CN213143776U - Plastering device for building construction - Google Patents

Plastering device for building construction Download PDF

Info

Publication number
CN213143776U
CN213143776U CN202021735703.6U CN202021735703U CN213143776U CN 213143776 U CN213143776 U CN 213143776U CN 202021735703 U CN202021735703 U CN 202021735703U CN 213143776 U CN213143776 U CN 213143776U
Authority
CN
China
Prior art keywords
storage box
gear
plate
ash storage
ash
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021735703.6U
Other languages
Chinese (zh)
Inventor
陈和标
朱青龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021735703.6U priority Critical patent/CN213143776U/en
Application granted granted Critical
Publication of CN213143776U publication Critical patent/CN213143776U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a plastering device for building construction, which comprises a bearing plate; the bearing plate is provided with a sliding plate; one end of the sliding plate is provided with a supporting seat and two supporting columns, a fixed plate is arranged between the two supporting columns, and two ends of the fixed plate are respectively connected with the top ends of the two supporting columns through pin shafts; fixing seats are respectively arranged on the opposite side surfaces of the two support columns, threaded holes are formed in the fixing seats, screw rods are arranged on the fixing seats corresponding to the threaded holes, and the screw rods are connected with the threaded holes; a slide block is arranged on the screw rod, an ash storage box is arranged on one side of the slide block, and the ash storage box is connected with the slide block; the lower end of the ash storage box is provided with a roller, and the roller is connected with the ash storage box; one end of the screw rod is provided with a second gear, a first gear is arranged below the second gear and connected with a rotating rod, and one end of the rotating rod is connected with a motor. The utility model discloses can adjust plastering unit's brush section of thick bamboo position according to the wall height, can accomplish the whitewashing of not co-altitude wall.

Description

Plastering device for building construction
Technical Field
The utility model relates to a construction equipment technical field specifically is a construction plastering unit.
Background
Plastering is a traditional construction method for plastering the wall surface of a house building by using mortar. Plastering projects are divided into inner plastering and outer plastering, and indoor plastering is generally called inner plastering, such as ground, ceiling, stairs and the like; the plastering outside is called external plastering, such as an external wall and a balcony. A canopy, etc. Present building construction is plastered and is all smeared through artifical manual, and is inefficient, if the wall is higher just need take the ladder moreover, go to the operation in the manual work just dangerous, and the security is not high, for this, for solving above-mentioned problem, we propose an automatic plastering unit, do not need artifical climbing, can adjust plastering unit's brush section of thick bamboo position according to the wall height.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a construction plastering unit to among the solution prior art, the work efficiency of manual work plastering is low, and the user can not adjust the technical problem who plasters a brush position according to the height of wall.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a plastering device for building construction comprises a bearing plate; the bearing plate is provided with a sliding plate; one end of the sliding plate is provided with a supporting seat and two supporting columns, the two supporting columns are arranged oppositely, a fixed plate is arranged between the two supporting columns, and two ends of the fixed plate are respectively connected with the top ends of the two supporting columns through pin shafts; fixing seats are respectively arranged on the opposite side surfaces of the two supporting columns, threaded holes are formed in the fixing seats, screw rods are arranged on the fixing plates corresponding to the threaded holes, and the screw rods are connected with the threaded holes; the screw rod is provided with a sliding block, one side of the sliding block is provided with an ash storage box, and the ash storage box is connected with the sliding block; the lower end of the ash storage box is provided with a roller, and the roller is connected with the ash storage box; a second gear is arranged at one end of the screw rod, a first gear is arranged below the second gear, and the first gear is meshed with the second gear; a rotating rod is sleeved in the first gear and penetrates through the bottom end of one of the support columns and the support seat through a connecting hole; one end of the rotating rod is connected with a motor, and the motor is installed on the sliding plate.
As the utility model discloses a preferred technical scheme, be provided with sliding guide on the bearing plate, the sliding tray has been seted up to the sliding plate bottom, the sliding plate is worn to establish through sliding tray slidable on the bearing plate.
As the utility model discloses an optimized technical scheme, the mounting groove has been seted up to slider one side, it is provided with the mounting panel to deposit ash bin one side, through the both ends card of mounting panel is established on the mounting groove, will deposit the ash bin with the slider is connected.
As the utility model discloses a preferred technical scheme, the both sides of depositing the ash case all are provided with the connecting plate, be provided with the cylinder between the connecting plate, the cylinder passes through the connecting plate with deposit the ash case and connect.
As the preferred technical scheme of the utility model, be provided with the storage hopper on the sliding plate.
As the utility model discloses a preferred technical scheme, the ash hole has been seted up to one side bottom of depositing the ash case, the ash hole is located the top of cylinder.
As an optimal technical scheme of the utility model, the bottom four corners department of bearing plate is provided with the gyro wheel, the gyro wheel with the bearing plate is connected.
Has the advantages that:
the utility model provides a construction plastering unit possesses following beneficial effect:
the ash storage box is arranged on the sliding blocks on the two screw rods, the rotating shaft is driven to rotate through the motor, the two screw rods are driven to rotate through the change gear, and when the two screw rods rotate, the sliding blocks can move up and down, so that the ash storage box is driven to move up and down, and the purpose of adjusting the height is achieved; the roller is arranged below the ash storage box, mortar flows out through an outlet of the ash storage box, the mortar directly flows on the roller, and the roller can be continuously painted on a wall.
Drawings
FIG. 1 is a perspective view of a plastering device for building construction of the present invention;
FIG. 2 is an exploded view of the plastering device for construction of the present invention;
fig. 3 is the utility model relates to a structure schematic diagram of ash storage box in the plastering unit for building construction.
In the figure: 1. a bearing plate; 2. a sliding plate; 3. a support pillar; 4. a threaded hole; 5. a slider; 6. a drum; 7. a connecting plate; 8. an ash storage box; 9. a fixing plate; 10. mounting a plate; 11. mounting grooves; 12. a screw; 13. a fixed seat; 14. a motor; 15. a storage hopper; 16. buckling; 17. rotating the rod; 18. a first gear; 19. a second gear; 20. a roller; 21. connecting holes; 24. an ash outlet; 100. a sliding guide rail; 200. a sliding groove; 201. and (4) supporting the base.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a plastering device for building construction comprises a bearing plate 1; the bearing plate 1 is provided with a sliding plate 2; one end of the sliding plate 2 is provided with a supporting seat 201 and two supporting columns 3, the two supporting columns 3 are arranged oppositely, a fixing plate 9 is arranged between the two supporting columns 3, and two ends of the fixing plate 9 are respectively connected with the top ends of the two supporting columns 3 through pin shafts; fixing seats 13 are respectively arranged on opposite side surfaces of the two supporting columns 3, threaded holes 4 are formed in the fixing seats 13, screw rods 12 are arranged on the fixing plates 9 corresponding to the threaded holes 4, and the screw rods 12 are connected with the threaded holes 4; a sliding block 5 is arranged on the screw 12, an ash storage box 8 is arranged on one side of the sliding block 5, and the ash storage box 8 is connected with the sliding block 5; the lower end of the ash storage box 8 is provided with a roller 6, and the roller 6 is connected with the ash storage box 8; a second gear 19 is arranged at one end of the screw rod 12, a first gear 18 is arranged below the second gear 19, and the first gear 18 is meshed with the second gear 19; a rotating rod 17 is sleeved in the first gear 18, and the rotating rod 17 is arranged on the bottom end of one of the support columns 3 and the support seat 201 in a penetrating manner through a connecting hole 21; one end of the rotating rod 17 is connected with the motor 14, and the motor 14 is installed on the sliding plate 2.
When the building construction plastering device is used, the motor 14 drives the rotating shaft to rotate, the rotating shaft and the second gear 19 are meshed for transmission through the first gear 18 and the second gear 19, the two screw rods 12 are rotated, the sliding block 5 on the screw rods 12 is enabled to move up and down, the mortar storage box 8 arranged on the sliding block 5 is driven to move up and down, the roller 6 is arranged at the bottom side of the mortar storage box 8, mortar directly flows onto the roller 6 through an outlet on the mortar storage box 8, and the roller 6 continuously rolls when contacting with a wall surface, so that the mortar can be plastered on the wall. When the mortar in the mortar storage box 8 is used up, the mortar storage box 8 can be rotated by the screw 12 to be lowered to the bottom, and then the mortar in the mortar storage hopper 15 can be contained in the mortar storage box 8. The screw 12 is used for transmission, the reliability is good, the threaded connection has self-locking performance, the ash storage box 8 at a high position cannot drop suddenly, and the safety is higher.
Specifically, the bearing plate 1 is provided with a sliding guide rail 100, the bottom end of the sliding plate 2 is provided with a sliding groove 200, and the sliding plate 2 is slidably arranged on the bearing plate 1 in a penetrating manner through the sliding groove 200. By means of the cooperation between the sliding guide rail 100 and the sliding groove 200, the sliding plate 2 can slide on the bearing plate 1, so as to drive each component on the sliding plate 2 to move transversely, so that the roller 6 can also move transversely, and the painting range is also enlarged.
Specifically, mounting groove 11 has been seted up to slider 5 one side, it is provided with mounting panel 10 to deposit ash bin 8 one side, through mounting panel 10's both ends card is established on mounting groove 11, will deposit ash bin 8 with slider 5 is connected. The ash storage box 8 can be connected to the sliding block 5 by clamping the mounting plate 10 on the mounting groove 11, and the mounting method is simple and is convenient to detach.
Specifically, connecting plates 7 are arranged on two sides of the ash storage box 8, a roller 6 is arranged between the connecting plates 7, and the roller 6 is connected with the ash storage box 8 through the connecting plates 7. Utilize connecting plate 7 to install cylinder 6 under depositing grey case 8, connecting plate 7 passes through 16 joints of buckle and is depositing the both sides of grey case 8, and its mounting means is simple, when needing to be changed cylinder 6, only needs to pull down connecting plate 7 and just can take off cylinder 6, dismantles very convenient and fast.
Specifically, the sliding plate 2 is provided with a storage hopper 15. The storage hopper 15 is for storing mortar, and when there is no mortar in the storage box 8, the mortar can be taken out from the storage hopper 15.
Specifically, the bottom of one side of the ash storage box 8 is provided with an ash outlet 24, and the ash outlet 24 is positioned above the roller 6. When the mortar storage box 8 is used, mortar directly flows on the roller 6 through the mortar outlet 24, and the roller 6 is tightly attached to a wall surface and continuously rotates from top to bottom, so that the mortar can be plastered on the wall.
Specifically, the four corners of the bottom end of the bearing plate 1 are provided with rollers 20, and the rollers 20 are connected with the bearing plate 1. The rollers 20 are arranged on the bearing plate 1, so that the whole mechanism can be transported to different places by using the rollers 20 without being lifted by people, and the labor intensity is reduced.
When the building construction plastering device is used, the sliding plate 2 is connected with the bearing plate 1 through the sliding guide rail 100, so that the aim of transverse movement can be fulfilled, other parts on the sliding plate 2 can also realize transverse movement, and the plastering area of the roller 6 is enlarged; the motor 14 drives the rotating shaft to rotate, the rotating shaft is meshed with the second gear 19 through the first gear 18, the two screw rods 12 are rotated, the sliding blocks 5 on the screw rods 12 are driven to move up and down, the ash storage box 8 arranged on the sliding blocks 5 is driven to move up and down, the roller 6 is arranged at the bottom side of the ash storage box 8, mortar directly flows on the roller 6 through the ash outlet 24 of the ash storage box 8, and the roller 6 continuously rolls in contact with a wall surface to brush the mortar on the wall. The utility model makes the slide block 5 on the screw rod 12 move vertically by utilizing the rotation of the screw rod 12, thereby achieving the purpose of adjusting the height of the plastering wall surface; the sliding plate 2 is transversely moved by the sliding guide rail 100, so that the painting area can be increased; when the whole device is required to be moved, the whole device can be moved through the rollers 20 only by pushing the bearing plate 1 without manual carrying.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a construction plastering unit which characterized in that: comprises a bearing plate (1); the bearing plate (1) is provided with a sliding plate (2); one end of the sliding plate (2) is provided with a supporting seat (201) and two supporting columns (3); the two supporting columns (3) are oppositely arranged, a fixing plate (9) is arranged between the two supporting columns (3), and two ends of the fixing plate (9) are respectively connected with the top ends of the two supporting columns (3) through pin shafts; fixing seats (13) are respectively arranged on opposite side surfaces of the two supporting columns (3), threaded holes (4) are formed in the fixing seats (13), screw rods (12) are arranged on the fixing plates (9) corresponding to the threaded holes (4), and the screw rods (12) are connected with the threaded holes (4); a sliding block (5) is arranged on the screw rod (12), an ash storage box (8) is arranged on one side of the sliding block (5), and the ash storage box (8) is connected with the sliding block (5); a roller (6) is arranged at the lower end of the ash storage box (8), and the roller (6) is connected with the ash storage box (8); a second gear (19) is installed at one end of the screw rod (12), a first gear (18) is arranged below the second gear (19), and the first gear (18) is meshed with the second gear (19); a rotating rod (17) is sleeved in the first gear (18), and the rotating rod (17) penetrates through the bottom end of one supporting column (3) and the supporting seat (201) through a connecting hole (21); one end of the rotating rod (17) is connected with a motor (14), and the motor (14) is installed on the sliding plate (2).
2. A plastering apparatus for construction work according to claim 1, wherein: the bearing plate (1) is provided with a sliding guide rail (100), the bottom end of the sliding plate (2) is provided with a sliding groove (200), and the sliding plate (2) is slidably arranged on the bearing plate (1) in a penetrating manner through the sliding groove (200).
3. A plastering apparatus for construction work according to claim 1, wherein: mounting groove (11) have been seted up to slider (5) one side, it is provided with mounting panel (10) to deposit ash box (8) one side, through the both ends card of mounting panel (10) is established on mounting groove (11), will deposit ash box (8) with slider (5) are connected.
4. A plastering apparatus for construction work according to claim 1, wherein: the ash storage box is characterized in that connecting plates (7) are arranged on two sides of the ash storage box (8), a roller (6) is arranged between the connecting plates (7), and the roller (6) is connected with the ash storage box (8) through the connecting plates (7).
5. A plastering apparatus for construction work according to claim 1, wherein: the sliding plate (2) is provided with a material storage hopper (15).
6. A plastering apparatus for construction work according to claim 1, wherein: an ash outlet (24) is formed in the bottom of one side of the ash storage box (8), and the ash outlet (24) is located above the roller (6).
7. A plastering apparatus for construction work according to claim 1, wherein: the bottom four corners department of bearing plate (1) is provided with gyro wheel (20), gyro wheel (20) with bearing plate (1) is connected.
CN202021735703.6U 2020-08-19 2020-08-19 Plastering device for building construction Expired - Fee Related CN213143776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021735703.6U CN213143776U (en) 2020-08-19 2020-08-19 Plastering device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021735703.6U CN213143776U (en) 2020-08-19 2020-08-19 Plastering device for building construction

Publications (1)

Publication Number Publication Date
CN213143776U true CN213143776U (en) 2021-05-07

Family

ID=75738922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021735703.6U Expired - Fee Related CN213143776U (en) 2020-08-19 2020-08-19 Plastering device for building construction

Country Status (1)

Country Link
CN (1) CN213143776U (en)

Similar Documents

Publication Publication Date Title
CN109095278B (en) Building site uses abandonment cable coiling mechanism
CN211499909U (en) Support bracket for constructional engineering
CN112360164A (en) Assembled auxiliary supporting device for installation of building wallboard
CN105922239B (en) A kind of building cleaning with rigid lift adjustment function supports robot
CN213143776U (en) Plastering device for building construction
CN214220654U (en) Assembled auxiliary supporting device for installation of building wallboard
CN210659409U (en) Temporary ceiling convenient to transport
CN110778137B (en) Assembled counterfort fixing device
CN219910021U (en) Ground leveling device for house building
CN116556643B (en) Adjustable steel support
CN220063051U (en) Environment monitoring device for building engineering
CN111959590A (en) Material transportation device for constructional engineering
CN112875526A (en) Combined type hoisting device for constructional engineering
CN217347904U (en) Building engineering material transport vehicle
CN116816009A (en) Foam cement composite sheet roofing installation auxiliary device
CN218456823U (en) A building vertical greening system
CN218715223U (en) Ground leveling device for building
CN116902852A (en) Elevator for civil construction
CN116657854A (en) Ceramic tile soaking device for construction site
CN213953043U (en) Integral sliding device for building steel structure
CN213267571U (en) Warning device is used in housing construction engineering construction
CN212567390U (en) A kind of inspection mirror for construction engineering inspection
CN210105248U (en) Leveling ruler with tracks
CN114560416A (en) Vertical transportation equipment for prefabricated building
CN223051762U (en) A mobile shared power rental cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210507

Termination date: 20210819

CF01 Termination of patent right due to non-payment of annual fee