the material arrives at a certain high level, the material is unloaded by lifting and overturning the material charging box, the material charging box does not need to manually enter the lifting frame for operation, the safety and the reliability are realized, and the labor intensity is reduced.
Drawings
The invention will be further explained with reference to the following figures and examples:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of a partial structure of the present invention.
Figure 3 is the structure schematic diagram of the middle lifting frame of the utility model.
Fig. 4 is a schematic structural view of the magazine of the present invention (first type).
Fig. 5 is a schematic structural view of the magazine of the present invention (second type).
Fig. 6 is a schematic view of the connection between the middle buffer board and the inner bottom board of the present invention.
Fig. 7 is a schematic view of the working state of the present invention.
Detailed Description
As shown in figure 1, the high-rise green building construction unloading device comprises a lifting frame 1, wherein a lifting turnover mechanism 2 is arranged in the lifting frame 1, and the lifting turnover mechanism 2 lifts and turns a charging box 3.
As shown in fig. 1 and 3, the lifting frame 1 comprises a support bottom plate 1-1, and the support bottom plate 1-1 is used for supporting a charging box 3. Four longitudinal supporting beams 1-2 are arranged on the periphery of the supporting base plate 1-1, guardrails 1-3 are arranged between the longitudinal supporting beams 1-2 on the left end surface, the right end surface and the rear end surface of the lifting frame 1, and the guardrails 1-3 are uniformly distributed on the left side surface and the right side surface. The guardrails 1-3 are arranged on the rear end surface and distributed on the lower part, and the upper part is provided with a space for the charging box 3 to turn over. The baffle plates 1-4 are arranged between the longitudinal support beams 1-2 on the front end face, and the baffle plates 1-4 can wholly or partially shield the front end face. One end of the baffle plate 1-4 is hinged with the longitudinal supporting beam 1-2 through a hinge, and the other side of the baffle plate 1-4 is locked and closed through a hasp. The material charging box 3 can be well shielded through the baffle plates 1-4 and the guardrails 1-3, and the falling of materials in the material charging box 3 in the lifting process of the lifting frame 1 is avoided.
The lifting frame 1 is provided with a plurality of lifting lugs 1-5. Thereby facilitating hoisting.
As shown in fig. 1-2, the lifting and turning mechanism 2 includes a double-row chain transmission mechanism 2-1, and the double-row chain transmission mechanism 2-1 is formed by arranging two groups of transmission chains side by side and is connected through a corresponding chain wheel and a corresponding rotating shaft. The rotating shaft at the upper end is connected with a motor 2-2. The left and right chains can be driven to run at the same speed and in the same direction by the motor 2-2.
The chain of the double-row chain conveying mechanism 2-1 is provided with a bracket 2-3, the bracket 2-3 comprises a connecting shaft, the connecting shaft is connected with the left and right chains, and two ends extending out of the chains are connected with the first travelling wheels 2-4. The first travelling wheels 2-4 are arranged on the straight sliding rails 2-5 in a sliding way. Connecting plates are fixed on the left and right sides of the inner sides of the two chains on the connecting shaft, a second walking wheel 2-6 is installed on one side above each connecting plate, and the second walking wheels 2-6 are slidably arranged in bent sliding rails 2-7 with the upper ends bent outwards. The other side of the upper part of each connecting plate is provided with an inserting rod 2-8, and the inserting rod 2-8 is inserted into a sleeve hole on the charging box 3.
As shown in fig. 4 to 5, the front face of the charging box 3 may be an opening structure or a closing structure. When the structure is an opening structure, large block materials can be conveyed, and when the structure is a sealing structure, small particle materials are moved.
The left and the right of the charging box 3 are provided with sleeve holes for the insertion rods 2-8 to pass through, and the bottom of the charging box 3 is provided with moving wheels which can be conveniently dragged by people.
As shown in FIG. 6, the upper end of the inner bottom plate 3-5 of the charging box 3 is provided with a buffer plate 3-1, and the buffer plate 3-1 is identical in size with the inner bottom plate 3-5 and can move up and down along the inner wall of the charging box 3. Four guide posts 3-2 are fixed on the periphery of the lower end of the buffer plate 3-1 in an array mode, each guide post 3-2 is slidably sleeved in a sleeve 3-3 of the inner bottom plate 3-5, the guide posts 3-2 and the sleeves 3-3 form telescopic posts, and springs 3-4 are sleeved on the telescopic posts. When no stress is applied to the buffer plate 3-1, the buffer plate partially bounces under the action of the spring 3-4, and when materials exist, the materials fall on the buffer plate 3-1 to be buffered, so that the materials are prevented from being damaged.
The working principle and the process are as follows: as shown in fig. 7, the flappers 1-4 are opened and the loading box 3 is transferred to the crane 1. The shutters 1 to 4 are then closed and locked. After the lifting frame 1 is lifted in place, the motor 2-2 is started, the chain of the double-row chain conveying mechanism 2-1 moves upwards, and the bracket 2-3 is driven to move upwards. The first travelling wheel 2-4 of the bracket 2-3 moves linearly upwards along with the chain, the second travelling wheel 2-6 of the bracket 2-3 enters the bending part of the bent slide rail 2-7 immediately and moves outwards in the bending part of the bent slide rail 2-7, so that the bracket 2-3 gradually enters the lifting frame 1 and turns over, the charging box 3 together with the bracket 2-3 also turns over, finally extends out of the lifting frame 1 and unloads materials (the integral unloading can be completed by matching with other transition chutes or transition plates during unloading). Then the motor 2-2 turns over, the bracket 2-3 drives the charging box 3 to rotate reversely, and the charging box returns to the vertical state and moves to the bottom end along with the double-row chain conveying mechanism 2-1.
Claims (4)
1. The utility model provides a high-rise green building construction discharge apparatus which characterized in that: the lifting device comprises a lifting frame (1), wherein a lifting turnover mechanism (2) is arranged in the lifting frame (1), and the lifting turnover mechanism (2) lifts and turns a charging box (3);
the lifting turnover mechanism (2) comprises a double-row chain conveying mechanism (2-1), the double-row chain conveying mechanism (2-1) is driven by a motor (2-2), a bracket (2-3) is connected with the double-row chain conveying mechanism (2-1), first walking wheels (2-4) are mounted at two ends, connected with chains, of the bracket (2-3) and the double-row chain conveying mechanism (2-1), the first walking wheels (2-4) are arranged on straight sliding rails (2-5) in a sliding mode, second walking wheels (2-6) are mounted above the bracket (2-3) and deviate from the first walking wheels (2-4), and the second walking wheels (2-6) are arranged in bent sliding rails (2-7) with the upper ends bent outwards in a sliding mode; and an inserting rod (2-8) is arranged on one side of the bracket (2-3) far away from the second travelling wheel (2-6), and the inserting rod (2-8) is inserted into the charging box (3).
2. The high-rise green building construction discharging device according to claim 1, characterized in that: the lifting frame (1) comprises a supporting base plate (1-1), longitudinal supporting beams (1-2) are arranged on the periphery of the supporting base plate (1-1), guardrails (1-3) are arranged between the longitudinal supporting beams (1-2) on the left end face, the right end face and the rear end face, a baffle (1-4) is hinged between the longitudinal supporting beams (1-2) on the front end face, and the other side of the baffle (1-4) is locked through a hasp.
3. The high-rise green building construction discharging device according to claim 1, characterized in that: a plurality of lifting lugs (1-5) are installed on the lifting frame (1).
4. The high-rise green building construction discharging device according to claim 1, characterized in that: the inner bottom plate (3-5) of the charging box (3) is provided with a buffer plate (3-1), the lower end of the buffer plate (3-1) is fixedly provided with a plurality of guide columns (3-2), the guide columns (3-2) are slidably sleeved in sleeves (3-3) of the inner bottom plate (3-5), the guide columns (3-2) and the sleeves (3-3) form telescopic columns, and springs (3-4) are sleeved on the telescopic columns.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021876140.2U CN213415573U (en) | 2020-09-01 | 2020-09-01 | High-rise green building construction discharge apparatus |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021876140.2U CN213415573U (en) | 2020-09-01 | 2020-09-01 | High-rise green building construction discharge apparatus |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN213415573U true CN213415573U (en) | 2021-06-11 |
Family
ID=76259458
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202021876140.2U Expired - Fee Related CN213415573U (en) | 2020-09-01 | 2020-09-01 | High-rise green building construction discharge apparatus |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN213415573U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116971583A (en) * | 2023-08-17 | 2023-10-31 | 中建八局西部发展有限公司 | Material transfer units for elevated platforms |
-
2020
- 2020-09-01 CN CN202021876140.2U patent/CN213415573U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116971583A (en) * | 2023-08-17 | 2023-10-31 | 中建八局西部发展有限公司 | Material transfer units for elevated platforms |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0754503A (en) | All-weather pollution-free dismantling method | |
| CN110905206B (en) | Overhanging discharging platform with drawing type channel and construction method | |
| CN217756403U (en) | Material lifting machine that conveying efficiency is high | |
| CN216105701U (en) | Hoisting device for engineering reinforcement construction | |
| CN111894281B (en) | A safety unloading platform for high-rise construction of hotel buildings and using method | |
| CN110255063A (en) | The installation method and system of bucket chain conveyor chain and hopper | |
| CN107444232B (en) | Automatic lifting device for carriage rear door | |
| CN217972190U (en) | Super high-rise building material conveyer | |
| CN105458645B (en) | A horizontal oil cylinder assembly device and method | |
| CN113216593A (en) | Anti-falling hoisting device for elevator shaft of high-rise building | |
| CN217783508U (en) | Supporting device for underground excavation of tunnel section | |
| CN109853421B (en) | A high-speed toll station anti-collision brake lever system | |
| CN217537955U (en) | Safe elevating gear based on housing construction | |
| KR100826617B1 (en) | Transport Supply Device for Skylight Glass Installation | |
| CN107559027B (en) | A kind of rail mounted carloader | |
| CN216971869U (en) | Building material lifting device with high bearing capacity | |
| CN206815943U (en) | A kind of pole upside-down mounting group founds lifting device | |
| CN216196428U (en) | Novel ingate operation construction platform | |
| US3950913A (en) | Method and apparatus for constructing a suspension bridge tower | |
| CN112551366B (en) | Lifting and transporting frame integrated building erecting machine construction equipment and construction method thereof | |
| CN220950995U (en) | Building material lifting machine | |
| CN211444939U (en) | Foundation pit earthwork outward transportation equipment | |
| CN209973619U (en) | Automatic material transporting plate for building | |
| CN219905592U (en) | Vertical lifting type buried garbage station | |
| CN114922048A (en) | Lifting pedestrian bridge of transfer conveyor of fully mechanized coal mining face of coal mine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210611 Termination date: 20210901 |