CN212507269U - An engineering building construction support - Google Patents

An engineering building construction support Download PDF

Info

Publication number
CN212507269U
CN212507269U CN202020850889.3U CN202020850889U CN212507269U CN 212507269 U CN212507269 U CN 212507269U CN 202020850889 U CN202020850889 U CN 202020850889U CN 212507269 U CN212507269 U CN 212507269U
Authority
CN
China
Prior art keywords
fixedly connected
motor
fixing plate
support frame
sliding groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020850889.3U
Other languages
Chinese (zh)
Inventor
常伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Xinsheng Ruitong Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020850889.3U priority Critical patent/CN212507269U/en
Application granted granted Critical
Publication of CN212507269U publication Critical patent/CN212507269U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

本实用新型属于建筑施工技术领域,尤其为一种工程建筑施工支架,包括第一固定板和箱体,所述第一固定板的顶部与箱体的底部固定连接;本实用新型,通过第一固定板、固定齿和螺纹孔的设置,可以使第一固定板牢牢的固定在地面上,从而降低了施工人员的危险,通过箱体、电动推杆、第二固定板和梯子的设置,施工人员能便捷地进入支撑架,通过控制面板可以使支撑架上下移动,在第一电机、螺纹柱、轴承、转轴、第一滑槽和第二滑槽的共同作用下,可使支撑架左右移动,增大了施工面积,且在第二电机、滑块和滑轮的作用下,也能使支撑架进行旋转,使得施工人员能自动的转动到施工位置,结构简单,操作方便,大大地提高了工作效率。

Figure 202020850889

The utility model belongs to the technical field of building construction, in particular to an engineering building construction support, comprising a first fixing plate and a box body, and the top of the first fixing plate is fixedly connected with the bottom of the box body; The setting of the fixing plate, the fixing teeth and the threaded holes can make the first fixing plate firmly fixed on the ground, thereby reducing the danger of construction personnel. The construction personnel can easily enter the support frame, and the support frame can be moved up and down through the control panel. The movement increases the construction area, and under the action of the second motor, the slider and the pulley, the support frame can also be rotated, so that the construction personnel can automatically rotate to the construction position. The structure is simple and the operation is convenient, which greatly improves the work efficiency.

Figure 202020850889

Description

Engineering building construction support
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to engineering construction support.
Background
The building construction engineering is a general name of scientific technology for building various land engineering facilities, and refers to applied materials, equipment, technical activities such as surveying, designing, constructing, maintaining and repairing and the like, and also refers to an object of engineering construction; the construction support is an essential engineering entity for various technical works such as investigation, planning, design, construction, installation and maintenance and the like of newly built, reconstructed or expanded building structures of various projects and related supporting facilities and the like except house buildings.
At present most construction support structure is complicated, difficult removal, and in the use, the support can not be fine fixed with ground moreover, has certain danger to the constructor, consequently, the utility model provides an engineering construction support of easy lift, easy removal, easy control.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides an engineering construction support has easy lift, easy removal, the characteristics of easy control.
In order to achieve the above object, the utility model provides a following technical scheme: an engineering building construction support comprises a first fixing plate and a box body, wherein the top of the first fixing plate is fixedly connected with the bottom of the box body, an electric push rod is installed in the box body, the upper end of the electric push rod is fixedly connected with a second fixing plate, a first sliding groove and a second sliding groove are formed in the second fixing plate and are communicated with each other, a bearing is fixedly connected with one end of the first sliding groove, a rotating shaft is movably arranged in the bearing in a penetrating manner, a threaded column is fixedly connected with one end of the rotating shaft, a threaded cap is connected with the outer surface of the threaded column in a threaded manner, a first motor is fixedly connected with the other end of the first sliding groove, an output shaft of the first motor is fixedly connected with the other end of the threaded column, a sliding block is connected in the second sliding groove in a sliding manner, the top of the sliding block is fixedly connected with the outer surface of the threaded cap, the connecting plate is fixedly connected with a second motor, an output shaft of the second motor is fixedly connected with a support frame, a control panel is arranged in the support frame, the bottom of the support frame is fixedly connected with a pulley, the connecting plate is provided with an annular groove, and the annular groove is in sliding connection with the pulley.
Preferably, the bottom of the first fixing plate is fixedly connected with a brake wheel.
Preferably, the ladder is installed through the bolt in the front of box, control panel passes through wire electric connection with first motor, second motor and electric putter respectively.
Preferably, the support frame is movably connected with an opening and closing door through a hinge.
Preferably, a threaded hole is formed in the first fixing plate, and fixing teeth are connected to the threaded hole in an internal thread mode.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through first fixed plate, the setting of fixed tooth and screw hole, can make the first fixed plate firmly fixed subaerial, thereby constructor's danger has been reduced, through the box, electric putter, the setting of second fixed plate and ladder, constructor can get into the support frame conveniently, can make the support frame reciprocate through control panel, at first motor, the screw thread post, a bearing, the apparatus further comprises a rotating shaft, under the combined action of first spout and second spout, can make the support frame control, construction area has been increased, and at the second motor, under the effect of slider and pulley, also can make the support frame rotate, make constructor can rotate the construction position automatically, moreover, the steam generator is simple in structure, and convenient for operation, and the work efficiency is greatly improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a front view section of the present invention;
FIG. 2 is a front schematic view of the present invention;
FIG. 3 is an enlarged schematic structural view of the position A of the present invention;
in the figure: 1. a brake wheel; 2. fixing teeth; 3. a first fixing plate; 4. a box body; 5. an electric push rod; 6. a second fixing plate; 7. a first motor; 8. a threaded post; 9. a threaded cap; 10. a support frame; 11. a control panel; 12. a second motor; 13. a pulley; 14. a bolt; 15. a ladder; 16. opening and closing the door; 17. a hinge; 18. a first chute; 19. a second chute; 20. a rotating shaft; 21. a bearing; 22. a threaded hole; 23. a slider; 24. a connecting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: an engineering building construction support comprises a first fixing plate 3 and a box body 4, wherein the top of the first fixing plate 3 is fixedly connected with the bottom of the box body 4, an electric push rod 5 is installed in the box body 4, the upper end of the electric push rod 5 is fixedly connected with a second fixing plate 6, a first sliding groove 18 and a second sliding groove 19 are formed in the second fixing plate 6, the first sliding groove 18 is communicated with the second sliding groove 19, one end of the first sliding groove 18 is fixedly connected with a bearing 21, a rotating shaft 20 is movably arranged in the bearing 21 in a penetrating manner, one end of the rotating shaft 20 is fixedly connected with a threaded column 8, the outer surface of the threaded column 8 is in threaded connection with a threaded cap 9, the other end of the first sliding groove 18 is fixedly connected with a first motor 7, the output shaft of the first motor 7 is fixedly connected with the other end of the threaded column 8, and a sliding block 23 is slidably connected with the, the top of slider 23 is connected with the external fixed surface of screw cap 9, the external fixed surface of screw cap 9 is connected with connecting plate 24, fixedly connected with second motor 12 on connecting plate 24, the output shaft fixedly connected with support frame 10 of second motor 12, be provided with control panel 11 in the support frame 10, the bottom fixedly connected with pulley 13 of support frame 10, the ring channel has been seted up on connecting plate 24, ring channel and pulley 13 sliding connection, through the setting of first fixed plate 3, fixed tooth 2 and screw hole 22, can make first fixed plate 3 firmly fix subaerial, thereby reduced constructor's danger, through the setting of box 4, electric putter 5, second fixed plate 6 and ladder 15, constructor can get into support frame 10 conveniently, can make support frame 10 reciprocate through control panel, at first motor 7, the outer fixed surface of screw cap 9 is connected with connecting plate 24, the ring channel is seted up with pulley 13 sliding, Under the combined action of the threaded column 8, the bearing 21, the rotating shaft 20, the first sliding groove 18 and the second sliding groove 19, the support frame 10 can move left and right, the construction area is increased, and the support frame 10 can also rotate under the action of the second motor 12, the sliding block 23 and the pulley 13, so that a constructor can automatically rotate to a construction position, the structure is simple, the operation is convenient, and the working efficiency is greatly improved.
Specifically, the bottom of the first fixing plate 3 is fixedly connected with a brake wheel 1.
Specifically, the front of the box 4 is provided with a ladder 15 through a bolt 14, and the control panel 11 is respectively electrically connected with the first motor 7, the second motor 12 and the electric push rod 5 through a lead.
Specifically, the support frame 10 is movably connected with an opening and closing door 16 through a hinge 17.
Specifically, a threaded hole 22 is formed in the first fixing plate 3, and the fixing teeth 2 are connected to the threaded hole 22 in an internal thread manner.
The utility model discloses a theory of operation and use flow: the utility model discloses, when wanting to be under construction, under the effect of brake wheel 1, can make the construction support move to the operation position, with the external power of support connection, screw up fixed tooth 2, can make the support firm fixed on ground, constructor can reach support frame 10 through climbing ladder 15, install control panel 11 in the support frame 10, constructor operation control panel 11, make electric putter 5 drive second fixed plate 6 and go up and down to corresponding position, when needing to move about, first motor 7 work drives screw post 8 and rotates, screw post 8 rotates and drives screw cap 9 and move right or left at the surface of screw post 8, slider 23 slides in second spout 19, consequently, screw cap 9 can take support frame 10 to move right or left, control panel 11 controls second motor 12 to rotate, second motor 12 takes support frame 10 to rotate, meanwhile, the pulley 13 slides in the annular groove, so that a constructor can automatically rotate to a working position, and after construction is finished, the bolt 14 is unscrewed, the ladder 15 can be quickly disassembled, and the use is very convenient.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides an engineering construction support, includes first fixed plate (3) and box (4), its characterized in that: the top of the first fixing plate (3) is fixedly connected with the bottom of the box body (4), an electric push rod (5) is installed in the box body (4), a second fixing plate (6) is fixedly connected with the upper end of the electric push rod (5), a first sliding groove (18) and a second sliding groove (19) are formed in the second fixing plate (6), the first sliding groove (18) and the second sliding groove (19) are communicated with each other, a bearing (21) is fixedly connected with one end of the first sliding groove (18), a rotating shaft (20) is movably arranged in the bearing (21), a threaded column (8) is fixedly connected with one end of the rotating shaft (20), a threaded cap (9) is connected with the outer surface of the threaded column (8) in a threaded manner, a first motor (7) is fixedly connected with the other end of the first sliding groove (18), an output shaft of the first motor (7) is fixedly connected with the other end of the threaded column (8), sliding connection has slider (23) in second spout (19), the top of slider (23) is connected with the fixed surface of screw cap (9), the fixed surface of screw cap (9) is connected with connecting plate (24), fixedly connected with second motor (12) on connecting plate (24), the output shaft fixedly connected with support frame (10) of second motor (12), be provided with control panel (11) in support frame (10), the bottom fixedly connected with pulley (13) of support frame (10), the ring channel has been seted up on connecting plate (24), ring channel and pulley (13) sliding connection.
2. The engineering and construction support of claim 1, wherein: the bottom of the first fixing plate (3) is fixedly connected with a brake wheel (1).
3. The engineering and construction support of claim 1, wherein: the front of box (4) is installed ladder (15) through bolt (14), control panel (11) pass through wire electric connection with first motor (7), second motor (12) and electric putter (5) respectively.
4. The engineering and construction support of claim 1, wherein: the support frame (10) is movably connected with an opening and closing door (16) through a hinge (17).
5. The engineering and construction support of claim 1, wherein: a threaded hole (22) is formed in the first fixing plate (3), and a fixing tooth (2) is connected to the threaded hole (22) in an internal thread mode.
CN202020850889.3U 2020-05-20 2020-05-20 An engineering building construction support Expired - Fee Related CN212507269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020850889.3U CN212507269U (en) 2020-05-20 2020-05-20 An engineering building construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020850889.3U CN212507269U (en) 2020-05-20 2020-05-20 An engineering building construction support

Publications (1)

Publication Number Publication Date
CN212507269U true CN212507269U (en) 2021-02-09

Family

ID=74392281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020850889.3U Expired - Fee Related CN212507269U (en) 2020-05-20 2020-05-20 An engineering building construction support

Country Status (1)

Country Link
CN (1) CN212507269U (en)

Similar Documents

Publication Publication Date Title
CN209119781U (en) A kind of building engineering lightning protection device support frame
CN216599495U (en) Photovoltaic panel support with height adjusting function
CN212507269U (en) An engineering building construction support
CN211264427U (en) An intelligent building disaster alarm monitoring device
CN221748273U (en) A photovoltaic power generation equipment
CN211176541U (en) Wisdom street lamp convenient to erect
CN215407437U (en) Building engineering construction template fastener
CN221837917U (en) A kind of anti-fall building construction support
CN213774393U (en) Safe anti-falling device for building construction
CN206257068U (en) A kind of stealthy fan
CN222798534U (en) A traffic engineering monitoring equipment mounting frame
CN212957820U (en) An energy-saving and environmentally friendly holiday home
CN211316037U (en) Energy-saving LED response lamp
CN210104954U (en) A low-carbon energy-saving sun room building
CN221684002U (en) A climbing-free surveillance camera body mounting pole
CN114809275A (en) Energy-saving assembled light steel building
CN223241176U (en) Double-opening-closing hemispherical crossed windproof dustproof electric sunshade device
CN221142804U (en) Safety support device for constructional engineering
CN221609312U (en) Outer wall sun-shading device for green building design
CN214062408U (en) Building engineering safety device
CN221483249U (en) Meteorological observation instrument bracket
CN221799085U (en) Civil engineering construction support
CN220817291U (en) Raise dust on-line monitoring device
CN221010042U (en) Container roof solar panel mounting structure convenient to maintain
CN210888013U (en) Climbing type building construction operation platform outside building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240418

Address after: 726000, Group 8, Manglongyu Village, Chenyuan Street Office, Shangzhou District, Shangluo City, Shaanxi Province

Patentee after: Liu Chunzhi

Country or region after: China

Patentee after: Liu Jia

Patentee after: Xing Fuqing

Address before: 063000 Tangshan real estate registration center, area a, Lunan District, Tangshan City, Hebei Province

Patentee before: Chang Wei

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240508

Address after: Room 1503, Unit 1, Building 5, Huitong Taikoo City Tianhou Garden, No. 55 Fengcheng 12th Road, Xi'an Economic and Technological Development Zone, Shaanxi Province, 710000

Patentee after: Shaanxi Xinsheng Ruitong Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 726000, Group 8, Manglongyu Village, Chenyuan Street Office, Shangzhou District, Shangluo City, Shaanxi Province

Patentee before: Liu Chunzhi

Country or region before: China

Patentee before: Liu Jia

Patentee before: Xing Fuqing

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209