- CN212837863U CN212837863U CN202021601823.7U CN202021601823U CN212837863U CN 212837863 U CN212837863 U CN 212837863U CN 202021601823 U CN202021601823 U CN 202021601823U CN 212837863 U CN212837863 U CN 212837863U
- Authority
- CN
- China
- Prior art keywords
- anchor foot
- cushion body
- duct piece
- jurisdiction
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Gasket Seals (AREA)
Abstract
The utility model relates to a pre-buried formula section of jurisdiction bight is sealed to fill up, include: the first cushion body is provided with a first embedding part along the length direction of the first cushion body, and a first anchor foot is formed on the first embedding part; the end part of the second cushion body is vertically connected with the end part of the first cushion body into a whole, a second embedded and fixed part is arranged on the second cushion body along the length direction of the second cushion body, and a second anchor foot is formed on the second embedded and fixed part; a distance is reserved between the end part of the first anchor foot and the joint of the first cushion body and the second cushion body; the tip of second anchor foot also has one section distance between the junction of first pad body and second pad body, the part that the section of jurisdiction corresponds is located to first solid portion of burying and the second between the tip of first anchor foot and the tip of second anchor foot buries solid portion and pastes and locates, first anchor foot, the second anchor foot, bury in solid portion on the first part that corresponds with first anchor foot and the second bury in solid portion on with the part that the second anchor foot corresponds all bury in the section of jurisdiction, can not drive the concrete section of jurisdiction and cause the cracked problem of section of jurisdiction concrete when making the sealed pad bight deformation of section of jurisdiction near the junction.
Description
Technical Field
The utility model relates to a building technical field refers in particular to a pre-buried formula section of jurisdiction bight is sealed fills up.
Background
A large number of subways and tunnels are built at home and abroad, a mature structural design calculation theory and engineering practice system is gradually formed, but the understanding on the waterproof aspect of the tunnels and underground engineering is relatively laggard. The subway inevitably passes through a stratum with higher water content (for example, a stratum where iron is located is mostly a saturated water-containing soft clay layer), so that the subway is necessarily subjected to the harmful effect of underground water. Without reliable waterproof and leakage stopping measures, underground water can invade the tunnel to influence the internal structure and auxiliary pipelines of the tunnel, even harm the operation of the subway and reduce the service life of the tunnel. The positions of the water leakage of the shield tunnel are the seams of the segments, the small cracks of the segments, the grouting holes, the hand holes and the like. Wherein the joint of the pipe piece is taken as the waterproof key point.
The joint between the segments is waterproofed by arranging the pre-embedded segment sealing gasket on the segments in the prior art, the anchor feet which are arranged in the segments in a long way and are anchored on the existing pre-embedded segment sealing gasket are used for increasing the connection strength between the segment sealing gasket and the segments, but the anchor feet are arranged at the corner parts of the segments to cause new problems, the corner parts of the segments are usually formed by splicing and fixing two segments of segment sealing gaskets, the stress performance is limited, the segments are spliced and then are subjected to extrusion acting force between the segments, so that the stress concentration of the joint of the two segments of segment sealing gaskets is realized, the segment sealing gasket at the joint is easily deformed, and the anchor feet are driven to deform, and further the anchor feet anchored in the segments drive the segment concrete to break the segments around the anchor feet.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, provide a pre-buried formula section of jurisdiction bight is sealed fills up to the sealed broken problem of section of jurisdiction that leads to the fact easily of the section of jurisdiction of the sealed pad of solving current section of jurisdiction bight department.
In order to achieve the above object, the utility model provides a pre-buried formula section of jurisdiction bight is sealed fills up locates the bight of section of jurisdiction, the bight structure includes:
the first cushion body is provided with a first embedding part along the length direction of the first cushion body, and the first embedding part is provided with a first anchor foot arranged along the length direction of the first cushion body; and
the end part of the second cushion body is vertically connected with the end part of the first cushion body into a whole, a second embedded and fixed part is arranged on the second cushion body along the length direction of the second cushion body, and a second anchor foot arranged along the length direction of the second cushion body is formed on the second embedded and fixed part;
wherein, a distance is arranged between the end part of the first anchor foot and the connection part of the first pad body and the second pad body;
a distance is also arranged between the end part of the second anchor foot and the joint of the first cushion body and the second cushion body, a first embedding part and a second embedding part which are positioned between the end part of the first anchor foot and the end part of the second anchor foot are attached to the corresponding part of the duct piece, and the first anchor foot, the second anchor foot, the part of the first embedding part corresponding to the first anchor foot and the part of the second embedding part corresponding to the second anchor foot are all embedded and fixed in the duct piece.
The utility model discloses a be located the tip of first anchor foot and bury solid portion and the second between the tip of second anchor foot first and bury solid portion subsides and locate the part that the section of jurisdiction corresponds, first anchor foot, second anchor foot, first bury on solid portion with part and the second that first anchor foot corresponds bury in solid portion with the part that second anchor foot corresponds all bury admittedly in the section of jurisdiction for can not drive the concrete section of jurisdiction and cause the cracked problem of section of jurisdiction concrete when being located the sealed pad deformation of section of jurisdiction bight. Two adjacent sealing gaskets at the corner of the duct piece deform and cling to the duct piece under the action of extrusion, and the sealing gasket at the corner of the duct piece is only not anchored in the duct piece for the part positioned at the corner of the duct piece, so that the anti-seepage effect of the sealing gasket at the corner of the duct piece is not influenced.
The utility model discloses the sealed pad of pre-buried formula section of jurisdiction bight is sealed further improves and lies in, first anchor foot with first pad body with the second pad body between the junction interval scope is 8-12 cm.
The utility model discloses the sealed pad of pre-buried formula section of jurisdiction bight is improved further and lies in, the second anchor foot distance with the first pad body with the interval scope between the junction of the second pad body is 8-12 cm.
The utility model discloses a pre-buried formula section of jurisdiction bight sealed pad's further improvement lies in, the first pad body still includes along its length direction through length set up and protruding the first protruding portion outside the section of jurisdiction, the first protruding portion with bury solid portion integrated into one piece;
the second pad body further comprises a second protruding portion which is arranged along the length direction of the second pad body in a full-length mode and protrudes out of the duct piece, and the second protruding portion and the second embedded portion are integrally formed.
The utility model discloses a pre-buried formula section of jurisdiction bight sealed pad's further improvement lies in, the first joint that buries solid portion and the first protruding portion forms the first thick liquid portion that ends that is sharp form, the first thick liquid portion that ends partly buries admittedly in the section of jurisdiction and the pointed end of the first thick liquid portion that ends is parallel and level with the surface of section of jurisdiction;
a second pulp stopping part in a pointed shape is formed at the joint of the second embedded part and the second protruding part, the second pulp stopping part is partially embedded and fixed in the pipe piece, and the tip of the second pulp stopping part is flush with the surface of the pipe piece;
the first grout stopping part and the corresponding second grout stopping part are vertically connected into a whole.
The utility model discloses a pre-buried formula section of jurisdiction bight sealed pad's further improvement lies in, the first buried solid portion is kept away from the one side of first protruding portion and is formed with first connecting surface, first anchor foot is located the top and the bottom of first connecting surface;
a second connecting surface is formed on one side of the second embedded fixing part, which is far away from the second protruding part, and the second anchor foot is positioned at the top end and the bottom end of the second connecting surface;
the first connecting surface and the second connecting surface are vertically connected into a whole.
The utility model discloses a further improvement of the pre-buried duct piece corner sealing gasket is that one side of the first protruding part far away from the first embedded part is provided with a first mounting surface;
a second mounting surface is formed on one side, far away from the second embedded fixing part, of the second protruding part;
the first mounting surface and the second mounting surface are vertically connected into a whole.
The utility model discloses a further improvement of the pre-buried duct piece corner sealing gasket is that the top end and the bottom end of the first mounting surface are provided with a first convex edge which protrudes outwards;
the top end and the bottom end of the second mounting surface are provided with second convex edges which protrude outwards;
the first convex edge is vertically connected with the corresponding second convex edge into a whole.
Drawings
Fig. 1 is a schematic structural diagram of the corner sealing gasket of the pre-buried duct piece of the present invention.
In the figure: the cushion comprises a first cushion body-1, a first embedded fixing part-11, a first anchor foot-111, a first connecting surface-112, a first protruding part-12, a first mounting surface-121, a first convex edge-122, a first grout stopping part-13, a second cushion body-2, a second embedded fixing part-21, a second anchor foot-211, a second connecting surface-212, a second protruding part-22, a second mounting surface 221, a second convex edge-222 and a second grout stopping part-23.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a pre-buried formula section of jurisdiction bight is sealed fills up plays waterproof effect to the seam crossing of section of jurisdiction bight. The utility model discloses a first pad body, the second pad body, first anchor foot and second anchor foot, the first portion of burying between the tip that is located the tip of first anchor foot and second anchor foot buries solid portion and second and pastes the part of locating the section of jurisdiction correspondence, first anchor foot, the second anchor foot, first portion of burying corresponding with first anchor foot in solid portion and second bury the part that corresponds with second anchor foot in solid portion and all bury admittedly in the section of jurisdiction for can not drive the concrete segment and cause the cracked problem of section of jurisdiction concrete when the sealed pad that is located section of jurisdiction bight is out of shape. Two adjacent sealing gaskets at the corner of the duct piece deform and cling to the duct piece under the action of extrusion, and the sealing gasket at the corner of the duct piece is only not anchored in the duct piece for the part positioned at the corner of the duct piece, so that the anti-seepage effect of the sealing gasket at the corner of the duct piece is not influenced.
The corner sealing gasket of the pre-buried duct piece of the present invention will be described with reference to the accompanying drawings.
Referring to fig. 1, a schematic structural diagram of the corner sealing gasket of the pre-buried duct piece of the present invention is shown. In this embodiment, a pre-buried formula section of jurisdiction bight is sealed fills up locates the bight of section of jurisdiction, and the bight structure includes: the cushion comprises a first cushion body 1 and a second cushion body 2, wherein the first cushion body 1 is provided with a first embedded fixing part 11 along the length direction, the first embedded fixing part 11 is provided with a first anchoring foot 111 arranged along the length direction of the first cushion body 1, the end part of the second cushion body 2 is vertically connected with the end part of the first cushion body 1 into a whole, the second cushion body 2 is provided with a second embedded fixing part 21 along the length direction, the second embedded fixing part 21 is provided with a second anchoring foot 211 arranged along the length direction of the second cushion body 2, a distance is reserved between the end part of the first anchoring foot 111 and the connecting part of the first cushion body 1 and the second cushion body 2, a distance is reserved between the end part of the second anchoring foot 211 and the connecting part of the first cushion body 1 and the second cushion body 2, the first embedded fixing part 11 and the second embedded fixing part 21 between the end part of the first anchoring foot 111 and the end part of the second anchoring foot 211 are attached to the corresponding parts of the duct piece, and the first anchoring foot 111, The second anchor leg 211, the portion of the first embedded portion 11 corresponding to the first anchor leg 111, and the portion of the second embedded portion 21 corresponding to the second anchor leg 211 are embedded and fixed in the pipe.
In this embodiment, the corner structure is attached to the corresponding portion of the duct piece through the first embedded portion 11 and the second embedded portion 21 between the end of the first anchor leg 111 and the end of the second anchor leg 211, and the first anchor leg 111, the second anchor leg 211, the portion of the first embedded portion 11 corresponding to the first anchor leg 111 and the portion of the second embedded portion 21 corresponding to the second anchor leg 211 are all embedded and fixed in the duct piece, so that the sealing gasket located at the corner of the duct piece is deformed without driving the concrete duct piece to break the concrete in the duct piece. Two adjacent sealing gaskets at the corner of the duct piece deform and cling to the duct piece under the action of extrusion, and the sealing gasket at the corner of the duct piece is only not anchored in the duct piece for the part positioned at the corner of the duct piece, so that the anti-seepage effect of the sealing gasket at the corner of the duct piece is not influenced.
Preferably, the distance between the first anchor leg 111 and the connection between the first pad 1 and the second pad 2 is 8-12 cm.
Preferably, the distance between the second anchor foot 211 and the joint of the first pad body 1 and the second pad body 2 is 8-12 cm.
Referring to fig. 1, further, the first cushion body 1 further includes a first protruding portion 12 which is arranged along the length direction thereof and protrudes outside the duct piece, the first protruding portion 12 and the first embedding portion 11 are integrally formed, the second cushion body 2 further includes a second protruding portion 22 which is arranged along the length direction thereof and protrudes outside the duct piece, and the second protruding portion 22 and the second embedding portion 21 are integrally formed.
Referring to fig. 1, further, a first pulp stopping portion 13 in a pointed shape is formed at a joint of the first embedded portion 11 and the first protruding portion 12, the first pulp stopping portion 13 is partially embedded and fixed in the tube sheet, a tip of the first pulp stopping portion 13 is flush with the surface of the tube sheet, a second pulp stopping portion 23 in a pointed shape is formed at a joint of the second embedded portion 21 and the second protruding portion 22, the second pulp stopping portion 23 is partially embedded and fixed in the tube sheet, a tip of the second pulp stopping portion 23 is flush with the surface of the tube sheet, and the first pulp stopping portion 13 and the corresponding second pulp stopping portion 23 are vertically connected into a whole. With sealed pre-buried in the preparation of section of jurisdiction of sealing pad in section of jurisdiction bight, need install first protruding portion 12 and protruding portion 22 of second in the recess of section of jurisdiction mould, the effect that thick liquid portion 23 was only in first thick liquid portion 13 and second is concrete infiltration recess when avoiding concreting, influences the shaping quality of section of jurisdiction and the drawing of patterns of section of jurisdiction.
Referring to fig. 1, in one embodiment, a first connection surface 112 is formed on a side of the first embedded fixing portion 11 away from the first protruding portion 12, the first anchoring leg 111 is located at a top end and a bottom end of the first connection surface 112, a second connection surface 212 is formed on a side of the second embedded fixing portion 21 away from the second protruding portion 22, the second anchoring leg 211 is located at a top end and a bottom end of the second connection surface 212, and the first connection surface 112 and the second connection surface 212 are vertically connected into a whole.
Referring to fig. 1, further, a first mounting surface 121 is formed on a side of the first protruding portion 12 away from the first embedded fixing portion 11, a second mounting surface 221 is formed on a side of the second protruding portion 22 away from the second embedded fixing portion 21, and the first mounting surface 121 and the second mounting surface 221 are vertically connected into a whole. The top end and the bottom end of the first mounting surface 121 are formed with a first convex edge 122 protruding outwards, the top end and the bottom end of the second mounting surface 221 are formed with a second convex edge 222 protruding outwards, and the first convex edge 122 and the corresponding second convex edge 222 are vertically connected into a whole. The inner wall of the groove is recessed to form a first engaging groove corresponding to the first convex edge 122, the inner wall of the groove is recessed to form a second engaging groove corresponding to the second convex edge 222, the first convex edge 122 is engaged with the first engaging groove, and the second convex edge 222 is engaged with the second engaging groove, so that the first protruding portion 12 and the second protruding portion 22 can be more firmly installed in the groove.
The construction process of the pre-buried duct piece corner sealing gasket of the present invention is described below.
Install first protruding portion 12 and second protruding portion 22 in the recess of section of jurisdiction mould for thick liquid portion 13 is only located the recess with the second in the first portion of ending 23 of thick liquid portion and the first most advanced notch department that ends 13 of thick liquid portion and the second and end 23 of thick liquid portion is located the recess, make first solid portion 11 of burying and the second bury solid portion 21 and be located the section of jurisdiction mould in the space of treating the casting concrete, pour concrete in this space and bury solid first solid portion 11 of burying and the second and bury solid portion 21, after the section of jurisdiction shaping of pouring, hang out fashioned section of jurisdiction from the section of jurisdiction mould.
By adopting the technical scheme, the utility model discloses following beneficial effect has:
the utility model discloses a be located the tip of first anchor foot and bury solid portion and the second between the tip of second anchor foot first and bury solid portion subsides and locate the part that the section of jurisdiction corresponds, first anchor foot, second anchor foot, first bury on solid portion with part and the second that first anchor foot corresponds bury in solid portion with the part that second anchor foot corresponds all bury admittedly in the section of jurisdiction for can not drive the concrete section of jurisdiction and cause the cracked problem of section of jurisdiction concrete when being located the sealed pad deformation of section of jurisdiction bight. Two adjacent sealing gaskets at the corner of the duct piece deform and cling to the duct piece under the action of extrusion, and the sealing gasket at the corner of the duct piece is only not anchored in the duct piece for the part positioned at the corner of the duct piece, so that the anti-seepage effect of the sealing gasket at the corner of the duct piece is not influenced.
It should be noted that the structure, ratio, size and the like shown in the drawings attached to the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by those skilled in the art, and are not used for limiting the limit conditions that the present invention can be implemented, so that the present invention has no technical essential meaning, and any structure modification, ratio relationship change or size adjustment should still fall within the scope that the technical content disclosed in the present invention can cover without affecting the efficacy and the achievable purpose of the present invention.
Claims (8)
1. The utility model provides a pre-buried formula section of jurisdiction bight is sealed fills up, locates the bight of section of jurisdiction, its characterized in that, the bight structure includes:
the first cushion body is provided with a first embedding part along the length direction of the first cushion body, and the first embedding part is provided with a first anchor foot arranged along the length direction of the first cushion body; and
the end part of the second cushion body is vertically connected with the end part of the first cushion body into a whole, a second embedded and fixed part is arranged on the second cushion body along the length direction of the second cushion body, and a second anchor foot arranged along the length direction of the second cushion body is formed on the second embedded and fixed part;
wherein, a distance is arranged between the end part of the first anchor foot and the connection part of the first pad body and the second pad body;
a distance is also arranged between the end part of the second anchor foot and the joint of the first cushion body and the second cushion body, a first embedding part and a second embedding part which are positioned between the end part of the first anchor foot and the end part of the second anchor foot are attached to the corresponding part of the duct piece, and the first anchor foot, the second anchor foot, the part of the first embedding part corresponding to the first anchor foot and the part of the second embedding part corresponding to the second anchor foot are all embedded and fixed in the duct piece.
2. The pre-buried duct piece corner gasket of claim 1, wherein a distance between the first anchor foot and a connection of the first pad body and the second pad body is in a range of 8-12 cm.
3. The pre-buried duct piece corner gasket of claim 1, wherein the second anchor leg distance is in the range of 8-12cm from the connection of the first pad and the second pad.
4. The pre-buried duct piece corner sealing gasket of claim 1, wherein the first gasket further comprises a first protrusion part which is arranged along the length direction of the first gasket and protrudes outside the duct piece, and the first protrusion part and the first buried fixing part are integrally formed;
the second pad body further comprises a second protruding portion which is arranged along the length direction of the second pad body in a full-length mode and protrudes out of the duct piece, and the second protruding portion and the second embedded portion are integrally formed.
5. The pre-buried duct piece corner sealing gasket according to claim 4, wherein a first pointed grout stopping part is formed at the joint of the first buried fixing part and the first protruding part, the first grout stopping part is partially buried and fixed in the duct piece, and the tip of the first grout stopping part is flush with the surface of the duct piece;
a second pulp stopping part in a pointed shape is formed at the joint of the second embedded part and the second protruding part, the second pulp stopping part is partially embedded and fixed in the pipe piece, and the tip of the second pulp stopping part is flush with the surface of the pipe piece;
the first grout stopping part and the corresponding second grout stopping part are vertically connected into a whole.
6. The pre-buried duct piece corner sealing gasket according to claim 4, wherein a first connecting surface is formed on one side of the first buried fixing part, which is far away from the first protruding part, and the first anchor foot is located at the top end and the bottom end of the first connecting surface;
a second connecting surface is formed on one side of the second embedded fixing part, which is far away from the second protruding part, and the second anchor foot is positioned at the top end and the bottom end of the second connecting surface;
the first connecting surface and the second connecting surface are vertically connected into a whole.
7. The pre-buried duct piece corner sealing gasket according to claim 4, wherein a first mounting surface is formed on one side of the first protruding portion away from the first buried fixing portion;
a second mounting surface is formed on one side, far away from the second embedded fixing part, of the second protruding part;
the first mounting surface and the second mounting surface are vertically connected into a whole.
8. The pre-buried duct piece corner gasket of claim 7, wherein the top and bottom ends of the first mounting surface are formed with outwardly projecting first flanges;
the top end and the bottom end of the second mounting surface are provided with second convex edges which protrude outwards;
the first convex edge is vertically connected with the corresponding second convex edge into a whole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021601823.7U CN212837863U (en) | 2020-08-05 | 2020-08-05 | Pre-buried formula section of jurisdiction bight is sealed fills up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021601823.7U CN212837863U (en) | 2020-08-05 | 2020-08-05 | Pre-buried formula section of jurisdiction bight is sealed fills up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212837863U true CN212837863U (en) | 2021-03-30 |
Family
ID=75129966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021601823.7U Active CN212837863U (en) | 2020-08-05 | 2020-08-05 | Pre-buried formula section of jurisdiction bight is sealed fills up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212837863U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4108881A1 (en) * | 2021-06-21 | 2022-12-28 | CTS Cordes tubes & seals GmbH & Co. KG | Notched tubbing corner |
-
2020
- 2020-08-05 CN CN202021601823.7U patent/CN212837863U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4108881A1 (en) * | 2021-06-21 | 2022-12-28 | CTS Cordes tubes & seals GmbH & Co. KG | Notched tubbing corner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103147763B (en) | A kind of tunnel invert termination combined steel | |
CN204266220U (en) | A kind of plugging device of precipitation well in foundation pit | |
CN105065009B (en) | A kind of method extending shield-tunneling construction subway station | |
CN214497558U (en) | Foundation pit dewatering well wellhead plugging casing pipe and structure | |
CN102162253A (en) | Precipitation construction method employing pipe embedding in deep foundation pits | |
CN212837863U (en) | Pre-buried formula section of jurisdiction bight is sealed fills up | |
CN210163950U (en) | Bottom plate deformation joint | |
CN112376624A (en) | Secondary pouring and retaining advanced water stop structure for basement floor post-cast strip and construction method | |
CN102367735B (en) | Back-to-back waterstop installation equipment for tunnel construction joint | |
CN105240023B (en) | A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station | |
CN112687180B (en) | New and old concrete joint waterproof structure model and manufacturing method and application thereof | |
CN210712963U (en) | Drainage structure of basement bottom plate post-cast strip | |
CN111501849A (en) | Waterproof structure adopting combined steel-edged rubber water stop and construction method thereof | |
CN202755385U (en) | Anti-floating structure of shallow-buried shield tunnel | |
CN202370544U (en) | Installation equipment for back-stick type waterstop for tunnel construction joint | |
CN212506439U (en) | Waterproof structure adopting combined steel-edge rubber waterstop | |
CN206457737U (en) | Conveyance Box Culvert bottom plate waterstop reinforces stopping means | |
CN212296413U (en) | Back-pasting type pi-shaped rubber water stop for tunnel engineering | |
CN213267910U (en) | Ultra-deep foundation pit enclosure water stop structure | |
CN211775777U (en) | A waterproof embedded structure for exhaust passage | |
CN210857184U (en) | Pier type foundation reinforcing structure | |
CN103590379B (en) | The easy mounted-dismounted type tunnel mouth baffle device for water of electric power plant circulating water system and construction method thereof | |
CN112302714A (en) | Dewatering well sealing system and construction method thereof | |
CN113356214A (en) | Grouting bottom sealing method for offshore wind turbine jacket foundation structure | |
CN218148467U (en) | Cast-in-place concrete cut-off wall and pore-creating cut-off wall connection structure |