CN212561883U - a building steel structure - Google Patents
a building steel structure Download PDFInfo
- Publication number
- CN212561883U CN212561883U CN202020662646.7U CN202020662646U CN212561883U CN 212561883 U CN212561883 U CN 212561883U CN 202020662646 U CN202020662646 U CN 202020662646U CN 212561883 U CN212561883 U CN 212561883U
- Authority
- CN
- China
- Prior art keywords
- threaded
- hole
- fixing
- holes
- outer frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 37
- 239000010959 steel Substances 0.000 title claims abstract description 37
- 239000002699 waste material Substances 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 2
- 230000000149 penetrating effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 6
- 238000003466 welding Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种建筑钢结构,包括支撑柱和横梁,所述支撑柱左侧开设有限位槽,限位槽内开设有贯穿支撑柱的通槽一,横梁的左端焊接有限位板,横梁穿过通槽一,限位板卡接于限位槽内,且限位板表面设置有若干固定螺栓三,所述支撑柱的右侧开设有卡槽,本实用新型通过设置固定外框和固定块先将横梁和支撑柱卡接固定,然后在通过螺栓连接固定,螺栓受力均匀不易损坏,连接结构紧密,且安装方便快捷,通过支架之间的连接结构设置成若干个的卡接组件,方便在某一组件损坏时及时进行更换,无需更换整个结构,减少了资源的浪费。
The utility model discloses a building steel structure, comprising a support column and a beam, a limit slot is provided on the left side of the support column, a through slot 1 penetrating the support column is opened in the limit slot, and a limit plate is welded at the left end of the beam. The cross beam passes through the first through slot, the limit plate is clamped in the limit slot, and the surface of the limit plate is provided with a number of fixing bolts. Third, the right side of the support column is provided with a slot. With the fixing block, the beam and the support column are first clamped and fixed, and then fixed by bolts. The bolts are evenly stressed and not easy to be damaged. The connection structure is tight and the installation is convenient and quick. It is convenient to replace a component in time when a component is damaged, without replacing the entire structure, reducing the waste of resources.
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020662646.7U CN212561883U (en) | 2020-04-27 | 2020-04-27 | a building steel structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020662646.7U CN212561883U (en) | 2020-04-27 | 2020-04-27 | a building steel structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212561883U true CN212561883U (en) | 2021-02-19 |
Family
ID=74610503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020662646.7U Active CN212561883U (en) | 2020-04-27 | 2020-04-27 | a building steel structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212561883U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113062453A (en) * | 2021-03-24 | 2021-07-02 | 机械工业第九设计研究院有限公司 | Assembled steel construction building special-shaped structure post |
-
2020
- 2020-04-27 CN CN202020662646.7U patent/CN212561883U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113062453A (en) * | 2021-03-24 | 2021-07-02 | 机械工业第九设计研究院有限公司 | Assembled steel construction building special-shaped structure post |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10989638B2 (en) | Multi-functional support capable of transferring horizontal and multi-point local vertical load and implementation method | |
CN103015537B (en) | Beam-column joint connecting device of assembled steel structure system | |
CN212561883U (en) | a building steel structure | |
CN207714517U (en) | Prefabricated modular buckling restrained brace bolted and welded connection node | |
CN105926811A (en) | Multi-cover-plate assembly type two-end connecting steel plate shear wall node | |
CN210369319U (en) | I-steel component that can splice | |
CN210086080U (en) | High-strength limiting support for bridge jacking translation | |
CN111535456A (en) | Strut overhanging end connecting node suitable for forked type prestress strut column | |
CN111101522A (en) | Transverse oblique connection truss support structure assembly | |
CN212613077U (en) | A connecting node of the outrigger end of a strut suitable for a bifurcated prestressed strut column | |
CN112376697B (en) | A splicing node of a prefabricated I-beam main beam and double-sided secondary beams | |
CN214739106U (en) | Curtain wall steel frame node | |
CN214034103U (en) | A splicing node of a prefabricated I-beam main beam and a double-sided secondary beam | |
CN211341135U (en) | Connection node of assembled concrete beam column | |
CN209412979U (en) | A kind of H profile steel beam and the unilateral affixed mechanism of H profile steel beam | |
CN221298200U (en) | Connecting component is assembled in steel house | |
CN222253192U (en) | A truss connection structure for factory building construction | |
CN220167144U (en) | Steel structure beam column | |
CN221298248U (en) | Assembled steel aluminium component connected node | |
CN217998476U (en) | Antidetonation bearing steel construction | |
CN219772710U (en) | Stable bridge template | |
CN219411233U (en) | Box post and H shaped steel roof beam connected node structure | |
CN218204962U (en) | Connecting piece is assembled fast to assembled steel construction building module | |
CN211690761U (en) | Steel structure column node connecting device | |
CN211472857U (en) | Assembled steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210617 Address after: 242074 office building, No.1 Government Road, Xiangyang Street, Xuanzhou District, Xuancheng City, Anhui Province Patentee after: Anhui Dingcheng construction and Installation Engineering Co.,Ltd. Address before: 610041 Building 2, No.89 Jule Road, Wuhou District, Chengdu City, Sichuan Province Patentee before: Chu Lisheng |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20241125 Address after: 835207 North of Nanhuan North Road, Jiangsu Industrial Park, Shanghai Road, Qingshuihe Town, Huocheng County, Ili Kazakh Autonomous Prefecture, Xinjiang Uygur Autonomous Region Patentee after: Ili Jijia Steel Structure Co.,Ltd. Country or region after: China Address before: 242074 office building, No.1 Government Road, Xiangyang Street, Xuanzhou District, Xuancheng City, Anhui Province Patentee before: Anhui Dingcheng construction and Installation Engineering Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right |