CN213290511U - Drilling equipment of processing usefulness of water supply PE pipe - Google Patents

Drilling equipment of processing usefulness of water supply PE pipe Download PDF

Info

Publication number
CN213290511U
CN213290511U CN202021706226.0U CN202021706226U CN213290511U CN 213290511 U CN213290511 U CN 213290511U CN 202021706226 U CN202021706226 U CN 202021706226U CN 213290511 U CN213290511 U CN 213290511U
Authority
CN
China
Prior art keywords
pipe
motor
processing
hydraulic pump
workstation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021706226.0U
Other languages
Chinese (zh)
Inventor
李勇
王大恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021706226.0U priority Critical patent/CN213290511U/en
Application granted granted Critical
Publication of CN213290511U publication Critical patent/CN213290511U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the technical field of the PE manages, especially, be a drilling equipment that processing of water supply PE pipe was used, comprises a workbench, the bottom of workstation is provided with the flexible post of spring, the bottom of the flexible post of spring is provided with anti-skidding base, the one end at workstation top is provided with first supporting station. This drilling equipment that processing of water supply PE pipe was used, through placing the PE pipe in the inside of first fixed ring, the slider can slide in the inside of electronic slide rail, promote the slider through electronic slide rail and drive first motor and be close to the PE pipe, the restriction fixture block inlay card is inside electronic slide rail, thereby it is convenient in fixing the slider, the compact type between electronic slide rail and the slider has been increased, thereby the stability of first motor has been strengthened, through starting first motor, make first motor rotate at the during operation drive axis of rotation, it punches to make things convenient for to punch the PE pipe in the drill bit, the PE pipe need not rotate and can obtain the annular hole, and is simple in operation, time saving and labor saving, and work efficiency is improved.

Description

Drilling equipment of processing usefulness of water supply PE pipe
Technical Field
The utility model belongs to the technical field of the PE pipe, concretely relates to drilling equipment of processing usefulness of water supply PE pipe.
Background
Polyethylene, abbreviated as PE, is a thermoplastic resin prepared by polymerizing ethylene, and also comprises a copolymer of ethylene and a small amount of olefin in industry, the polyethylene is odorless and nontoxic, has a wax-like hand feeling, has excellent low-temperature resistance, good chemical stability, can resist corrosion of most of acid and alkali (cannot resist acid with oxidation property), is insoluble in common solvents at normal temperature, and has small water absorption and excellent electrical insulation.
Based on characteristics such as nontoxic, corrosion-resistant, adopt PE pipe as the carrier that supplies water in a large number in various buried line work progress at present, for better utilization water resource, carry the water resource, so bury PE pipe as the carrier in channel bottom basis the inside, it is convenient in supplying water, PE pipe does not have porosely on the circumference when dispatching from the factory, so need process the drilling to PE pipe, most drilling equipment can only be single drilling, can not carry out annular drilling to PE pipe simultaneously, make the application scope of PE pipe receive the restriction, the drilling equipment of PE pipe processing usefulness on the market now, can not carry out annular drilling to PE pipe well.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a drilling equipment that processing of water supply PE pipe was used has solved the problem that can not carry out annular drilling to PE pipe well.
In order to achieve the above object, the utility model provides a following technical scheme: a drilling device for processing a PE (polyethylene) pipe for water supply comprises a workbench, wherein a spring telescopic column is arranged at the bottom of the workbench, an anti-skidding base is arranged at the bottom of the spring telescopic column, a first supporting table is arranged at one end of the top of the workbench, a second supporting table is arranged at one side of the first supporting table, a first fixed ring is arranged inside the second supporting table, an electric sliding rail is arranged at one side of the first fixed ring, a sliding block is arranged inside the electric sliding rail, a mounting plate is arranged at the top of the sliding block, a first motor is fixedly mounted at one side of the mounting plate, a second motor is fixedly mounted at one end of the first supporting table, an output end of the second motor penetrates through the first supporting table to be connected with a threaded rotating rod, a guide rod is arranged at one side of the threaded rotating rod, and a connecting sleeve ring is sleeved on the surface of the threaded rotating rod, the one end of connecting the lantern ring is provided with the fixed ring of second, the silo down has been seted up to the inside of workstation, the bottom of workstation is provided with the collecting box, one side of second brace table is provided with the third brace table.
Preferably, one end of the sliding block is provided with a limiting clamping block, and one side inside the electric sliding rail is provided with a sliding groove matched with the limiting clamping block.
Preferably, the first motors are distributed with four at equal intervals, the output ends of the first motors are connected with rotating shafts, and drill bits are arranged at one ends of the rotating shafts.
Preferably, one side of the second fixed ring is provided with a first hydraulic pump, one side of the first hydraulic pump is provided with a vertical plate, the output end of the first hydraulic pump is connected with a first telescopic rod, one end of the first telescopic rod penetrates through the vertical plate and is connected with an arc-shaped clamping plate, and an anti-slip pad is arranged inside the arc-shaped clamping plate.
Preferably, the bottom of the connecting sleeve ring is provided with a connecting column, the top of the workbench is provided with a movable sliding chute, and one side of the surface of the workbench is provided with a scale.
Preferably, a second hydraulic pump is arranged at the top of the third supporting table, the output end of the second hydraulic pump is connected with a second telescopic rod, and a fixing clamp plate is arranged at one end of the second telescopic rod.
Compared with the prior art, the beneficial effects of the utility model are that:
this drilling equipment that processing of water supply PE pipe was used, through placing the PE pipe in the inside of first fixed ring, the slider can slide in the inside of electronic slide rail, promote the slider through electronic slide rail and drive first motor and be close to the PE pipe, the restriction fixture block inlay card is inside electronic slide rail, thereby it is convenient in fixing the slider, the compact type between electronic slide rail and the slider has been increased, thereby the stability of first motor has been strengthened, through starting first motor, make first motor rotate at the during operation drive axis of rotation, it punches to make things convenient for to punch the PE pipe in the drill bit, the PE pipe need not rotate and can obtain the annular hole, and is simple in operation, time saving and labor saving, and work efficiency is improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a first three-dimensional structure diagram of the present invention;
FIG. 2 is a second perspective structural view of the present invention;
FIG. 3 is a perspective view of the first fixed ring of the present invention;
fig. 4 is a three-dimensional structure view of the electric slide rail of the present invention;
fig. 5 is a perspective view of a second fixing ring according to the present invention.
In the figure: 1, a workbench; 2, a spring telescopic column; 3, an anti-slip base; 4 a first support table; 5 a second support table; 6 a first fixed ring; 7, an electric slide rail; 8, a sliding block; 9 limiting the fixture block; 10, mounting a plate; 11 a first motor; 12 rotating the shaft; 13 a drill bit; 14 a second motor; 15, a threaded rotating rod; 16 a guide bar; 17 connecting the lantern rings; 18 a second fixed ring; 19 a first hydraulic pump; 20 a first telescoping rod; 21, arranging a vertical plate; 22 arc-shaped splints; 23 connecting columns; 24 moving the chute; 25, a scale; 26, feeding a trough; 27 a collection box; 28 a third support table; 29 a second hydraulic pump; 30 a second telescoping rod; 31 to secure the splint.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides the following technical solutions: a drilling device for processing a PE (polyethylene) pipe for water supply comprises a workbench 1, wherein a spring telescopic column 2 is arranged at the bottom of the workbench 1, so that vibration generated during punching on the top of the workbench 1 can be absorbed and buffered conveniently, vibration of the device is reduced, the overall stability is improved, an anti-skidding base 3 is arranged at the bottom of the spring telescopic column 2, the friction force between the spring telescopic column 2 and the ground is increased, the stability is improved, a first supporting table 4 is arranged at one end of the top of the workbench 1, so that a second motor 14 can be installed conveniently, a second supporting table 5 is arranged at one side of the first supporting table 4, a first fixing ring 6 is arranged inside the second supporting table 5, an electric sliding rail 7 is arranged at one side of the first fixing ring 6, a sliding block 8 is arranged inside the electric sliding rail 7, a mounting plate 10 is arranged at the top of the sliding block 8, and a first motor 11 is fixedly arranged at one side of the mounting, the electric sliding rail 7 is matched with the sliding block 8, a first motor 11 is convenient to approach to a PE pipe and to complete punching processing, a second motor 14 is fixedly installed at one end of a first supporting table 4, the output end of the second motor 14 penetrates through the first supporting table 4 to be connected with a threaded rotating rod 15, a guide rod 16 is arranged on one side of the threaded rotating rod 15, the second motor 14 is started to drive the threaded rotating rod 15 to rotate, the threaded rotating rod 15 is matched with the guide rod 16, horizontal movement of a connecting sleeve ring 17 on the surface of the threaded rotating rod 15 is convenient, accordingly, PE pipes inside the second fixed ring 18 are convenient to be driven to approach to the first fixed ring 6, equidistant punching is completed, the connecting sleeve ring 17 is sleeved on the surface of the threaded rotating rod 15, the second fixed ring 18 is arranged at one end of the connecting sleeve ring 17, a discharging groove 26 is formed in the workbench 1, and a collecting box 27 is arranged at the bottom of the workbench 1, the blanking groove 26 is communicated with a collecting box 27 to facilitate the collection and treatment of the scraps generated by punching, and a third supporting platform 28 is arranged on one side of the second supporting platform 5.
Specifically, the one end of slider 8 is provided with restriction fixture block 9, and the inside one side of electronic slide rail 7 is seted up with restriction fixture block 9 assorted spout, and restriction fixture block 9 removes in the inside of spout, makes restriction fixture block 9 inlay card inside electronic slide rail 7 to the convenience is fixed in slider 8, has increased the compact type between electronic slide rail 7 and the slider 8, thereby has strengthened first motor 11's stability.
Specifically, equidistant distribution of first motor 11 has four, and the output of first motor 11 is connected with axis of rotation 12, and the one end of axis of rotation 12 is provided with drill bit 13, through starting first motor 11, makes first motor 11 drive axis of rotation 12 at the during operation and rotates, conveniently punches to the PE pipe in drill bit 13, need not rotate the PE pipe and can obtain the annular hole, easy operation, labour saving and time saving has improved work efficiency.
It is specific, one side of second fixed ring 18 is provided with first hydraulic pump 19, one side of first hydraulic pump 19 is provided with riser 21, riser 21 restricts first telescopic link 20, first telescopic link 20 takes place to rock when avoiding punching, thereby the fixed effect has been influenced, first hydraulic pump 19's output is connected with first telescopic link 20, the one end of first telescopic link 20 runs through riser 21 and is connected with arc splint 22, arc splint 22's inside is provided with the slipmat, through starting first hydraulic pump 19, make first hydraulic pump 19 drive first telescopic link 20 and stretch out and draw back, thereby it is convenient that the PE pipe that can not unidimensional size in arc splint 22 carries out the centre gripping fixedly, the slipmat has increased the frictional force between arc splint 22 and the PE pipe, thereby stability when punching has been increased, the precision of punching has been improved.
Specifically, the bottom of the connecting sleeve ring 17 is provided with spliced pole 23, removal spout 24 has been seted up at the top of workstation 1, one side on workstation 1 surface is provided with scale 25, spliced pole 23 is in the inside slip of removing spout 24, it is convenient in restricting the connecting sleeve ring 17, it takes place to rock to reduce the connecting sleeve ring 17, stability when having increased the connecting sleeve ring 17 and removing, on the other hand, spliced pole 23 is pressed close to with scale 25, it observes the distance between hole and the hole to make things convenient for when punching, the distance that can accurately punch.
Specifically, the top of third brace table 28 is provided with second hydraulic pump 29, the output of second hydraulic pump 29 is connected with second telescopic link 30, the one end of second telescopic link 30 is provided with solid fixed splint 31, through starting second hydraulic pump 29, make second hydraulic pump 29 drive second telescopic link 30 and stretch out and draw back at the during operation, thereby it adds to hold to drive solid fixed splint 31 to the PE pipe, the inside of solid fixed splint 31 is provided with the protruding pad of rubber, frictional force has been increased, gu fixed splint 31 cooperatees with arc splint 22, can fix the PE pipe well.
The utility model discloses a theory of operation and use flow: the utility model discloses install the back, electric slide rail 7 through the setting, slider 8, first motor 11, drill bit 13 is convenient in punching the PE pipe, second motor 14 through the setting, screw thread bull stick 15, guide bar 16, the connecting sleeve ring 17 is convenient in removing the PE pipe, first hydraulic pump 19 through the setting, first telescopic link 20, riser 21, arc splint 22 are convenient in fixing the one end of PE pipe, second hydraulic pump 29 through the setting, second telescopic link 30, solid fixed splint 31 are convenient in fixing the other end of PE pipe, all consumer all supply power through external power supply in this device.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a drilling equipment that processing of water supply PE pipe was used, includes workstation (1), its characterized in that: the anti-skid device is characterized in that a spring telescopic column (2) is arranged at the bottom of the workbench (1), an anti-skid base (3) is arranged at the bottom of the spring telescopic column (2), a first supporting table (4) is arranged at one end of the top of the workbench (1), a second supporting table (5) is arranged at one side of the first supporting table (4), a first fixed ring (6) is arranged inside the second supporting table (5), an electric sliding rail (7) is arranged at one side of the first fixed ring (6), a sliding block (8) is arranged inside the electric sliding rail (7), a mounting plate (10) is arranged at the top of the sliding block (8), a first motor (11) is fixedly mounted at one side of the mounting plate (10), a second motor (14) is fixedly mounted at one end of the first supporting table (4), and the output end of the second motor (14) penetrates through the first supporting table (4) and is connected with a threaded rotating rod (15), one side of screw thread bull stick (15) is provided with guide bar (16), the surface cover of screw thread bull stick (15) is equipped with the connection lantern ring (17), the one end of connection lantern ring (17) is provided with the fixed ring of second (18), silo (26) down have been seted up to the inside of workstation (1), the bottom of workstation (1) is provided with collecting box (27), one side of the second brace table (5) is provided with third brace table (28).
2. The drilling device for processing the PE pipe according to claim 1, wherein: one end of the sliding block (8) is provided with a limiting clamping block (9), and one side inside the electric sliding rail (7) is provided with a sliding groove matched with the limiting clamping block (9).
3. The drilling device for processing the PE pipe according to claim 1, wherein: the equal interval distribution of first motor (11) has four, the output of first motor (11) is connected with axis of rotation (12), the one end of axis of rotation (12) is provided with drill bit (13).
4. The drilling device for processing the PE pipe according to claim 1, wherein: one side of the second fixed ring (18) is provided with a first hydraulic pump (19), one side of the first hydraulic pump (19) is provided with a vertical plate (21), the output end of the first hydraulic pump (19) is connected with a first telescopic rod (20), one end of the first telescopic rod (20) penetrates through the vertical plate (21) and is connected with an arc-shaped clamping plate (22), and an anti-slip pad is arranged inside the arc-shaped clamping plate (22).
5. The drilling device for processing the PE pipe according to claim 1, wherein: the bottom of connecting lantern ring (17) is provided with spliced pole (23), removal spout (24) have been seted up at the top of workstation (1), one side on workstation (1) surface is provided with scale (25).
6. The drilling device for processing the PE pipe according to claim 1, wherein: the top of the third supporting platform (28) is provided with a second hydraulic pump (29), the output end of the second hydraulic pump (29) is connected with a second telescopic rod (30), and one end of the second telescopic rod (30) is provided with a fixed clamping plate (31).
CN202021706226.0U 2020-08-17 2020-08-17 Drilling equipment of processing usefulness of water supply PE pipe Expired - Fee Related CN213290511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021706226.0U CN213290511U (en) 2020-08-17 2020-08-17 Drilling equipment of processing usefulness of water supply PE pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021706226.0U CN213290511U (en) 2020-08-17 2020-08-17 Drilling equipment of processing usefulness of water supply PE pipe

Publications (1)

Publication Number Publication Date
CN213290511U true CN213290511U (en) 2021-05-28

Family

ID=76024863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021706226.0U Expired - Fee Related CN213290511U (en) 2020-08-17 2020-08-17 Drilling equipment of processing usefulness of water supply PE pipe

Country Status (1)

Country Link
CN (1) CN213290511U (en)

Similar Documents

Publication Publication Date Title
CN213290511U (en) Drilling equipment of processing usefulness of water supply PE pipe
CN216158607U (en) Delivery pump support convenient to quick travel is fixed
CN214772546U (en) Plastic instrument cover punching device
CN212551998U (en) Cutting device for building construction wire arranging pipe
CN212605234U (en) Convenient conveyer of electric automatization equipment
CN212146683U (en) PVC feed pipe cutting device
CN210585511U (en) Plastic-coated paint spraying device for spiral steel pipe
CN208895232U (en) A kind of pipe punching device with flexible jig
CN213144405U (en) Oil drill pipe bracket with adjustable length
CN214520681U (en) Perforating device is used in processing of PE pipe
CN221135023U (en) Fixed tooling for drilling of high-voltage ring network cabinets
CN205565548U (en) Cable connection end fixture
CN216502523U (en) Efficient drilling machine with switchable drill bits
CN214204797U (en) Portable multi-functional electric power termination
CN221187147U (en) Drilling mechanism for semiconductor processing
CN221275200U (en) Packaging drinking water production filling machine group
CN215432472U (en) Table type drilling and tapping dual-purpose machine
CN213289724U (en) PE pipe end surface grinding device
CN213469794U (en) Positioning feeding mechanism for ring cutting machine
CN219100892U (en) Novel power distribution network frame for realizing power distribution network planning
CN215451374U (en) Fixing device is used in production of power semiconductor device
CN208483260U (en) A kind of pipe punching device with flexible jig
CN214538157U (en) Underground water level monitoring device
CN211218829U (en) Energy-concerving and environment-protective type drilling equipment for machine-building
CN216692853U (en) Wireless easily-assembled intelligent pump station data terminal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210528

Termination date: 20210817