CN212583289U - Platform of unloading of encorbelmenting - Google Patents
Platform of unloading of encorbelmenting Download PDFInfo
- Publication number
- CN212583289U CN212583289U CN202021036048.5U CN202021036048U CN212583289U CN 212583289 U CN212583289 U CN 212583289U CN 202021036048 U CN202021036048 U CN 202021036048U CN 212583289 U CN212583289 U CN 212583289U
- Authority
- CN
- China
- Prior art keywords
- platform
- indoor
- outdoor
- fixedly connected
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing Effects 0.000 claims abstract description 18
- 230000002787 reinforcement Effects 0.000 claims abstract description 13
- 238000003466 welding Methods 0.000 claims abstract description 10
- 239000000789 fastener Substances 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 238000007599 discharging Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 abstract description 15
- 241000893018 Armeria Species 0.000 abstract description 2
- 239000002965 rope Substances 0.000 description 9
- 238000010276 construction Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reaction Methods 0.000 description 2
- 230000003068 static Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000149 penetrating Effects 0.000 description 1
Images
Abstract
The utility model discloses a platform of unloading of encorbelmenting, including outdoor platform and indoor platform, the one end of outdoor platform is provided with indoor platform, indoor platform and outdoor platform pass through the mode fixed connection of joint, the up end of outdoor platform and indoor platform all is through screw fixedly connected with reinforcement, outdoor platform includes first crossbeam and first perpendicular roof beam, the first both ends of erecting the roof beam all are provided with first crossbeam, first crossbeam and first perpendicular roof beam pass through welding mode fixed connection, the one end of first crossbeam is provided with the reinforcing plate, reinforcing plate and first crossbeam set up to the integrated into one piece structure, and the side fixedly connected with of reinforcing plate connects the fastener. Through the indoor platform and the outdoor platform that set up, can install indoor platform in advance like this, and then just can prevent because the built-in fitting installation is inaccurate, lead to the problem of later stage installation difficulty to reach and practice thrift the manual work, improve the installation accuracy nature.
Description
Technical Field
The utility model relates to a building construction equipment technical field specifically is a platform of unloading encorbelments.
Background
The unloading platform is formed by erecting various temporary operation platforms and operation frames on a construction site and is generally used for material turnover, and the unloading platform is divided into an unloading platform, a floor type unloading platform and an overhanging type unloading platform during moving.
The applicant of the utility model finds that when the existing overhanging type unloading platform is installed, the length of the overhanging type unloading platform in the building is longer, and a blind area exists in a tower crane when the unloading platform is hoisted after the outer frame is erected, so that the installation is more complicated; and the installation is not measured and is pre-buried firstly and then installed, and the positions of the pre-buried parts are not right when the installation is carried out, so that the installation positions in the later period are not right.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an overhanging discharging platform, which aims to improve the problems that when the existing overhanging discharging platform is installed, the length of the overhanging discharging platform in a building is longer, and a tower crane has blind areas when the discharging platform is hoisted after an external frame is erected, so that the installation is more complicated; and the problem that the positions of embedded parts are not aligned in the later period of installation is possibly caused because the embedded parts are embedded firstly and then installed when the embedded parts are not installed.
The utility model discloses a realize like this:
a cantilever unloading platform comprises an outdoor platform and an indoor platform, wherein one end of the outdoor platform is provided with the indoor platform, the indoor platform and the outdoor platform are fixedly connected in a clamping manner, the upper end surfaces of the outdoor platform and the indoor platform are fixedly connected with reinforcing members through screws, the outdoor platform comprises a first cross beam and a first vertical beam, two ends of the first vertical beam are respectively provided with a first cross beam, the first cross beam and the first vertical beam are fixedly connected in a welding manner, one end of the first cross beam is provided with a reinforcing plate, the reinforcing plate and the first cross beam are arranged into an integral structure, the side surface of the reinforcing plate is fixedly connected with a connecting clamping piece, the indoor platform comprises a second cross beam and a second vertical beam, the two ends of the second vertical beam are fixedly connected with the second cross beam in a welding mode, the shape of the second cross beam is an L-shaped structure, and one end of the second cross beam is provided with a connecting clamping groove, and the connecting clamping groove and the connecting clamping piece are matched with each other.
Further, the side of first crossbeam is provided with the steel cable connecting seat, and steel cable connecting seat and first crossbeam pass through welding mode fixed connection, and the quantity of steel cable connecting seat sets up to two, is provided with the steel cable connecting seat through the side at first crossbeam, is for the ease of bolt wire rope to carry out fixed connection through the other end with wire rope and the outer wall of building, can improve like this the utility model discloses a steadiness.
Further, the upper end face of the first cross beam is provided with a guardrail mounting seat, the guardrail mounting seat is fixedly connected with the first cross beam, the guardrail mounting seat is distributed at equal intervals, the guardrail mounting seat is arranged on the upper end face of the first cross beam, so that the guardrail can be conveniently mounted on the upper end face of the outdoor platform, the workers can be protected when unloading, and the workers can be safer during construction.
Further, first connection thread groove has been seted up to the up end of first crossbeam, and the second connection thread groove has been seted up to the up end of second crossbeam, is for the convenience of being connected outdoor platform and indoor platform through the reinforcement through setting up like this, and then can improve the utility model discloses a steadiness.
Further, the side of reinforcement runs through and has seted up the locating hole, and the locating hole symmetry sets up, and the vaulting pole fixed slot has been seted up to the one end side of second crossbeam, is for the connection steadiness between further outdoor platform of enhancement and the indoor platform through setting up the reinforcement, has seted up the locating hole through running through in the side of reinforcement, is for the ease of fixing the reinforcement at the up end of outdoor platform and indoor platform through the screw.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the characteristics of rational in infrastructure, simple to operate, through the indoor platform and the outdoor platform that set up, can install indoor platform in advance like this, and then just can prevent because the built-in fitting installation is inaccurate, lead to the problem of later stage installation difficulty to reach and practice thrift the manual work, improve the installation accuracy nature.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural view of an overhanging discharging platform of the utility model;
FIG. 2 is a schematic view of a split structure of the overhanging discharging platform of the present invention;
fig. 3 is a schematic structural view of an outdoor platform of the overhanging discharging platform of the present invention;
fig. 4 is a schematic structural view of an indoor platform of the overhanging discharging platform of the present invention;
fig. 5 is a schematic structural view of the reinforcing member of the cantilever discharge platform of the present invention.
In the figure: 1. an outdoor platform; 11. a first cross member 111, a reinforcing plate; 112. a first connecting screw groove; 12. a first vertical beam; 13. a steel rope connecting seat; 14. connecting clamping pieces; 15. a guardrail mounting seat; 2. an indoor platform; 21. a second cross member; 211. a stay bar fixing groove; 212. a second connecting screw groove; 213. a connecting clamping groove; 22. a second vertical beam; 3. a reinforcement; 31. and (7) positioning the holes.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work all belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3, 4 and 5, an overhanging discharging platform comprises an outdoor platform 1 and an indoor platform 2, wherein the indoor platform 2 is arranged at one end of the outdoor platform 1, the indoor platform 2 and the outdoor platform 1 are fixedly connected in a clamping manner, reinforcing members 3 are fixedly connected to the upper end surfaces of the outdoor platform 1 and the indoor platform 2 through screws, the outdoor platform 1 comprises a first cross beam 11 and a first vertical beam 12, a steel rope connecting seat 13 is arranged on the side surface of the first cross beam 11, the steel rope connecting seat 13 and the first cross beam 11 are fixedly connected in a welding manner, and the number of the steel rope connecting seats 13 is two, by arranging the steel rope connecting seat 13 on the side surface of the first beam 11, the steel rope is convenient to bolt, therefore, the other end of the steel wire rope is fixedly connected with the outer wall of the building, so that the stability of the utility model can be improved; the two ends of the first vertical beam 12 are respectively provided with the first cross beam 11, the first cross beam 11 and the first vertical beam 12 are fixedly connected in a welding mode, the upper end face of the first cross beam 11 is provided with the guardrail mounting seat 15, the guardrail mounting seats 15 are fixedly connected with the first cross beam 11, the guardrail mounting seats 15 are distributed at equal intervals, and the guardrail mounting seats 15 are arranged on the upper end face of the first cross beam 11, so that installation of guardrails is facilitated, the guardrails can be conveniently installed on the upper end face of the outdoor platform 1, workers can be protected during unloading, and the workers can be safer during construction;
the upper end surface of the first beam 11 is provided with a first connecting screw groove 112, the upper end surface of the second beam 21 is provided with a second connecting screw groove 212, and the arrangement is convenient for connecting the outdoor platform 1 and the indoor platform 2 through the reinforcing member 3, so that the stability of the utility model can be improved; one end of the first beam 11 is provided with a reinforcing plate 111, the reinforcing plate 111 and the first beam 11 are arranged into an integrated structure, and the side of the reinforcing plate 111 is fixedly connected with a connecting fastener 14, the indoor platform 2 comprises a second cross beam 21 and a second vertical beam 22, both ends of the second vertical beam 22 are fixedly connected with the second cross beam 21 by welding, the shape of the second cross beam 21 is an L-shaped structure, and one end of the second beam 21 is provided with a connecting slot 213, the connecting slot 213 and the connecting fastener 14 are matched with each other, the side surface of the reinforcement 3 is provided with a positioning hole 31 in a penetrating way, the positioning holes 31 are symmetrically arranged, the side surface of one end of the second beam 21 is provided with a stay fixing groove 211, the reinforcement 3 is provided to further enhance the connection stability between the outdoor platform 1 and the indoor platform 2, the positioning holes 31 are formed through the side surfaces of the reinforcement 3, so that the reinforcement 3 can be fixed on the upper end surfaces of the outdoor platform 1 and the indoor platform 2 by screws.
The utility model discloses an installation method: it is right the utility model discloses when installing, at first need install indoor platform 2 inside the building, and fix it, then be connected outdoor platform 1 and indoor platform 2 through the mode of joint, and pass through the up end of screw fixation at outdoor platform 1 and indoor platform 2 with reinforcement 3, then lay the plank at outdoor platform 1's up end, and fix with the steel wire, then install the steel cable at steel cable connecting seat 13, and fix the other end of steel cable, and for the sake of safety, after the installation is accomplished, must carry out the static load test, will hang limit load warning sign on the platform of unloading after the static load test is qualified.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. The utility model provides a platform of unloading of encorbelmenting, includes outdoor platform (1) and indoor platform (2), its characterized in that: the indoor platform is characterized in that one end of the outdoor platform (1) is provided with an indoor platform (2), the indoor platform (2) and the outdoor platform (1) are fixedly connected in a clamping manner, the upper end faces of the outdoor platform (1) and the indoor platform (2) are fixedly connected with reinforcing members (3) through screws, the outdoor platform (1) comprises a first cross beam (11) and a first vertical beam (12), the two ends of the first vertical beam (12) are respectively provided with the first cross beam (11), the first cross beam (11) and the first vertical beam (12) are fixedly connected in a welding manner, one end of the first cross beam (11) is provided with a reinforcing plate (111), the reinforcing plate (111) and the first cross beam (11) are arranged into an integrated structure, the side face of the reinforcing plate (111) is fixedly connected with a connecting clamping member (14), the indoor platform (2) comprises a second cross beam (21) and a second vertical beam (22), the both ends of second vertical beam (22) all are through welding mode fixedly connected with second crossbeam (21), the shape of second crossbeam (21) sets up to L type structure, and connecting groove (213) have been seted up to the one end of second crossbeam (21), connecting groove (213) and connection fastener (14) mutually support.
2. The cantilever unloading platform according to claim 1, wherein a steel cable connecting seat (13) is arranged on the side surface of the first beam (11), the steel cable connecting seat (13) and the first beam (11) are fixedly connected by welding, and the number of the steel cable connecting seats (13) is two.
3. An overhanging discharging platform according to claim 2, wherein the upper end surface of the first beam (11) is provided with guardrail mounting seats (15), the guardrail mounting seats (15) are fixedly connected with the first beam (11), and the guardrail mounting seats (15) are distributed at equal intervals.
4. The cantilever platform according to claim 3, wherein the first beam (11) has a first connecting screw groove (112) formed on its upper end surface, and the second beam (21) has a second connecting screw groove (212) formed on its upper end surface.
5. The cantilever platform according to claim 4, wherein the side of the reinforcement member (3) is provided with a positioning hole (31) therethrough, the positioning hole (31) is symmetrically arranged, and one end of the second beam (21) is provided with a strut fixing groove (211).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021036048.5U CN212583289U (en) | 2020-06-08 | 2020-06-08 | Platform of unloading of encorbelmenting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021036048.5U CN212583289U (en) | 2020-06-08 | 2020-06-08 | Platform of unloading of encorbelmenting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212583289U true CN212583289U (en) | 2021-02-23 |
Family
ID=74642757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021036048.5U Active CN212583289U (en) | 2020-06-08 | 2020-06-08 | Platform of unloading of encorbelmenting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212583289U (en) |
-
2020
- 2020-06-08 CN CN202021036048.5U patent/CN212583289U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210164206U (en) | High steep rock slope scaffold puts up conversion equipment | |
KR20110014341A (en) | Tower ctane wall bracing with a safety fence | |
CN212583289U (en) | Platform of unloading of encorbelmenting | |
CN110725525A (en) | Supporting device of assembled cantilever scaffold and construction method thereof | |
KR100642326B1 (en) | A temporary apparatus for constructing girder by top-down style construction method | |
CN212376021U (en) | Steel corbel and support-free installation connecting node comprising same | |
CN113202281A (en) | Building templates operation platform | |
CN106144832A (en) | A kind of special extended type wall-attached frame and preparation method thereof | |
CN211920714U (en) | Support system of pull-up and pull-down type external hanging self-climbing tower crane | |
CN110714607A (en) | Climb adjustable adaptor for frame | |
CN110130577A (en) | A kind of main building column structure and its construction method of installation | |
CN209855253U (en) | Auxiliary fixing device for mounting roof super-long steel beam | |
CN216476479U (en) | Anti-toppling reinforcing device for civil and industrial buildings | |
CN213806834U (en) | Tower house | |
CN214739791U (en) | Truss type cantilever beam combined structure for climbing frame | |
CN210622277U (en) | Hanging flower basket high support fixing device | |
CN216305332U (en) | Guide rail upright post for building construction | |
CN212052855U (en) | Assembled reinforced concrete barricade | |
CN215948853U (en) | Building courtyard lifting construction platform | |
CN216663855U (en) | Steel anchor beam hanger | |
CN218261702U (en) | Thin-wall type assembled tower crane anchoring and drawknot device | |
CN214785815U (en) | Double-deck protection frame system for building | |
CN216740618U (en) | Steel construction protection scaffold puts up system suitable for light rail station | |
CN216196520U (en) | I-steel positioning and clamping device | |
CN215947843U (en) | Novel steel web concrete box girder structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |