CN213231102U - Rail guard for building elevator - Google Patents

Rail guard for building elevator Download PDF

Info

Publication number
CN213231102U
CN213231102U CN202021954183.8U CN202021954183U CN213231102U CN 213231102 U CN213231102 U CN 213231102U CN 202021954183 U CN202021954183 U CN 202021954183U CN 213231102 U CN213231102 U CN 213231102U
Authority
CN
China
Prior art keywords
movable door
tool placing
elevator
area
guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021954183.8U
Other languages
Chinese (zh)
Inventor
贾玉龙
尹新红
贡丽霞
曹英汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Lianchuang Municipal Landscaping Engineering Co ltd
Original Assignee
Henan Lianchuang Municipal Landscaping Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Lianchuang Municipal Landscaping Engineering Co ltd filed Critical Henan Lianchuang Municipal Landscaping Engineering Co ltd
Priority to CN202021954183.8U priority Critical patent/CN213231102U/en
Application granted granted Critical
Publication of CN213231102U publication Critical patent/CN213231102U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Elevator Door Apparatuses (AREA)

Abstract

The utility model relates to a guard railing for building elevator, which comprises an elevator body and a guard railing, wherein the right end of the elevator body is connected with a lifting mechanism, the guard railing is arranged inside the elevator body, the guard railing divides the inside of the elevator body into a left chamber and a right chamber, the right chamber is a staff standing area, the left chamber is a tool placing area, the front end of the staff standing area is provided with a first movable door, the inside of the tool placing area is horizontally provided with a baffle plate, the inner walls of the front end and the rear end of the tool placing area are respectively provided with a reinforcing plate, the center of the reinforcing plate is provided with a rectangular through hole, the left wall of the tool placing area is provided with a sliding chute, the left end of the baffle plate extends into the sliding chute, the front end and the rear end of the tool placing area are respectively inserted into the corresponding rectangular through holes, then the baffle plate is fixed to the middle part of the tool placing area, the front end of, the middle part of the side wall in the employee standing area is provided with a strip handle.

Description

Rail guard for building elevator
Technical Field
The utility model relates to a building elevator technical field specifically is a rail guard for building elevator.
Background
As is well known, with the development of cities, high-rise buildings are pulled out of cities, and in the process of building the high-rise buildings, a building elevator becomes one of indispensable people transportation tools, so that the use of the building elevator not only promotes the project progress, but also effectively ensures the personnel safety.
The existing building elevator has poor internal safety protection effect, and when the elevator is in an emergency, metal tools carried by people are easy to smash towards human bodies under the action of external force, so that the safety of the people is damaged; moreover, the guard rail for the building elevator is poor in fixation of personnel, and when an emergency occurs, the personnel are easy to have unstable gravity center and collide on the hard inner wall of the elevator to cause injury to the body of the personnel.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a rail guard for building elevator.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a guard railing for a building elevator comprises an elevator body and a guard railing matched with the elevator body, wherein a lifting mechanism used for driving the elevator body to lift is installed at the right end of the elevator body, the guard railing is arranged inside the elevator body and divides the inside of the elevator body into a left chamber and a right chamber, the right chamber is a staff standing area, the left chamber is a tool placing area, a first movable door is arranged at the front end of the staff standing area, the right end of the first movable door is movably connected with the front wall of the elevator body through a hinge, a blocking plate is horizontally arranged inside the tool placing area, reinforcing plates are fixedly arranged on the inner walls of the front end and the rear end of the tool placing area, a rectangular through hole matched with the blocking plate is formed in the center of each reinforcing plate, a sliding groove matched with the blocking plate is formed in the left wall of the tool placing area, the left end of each blocking plate extends into the sliding groove, the front end and the rear, the front end in district is placed to the instrument is provided with the second dodge gate with rectangle through-hole assorted, the left end of second dodge gate passes through hinge swing joint with the antetheca of elevator body, the front portion of rail guard is provided with the third dodge gate, the front end of third dodge gate passes through hinge swing joint with the front end of rail guard right side wall, district and staff's district of standing are placed to third dodge gate intercommunication instrument, and the third dodge gate is opened towards the staff direction of standing, the staff stands and distinguishes the middle part of inside lateral wall and all fixes and be provided with rectangular handle.
In order to make the space utilization rate of the tool placing area higher, the utility model has the improvement that the number of the baffle plates is 1-4.
In order to make elevator body space utilization more reasonable, the utility model discloses an improvement has, and the space that the staff stood the district is greater than the space that the district was placed to the instrument.
In order to make the performance of this device more excellent, the utility model discloses an improvement has, and the size of third dodge gate is the half of rail guard size, and both ends all are provided with the observation window about the rail guard of the middle part of third dodge gate, third dodge gate rear end.
In order to make rectangular handle more firm, the utility model discloses an improvement has, and rectangular handle and staff stand and fixedly be provided with a plurality of fixed blocks between the inner wall in district.
In order to make each dodge gate all easily open and close, the utility model discloses an improvement has, and the right-hand member of the left end of first dodge gate antetheca, second dodge gate antetheca and the rear end of third dodge gate right side wall are all fixed and are provided with the handle.
(III) advantageous effects
Compared with the prior art, the utility model provides a rail guard for building elevator possesses following beneficial effect:
the protective guard for the building elevator divides the elevator body into two spaces, and separately transports the staff and the tool, so that the device is safer, reduces the accidental injury to the staff caused by the tool in the transportation process, ensures the staff to be more stable by the long strip-shaped handle, reduces the accidental injury caused by unstable gravity center, ensures the long strip-shaped handle to be firmer by fixedly arranging a plurality of fixed blocks between the long strip-shaped handle and the inner wall of a staff standing area, thereby the device is safer, the baffle plate can improve the space utilization rate of the tool placing area, the performance of the device is better, the baffle plate can be properly adjusted by the second movable door, the device can be adjusted according to the actual situation, thereby the space utilization rate is higher, the observation window can facilitate the staff to observe the tools in the tool placing area, therefore, the position of a tool is accurately judged, time is saved, and the reinforcing plate enables the blocking plate to be more stable.
Drawings
Fig. 1 is a schematic front structural view of the present invention;
FIG. 2 is a schematic front sectional view of the present invention;
fig. 3 is a first side cross-sectional view of the present invention;
fig. 4 is a second side cross-sectional view of the present invention;
fig. 5 is a schematic top view of the cross-sectional structure of the present invention.
In the figure: 1. an elevator body; 2. a first movable door; 3. a second movable door; 4. a handle; 5. a lifting mechanism; 6. protecting the fence; 7. a third movable door; 8. a reinforcing plate; 9. a rectangular through hole; 10. a barrier plate; 11. a chute; 12. a bar handle; 13. a staff standing area; 14. an observation window; 15. a tool placement area; 16. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the protective guard for construction elevator of the present invention comprises an elevator body 1 and a protective guard 6 matched with the elevator body 1, wherein a lifting mechanism for driving the elevator body 1 to lift is installed at the right end of the elevator body 1, the protective guard 6 is disposed inside the elevator body 1, the protective guard 6 divides the interior of the elevator body 1 into a left chamber and a right chamber, the right chamber is a staff standing area 13, the left chamber is a tool placing area 15, a first movable door 2 is disposed at the front end of the staff standing area 13, the right end of the first movable door 2 is movably connected with the front wall of the elevator body 1 through a hinge, a blocking plate 10 is horizontally disposed inside the tool placing area 15, reinforcing plates 8 are fixedly disposed on the inner walls of the front and rear ends of the tool placing area 15, a rectangular through hole 9 matched with the blocking plate 10 is disposed at the center of the reinforcing plate 8, a chute 11 matched with the blocking plate 10 is disposed on the left wall, the left end of barrier plate 10 stretches into spout 11, both ends insert corresponding rectangle through-hole 9 respectively around the middle part that 15 district 15 was placed to the instrument to barrier plate 10 fixed, the front end that 15 was placed to the instrument is provided with and passes through hinge swing joint with rectangle through-hole 9 assorted second dodge gate 3, the left end of second dodge gate 3 passes through hinge swing joint with elevator body 1's antetheca, the front portion of rail guard 6 is provided with third dodge gate 7, hinge swing joint is passed through with the front end of 6 right walls of rail guard to the front end of third dodge gate 7, district 15 and the staff district 13 of standing are placed to third dodge gate 7 intercommunication instrument, and third dodge gate 7 is opened towards staff district 13 orientation of standing, the middle part of 13 inside lateral walls in the staff district is all fixed and is provided with rectangular handle 12.
It should be noted that the number of the blocking plates 10 is 1-4, so that the space utilization rate of the tool placement area 15 is higher. The space of the staff standing area 13 is larger than that of the tool placing area 15, so that the space utilization of the elevator body 1 is more reasonable. The size of the third movable door 7 is half of the size of the guard rail 6, and the observation windows 14 are arranged in the middle of the third movable door 7 and at the upper end and the lower end of the guard rail 6 at the rear end of the third movable door 7, so that the device is better in performance, tools in the tool placement area 15 are easy to observe, and therefore taking is more convenient and time is saved. A plurality of fixing blocks 16 are fixedly arranged between the long handle 12 and the inner wall of the staff standing area 13, so that the long handle 12 is firmer, and the device is safer. Handles 4 are fixedly arranged at the left end of the front wall of the first movable door 2, the right end of the front wall of the second movable door 3 and the rear end of the right wall of the third movable door 7, so that each movable door is easy to open and close
In summary, the operation principle and the operation process of the guard railing for the building elevator are that, when the guard railing is used, the elevator body 1 is lowered to the lowest by the lifting mechanism 5, the lifting mechanism 5 is a known device directly purchased from the market and used by people in the field, and the structure and the function of the guard railing are not improved, and no detailed description is given here, then the first movable door 2 is opened, a staff enters the staff standing area 13 through the first movable door 2, the staff entering the staff standing area 13 opens the third movable door 7, a tool is placed on the barrier plate 10 in the tool placing area 15 through the third movable door 7, the third movable door 7 is closed after the placement is finished, after the first movable door 2 and the third movable door 7 are closed, the staff stably grabs the long handle 12, and then the elevator body 1 is lifted by the lifting mechanism 5, reach suitable height and elevator body 1 and stabilize the back, the staff opens and walks out elevator body 1 through first dodge gate 2 after third dodge gate 7 takes out the instrument, the work finishes, when adjusting the group's baffle according to specific instrument and placing the space utilization in order to improve the instrument and place district 15, open second dodge gate 3, barrier plate 10 in the manual extraction rectangle through-hole 9, can demolish barrier plate 10, perhaps will organize the baffle and align with rectangle through-hole 9 and spout 11 after insert the middle part that the instrument placed district 15, realize the installation of barrier plate 10, thereby realize placing the rational utilization in 15 spaces in district to the instrument.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a rail guard for building elevator, includes elevator body (1) and with elevator body (1) assorted rail guard (6), its characterized in that: the elevator is characterized in that a lifting mechanism used for driving the elevator body (1) to lift is installed at the right end of the elevator body (1), the protective guard (6) is arranged inside the elevator body (1), the protective guard (6) divides the inside of the elevator body (1) into a left chamber and a right chamber, the right chamber is a staff standing area (13), the left chamber is a tool placing area (15), a first movable door (2) is arranged at the front end of the staff standing area (13), the right end of the first movable door (2) is movably connected with the front wall of the elevator body (1) through a hinge, a blocking plate (10) is horizontally arranged inside the tool placing area (15), reinforcing plates (8) are fixedly arranged on the inner walls of the front end and the rear end of the tool placing area (15), a rectangular through hole (9) matched with the blocking plate (10) is formed in the center of the reinforcing plate (8), and a sliding groove (11) matched with the blocking plate (10) in type is formed in the left wall of the tool, the left end of the baffle plate (10) extends into the sliding chute (11), the front end and the rear end of the baffle plate are respectively inserted into the corresponding rectangular through holes (9), the baffle plate (10) is fixed to the middle part of the tool placing area (15), the front end of the tool placing area (15) is provided with a second movable door (3) matched with the rectangular through holes (9), the left end of the second movable door (3) is movably connected with the front wall of the elevator body (1) through a hinge, a third movable door (7) is arranged at the front part of the guard rail (6), the front end of the third movable door (7) is movably connected with the front end of the right wall of the protective guard (6) through a hinge, the third movable door (7) is communicated with a tool placing area (15) and a staff standing area (13), and the third movable door (7) is opened towards the direction of the staff standing area (13), and the middle parts of the side walls in the staff standing area (13) are all fixedly provided with long-strip handles (12).
2. The guard rail for the construction elevator according to claim 1, wherein: the number of the barrier plates (10) is 1-4.
3. The guard rail for the construction elevator according to claim 2, wherein: the space of the staff standing area (13) is larger than the space of the tool placing area (15).
4. The guard rail for the construction elevator according to claim 3, wherein: the size of the third movable door (7) is half of that of the guard rail (6), and observation windows (14) are arranged in the middle of the third movable door (7) and at the upper end and the lower end of the guard rail (6) at the rear end of the third movable door (7).
5. The guard rail for the construction elevator according to claim 4, wherein: a plurality of fixing blocks (16) are fixedly arranged between the long strip handle (12) and the inner wall of the staff standing area (13).
6. The guard rail for the construction elevator according to claim 5, wherein: the left end of the front wall of the first movable door (2), the right end of the front wall of the second movable door (3) and the rear end of the right wall of the third movable door (7) are all fixedly provided with handles (4).
CN202021954183.8U 2020-09-09 2020-09-09 Rail guard for building elevator Expired - Fee Related CN213231102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021954183.8U CN213231102U (en) 2020-09-09 2020-09-09 Rail guard for building elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021954183.8U CN213231102U (en) 2020-09-09 2020-09-09 Rail guard for building elevator

Publications (1)

Publication Number Publication Date
CN213231102U true CN213231102U (en) 2021-05-18

Family

ID=75871985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021954183.8U Expired - Fee Related CN213231102U (en) 2020-09-09 2020-09-09 Rail guard for building elevator

Country Status (1)

Country Link
CN (1) CN213231102U (en)

Similar Documents

Publication Publication Date Title
CN213231102U (en) Rail guard for building elevator
CN213039145U (en) Slide rail type civil air defense door
CN212387617U (en) Tower crane base convenient for bidirectional combination reinforcement
CN112065020B (en) Combined scaffold for civil engineering
CN212837417U (en) Anti-impact civil air defense door convenient for fixing door leaf
CN205701799U (en) A kind of safety laboratory hood
CN212779249U (en) Portable measurement combination tool for building construction
CN210366888U (en) Safety protection device for elevator
CN217535113U (en) Elevator for construction with elevator mouth separation mechanism
CN217268748U (en) Hanging flower basket that stability can be good for building engineering
CN217151745U (en) Connecting structure for aluminum alloy anti-theft door and window
CN216476288U (en) Safety barrier is used in construction of building outer wall
CN219794612U (en) Safety device is used in building templates construction
CN215859885U (en) Security protection door forbidden district security protection fence with prevent pressing from both sides function
CN214828852U (en) Forklift manned platform
CN204040510U (en) A kind of safety protective door for elevator hoistways
CN214547795U (en) Teaching box for teaching
CN213202040U (en) Construction elevator floor guard gate
CN219255855U (en) Wooden finishing material cutting device that interior decoration used
CN205740267U (en) A kind of safety barrier of elevator
CN220848617U (en) Multifunctional operation platform for elevator shaft
CN218028896U (en) Protective hanging basket
CN210563521U (en) Movable work box
CN215484558U (en) Hanging box for building curtain wall engineering
CN211598461U (en) Fixing device of fireproof rolling shutter door

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210518

Termination date: 20210909