CN213269263U - Building site construction is with interim guardrail mechanism - Google Patents
Building site construction is with interim guardrail mechanism Download PDFInfo
- Publication number
- CN213269263U CN213269263U CN202021956620.XU CN202021956620U CN213269263U CN 213269263 U CN213269263 U CN 213269263U CN 202021956620 U CN202021956620 U CN 202021956620U CN 213269263 U CN213269263 U CN 213269263U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- plate
- hole
- fixing
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 230000007246 mechanism Effects 0.000 title claims abstract description 24
- 230000000149 penetrating effect Effects 0.000 claims description 7
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a building site construction is with interim guardrail mechanism, including bottom plate, unable adjustment base, montant, clamp plate, horizontal pole and truckle, a truckle is installed to the left end of bottom plate lower surface, a truckle is installed to the right-hand member of bottom plate lower surface, two fixing thread holes have been seted up to the left end of bottom plate upper surface, two fixing thread holes have been seted up to the right-hand member of bottom plate upper surface, compare with prior art, the utility model discloses following beneficial effect has: through designing an interim guardrail with truckle, convenient interim transportation conveniently moves at any time, through designing into the guardrail of bolt equipment, conveniently dismantles and carries out transportation in batches greatly, is two meters guardrail through the design height, can prevent effectively that children from turning over, avoids causing the incident.
Description
Technical Field
The utility model relates to a building site construction is with interim guardrail mechanism belongs to the mechanical equipment field.
Background
The guardrail is mainly used for protecting and protecting personal safety and equipment and facilities in occasions such as houses, roads, commercial districts, public places and the like, is visible everywhere in our lives, and has different prices per meter according to different heights.
Traditional guardrail is mostly steel pipe frame formula guardrail that steel pipe assembly welding formed, and traditional guardrail is mostly fixed, and fixed guardrail is made conveniently, but the transportation of being not convenient for, and traditional guardrail height generally is about a meter, and is highly lower, has children to turn over easily, and children turn over and get into the building site inside and suffer the personal danger easily more, cause the incident.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a building site construction is with interim guardrail mechanism to solve the problem that provides in the above-mentioned background art.
In order to achieve the above purpose, the present invention is realized by the following technical solution: a temporary guardrail mechanism for construction in a construction site comprises a bottom plate, a fixed base, vertical rods, a pressing plate, cross rods and trundles, wherein the trundle is installed at the left end of the lower surface of the bottom plate, the trundle is installed at the right end of the lower surface of the bottom plate, two fixing threaded holes are formed in the left end of the upper surface of the bottom plate, two fixing threaded holes are formed in the right end of the upper surface of the bottom plate, connecting threaded holes are formed in the middle of the upper surface of the bottom plate at equal intervals, the fixed base is installed at the left end of the upper surface of the bottom plate, the fixed base is installed at the right end of the upper surface of the bottom plate, a plurality of vertical rods are arranged on the upper surface of the bottom plate, the fixing plate is arranged at the bottom end of each vertical rod, the pressing plate is arranged on the fixing plate, a cross rod is arranged in a rectangular groove in the rear surface of the vertical rod.
Further, the fixing base is provided with a top plate, an inclined plate and a ground plate, the top plate is provided with a base fixing hole, the base fixing hole is provided with a fixing bolt and a fixing nut in a matched mode, and the ground plate is provided with a foundation screw hole.
Furthermore, a half hole is formed in the left end face of the fixing plate, a half hole is formed in the right end face of the fixing plate, and the half holes are aligned with the connecting threaded holes in the base plate.
Furthermore, rod penetrating holes are formed in the pressure plate at equal intervals and are rectangular holes, and the shape of each rectangular hole is the same as that of the horizontal section of the corresponding vertical rod.
Furthermore, the pressing plate is provided with through holes at equal intervals, the positions of the through holes are aligned with the positions of the connecting threaded holes in the bottom plate, and the pressing plate is fixedly connected with the bottom plate through bolts.
Furthermore, a plurality of threaded holes are formed in the cross rod, the cross rod is fixedly connected with the vertical rod through bolts and nuts, and the length of the vertical rod is two meters.
The utility model has the advantages that: the utility model discloses an interim guardrail mechanism is used in building site construction through designing an interim guardrail with the truckle, convenient interim transportation, and convenient the mobilization at any time, through designing into the guardrail through the bolt equipment, conveniently dismantles and carries out big transportation in batches, highly is two meters's guardrail through the design, can prevent effectively that children from turning over, avoids causing the incident.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural view of a temporary guardrail mechanism for construction site construction of the utility model;
fig. 2 is a top view of a bottom plate of the temporary guard bar mechanism for construction site construction of the present invention;
fig. 3 is a front view of a fixing base of the temporary guard bar mechanism for construction site construction of the present invention;
fig. 4 is a top view of a fixing base of the temporary guard bar mechanism for construction site construction according to the present invention;
fig. 5 is a left side view of the fixing base of the temporary guard bar mechanism for construction site of the present invention;
fig. 6 is a left side view of a vertical rod of the temporary guard bar mechanism for construction site according to the present invention;
fig. 7 is a top view of a vertical rod of the temporary guard bar mechanism for construction site according to the present invention;
fig. 8 is a top view of a pressing plate of the temporary guard bar mechanism for construction site according to the present invention;
fig. 9 is a top view of a cross bar of the temporary guard bar mechanism for construction site according to the present invention;
fig. 10 is a schematic view of an installation structure of a temporary guardrail mechanism for construction site according to the present invention;
in the figure: 1-bottom plate, 11-fixed threaded hole, 12-connecting threaded hole, 2-fixed base, 21-base fixed hole, 22-top plate, 23-sloping plate, 24-grounding plate, 25-anchor screw hole, 3-vertical rod, 31-fixed plate, 32-half hole, 33-rectangular groove, 4-pressing plate, 41-rod penetrating hole, 42-through hole, 5-cross rod and 6-caster.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1 to 10, the present invention provides a technical solution: a temporary guardrail mechanism for construction in a construction site comprises a bottom plate 1, a fixed base 2, vertical rods 3, a pressure plate 4, cross rods 5 and trundles 6, wherein the left end of the lower surface of the bottom plate 1 is provided with the trundle 6, the right end of the lower surface of the bottom plate 1 is provided with the trundle 6, the left end of the upper surface of the bottom plate 1 is provided with two fixed threaded holes 11, the right end of the upper surface of the bottom plate 1 is provided with the two fixed threaded holes 11, the middle of the upper surface of the bottom plate 1 is provided with connecting threaded holes 12 at equal intervals, the left end of the upper surface of the bottom plate 1 is provided with the fixed base 2, the right end of the upper surface of the bottom plate 1 is provided with the fixed base 2, the upper surface of the bottom plate 1 is provided with a plurality of the vertical rods 3, the bottom end of each vertical rod 3 is provided with a fixed plate 31, the pressure plate 4, a cross bar 5 is mounted in a rectangular groove 33 in the rear surface of the vertical bar 3.
The fixing base 2 is provided with a top plate 22, an inclined plate 23 and a ground plate 24, the top plate 22 is provided with a base fixing hole 21, the base fixing hole 21 is provided with a fixing bolt and a fixing nut in a matched mode, and the ground plate 24 is provided with a foundation screw hole 25 for fixing the device on a floor by using a foundation screw.
A half hole 32 is formed in the left end face of the fixing plate 31, a half hole 32 is formed in the right end face of the fixing plate 31, the half holes 32 are aligned with the connecting threaded holes 12 in the base plate 1, and a round hole is formed by the two adjacent half holes 32 and used for enabling a bolt to pass through.
The pressing plate 4 is equidistantly provided with a rod penetrating hole 41, the rod penetrating hole 41 is a rectangular hole, and the shape of the rectangular hole is the same as the horizontal section shape of the vertical rod 3 and is used for enabling the vertical rod 3 to penetrate through the rectangular hole.
The pressing plate 4 is provided with through holes 42 at equal intervals, the positions of the through holes 42 are aligned with the positions of the connecting threaded holes 12 on the bottom plate 1, and the pressing plate 4 is fixedly connected with the bottom plate 1 through bolts and used for tightly pressing and fixing the vertical rods 3 on the bottom plate 1.
A plurality of screw holes have been seted up on horizontal pole 5, and horizontal pole 5 is fixed through bolt and nut and 3 interconnect of montant, and 3 length of montant are two meters for prevent that children from turning over, avoid causing the incident.
As an embodiment of the present invention: when in actual use, the fixing bolt and the fixing nut which are matched and arranged on the base fixing hole 21 are unscrewed, then the fixing base 2 is arranged below the bottom plate 1, the upper surface of the top plate 22 of the fixing base 2 is attached to the lower surface of the bottom plate 1, then the fixing base 2 and the bottom plate 1 are fixedly connected through the fixing bolt and the fixing nut, then the fixing base 2 and the guardrail are fixed on the ground together through the foundation screw holes 25 by penetrating the foundation screw holes 25 through the foundation screws, when the guardrail needs to be moved, the foundation screws are taken out again, the fixing base 2 is detached and then installed above the bottom plate 1, then the trundles 6 on the lower surface of the bottom plate 1 are passed through, and the guardrail can be integrally transported away.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above embodiments, and although the present invention has been disclosed with the preferred embodiments, it is not limited to the present invention, and any skilled person in the art can make some modifications or equivalent embodiments without departing from the scope of the present invention, but all the technical matters of the present invention are within the scope of the present invention.
Claims (6)
1. The utility model provides a building site construction is with interim guardrail mechanism, includes bottom plate, unable adjustment base, montant, clamp plate, horizontal pole and truckle, its characterized in that: a truckle is installed to the left end of bottom plate lower surface, a truckle is installed to the right-hand member of bottom plate lower surface, two fixing screw holes have been seted up to the left end of bottom plate upper surface, two fixing screw holes have been seted up to the right-hand member of bottom plate upper surface, connecting screw hole has been seted up to the centre equidistance of bottom plate upper surface, a unable adjustment base is installed to the left end of bottom plate upper surface, a unable adjustment base is installed to the right-hand member of bottom plate upper surface, the bottom plate upper surface is provided with a plurality of montants, the montant bottom is equipped with the fixed plate, be provided with the clamp plate on the fixed plate, the rectangular channel has been seted up to the front surface lower part of montant, the rectangular channel has been seted up on the rear surface upper portion of montant.
2. The temporary guard rail mechanism for construction site according to claim 1, wherein: the fixing base is provided with a top plate, an inclined plate and a ground plate, the top plate is provided with a base fixing hole, the base fixing hole is provided with a fixing bolt and a fixing nut in a matched mode, and the ground plate is provided with a foundation screw hole.
3. The temporary guard rail mechanism for construction site according to claim 1, wherein: the left end face of the fixing plate is provided with a half hole, the right end face of the fixing plate is provided with a half hole, and the half hole is aligned with the connecting threaded hole in the base plate.
4. The temporary guard rail mechanism for construction site according to claim 1, wherein: the pressing plate is provided with rod penetrating holes at equal intervals, each rod penetrating hole is a rectangular hole, and the shape of each rectangular hole is the same as that of the horizontal section of each vertical rod.
5. The temporary guard rail mechanism for construction site according to claim 1, wherein: the pressing plate is provided with through holes at equal intervals, the positions of the through holes are aligned with the positions of the connecting threaded holes in the bottom plate, and the pressing plate is fixedly connected with the bottom plate through bolts.
6. The temporary guard rail mechanism for construction site according to claim 1, wherein: a plurality of threaded holes are formed in the cross rod, the cross rod is fixedly connected with the vertical rod through bolts and nuts, and the length of the vertical rod is two meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021956620.XU CN213269263U (en) | 2020-09-09 | 2020-09-09 | Building site construction is with interim guardrail mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021956620.XU CN213269263U (en) | 2020-09-09 | 2020-09-09 | Building site construction is with interim guardrail mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213269263U true CN213269263U (en) | 2021-05-25 |
Family
ID=75939569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021956620.XU Expired - Fee Related CN213269263U (en) | 2020-09-09 | 2020-09-09 | Building site construction is with interim guardrail mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213269263U (en) |
-
2020
- 2020-09-09 CN CN202021956620.XU patent/CN213269263U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201786036U (en) | Temporary protective railing for building construction | |
CN213269263U (en) | Building site construction is with interim guardrail mechanism | |
CN205617823U (en) | Guardrail bar is prevented to assembled net | |
CN210563509U (en) | Combined type limb protective rail with simple structure, extension and angle change | |
CN213328818U (en) | Steel guardrail | |
CN210530504U (en) | Multifunctional protective railing for construction site | |
CN211448071U (en) | Integral type zinc steel guardrail structure | |
CN202689682U (en) | Safe protective screening | |
CN213509550U (en) | Scaffold inboard free position drag props protector | |
CN214463200U (en) | Municipal construction safety fence with adjustable protection area | |
CN201649003U (en) | Active powder concrete column and steel pipe combination rail structure | |
KR20100007465U (en) | Soundproof Liftcar Canopy Assembly | |
CN218597929U (en) | Photovoltaic power generation railing | |
CN207647285U (en) | A kind of civil engineering building guardrail | |
CN221627855U (en) | Hydraulic engineering pit protection rail based on tensile stress | |
CN216714051U (en) | Composite structure fence easy to maintain | |
CN218405208U (en) | Road guardrail convenient to installation | |
CN212743207U (en) | Aluminium alloy glass barrier guardrail | |
CN211341839U (en) | Construction elevator is with protection canopy | |
CN212317636U (en) | Security fence for construction | |
CN216920014U (en) | Use railing structure at bridge | |
CN204960193U (en) | Guardrail bar is prevented to movable stair of dismantling | |
CN216110056U (en) | Anti-theft guardrail net | |
CN211775972U (en) | Handy protective barrier | |
CN215927015U (en) | Protective wall for engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210525 |