CN212689522U CN202021041735.6U CN202021041735U CN212689522U CN 212689522 U CN212689522 U CN 212689522U CN 202021041735 U CN202021041735 U CN 202021041735U CN 212689522 U CN212689522 U CN 212689522U
Authority
CN
China
Prior art keywords
tower crane
wall
cage
fixing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021041735.6U
Other languages
Chinese (zh)
Inventor
赵云龙
杨春辉
周桂军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202021041735.6U priority Critical patent/CN212689522U/en
Application granted granted Critical
Publication of CN212689522U publication Critical patent/CN212689522U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a cage is hung in design suitable for wall construction is attached to prefabricated building tower crane, include: a platform device for being connected with the side fascia and being used for providing operation platform, the platform device locates the fixing device top, and the fixing device lateral part is equipped with and is used for corresponding complex retaining member with the mounting hole of side fascia. The utility model provides a cage is hung in design suitable for assembly type structure tower crane attaches wall construction, it is applicable to the tower crane and attaches the wall construction use, need not to set up operation platform at high altitude environment, can effectively reduce the tower crane and attach the safe risk of wall work progress to, this device simple structure, convenient to use can use widely.

Description

Cage is hung in design suitable for wall construction is attached to prefabricated building tower crane
Technical Field
The utility model relates to a construction technical field, more specifically say, relate to a cage is hung in design suitable for wall construction is attached to prefabricated building tower crane.
Background
In the prior art, the prefabricated building has the advantages of high construction speed, short construction period, capability of greatly saving labor force and the like, and gradually becomes the mainstream trend of the development of the building industry. Wherein, prefabricated assembly type structure's outer wall is mostly prefabricated component, in order to avoid influencing assembly type structure security, does not allow to open a hole again on the outer wall during the construction, consequently, hardly sets up steel pipe scaffold on the outer wall.
At present, protect through using two-layer promotion formula stores pylon mostly at the job site, nevertheless because the stores pylon need promote along with the construction progress, and the outer facade of stores pylon does not have steel pipe scaffold frame and provides operation platform, leads to operating personnel to need under the prerequisite of no protection, adopts the steel pipe to set up interim operation platform at the high altitude, and it is big that this platform sets up the operation degree of difficulty, and the safety risk is high, and the work progress leads to the fact the incident easily.
In summary, how to provide a device which is suitable for tower crane wall attachment construction and can reduce the safety risk of tower crane wall attachment construction is a problem to be solved urgently by technical personnel in the field at present.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a cage is hung in design suitable for assembly type structure tower crane attaches wall construction, it is applicable to the tower crane and attaches wall construction use, need not to set up operation platform at high altitude environment, can effectively reduce the tower crane and attach the safe risk of wall work progress to, this device simple structure, convenient to use can use widely.
In order to achieve the above object, the present invention provides the following technical solutions:
the utility model provides a cage is hung in design suitable for wall construction is attached to prefabricated building tower crane, includes: a platform device for being connected with the external wall panel and being used for providing operation platform, platform device locates the fixing device top, the fixing device lateral part be equipped with be used for with the mounting hole of external wall panel corresponds complex retaining member.
Preferably, fixing device including be used for with the first mounting of side fascia laminating setting, be used for supporting the second mounting of platform device and be used for connecting first mounting with the third mounting of second mounting, the second mounting perpendicular to first mounting sets up, first mounting is equipped with the retaining member.
Preferably, a reinforcing rib is arranged between the third fixing piece and the first fixing piece.
Preferably, the first fixing piece, the second fixing piece and the third fixing piece are all high-bearing material pieces.
Preferably, the platform device comprises a stepping part arranged at the top of the fixing device and a protection part used for forming an open type protection ring, and the protection part is arranged around the stepping part.
Preferably, the tread part is an anti-skid steel scaffold board.
Preferably, the protection part includes a plurality of mutual connection so as to form the square steel of hanging cage form frame and centers on hang the steel mesh piece that cage form frame set up, hang cage form frame and center on the limit portion setting of stepping on foot portion.
Preferably, the height of the hanging cage-shaped frame ranges from 1.0m to 1.2 m.
Use the utility model provides a when cage is hung in design suitable for assembly type building tower crane attaches wall construction, can utilize hoisting accessory to hoist fixing device earlier, make fixing device's retaining member and side fascia's mounting hole align, then, operating personnel can outwards collude in the wall and get platform device, make fixing device's retaining member accurate insert in the mounting hole of side fascia, then tighten the retaining member in one side in the wall, make fixing device firm fix on the side fascia, meanwhile, platform device can be effectively fixed on the side fascia outside, then, constructor can stand and carry out construction operation on platform device, with effectively reducing constructor's safety risk, reduce the incident that the work progress probably appears.
To sum up, the utility model provides a cage is hung in design suitable for assembly type structure tower crane attaches wall construction, it is applicable to the tower crane and attaches the wall construction use, need not to set up operation platform at high altitude environment, can effectively reduce the tower crane and attach the safety risk of wall work progress to, this device simple structure, convenient to use can use widely.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
FIG. 1 is a schematic structural view of the assembled shaped hanging cage and external wall panel for wall-attached construction of a tower crane for an assembly type building;
FIG. 2 is a front view of a sizing suspension cage suitable for wall attachment construction of a fabricated building tower crane;
FIG. 3 is a top view of a sizing hanging cage suitable for wall-attached construction of a fabricated building tower crane.
In fig. 1-3:
the fixing device comprises a fixing device 1, a first fixing piece 11, a second fixing piece 12, a third fixing piece 13, a reinforcing rib 14, a locking piece 15, a platform device 2, a stepping part 21, a protection part 22, square steel 23, a steel wire mesh 24 and an external wall panel 3.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The core of the utility model is to provide a cage is hung in design suitable for assembly type structure tower crane attaches wall construction, it is applicable to the tower crane and attaches the wall construction use, need not to set up operation platform at high altitude environment, can effectively reduce the tower crane and attach the safe risk of wall work progress to, this device simple structure, convenient to use can use widely.
Please refer to fig. 1 and fig. 3, wherein fig. 1 is a schematic structural diagram of the assembled shaped hanging cage and external wall plate for the wall-attached construction of the fabricated building tower crane of the present invention; FIG. 2 is a front view of a sizing suspension cage suitable for wall attachment construction of a fabricated building tower crane; FIG. 3 is a top view of a sizing hanging cage suitable for wall-attached construction of a fabricated building tower crane.
This specific embodiment provides a cage is hung in design suitable for wall construction is attached to prefabricated building tower crane, includes: a platform device 2 for being connected fixing device 1 with side fascia 3 and being used for providing operation platform, fixing device 1 top is located to platform device 2, and fixing device 1 lateral part is equipped with and is used for corresponding complex retaining member 15 with the mounting hole of side fascia 3.
It should be noted that, because the retaining member 15 is arranged on the side wall of the fixing device 1, and the retaining member 15 is matched with the mounting hole of the external wall panel 3, therefore, when the retaining member 15 of the fixing device 1 is fixed on the external wall panel 3, the constructor does not need to perform the perforating operation on the external wall panel 3 again, and because the aperture of the mounting hole is relatively small, the damage to the wall body caused when the retaining member 15 penetrates the wall body can be effectively reduced.
It should be further noted that the platform device 2 is used for providing an operation platform for constructors, so that a protection device for protecting the constructors can be arranged on the platform device 2, so that the constructors are prevented from falling down when operating at high altitude, and the safety risk of the construction process can be further reduced.
In the actual application process, the structure, size, material, position, shape, etc. of the fixing device 1 and the platform device 2 can be determined according to the actual situation and the actual requirement.
Use the utility model provides a when cage is hung in design suitable for assembly type structure tower crane attaches wall construction, can utilize hoisting accessory to hoist fixing device 1 earlier, make fixing device 1's retaining member 15 and side fascia 3's mounting hole align, then, operating personnel can outwards collude in the wall and get platform device 2, make fixing device 1's retaining member 15 accurate insert in side fascia 3's the mounting hole, then in the wall one side screw up retaining member 15, make fixing device 1 firm fix on side fascia 3, meanwhile, platform device 2 can be effectively fixed on the side fascia 3 outside, then, constructor can stand on platform device 2 and carry out construction operation, with effectively reducing constructor's safety risk, reduce the incident that the work progress probably appears.
To sum up, the utility model provides a cage is hung in design suitable for assembly type structure tower crane attaches wall construction, it is applicable to the tower crane and attaches the wall construction use, need not to set up operation platform at high altitude environment, can effectively reduce the tower crane and attach the safety risk of wall work progress to, this device simple structure, convenient to use can use widely.
On the basis of the above embodiment, it is preferable that the fixing device 1 includes a first fixing member 11 for being attached to the external wall panel 3, a second fixing member 12 for supporting the platform device 2, and a third fixing member 13 for connecting the first fixing member 11 and the second fixing member 12, wherein the second fixing member 12 is disposed perpendicular to the first fixing member 11, and the first fixing member 11 is provided with a locking member 15.
In this embodiment, when the device is fixedly installed, a constructor can stand on the inner side of an established external wall panel 3, hook the platform device 2 lifted to a preset height outwards, so that the locking member 15 of the first fixing member 11 is aligned and inserted into the installation hole of the external wall panel 3, then the constructor can tighten the locking member 15 on the inner side of the wall by using a nut, so that the first fixing member 11 is firmly locked on the outer side of the external wall panel 3, and meanwhile, the second fixing member 12 can vertically abut on the outer side of the external wall panel 3, so that the platform device 2 abuts on the external wall panel 3, so as to complete the fixed installation of the device, and finally, the constructor can straddle into the platform device 2 to perform corresponding construction operation.
Preferably, the locking member 15 may be provided as a high-strength bolt, and the mounting hole may be provided as a bolt hole matched in size to the bolt.
In the actual application process, the shape, size, structure, position, material, etc. of the first fixing member 11, the second fixing member 12, and the third fixing member 13 can be determined according to the actual situation and the actual requirement.
Preferably, a reinforcing rib 14 is provided between the third fixing member 13 and the first fixing member 11 to improve the overall structural stability of the fixing apparatus 1.
Preferably, the first fixing member 11, the second fixing member 12 and the third fixing member 13 are all high-bearing material members, so that the fixing device 1 can effectively support the platform device 2, and the phenomenon of falling caused by insufficient bearing capacity of the fixing device 1 when the construction personnel perform construction operation in the platform device 2 is avoided.
It should be noted that, the first fixing element 11 and the second fixing element 12 may be configured as channel steel, so as to implement the fixed mounting connection between the fixing device 1 and the outer wall and the mounting connection between the platform device 2 and the fixing device 1, and the third fixing element 13 may be configured as square steel, so as to effectively improve the connection fixing effect of the first fixing element 11 and the second fixing element 12.
It should be noted that the first fixing member 11, the second fixing member 12 and the third fixing member 13 may form a support frame in the form of a right triangle, so that the support frames may be respectively disposed on the left and right sides of the bottom of the platform device 2, so that the platform device 2 may be stressed in a balanced manner and maintain water stability, and the fixing effect of the fixing device 1 and the external wall panel 3 may be improved.
In addition, it should be noted that, in the present application, the first fixing member 11, the second fixing member 12 and the third fixing member 13 are mentioned, wherein the first, the second and the third are only for distinguishing the position differences and are not in sequence.
On the basis of the above embodiment, it is preferable that the platform device 2 includes a stepping portion 21 provided on the top of the fixing device 1 and a guard portion 22 for forming an open guard ring, and the guard portion 22 is provided around the stepping portion 21.
It should be noted that, the protection portion 22 is an open protection ring, which means that the top of the protection portion 22 is an open structure, the side of the protection portion 22 is a protection ring structure, the open structure is for the convenience of the constructor stepping on the stepping portion 21, and the protection ring structure is for effectively protecting the safety of the constructor in the construction process and avoiding the high-altitude falling phenomenon caused by shaking or stepping empty of the constructor.
It should be further noted that the guard ring herein may be a cylindrical structure, and may also be a rectangular structure, that is, in the actual application process, the shape, size, structure, material, etc. of the guard ring may be determined according to the actual situation and the actual requirement.
Preferably, step on foot 21 for anti-skidding steel scaffold board, can effectively avoid constructor to take place to slide to the accident when standing on step on foot 21 and carrying out construction operation like this.
In the actual application process, the shape, size, material, structure, etc. of the tread part 21 can be determined according to the actual situation and the actual requirement.
Preferably, the protection part 22 includes a plurality of square steels 23 connected to each other to form a cage-shaped frame and a steel wire mesh 24 disposed around the cage-shaped frame, the cage-shaped frame being disposed around the edge of the stepping part 21.
It should be noted that, a plurality of square steels 23 are connected to form a hanging cage-shaped frame, in order to improve the overall structural stability of the protection portion 22, and the steel wire mesh 24 is arranged around the hanging cage-shaped frame, in order to effectively close the hanging cage-shaped frame, so as to improve a safer operation environment for the constructors, thereby effectively reducing the safety risk of the constructors working aloft.
Preferably, the steel mesh sheet 24 is connected to the square steel 23 by electric welding.
In the actual application process, the shapes, sizes, numbers and the like of the square steel 23 and the steel wire mesh sheets 24 can be determined according to actual conditions and actual requirements.
Preferably, the height range of the hanging cage-shaped frame is 1.0m to 1.2m, so that a constructor can conveniently step over the protection part 22 and stand on the stepping part 21 for construction operation, and the safety of the standing constructor can be effectively protected.
It should be noted that the directions and positional relationships indicated by "left" and "right" in the present application are based on the directions and positional relationships shown in the drawings, and are only for the convenience of simplifying the description and facilitating the understanding, but do not indicate or imply that the device or element referred to must have a specific direction, be constructed in a specific direction and operate, and therefore, should not be construed as limiting the present invention.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The utility model provides an arbitrary compound mode of all embodiments all is in this utility model's a protection scope, does not do here and gives unnecessary details.
It is right above the utility model provides a cage is hung in design suitable for wall construction is attached to prefabricated building tower crane has carried out detailed introduction. The principles and embodiments of the present invention have been explained herein using specific examples, and the above descriptions of the embodiments are only used to help understand the method and its core ideas of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (8)

1. The utility model provides a cage is hung in design suitable for wall construction is attached to prefabricated building tower crane which characterized in that includes: a platform device (2) for being connected fixing device (1) with side fascia (3) and being used for providing operation platform, platform device (2) are located fixing device (1) top, fixing device (1) lateral part be equipped with be used for with the mounting hole of side fascia (3) corresponds complex retaining member (15).
2. The shaping hanging cage suitable for wall-attached construction of an assembly type building tower crane according to claim 1 is characterized in that the fixing device (1) comprises a first fixing piece (11) used for being attached to the outer wall plate (3), a second fixing piece (12) used for supporting the platform device (2) and a third fixing piece (13) used for being connected with the first fixing piece (11) and the second fixing piece (12), the second fixing piece (12) is perpendicular to the first fixing piece (11), and the locking piece (15) is arranged on the first fixing piece (11).
3. The shaping hanging cage suitable for the wall-attached construction of the fabricated building tower crane according to claim 2 is characterized in that a reinforcing rib (14) is arranged between the third fixing piece (13) and the first fixing piece (11).
4. The sizing hanging cage suitable for wall-attached construction of the fabricated building tower crane according to claim 3, wherein the first fixing member (11), the second fixing member (12) and the third fixing member (13) are all high-bearing material pieces.
5. The sizing suspension cage suitable for wall-attached construction of a fabricated building tower crane according to any one of claims 1 to 4, wherein the platform device (2) comprises a stepping part (21) arranged at the top of the fixing device (1) and a protection part (22) used for forming an open protection ring, and the protection part (22) is arranged around the stepping part (21).
6. The shaping hanging cage suitable for the wall-attached construction of the fabricated building tower crane according to claim 5, wherein the stepping part (21) is an anti-slip steel scaffold board.
7. The sizing hanging cage suitable for wall-attached construction of a fabricated building tower crane as claimed in claim 6, wherein the protection part (22) comprises a plurality of square steels (23) which are connected with each other to form a hanging cage-shaped frame and a steel wire mesh (24) which is arranged around the hanging cage-shaped frame, and the hanging cage-shaped frame is arranged around the edge part of the stepping part (21).
8. The sizing cage suitable for wall-attached construction of a fabricated building tower crane according to claim 7, wherein the height of the cage-shaped frame ranges from 1.0m to 1.2 m.
CN202021041735.6U 2020-06-08 2020-06-08 Cage is hung in design suitable for wall construction is attached to prefabricated building tower crane Active CN212689522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021041735.6U CN212689522U (en) 2020-06-08 2020-06-08 Cage is hung in design suitable for wall construction is attached to prefabricated building tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021041735.6U CN212689522U (en) 2020-06-08 2020-06-08 Cage is hung in design suitable for wall construction is attached to prefabricated building tower crane

Publications (1)

Publication Number Publication Date
CN212689522U true CN212689522U (en) 2021-03-12

Family

ID=74890062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021041735.6U Active CN212689522U (en) 2020-06-08 2020-06-08 Cage is hung in design suitable for wall construction is attached to prefabricated building tower crane

Country Status (1)

Country Link
CN (1) CN212689522U (en)

Similar Documents

Publication Publication Date Title
CN212689522U (en) Cage is hung in design suitable for wall construction is attached to prefabricated building tower crane
CN203255914U (en) Unit-typed curtain wall lifting device
CN109019371B (en) Turnover supporting device and tower crane climbing method
CN215055564U (en) Elevator shaft opening protection device
CN213894898U (en) Hoist device is used in building engineering construction
CN204038917U (en) Detachable external hanging type operating platform
CN211714558U (en) Hanging stirrup for nuclear power template
CN210763910U (en) Auxiliary force application structure for hoisting steel structure
CN208964367U (en) A kind of safe and simple vertical support hanging apparatus
CN219909888U (en) Tower crane attaches wall operation platform
CN221027152U (en) Silo wall lifting frame for silo construction
CN202324586U (en) Integral attached device attached with lifting scaffold
CN212982219U (en) Hoisting structure convenient for angle adjustment and used for installation of security and protection equipment
CN216641382U (en) Turnover plate protection device between external scaffold and building main body
CN211895797U (en) Panel hoist and mount system of adaptable complicated topography
CN220998884U (en) Assembled superimposed sheet adjustable angle hoist device
CN212668947U (en) Steel construction crossbeam hoist device
CN215055488U (en) Platform of unloading that construction was used
CN220747598U (en) Support device and attached lifting scaffold
CN214318906U (en) Unit water inlet gate drill way safety belt linkage
CN218420710U (en) Safety rope hangs fixed arrangement structure
CN212614716U (en) Adjustable hanging scaffold device
CN217461575U (en) Steel construction engineering faces limit and protects connection structure
CN209509459U (en) A kind of attachment type raise scaffold promotion upper pendant