CN212417506U - A high-efficient desulfurizing tower for flue gas is administered - Google Patents

A high-efficient desulfurizing tower for flue gas is administered Download PDF

Info

Publication number
CN212417506U
CN212417506U CN202020364478.3U CN202020364478U CN212417506U CN 212417506 U CN212417506 U CN 212417506U CN 202020364478 U CN202020364478 U CN 202020364478U CN 212417506 U CN212417506 U CN 212417506U
Authority
CN
China
Prior art keywords
tower
tower body
cavity
flue gas
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020364478.3U
Other languages
Chinese (zh)
Inventor
廖树伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Haoxiangyu Environmental Technology Service Co ltd
Original Assignee
Shenzhen Haoxiangyu Environmental Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Haoxiangyu Environmental Technology Service Co ltd filed Critical Shenzhen Haoxiangyu Environmental Technology Service Co ltd
Priority to CN202020364478.3U priority Critical patent/CN212417506U/en
Application granted granted Critical
Publication of CN212417506U publication Critical patent/CN212417506U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Exhaust Gas After Treatment (AREA)

Abstract

本实用新型涉及烟气治理技术领域,且公开了一种用于烟气治理的高效脱硫塔,包括塔体,塔体的上端设置有塔盖,塔体与塔盖之间设置有固定机构,塔盖的上端固定设置有水箱,水箱的两端固定设置有水管,两个水管贯穿塔盖延伸至塔体的内部并固定设置有喷雾头,塔体的下端开设有第一空腔,塔体的两侧壁开设有第二空腔,第一空腔的内部横向设置有转杆,转杆的右端通过第一转动轴承与第一空腔的侧壁转动连接。本实用新型,可快速清理脱硫塔内壁附着的反应沉淀,增加脱硫效率,清洁刷损坏时,方便对清洁刷进行拆卸和安装。

Figure 202020364478

The utility model relates to the technical field of flue gas treatment, and discloses a high-efficiency desulfurization tower for flue gas treatment, comprising a tower body, the upper end of the tower body is provided with a tower cover, and a fixing mechanism is arranged between the tower body and the tower cover, The upper end of the tower cover is fixed with a water tank, the two ends of the water tank are fixed with water pipes, the two water pipes extend through the tower cover to the inside of the tower body and are fixedly arranged with a spray head, the lower end of the tower body is provided with a first cavity, and the tower body is provided with a first cavity. The two side walls are provided with second cavities, the interior of the first cavity is laterally provided with a rotating rod, and the right end of the rotating rod is rotatably connected with the side wall of the first cavity through a first rotating bearing. The utility model can quickly clean the reaction precipitate attached to the inner wall of the desulfurization tower, increase the desulfurization efficiency, and facilitate the disassembly and installation of the cleaning brush when the cleaning brush is damaged.

Figure 202020364478

Description

A high-efficient desulfurizing tower for flue gas is administered
Technical Field
The utility model relates to a technical field is administered to the flue gas, especially relates to a high-efficient desulfurizing tower for flue gas is administered.
Background
Along with the development of industry and the improvement of living standard of people, the desire of people for energy is continuously increased, SO2 in coal-fired flue gas becomes a main cause of air pollution, the reduction of SO2 pollution becomes a urgent necessity for the treatment of the current atmospheric environment, and the high-efficiency desulfurizing tower plays an important role in the aspect of flue gas treatment.
After the desulfurizing tower used in the past, the inner wall can adhere to a large amount of reaction sediment, and is difficult to clear up, influences the desulfurizing tower to flue gas desulfurization's efficiency and quality, and after long-time the use, the cleaning brush damages, and the change is hardly dismantled.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the adherent reaction sediment of desulfurizing tower inner wall is piled up for a long time and is hardly cleared up among the prior art, and the installation is hardly dismantled to the cleaning brush when damaging, and the high-efficient desulfurizing tower who is used for flue gas to administer that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a high-efficiency desulfurizing tower for flue gas treatment comprises a tower body, wherein a tower cover is arranged at the upper end of the tower body, a fixing mechanism is arranged between the tower body and the tower cover, a water tank is fixedly arranged at the upper end of the tower cover, water pipes are fixedly arranged at two ends of the water tank, two water pipes penetrate through the tower cover and extend into the tower body, an atomizing spray head is fixedly arranged on the two water pipes, a first cavity is formed in the lower end of the tower body, a second cavity is formed in two side walls of the tower body, a rotating rod is transversely arranged in the first cavity, the right end of the rotating rod is rotatably connected with the side wall of the first cavity through a first rotating bearing, the left end of the rotating rod penetrates through the side wall of the tower body and extends to the outside, a motor is fixedly arranged on the side wall of the rotating rod, first bevel gears are fixedly sleeved at two ends of the rotating rod wall, lead screws are longitudinally arranged in the two second cavities, and the upper, two the lower extreme of lead screw is passed through sealed bearing and is connected, two the lower extreme of lead screw all runs through the lower lateral wall of tower body and the fixed second bevel gear that is provided with, two first bevel gear and two meshing between the second bevel gear, two the equal threaded connection of pole wall of lead screw has the slider, two the lateral wall of slider is fixed all to be provided with detachable devices, the inside of tower body is provided with annular cleaning brush, annular cleaning brush contacts between the lateral wall through detachable devices and tower body and is connected, the both ends of tower body are provided with inlet port and venthole respectively, the fixed drain that is provided with of lower extreme of tower body.
Preferably, the fixing mechanism comprises a first fixing block and a second fixing block, the first fixing block is fixedly connected with the two ends of the tower cover, the second fixing block is fixedly connected with the two ends of the tower body, and the first fixing block is fixedly connected with the second fixing block through a first bolt.
Preferably, the detachable mechanism includes the spring, two the third cavity has all been seted up to the inside of slider, the spring is fixed to be set up in the inside of third cavity, the fixed stopper that is provided with of lateral wall of spring, the fixed connecting rod that is provided with of lateral wall of stopper, the connecting rod passes through the lateral wall fixed connection of second bolt and annular cleaning brush.
Preferably, the lower end of the tower body is fixedly provided with a base.
Preferably, a sealing ring is fixedly arranged between the tower body and the tower cover.
Compared with the prior art, the utility model provides a high-efficient desulfurizing tower for flue gas is administered possesses following beneficial effect:
1. this a high-efficient desulfurizing tower for flue gas is administered, through the combined action of lead screw, slider and cleaning brush, the motor rotates, drives the bull stick and rotates, and the bull stick drives two lead screws and rotates, and threaded connection's slider motion is gone up to two four bars drive pole walls, and two sliders drive the connecting rod and rotate, and the connecting rod drives cleaning brush up-and-down motion, the reaction of clearance tower body inner wall deposits.
2. This a high-efficient desulfurizing tower for flue gas is administered, through second bolt, connecting rod, stopper and spring combined action, rotate the second bolt, press the connecting rod, connecting rod compression spring with separately between connecting rod and the cleaning brush, when the cleaning brush damages, make things convenient for the dismantlement and the installation of cleaning brush.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses convenient operation can clear up the adnexed reaction of desulfurizing tower inner wall fast and deposit, increases desulfurization efficiency, and when the cleaning brush damaged, the convenience was dismantled and was installed the cleaning brush.
Drawings
FIG. 1 is a schematic view of the front structure of a high-efficiency desulfurizing tower for flue gas treatment according to the present invention;
FIG. 2 is an enlarged schematic view of portion A of FIG. 1;
fig. 3 is a schematic top view of the slider shown in fig. 1.
In the figure: the device comprises a tower body 1, a tower cover 2, a water tank 3, a water pipe 4, a spray head 5, a rotating rod 6, a motor 7, a first bevel gear 8, a screw rod 9, a second bevel gear 10, a sliding block 11, an annular cleaning brush 12, an air inlet 13, an air outlet 14, a sewage discharge outlet 15, a first fixing block 16, a second fixing block 17, a first bolt 18, a spring 19, a limiting block 20, a connecting rod 21 and a second bolt 22.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a high-efficiency desulfurizing tower for flue gas treatment, comprising a tower body 1, a tower cover 2 arranged at the upper end of the tower body 1, a base fixedly arranged at the lower end of the tower body 1, a sealing ring fixedly arranged between the tower body 1 and the tower cover 2, a fixing mechanism arranged between the tower body 1 and the tower cover 2 and comprising a first fixing block 16 and a second fixing block 17, wherein the two first fixing blocks 16 are fixedly connected with the two ends of the tower cover 2, the two second fixing blocks 17 are fixedly connected with the two ends of the tower body 1, the first fixing block 16 is fixedly connected with the second fixing blocks 17 through a first bolt 18, a water tank 3 is fixedly arranged at the upper end of the tower cover 2, water pipes 4 are fixedly arranged at the two ends of the water tank 3, the two water pipes 4 penetrate through the tower cover 2 and extend into the tower body 1 and are fixedly provided with an atomizing spray head 5, a first cavity is arranged at the, a rotating rod 6 is transversely arranged in the first cavity, the right end of the rotating rod 6 is rotatably connected with the side wall of the first cavity through a first rotating bearing, the left end of the rotating rod 6 penetrates through the side wall of the tower body 1 to extend to the outside and is fixedly provided with a motor 7, the two ends of the rod wall of the rotating rod 6 are fixedly sleeved with a first bevel gear 8, the insides of the two second cavities are respectively and longitudinally provided with a screw rod 9, the upper ends of the two screw rods 9 are respectively and rotatably connected with the side wall of the second cavity through a second rotating bearing, the lower ends of the two screw rods 9 are rotatably connected with the side wall of the tower body 1 through a sealing bearing, the lower ends of the two screw rods 9 penetrate through the lower side wall of the tower body 1 and are fixedly provided with second bevel gears 10, the two first bevel gears 8 are meshed with the two second bevel gears 10, the rod walls of the two screw rods, the detachable mechanism includes spring 19, the third cavity has all been seted up to the inside of two sliders 11, spring 19 is fixed to be set up in the inside of third cavity, spring 19's the fixed stopper 20 that is provided with of lateral wall, the fixed connecting rod 21 that is provided with of lateral wall of stopper 20, connecting rod 21 passes through the lateral wall fixed connection of second bolt 22 with annular cleaning brush 12, the inside of tower body 1 is provided with annular cleaning brush 12, annular cleaning brush 12 is connected through the contact between the lateral wall of detachable mechanism and tower body 1, the both ends of tower body 1 are provided with inlet port 13 and venthole 14 respectively, the fixed drain 15 that is provided with of lower extreme of tower body 1.
The utility model discloses in, after the desulfurizing tower carries out the desulfurization to the flue gas, motor 7 rotates, motor 7 drives bull stick 6 and rotates, bull stick 6 drives the fixed first bevel gear 8 that cup joints in both ends, two first bevel gears 8 drive the rotation of upper end meshed second bevel gear 10, two second bevel gears 10 drive lead screw 9 and rotate, two lead screw 9 drive the slider 11 motion of pole wall threaded connection, slider 11 drives connecting rod 21 motion, two connecting rod 21 drive annular cleaning brush 12 motions, effectively clear up the adnexed reaction of 1 inner wall of tower body and deposit, long-time the back of using, when annular cleaning brush 12 needs to be dismantled and change, rotate second bolt 22, part connecting rod 21 and annular cleaning brush 12, press connecting rod 21, connecting rod 21 promotes spring 19, make things convenient for the dismouting of annular cleaning brush 12.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1.一种用于烟气治理的高效脱硫塔,包括塔体(1),其特征在于,所述塔体(1)的上端设置有塔盖(2),所述塔体(1)与塔盖(2)之间设置有固定机构,所述塔盖(2)的上端固定设置有水箱(3),所述水箱(3)的两端固定设置有水管(4),两个所述水管(4)贯穿塔盖(2)延伸至塔体(1)的内部并固定设置有喷雾头(5),所述塔体(1)的下端开设有第一空腔,所述塔体(1)的两侧壁开设有第二空腔,所述第一空腔的内部横向设置有转杆(6),所述转杆(6)的右端通过第一转动轴承与第一空腔的侧壁转动连接,所述转杆(6)的左端贯穿塔体(1)的侧壁延伸至外部并固定设置有电机(7),所述转杆(6)杆壁的两端固定套接有第一锥齿轮(8),两个所述第二空腔的内部均纵向设置有丝杆(9),两个所述丝杆(9)的上端均通过第二转动轴承与第二空腔的侧壁转动连接,两个所述丝杆(9)的下端通过密封轴承与塔体(1)的侧壁转动连接,两个所述丝杆(9)的下端均贯穿塔体(1)的下侧壁并固定设置有第二锥齿轮(10),两个所述第一锥齿轮(8)与两个所述第二锥齿轮(10)之间啮合,两个所述丝杆(9)的杆壁均螺纹连接有滑块(11),两个所述滑块(11)的侧壁均固定设置有可拆卸机构,所述塔体(1)的内部设置有环形清洁刷(12),所述环形清洁刷(12)通过可拆卸机构与塔体(1)的侧壁之间接触连接,所述塔体(1)的两端分别设置有进气孔(13)和出气孔(14),所述塔体(1)的下端固定设置有排污口(15)。1. a high-efficiency desulfurization tower for flue gas treatment, comprising a tower body (1), characterized in that the upper end of the tower body (1) is provided with a tower cover (2), and the tower body (1) and A fixing mechanism is arranged between the tower covers (2), a water tank (3) is fixedly arranged at the upper end of the tower cover (2), and water pipes (4) are fixedly arranged at both ends of the water tank (3). The water pipe (4) extends through the tower cover (2) to the interior of the tower body (1) and is fixedly provided with a spray head (5). The lower end of the tower body (1) is provided with a first cavity, and the tower body (1) 1) The two side walls are provided with a second cavity, the interior of the first cavity is laterally provided with a rotating rod (6), and the right end of the rotating rod (6) is connected to the first cavity through the first rotating bearing. The side walls are rotatably connected, the left end of the rotating rod (6) extends to the outside through the side wall of the tower body (1) and is fixedly provided with a motor (7), and the two ends of the rod wall of the rotating rod (6) are fixedly sleeved There is a first bevel gear (8), a lead screw (9) is longitudinally arranged inside the two second cavities, and the upper ends of the two lead screws (9) are connected to the second hollow through the second rotating bearing. The side walls of the cavity are rotatably connected, and the lower ends of the two screw rods (9) are rotatably connected to the side walls of the tower body (1) through sealed bearings, and the lower ends of the two screw rods (9) pass through the tower body (1). ) is fixedly provided with a second bevel gear (10), the two first bevel gears (8) mesh with the two second bevel gears (10), and the two screw rods The rod walls of (9) are all screwed with sliders (11), the side walls of the two sliders (11) are fixedly provided with detachable mechanisms, and the inside of the tower body (1) is provided with an annular cleaning brush (12), the annular cleaning brush (12) is in contact with the side wall of the tower body (1) through a detachable mechanism, and the two ends of the tower body (1) are respectively provided with air intake holes (13) and The air outlet (14) is fixedly provided with a sewage outlet (15) at the lower end of the tower body (1). 2.根据权利要求1所述的一种用于烟气治理的高效脱硫塔,其特征在于,所述固定机构包括第一固定块(16)和第二固定块(17),两个所述第一固定块(16)均与塔盖(2)的两端固定连接,两个所述第二固定块(17)均与塔体(1)的两端固定连接,所述第一固定块(16)与第二固定块(17)之间通过第一螺栓(18)固定连接。2. A high-efficiency desulfurization tower for flue gas treatment according to claim 1, wherein the fixing mechanism comprises a first fixing block (16) and a second fixing block (17), and the two The first fixing blocks (16) are fixedly connected to both ends of the tower cover (2), and the two second fixing blocks (17) are fixedly connected to both ends of the tower body (1). (16) and the second fixing block (17) are fixedly connected by first bolts (18). 3.根据权利要求1所述的一种用于烟气治理的高效脱硫塔,其特征在于,所述可拆卸机构包括弹簧(19),两个所述滑块(11)的内部均开设有第三空腔,所述弹簧(19)固定设置在第三空腔的内部,所述弹簧(19)的侧壁固定设置有限位块(20),所述限位块(20)的侧壁固定设置有连接杆(21),所述连接杆(21)通过第二螺栓(22)与环形清洁刷(12)的侧壁固定连接。3. A high-efficiency desulfurization tower for flue gas treatment according to claim 1, wherein the detachable mechanism comprises a spring (19), and the interiors of the two sliding blocks (11) are provided with The third cavity, the spring (19) is fixedly arranged inside the third cavity, the side wall of the spring (19) is fixedly provided with a limit block (20), and the side wall of the limit block (20) A connecting rod (21) is fixedly arranged, and the connecting rod (21) is fixedly connected with the side wall of the annular cleaning brush (12) through a second bolt (22). 4.根据权利要求1所述的一种用于烟气治理的高效脱硫塔,其特征在于,所述塔体(1)的下端固定设置有底座。4 . The high-efficiency desulfurization tower for flue gas treatment according to claim 1 , wherein a base is fixedly arranged at the lower end of the tower body ( 1 ). 5 . 5.根据权利要求1所述的一种用于烟气治理的高效脱硫塔,其特征在于,所述塔体(1)与塔盖(2)之间固定设置有密封圈。5 . The high-efficiency desulfurization tower for flue gas treatment according to claim 1 , wherein a sealing ring is fixedly arranged between the tower body ( 1 ) and the tower cover ( 2 ). 6 .
CN202020364478.3U 2020-03-20 2020-03-20 A high-efficient desulfurizing tower for flue gas is administered Expired - Fee Related CN212417506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020364478.3U CN212417506U (en) 2020-03-20 2020-03-20 A high-efficient desulfurizing tower for flue gas is administered

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020364478.3U CN212417506U (en) 2020-03-20 2020-03-20 A high-efficient desulfurizing tower for flue gas is administered

Publications (1)

Publication Number Publication Date
CN212417506U true CN212417506U (en) 2021-01-29

Family

ID=74291010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020364478.3U Expired - Fee Related CN212417506U (en) 2020-03-20 2020-03-20 A high-efficient desulfurizing tower for flue gas is administered

Country Status (1)

Country Link
CN (1) CN212417506U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113101794A (en) * 2021-03-26 2021-07-13 四川益能康生环保科技有限公司 Device for removing sulfur dioxide in flue gas
CN113457423A (en) * 2021-07-30 2021-10-01 宁波众茂杭州湾热电有限公司 Desulfurizing tower
CN113856403A (en) * 2021-10-08 2021-12-31 刘德超 An adsorption type harmful steam treatment device for plastic processing
CN116085820A (en) * 2023-03-13 2023-05-09 西安热工研究院有限公司 Desulfurizing tower of power plant

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113101794A (en) * 2021-03-26 2021-07-13 四川益能康生环保科技有限公司 Device for removing sulfur dioxide in flue gas
CN113457423A (en) * 2021-07-30 2021-10-01 宁波众茂杭州湾热电有限公司 Desulfurizing tower
CN113856403A (en) * 2021-10-08 2021-12-31 刘德超 An adsorption type harmful steam treatment device for plastic processing
CN116085820A (en) * 2023-03-13 2023-05-09 西安热工研究院有限公司 Desulfurizing tower of power plant

Similar Documents

Publication Publication Date Title
CN212417506U (en) A high-efficient desulfurizing tower for flue gas is administered
CN111847676A (en) A multi-angle aeration device for sewage treatment
CN219355375U (en) An easy-to-clean sewage treatment tank
CN208534601U (en) A kind of cleaning type automobile exhaust gas processing apparatus easy to disassemble
CN111777283A (en) Sewage treatment device capable of carrying out sludge treatment
CN214597916U (en) Environment-friendly industrial waste gas purification device
CN213050042U (en) Sulfur dioxide absorption tower
CN209771767U (en) A desulfurization, denitrification and dust removal device
CN219518522U (en) A zero-discharge fluoride removal device for coal chemical wastewater
CN216073322U (en) High-efficient algae device that removes based on dynamic membrane separation under gravity drive
CN214399952U (en) A catalytic oxidation device for high-concentration organic wastewater treatment
CN210065274U (en) Intelligent water microbubble algae removal device
CN210080287U (en) High-efficient automatically cleaning sewage treatment pond
CN109012066B (en) Organic waste gas biological treatment's collection device
CN113578017A (en) High-efficient single-tower dedusting and desulfurizing's environmental protection multi-stage treatment equipment in coordination
CN112065784A (en) Sewage and garbage separation treatment water pump
CN217725105U (en) Comprehensive flue gas treatment device
CN218392966U (en) High-efficiency petrochemical waste gas treatment device
CN222534479U (en) Exhaust treatment desulfurizing tower
CN215462224U (en) Oil sludge sedimentation tank convenient to clean
CN212663150U (en) Spray tower for exhaust-gas treatment
CN221051587U (en) Water purification machine with antibacterial self-cleaning function
CN221848105U (en) Sewage treatment pool cleaning device
CN211466899U (en) Concrete clean production raw material pool
CN218025599U (en) Landscape water ecological restoration system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 518000 Room 802, chentian R & D building, No. 50, Baotian 1st Road, chentian community, Xixiang street, Bao'an District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen haoxiangyu Environmental Technology Service Co.,Ltd.

Address before: 104a, building B, Dingjunshan film culture and Technology Creative Park, chentian community, Xixiang street, Bao'an District, Shenzhen, Guangdong 518000

Patentee before: Shenzhen haoxiangyu Environmental Technology Service Co.,Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210129

CF01 Termination of patent right due to non-payment of annual fee