CN213171224U - Tower crane attached quick-mounting platform - Google Patents
Tower crane attached quick-mounting platform Download PDFInfo
- Publication number
- CN213171224U CN213171224U CN202021940997.6U CN202021940997U CN213171224U CN 213171224 U CN213171224 U CN 213171224U CN 202021940997 U CN202021940997 U CN 202021940997U CN 213171224 U CN213171224 U CN 213171224U
- Authority
- CN
- China
- Prior art keywords
- platform
- steel
- fixedly connected
- support frame
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 70
- 239000010959 steel Substances 0.000 claims abstract description 70
- 238000006073 displacement reaction Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a tower crane attached fast-assembly platform, which comprises four support frames, a steel mesh and a connecting platform, wherein the four support frames are arranged in a rectangular shape, the support frames are fixedly connected with a fixing frame, two steel plates are symmetrically and fixedly connected to each support frame, a limiting bulge is arranged at one end of each steel plate, the connecting platform is connected between two adjacent support frames, and the steel mesh is fixedly connected to the connecting platform; the four connecting platforms are respectively and directly horizontally placed on the adjacent supporting frames, the side edges of the connecting platforms are limited through the limiting bulges on the steel plates, and the four connecting platforms are connected into a whole through bolts; so simple safe support frame of this equipment fixing and connection platform all can dismantle, and can carry out spacing joint to connection platform fast through spacing arch on the steel sheet, so this equipment fixing and dismantlement are efficient, can be quick with this equipment fixing and dismantlement.
Description
Technical Field
The utility model relates to a tower crane equipment technical field specifically is tower crane adheres to ready-package platform.
Background
With the increasing application amount of tower cranes in construction of the building industry, multi-story high-rise buildings and high pier bridges are increasing day by day, the construction of the tower cranes is adopted to meet the requirements of vertical and horizontal transportation and the attachment of the tower cranes is indispensable, and higher requirements are provided for the installation of the tower crane attachment frame and the safety management of the later maintenance process;
the traditional tower erection platform is generally erected by scaffold steel pipes, has the defects of complex installation, low efficiency and the like, and can be erected in a long time;
to sum up, this application now proposes tower crane and adheres to ready-package platform, solves the problem that the aforesaid appears.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a tower crane adheres to ready-package platform to solve the problem that proposes in the above-mentioned background art, the utility model discloses convenient to use, easy operation, systematic height, the practicality is strong.
In order to achieve the above object, the utility model provides a following technical scheme: quick-mounting platform is adhered to tower crane, including support frame, steel mesh and connection platform, the support frame is equipped with four, four the support frame is the rectangle and arranges, just support frame and mount fixed connection, every two steel sheets of equal symmetry fixedly connected with on the support frame, just spacing arch has all been seted up to the one end of steel sheet, adjacent two be connected with connection platform between the support frame, fixedly connected with steel mesh on the connection platform.
Preferably, the connection platform includes angle steel, first steel pipe and second steel pipe, the second steel pipe is equipped with two, two parallel arrangement, and two between the second steel pipe even fixedly connected with a plurality of first steel pipe between the second steel pipe, the equal fixedly connected with angle steel in both ends of connection platform, spacing arch plays limiting displacement to the second steel pipe.
Preferably, the supporting frame is fixedly connected to the fixing frame through bolts.
Preferably, two adjacent connecting platforms are fixedly connected through bolts.
Preferably, the first steel pipe is perpendicularly welded to the second steel pipe.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a through setting up the mutual cooperation of support frame, angle steel, first steel pipe, second steel pipe, steel mesh and connection platform, through directly placing four connection platforms on adjacent support frame respectively horizontally, then spacing the side of connecting platform through spacing arch on the steel sheet, link four connection platforms into a whole through the bolt; so simple safe support frame of this equipment fixing and connection platform all can dismantle, and can carry out spacing joint to connection platform fast through spacing arch on the steel sheet, so this equipment fixing and dismantlement are efficient, can be quick with this equipment fixing and dismantlement.
Drawings
FIG. 1 is a schematic top view of the steel net of the present invention;
fig. 2 is a schematic top view of the connection platform of the present invention;
FIG. 3 is an enlarged schematic view of the area A in FIG. 2 according to the present invention;
fig. 4 is a schematic top view of the supporting frame of the present invention;
fig. 5 is a schematic view of the structure of the middle steel plate of the present invention.
Reference numerals: 1. a support frame; 2. a steel plate; 3. a limiting bulge; 4. a steel mesh; 5. connecting the platform; 6. angle steel; 7. a first steel pipe; 8. a second steel pipe; 9. a fixing frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the tower crane attached fast-assembly platform comprises four support frames 1, steel meshes 4 and connecting platforms 5, wherein the four support frames 1 are arranged in a rectangular shape, the support frames 1 are fixedly connected with a fixing frame 9, two steel plates 2 are symmetrically and fixedly connected to each support frame 1, limiting bulges 3 are arranged at one ends of the steel plates 2, the connecting platforms 5 are connected between every two adjacent support frames 1, and the steel meshes 4 are fixedly connected to the connecting platforms 5;
the limiting bulge 3 limits the connecting platform 5, the connecting platform 5 is placed on the steel plate 2, and the connecting platform 5 and the support frame 1 are fixed in a placing and clamping mode;
wherein, the steel mesh 4 is welded on the connecting platform 5;
wherein, the four support frames 1 form a rectangular structure;
the connecting platform 5 comprises angle steel 6, first steel pipes 7 and second steel pipes 8, the number of the second steel pipes 8 is two, the two second steel pipes 8 are arranged in parallel, a plurality of first steel pipes 7 are uniformly and fixedly connected between the two second steel pipes 8, the angle steel 6 is fixedly connected to both ends of the connecting platform 5, and the limiting protrusions 3 limit the second steel pipes 8;
the support frame 1 is fixedly connected to the fixed frame 9 through bolts;
two adjacent connecting platforms 5 are fixedly connected through bolts;
the first steel pipe 7 is vertically welded on the second steel pipe 8;
the working principle is as follows: firstly, four support frames 1 are fixedly connected to a fixed frame 9 through bolts, then four connecting platforms 5 are respectively and directly horizontally placed on the adjacent support frames 1, the connecting platforms 5 are supported through steel plates 2, then the side edges of the connecting platforms 5 are limited through limiting bulges 3 on the steel plates 2, and then the two adjacent connecting platforms 5 are fixedly connected through the bolts, so that the four connecting platforms 5 can be connected into a whole; so this equipment fixing is simple safety, and four support frames 1 and connection platform 5 can all be dismantled, and can carry out spacing joint to connection platform 5 fast through spacing arch 3 on the steel sheet 2, so this equipment fixing and dismantlement are efficient, can be quick with this equipment fixing and dismantlement.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. Attached ready-package platform of tower crane, its characterized in that: including support frame (1), steel mesh (4) and connection platform (5), support frame (1) is equipped with four, four support frame (1) is the rectangle and arranges, just support frame (1) and mount (9) fixed connection, every two equal symmetrical two steel sheets (2) of fixedly connected with on support frame (1), just spacing arch (3), adjacent two have all been seted up to the one end of steel sheet (2) be connected with connection platform (5) between support frame (1), fixedly connected with steel mesh (4) on connection platform (5).
2. The tower crane attachment fast-assembly platform of claim 1, wherein: connecting platform (5) include angle steel (6), first steel pipe (7) and second steel pipe (8), second steel pipe (8) are equipped with two, two parallel arrangement between second steel pipe (8), and two first steel pipe (7) of even fixedly connected with a plurality of between second steel pipe (8), the equal fixedly connected with angle steel (6) in both ends of connecting platform (5), spacing arch (3) play limiting displacement to second steel pipe (8).
3. The tower crane attachment fast-assembly platform of claim 1, wherein: the support frame (1) is fixedly connected to the fixed frame (9) through bolts.
4. The tower crane attachment fast-assembly platform of claim 1, wherein: two adjacent connecting platforms (5) are fixedly connected through bolts.
5. The tower crane attachment fast-assembly platform of claim 2, wherein: the first steel pipe (7) is vertically welded on the second steel pipe (8).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021940997.6U CN213171224U (en) | 2020-09-08 | 2020-09-08 | Tower crane attached quick-mounting platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021940997.6U CN213171224U (en) | 2020-09-08 | 2020-09-08 | Tower crane attached quick-mounting platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN213171224U true CN213171224U (en) | 2021-05-11 |
Family
ID=75771566
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202021940997.6U Active CN213171224U (en) | 2020-09-08 | 2020-09-08 | Tower crane attached quick-mounting platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN213171224U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114506464A (en) * | 2022-01-18 | 2022-05-17 | 北京华能新锐控制技术有限公司 | Temporary stop station of unmanned aerial vehicle for inspection |
-
2020
- 2020-09-08 CN CN202021940997.6U patent/CN213171224U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114506464A (en) * | 2022-01-18 | 2022-05-17 | 北京华能新锐控制技术有限公司 | Temporary stop station of unmanned aerial vehicle for inspection |
| CN114506464B (en) * | 2022-01-18 | 2024-03-15 | 北京华能新锐控制技术有限公司 | Temporary stop station of unmanned aerial vehicle for inspection |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN215104737U (en) | A prefabricated bracket for bridge construction | |
| CN201953070U (en) | Reusable fabricated processing shed for construction site | |
| CN210857253U (en) | Foundation fixing node of permanent box type house | |
| CN202227701U (en) | Assembled horizontal passage device | |
| CN213171224U (en) | Tower crane attached quick-mounting platform | |
| CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
| CN216641367U (en) | Power transmission tower operation and maintenance platform | |
| CN216007746U (en) | Lifting type elevator shaft safety operation platform | |
| CN204691201U (en) | A kind of Liftable hanging formula scaffold system | |
| CN217461409U (en) | Building scaffold bearing structure | |
| CN215484851U (en) | Existing building floor's reinforcement transformation structure and hoist and mount construction system thereof | |
| CN214739106U (en) | A curtain wall steel frame joint | |
| CN210151938U (en) | Column top supporting device for low-position jacking formwork system | |
| CN211922969U (en) | Umbrella-shaped elevated structure supporting frame for integrated module house | |
| CN214062433U (en) | Temporary supporting structure of assembled steel structure | |
| CN212866772U (en) | Large-span scaffold with moving platform | |
| CN211949131U (en) | Combined upper-chord corrugated web ribbed secondary beam floor system | |
| CN222513385U (en) | Overhanging type disc buckle type edge protection structure for construction of building main body | |
| CN218149672U (en) | Truss corner connecting device | |
| CN209704028U (en) | Standardized protection system of assembled building | |
| CN221627570U (en) | Mobile assembled steel frame body for construction of tall and large independent upright posts | |
| CN219491486U (en) | Bearing beam structure is built in room | |
| CN113404279A (en) | Lifting type elevator shaft operating platform utilizing triangular support frame and screw opposite-pulling system | |
| CN207905103U (en) | A kind of precast concrete balcony being suitable for prefabricated construction | |
| CN115596091A (en) | Modular honeycomb building structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |