CN212836613U - Split type operating platform that hangs - Google Patents
Split type operating platform that hangs Download PDFInfo
- Publication number
- CN212836613U CN212836613U CN202021241927.1U CN202021241927U CN212836613U CN 212836613 U CN212836613 U CN 212836613U CN 202021241927 U CN202021241927 U CN 202021241927U CN 212836613 U CN212836613 U CN 212836613U
- Authority
- CN
- China
- Prior art keywords
- base frame
- platform
- split type
- bed
- operation platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to the field of steel structure construction, in particular to a split type hanging operation platform; the method is characterized in that: the novel multifunctional combined bicycle comprises a base frame with a cross section in a shape like a Chinese character 'ji', an arc-shaped clamping groove arranged at the top of the center of the base frame, pedals arranged on a vertical rod of the base frame, diagonal draw bars arranged at two sides of the base frame and a movable bolt arranged at the bottom of the center of the base frame. The platform is structurally designed for the working faces on two sides, has the advantages of convenience in mounting, safety and stability due to symmetrical balance and stability, and is convenient to detach and high in universality.
Description
Technical Field
The utility model relates to a steel construction field specifically is a split type operation platform that hangs.
Background
In the pipe truss assembling or installing process, a plurality of rod piece butt joints, neutral gear rod supplementing and other works exist, because the truss rod pieces are more, the height is higher, the span is larger, a common hanging basket cannot provide two side operation faces for welding a horizontal butt joint of the pipe truss, the fixing difficulty on the pipe truss is large, the safety is low, the weight is large due to the fact that the common hanging basket cannot be disassembled, the operation faces are small, and the pipe truss assembling and installing cannot be met.
Disclosure of Invention
An object of the utility model is to overcome above-mentioned defect, provide a platform that can build temporarily in high altitude, it has light in weight, easily ann tears open, advantage that stability is good.
In order to achieve the above object, the present invention is realized as follows:
the utility model provides an operation platform is hung to split type, includes that the cross-section is the bed frame of nearly font, sets up the arcuation draw-in groove at bed frame central authorities top, sets up the pedal in the bed frame pole setting and sets up the diagonal draw bar in bed frame both sides and set up the activity bolt in bed frame central authorities bottom.
The split type hanging operation platform is characterized in that a springboard is laid at the bottom of the base frame.
Split type operation platform of hanging, hang two nearly font bed framves through the arcuation draw-in groove respectively and establish and fix to the truss chord member on, penetrate the activity bolt in the bottom of bed frame, place the springboard between two bed frames, with the iron wire with the springboard ligature on the pendant, set up in the outside of bed frame and face limit safety protection to constitute interim operation platform.
This operation platform is hung to split type has following advantage:
1. the split type hanging operation platform is convenient to install and disassemble and convenient for material turnover. The operation platform has the advantages of being high in flexibility, convenient and fast, the weight of the operation platform is greatly reduced due to the detachable characteristic, a hoisting machine class of a crane is omitted, and the operation platform is suitable for installation and welding operation of pipe trusses and rectangular or H-shaped steel section members.
2. The two sides of the pipe truss can be symmetrically welded by simultaneous operation, so that the welding deformation of the components caused by single-side welding is reduced, and the construction operation efficiency is improved.
3. In the aspect of safety, the structural design of the two-side working face has the advantages of convenience in mounting, safety and stability due to symmetrical balance and stability, convenience in dismounting and high universality.
4. The platform can be laid in the air for a temporary passage for high-altitude operation.
Drawings
Fig. 1 is a side view of the present platform.
Fig. 2 is a schematic diagram of the usage state of the platform.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1 and fig. 2, a split type hanging operation platform comprises a base frame 1 with a cross section in a shape like a Chinese character 'ji', an arc-shaped slot 2 arranged at the top of the center of the base frame 1, pedals 3 arranged on the vertical rods of the base frame 1, diagonal rods 4 arranged at two sides of the base frame 1, and a movable bolt 5 arranged at the bottom of the center of the base frame 1.
The split type hanging operation platform is characterized in that a springboard 6 is laid at the bottom of the base frame 1.
Split type operation platform of hanging, hang the bed frame 1 of two nearly font through arcuation draw-in groove 2 respectively and establish and fix to truss chord member 7 on, penetrate the activity bolt in the bottom of bed frame, place the springboard between two bed frames, with the iron wire with the springboard ligature on the pendant, set up in the outside of bed frame and face limit safety protection to constitute interim operation platform.
This operation platform is hung to split type has following advantage:
1. the split type hanging operation platform is convenient to install and disassemble and convenient for material turnover. The operation platform has the advantages of being high in flexibility, convenient and fast, the weight of the operation platform is greatly reduced due to the detachable characteristic, a hoisting machine class of a crane is omitted, and the operation platform is suitable for installation and welding operation of pipe trusses and rectangular or H-shaped steel section members.
2. The two sides of the pipe truss can be symmetrically welded by simultaneous operation, so that the welding deformation of the components caused by single-side welding is reduced, and the construction operation efficiency is improved.
3. In the aspect of safety, the structural design of the two-side working face has the advantages of convenience in mounting, safety and stability due to symmetrical balance and stability, convenience in dismounting and high universality.
4. The platform can be laid in the air for a temporary passage for high-altitude operation.
Claims (3)
1. The utility model provides an operation platform is hung to split type, characterized by: the novel multifunctional combined bicycle comprises a base frame with a cross section in a shape like a Chinese character 'ji', an arc-shaped clamping groove arranged at the top of the center of the base frame, pedals arranged on a vertical rod of the base frame, diagonal draw bars arranged at two sides of the base frame and a movable bolt arranged at the bottom of the center of the base frame.
2. The split hanging platform of claim 1, wherein: and laying a springboard at the bottom of the base frame.
3. The split hanging platform of claim 1, wherein: hang two nearly font bed framves respectively through the arcuation draw-in groove and establish and fix to the truss chord member on, will move about the bolt and penetrate in the bottom of bed frame, place the springboard between two bed frames, with the iron wire with the springboard ligature on the pendant, set up in the outside of bed frame and face limit safety protection to constitute interim operation platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021241927.1U CN212836613U (en) | 2020-06-30 | 2020-06-30 | Split type operating platform that hangs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021241927.1U CN212836613U (en) | 2020-06-30 | 2020-06-30 | Split type operating platform that hangs |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212836613U true CN212836613U (en) | 2021-03-30 |
Family
ID=75178577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021241927.1U Active CN212836613U (en) | 2020-06-30 | 2020-06-30 | Split type operating platform that hangs |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212836613U (en) |
-
2020
- 2020-06-30 CN CN202021241927.1U patent/CN212836613U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212836613U (en) | Split type operating platform that hangs | |
CN211369646U (en) | Reinforced supporting structure for constructional engineering | |
CN219280494U (en) | Tower beam temporary consolidation supporting structure for bridge tower stability control | |
CN211622534U (en) | Movable cantilever operation platform | |
CN102677912B (en) | Temporary supporting device | |
CN110107095A (en) | The installation method of high-altitude long-span steel truss | |
CN214656433U (en) | Connecting buckle type scaffold | |
CN205840289U (en) | A kind of suspension type vertical operating platform | |
CN214402353U (en) | Three-hinge type steel structure curtain wall assembling and hoisting structure | |
CN212129965U (en) | Interim securing device is assembled in air to box steel construction post | |
CN209568359U (en) | A kind of falsework for the construction of outer-enwraped type Guard fence base | |
CN209686833U (en) | Operating platform support frame and operating platform | |
CN203080988U (en) | Umbrella-shaped standard processing shed | |
CN207277893U (en) | A kind of section steel platform formwork erecting structure for high-altitude overhanging | |
CN220166688U (en) | Cantilever lifting die support for deck bridge deck slab | |
CN220394293U (en) | Detachable operating platform for catwalk portal frame | |
CN212773382U (en) | Tensioning operation platform for high-altitude steel structure cable | |
CN205077697U (en) | Reverse support system structure of block mount formula furred ceiling | |
CN109505304A (en) | A kind of permafrost soil area assembled type base for power transmission line iron tower prefab-form | |
CN213390842U (en) | Local bearing and supporting structure of steel truss | |
CN217461389U (en) | Scaffold frame supporting platform is used in construction of hole edge | |
CN218088847U (en) | Novel lift of steam power plant boiler furnace overhauls platform | |
CN211714573U (en) | Be applied to aerial large-span hang mould strutting arrangement | |
CN214144633U (en) | Upside-down hanging attached lifting scaffold | |
CN211622697U (en) | Anti-falling device for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |