CN212924325U - Electric power overhauls operation platform - Google Patents
Electric power overhauls operation platform Download PDFInfo
- Publication number
- CN212924325U CN212924325U CN202021916629.8U CN202021916629U CN212924325U CN 212924325 U CN212924325 U CN 212924325U CN 202021916629 U CN202021916629 U CN 202021916629U CN 212924325 U CN212924325 U CN 212924325U
- Authority
- CN
- China
- Prior art keywords
- platform
- pulley
- electric power
- operating platform
- lifting platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
An electric power overhaul operating platform comprises an overhaul track and an overhaul device; the maintenance track is circular and is arranged around the area to be maintained in a surrounding manner; the maintenance device comprises a bearing platform, a lifting platform and an operation platform; a first pulley is arranged at the bottom of the bearing platform; the first pulley is driven by the motor to move along the track for maintenance; a hydraulic rod is vertically arranged on the bearing platform; four hydraulic rods are arranged and are respectively arranged at four corners of the bearing platform; a lifting platform is arranged at the top of the hydraulic rod; the lifting platform is driven by the hydraulic rod to move up and down in the vertical direction; two parallel operation slide rails are arranged on the lifting platform; an operation platform is arranged at the top of the lifting platform; a second pulley is arranged at the bottom of the operating platform; the second pulley is embedded in the operation sliding rail; the device is convenient and quick to install and use, high in safety and flexibility and suitable for being used in most flat-bottom environments.
Description
Technical Field
The utility model belongs to auxiliary assembly makes the field for the electric power construction, concretely relates to electric power overhauls operation platform.
Background
In the electric power construction maintenance process, the maintenance platform is required to be used for maintaining the electric power equipment, the existing electric power maintenance platform is single in function, and the maintenance effect is poor. When a technician overhauls, the stability of the operating platform needs to be ensured, the operable range needs to be expanded as much as possible, and the problem that the technician is far away and cannot reach the operating platform is avoided.
Disclosure of Invention
An object of the utility model is to avoid prior art not enough, provide an electric power overhauls operation platform to effectively solve prior art's problem.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an electric power overhaul operating platform comprises an overhaul track 1 and an overhaul device; the overhauling track 2 is circular and is arranged around the area to be overhauled in a surrounding way;
the maintenance device comprises a bearing platform 3, a lifting platform 4 and an operation platform 5; the bottom of the bearing platform 3 is provided with a first pulley 6; the first pulley 6 is driven by a motor to move along the track 1 for overhauling; a hydraulic rod 7 is vertically arranged on the bearing platform 3; four hydraulic rods 7 are arranged and are respectively arranged at four corners of the bearing platform 3; the top of the hydraulic rod 7 is provided with a lifting platform 4; the lifting platform 4 is driven by the hydraulic rod 7 to move up and down in the vertical direction; two parallel operation slide rails 8 are arranged on the lifting platform 4; an operation platform 5 is arranged at the top of the lifting platform 4; the bottom of the operating platform 5 is provided with a second pulley 9; the second pulley 9 is embedded in the operation slide rail 8; the second pulley 9 drives the operating platform 5 to move along the operating slide rail 8, and the operating platform is close to or far away from the area to be overhauled; the second pulley 9 is driven by a motor to move; the inner wall of the protective fence 10 is provided with a motor control switch 11.
Further, a protective fence 10 is arranged on the side wall of the lifting platform 4 except the side facing the area to be overhauled.
Further, a telescopic rod 12 is arranged on the side edge of the operating platform 5 far away from the area to be overhauled; the end of the telescopic rod 12 is connected with the inner wall of the protective fence 10.
Further, a fixing ring 13 is arranged on the protective fence 10; the fixing ring 13 is fixedly provided with a safety rope 14.
Further, an infrared sensor 15 is arranged on one side of the operating platform 5 close to the area to be overhauled; a central controller 16 is arranged below the operating platform 5; the central controller 16 is connected with the infrared sensor 15; an alarm 17 is connected to the central controller 16.
Further, a camera 18 is disposed on the inner wall of the protective fence 10.
Compared with the prior art, the utility model discloses following beneficial effect has at least:
the utility model designs an electric power overhauls operation platform, convenient to wait to overhaul the removal of 360 degrees within ranges of regional, avoided the potential safety hazard and the loaded down with trivial details operation that the maintenance process brought because of angle modulation; in addition, the utility model can control the distance between the operation platform and the area to be maintained in a certain range, and the movement is flexible and controllable, thereby avoiding the inconvenience caused by the whole equipment approaching the area to be maintained; the device is convenient and quick to install and use, high in safety and flexibility and suitable for being used in most flat-bottom environments.
Drawings
Fig. 1 is a schematic structural view of a front cross section of the present invention;
fig. 2 is a schematic structural diagram of the operation platform of the present invention;
fig. 3 is a schematic top view of the present invention;
in the figure: a track 1 for maintenance; a camera 2; a load-bearing platform 3; a lifting platform 4; an operating platform 5; a first pulley 6; a hydraulic rod 7; operating the slide rail 8; a second pulley 9; a protective fence 10; a motor control switch 11; a telescopic rod 12; a fixed ring 13; a safety line 14; an infrared sensor 15; a central controller 16; and an alarm 17.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
As shown in fig. 1-3:
example 1:
an electric power overhaul operating platform comprises an overhaul track 1 and an overhaul device; the overhauling track 1 is circular and is arranged around the area to be overhauled in a surrounding manner;
the maintenance device comprises a bearing platform 3, a lifting platform 4 and an operation platform 5; the bottom of the bearing platform 3 is provided with a first pulley 6; the first pulley 6 is driven by a motor to move along the track 1 for overhauling; a hydraulic rod 7 is vertically arranged on the bearing platform 3; four hydraulic rods 7 are arranged and are respectively arranged at four corners of the bearing platform 3; the top of the hydraulic rod 7 is provided with a lifting platform 4; the lifting platform 4 is driven by the hydraulic rod 7 to move up and down in the vertical direction; two parallel operation slide rails 8 are arranged on the lifting platform 4; an operation platform 5 is arranged at the top of the lifting platform 4; the bottom of the operating platform 5 is provided with a second pulley 9; the second pulley 9 is embedded in the operation slide rail 8; the second pulley 9 drives the operating platform 5 to move along the operating slide rail 8, and the operating platform is close to or far away from the area to be overhauled; the second pulley 9 is driven by a motor to move; the inner wall of the protective fence 10 is provided with a motor control switch 11.
Example 2:
on the basis of embodiment 1, a protective fence 10 is arranged on the side wall of the lifting platform 4 except the side facing the area to be overhauled.
Example 3:
on the basis of the embodiment 1-2, the side edge of the operation platform 5, which is far away from the area to be overhauled, is provided with a telescopic rod 12; the end of the telescopic rod 12 is connected with the inner wall of the protective fence 10.
Example 4:
on the basis of the embodiments 1 to 3, the protective fence 10 is provided with a fixing ring 13; the fixing ring 13 is fixedly provided with a safety rope 14.
Example 5:
on the basis of the embodiments 1-4, an infrared sensor 15 is arranged on one side of the operating platform 5 close to the area to be overhauled; a central controller 16 is arranged below the operating platform 5; the central controller 16 is connected with the infrared sensor 15; an alarm 17 is connected to the central controller 16.
Example 6:
on the basis of the embodiments 1 to 5, the inner wall of the protective fence 10 is provided with the camera 2.
The utility model discloses an operation flow does:
firstly, the whole bearing platform 3 is moved to the track 1 for maintenance, the hydraulic rod 7 is lowered to the lowest position, the technician 7 stands at the edge of the lifting platform 4, the safety rope 14 is tied, and the operation platform 5 is retracted into the lifting platform 4; then the hydraulic rod 7 is started, and the lifting platform 4 and the operation platform 5 are lifted to the height of the maintenance position; a technician controls the motor control switch 11 to move the whole operation platform 5 outwards to a position where the operation platform can reach the overhaul area and then fix the operation platform; at the moment, the position is fixed, and a maintainer moves to the operating platform 5 to operate; after the maintenance operation is completed, if the maintenance angle needs to be adjusted, the operation platform 5 is retracted, the bearing platform 3 and other connected components are moved along the track 1 for maintenance, the next area to be maintained is located, and the steps are repeated again.
After all the maintenance tasks are completed, the hydraulic rod 7 is retracted and the technician returns to the ground.
The utility model designs an electric power overhauls operation platform, convenient to wait to overhaul the removal of 360 degrees within ranges of regional, avoided the potential safety hazard and the loaded down with trivial details operation that the maintenance process brought because of angle modulation; in addition, the utility model can control the distance between the operation platform and the area to be maintained in a certain range, and the movement is flexible and controllable, thereby avoiding the inconvenience caused by the whole equipment approaching the area to be maintained; the device is convenient and quick to install and use, high in safety and flexibility and suitable for being used in most flat-bottom environments.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.
Claims (6)
1. An electric power overhaul operating platform is characterized by comprising an overhaul track (1) and an overhaul device; the track (1) for overhauling is round and is arranged around the area to be overhauled in a surrounding way;
the maintenance device comprises a bearing platform (3), a lifting platform (4) and an operation platform (5); a first pulley (6) is arranged at the bottom of the bearing platform (3); the first pulley (6) is driven by the motor to move along the track (1) for overhauling; a hydraulic rod (7) is vertically arranged on the bearing platform (3); four hydraulic rods (7) are arranged and are respectively arranged at four corners of the bearing platform (3); the top of the hydraulic rod (7) is provided with a lifting platform (4); the lifting platform (4) is driven by the hydraulic rod (7) to move up and down in the vertical direction; two parallel operation slide rails (8) are arranged on the lifting platform (4); an operation platform (5) is arranged at the top of the lifting platform (4); a second pulley (9) is arranged at the bottom of the operating platform (5); the second pulley (9) is embedded in the operation sliding rail (8); the second pulley (9) drives the operating platform (5) to move along the operating slide rail (8) and to be close to or far away from the area to be overhauled; the second pulley (9) is driven to move by a motor; the inner wall of the protective fence (10) is provided with a motor control switch (11).
2. An electric service operation platform according to claim 1, characterized in that the side walls of the lifting platform (4) excluding the side facing the area to be serviced are provided with protective fences (10).
3. An electric power overhaul operating platform according to claim 1, wherein the side of the operating platform (5) away from the area to be overhauled is provided with a telescopic rod (12); the tail end of the telescopic rod (12) is connected with the inner wall of the protective fence (10).
4. An electric power overhaul operating platform according to claim 1, wherein the protective fence (10) is provided with a fixing ring (13); a safety rope (14) is fixedly arranged on the fixing ring (13).
5. An electric power overhaul operating platform according to claim 1, wherein an infrared sensor (15) is arranged on one side of the operating platform (5) close to the area to be overhauled; a central controller (16) is arranged below the operating platform (5); the central controller (16) is connected with the infrared sensor (15); an alarm (17) is connected to the central controller (16).
6. An electric power overhaul operating platform according to claim 1, wherein a camera (2) is arranged on the inner wall of the protective fence (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021916629.8U CN212924325U (en) | 2020-09-04 | 2020-09-04 | Electric power overhauls operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021916629.8U CN212924325U (en) | 2020-09-04 | 2020-09-04 | Electric power overhauls operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212924325U true CN212924325U (en) | 2021-04-09 |
Family
ID=75305285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021916629.8U Active CN212924325U (en) | 2020-09-04 | 2020-09-04 | Electric power overhauls operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212924325U (en) |
-
2020
- 2020-09-04 CN CN202021916629.8U patent/CN212924325U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204549950U (en) | For the docking facility of elevator boom rack | |
CN103183297B (en) | Mobile rescue elevator and rescue vehicle | |
CN204629404U (en) | Gear-driven navigational lighting aid tower fragile stem jacking system | |
CN106006488B (en) | aerial work platform | |
CN209685268U (en) | The double-deck synchronous lifting platform | |
CN204629405U (en) | Navigational lighting aid tower fragile stem jacking system | |
CN113175194B (en) | Automatic multisection horizontal lift telescopic operation platform | |
CN212924325U (en) | Electric power overhauls operation platform | |
CN111456404A (en) | Double-layer operation platform and construction method for avoiding attachment of tower crane | |
CN203474368U (en) | Lift structure | |
CN206827516U (en) | A kind of trans-routing track | |
CN213141328U (en) | Hanging basket for mounting safety type outdoor high-rise building electrical appliances | |
CN211547279U (en) | Simulator boarding bridge | |
CN213679511U (en) | Crane convenient to move | |
CN112456397B (en) | Working platform for high-altitude electrician operation | |
CN210973690U (en) | Material lifting device for building engineering | |
CN212553760U (en) | Engine and propeller system working platform | |
CN210366899U (en) | Lifting platform | |
CN208203101U (en) | A kind of quarry tipper step ladder | |
KR100500133B1 (en) | Lift using vehicle maintenance dock | |
CN219884085U (en) | Boarding bridge capable of being automatically folded and unfolded and safety control system thereof | |
CN215450438U (en) | Meteorological monitoring equipment applied to expressway | |
CN214423207U (en) | Bridge maintenance replacing equipment with automatic support replacing function | |
CN211198281U (en) | Gear rack elevator system device for truss fan | |
CN214270144U (en) | Insulating holding pole close to live equipment operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220415 Address after: 655099 No. a, floor 1-11, building a, sunshine Shangcheng community, west of Huanxi road and south of Wenbi Road, Qujing City, Yunnan Province Patentee after: Qujing qudian Power Investment Co.,Ltd. Address before: 655000 south of Wenbi Road, Qilin District, Qujing City, Yunnan Province Patentee before: Qujing Dongdian Power Design Co.,Ltd. |