CN212387437U - Water conservancy construction pipe laying pay-off - Google Patents

Water conservancy construction pipe laying pay-off Download PDF

Info

Publication number
CN212387437U
CN212387437U CN202020519120.3U CN202020519120U CN212387437U CN 212387437 U CN212387437 U CN 212387437U CN 202020519120 U CN202020519120 U CN 202020519120U CN 212387437 U CN212387437 U CN 212387437U
Authority
CN
China
Prior art keywords
connecting block
base
wall
water conservancy
pipe laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202020519120.3U
Other languages
Chinese (zh)
Inventor
曹建华
李冬梅
姜婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Shuohua Construction Engineering Co ltd
Original Assignee
Ningxia Shuohua Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Shuohua Construction Engineering Co ltd filed Critical Ningxia Shuohua Construction Engineering Co ltd
Priority to CN202020519120.3U priority Critical patent/CN212387437U/en
Application granted granted Critical
Publication of CN212387437U publication Critical patent/CN212387437U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a water conservancy construction pipe laying pay-off, including base connecting block, carousel connecting block, telescopic link, protection casing and base, the top of base connecting block all is provided with the support baffle, and the top of support baffle all is provided with the pivot connecting block, the inboard of pivot connecting block sets up the pivot, and the outside of pivot all is provided with the sliding connection piece, the outside of sliding connection piece all is provided with the stopper, the carousel connecting block sets up right-hand at the pivot connecting block, and the right-hand carousel that is provided with of carousel connecting block, the right-hand handle that is provided with of carousel, and the outside of handle is provided with handle antiskid cover. The utility model provides a water conservancy construction pipe laying pay-off, through setting up the protection casing, can avoid outside debris and rubbish to fall into the device inside inconvenience of bringing like this when the unwrapping wire, has solved the pivot and has fallen into because of debris and produce the dead problem of card, improves the device's work efficiency, reduces the device's manual maintenance cost.

Description

Water conservancy construction pipe laying pay-off
Technical Field
The utility model relates to a pay-off field specifically is a water conservancy construction pipe laying pay-off.
Background
The water conservancy industry is continuously developed along with the development of social productivity and becomes an important support for the civilization and economic development of human society. Water is a source of all lives, is an essential substance in human life and production activities, needs to be buried in a pipe for paying off in the process of water conservancy construction, and is particularly important for a buried pipe paying off device in the process of water conservancy construction.
Traditional water conservancy construction pipe laying pay-off, when the unwrapping wire, the pivot is owing to do not have safeguard function, and inside the in-process of unwrapping wire, outside debris and rubbish fell into the device easily, produce the dead phenomenon of coil card easily, lead to unable continuation unwrapping wire work, reduce work efficiency, increase the device's maintenance cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction pipe laying pay-off to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a water conservancy construction pipe laying pay-off device comprises a base connecting block, a turntable connecting block, a telescopic rod, a protective cover and a base, wherein support baffles are arranged above the base connecting block, and the upper parts of the bracket baffles are all provided with rotating shaft connecting blocks, the inner sides of the rotating shaft connecting blocks are provided with rotating shafts, and the outer sides of the rotating shafts are provided with sliding connecting blocks, the outer sides of the sliding connecting blocks are provided with limiting blocks, the turntable connecting block is arranged at the right side of the rotating shaft connecting block, the right side of the rotary disc connecting block is provided with a rotary disc, the right side of the rotary disc is provided with a handle, the outer side of the handle is provided with a handle anti-skid sleeve, the telescopic rods are all arranged above the rotary shaft connecting block, and the inner sides of the telescopic rods are provided with extrusion blocks, the protective cover is arranged above the bracket baffle, the base sets up in base connecting block below, and the inside of base all welds and has damping spring.
Preferably, the support baffle is tightly attached to the base connecting block, and the support baffle is connected with the base connecting block through a clamping groove.
Preferably, the outer wall of the limiting block is connected with the rotating shaft in a sliding mode through the inner wall of the sliding connection block, and the limiting block is symmetrically arranged relative to the central axis of the base connection block.
Preferably, the left end of the rotary table connecting block is rotatably connected with the inner wall of the bracket baffle through the outer wall of the rotary shaft connecting block, and the outer wall of the rotary table connecting block and the outer wall of the rotary shaft connecting block are both in open-hole design.
Preferably, the left end of the extrusion block and the outer wall of the telescopic rod and the inner wall of the support baffle form a telescopic structure, and the telescopic rod is symmetrically arranged relative to the central axis of the base connecting block.
Preferably, the outer wall of protection casing and the outer wall of support baffle are open cell type design, and the protection casing is netted setting.
Preferably, damping spring all welds inside the base, and damping spring is the equidistance setting inside the base.
Compared with the prior art, the beneficial effects of the utility model are that:
1. a water conservancy construction pipe laying pay-off device is provided with a support baffle, and the support baffle is connected with a base connecting block through a clamping groove, so that workers can conveniently detach and install the device, and the working efficiency is improved;
2. a water conservancy construction pipe laying pay-off device is provided with a limiting block, so that the limiting block can slide to a proper state through a rotating shaft to clamp a coil, and the problem that the device shakes during pay-off to cause low working efficiency can be avoided;
3. the utility model provides a water conservancy construction pipe laying pay-off, through setting up the protection casing, can avoid outside debris and rubbish to fall into the device inside inconvenience of bringing like this when the unwrapping wire, has solved the pivot and has fallen into because of debris and produce the dead problem of card, improves the device's work efficiency, reduces the device's manual maintenance cost.
Drawings
FIG. 1 is a schematic view of a front internal structure of a water conservancy construction pipe laying and paying-off device;
FIG. 2 is a schematic diagram of a right-side view structure of a water conservancy construction pipe laying and paying-off device;
FIG. 3 is a schematic top view of a water conservancy construction pipe laying and paying-off device;
fig. 4 is an enlarged schematic view of a portion a in fig. 1.
In the figure: 1. a base connecting block; 2. a bracket baffle; 3. a rotating shaft connecting block; 4. a rotating shaft; 5. a sliding connection block; 6. a limiting block; 7. a turntable connecting block; 8. a turntable; 9. a handle; 10. a handle anti-slip cover; 11. a telescopic rod; 12. extruding the block; 13. a protective cover; 14. a base; 15. a shock absorbing spring.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Referring to fig. 1-4, a water conservancy construction pipe laying pay-off device comprises a base connecting block 1, a rotary disc connecting block 7, a telescopic rod 11, a protective cover 13 and a base 14, wherein a support baffle 2 is arranged above the base connecting block 1, a rotary shaft connecting block 3 is arranged above the support baffle 2, a rotary shaft 4 is arranged inside the rotary shaft connecting block 3, a sliding connecting block 5 is arranged outside the rotary shaft 4, a limit block 6 is arranged outside the sliding connecting block 5, the rotary disc connecting block 7 is arranged at the right side of the rotary shaft connecting block 3, a rotary disc 8 is arranged at the right side of the rotary disc connecting block 7, a handle 9 is arranged at the right side of the rotary disc 8, a handle anti-slip sleeve 10 is arranged outside the handle 9, the telescopic rod 11 is arranged above the rotary shaft connecting block 3, an extrusion block 12 is arranged inside the telescopic rod 11, and the protective cover, the base 14 is arranged below the base connecting block 1, and damping springs 15 are welded inside the base 14.
Further, closely laminating between support baffle 2 and the base connecting block 1, and be connected for the draw-in groove between support baffle 2 and the base connecting block 1, through setting up support baffle 2, be connected for the draw-in groove between support baffle 2 and the base connecting block 1, the staff of can being convenient for like this is to the dismantlement and the installation of device to improve work efficiency.
Further, the lower extreme of stopper 6 passes through the inner wall of sliding connection piece 5 and the outer wall sliding connection of pivot 4, and stopper 6 sets up about the axis symmetry of base connecting block 1, through setting up stopper 6, can slide stopper 6 to suitable state through pivot 4 like this, can play spacing guard action to required winding coil like this, avoids at the winding during operation, and the inside card phenomenon of dying that appears leads to work efficiency low.
Further, the outer wall of pivot connecting block 3 and the inner wall swivelling joint of backplate 2 are passed through to the left end of carousel connecting block 7, and the outer wall of carousel connecting block 7 and the outer wall of pivot connecting block 3 are trompil formula design, through setting up carousel connecting block 7, can be rotatory to suitable position through pivot connecting block 3 with carousel connecting block 7 like this, can be according to the work demand like this, carry out rotation regulation to required winding coil, make things convenient for receipts line and unwrapping wire of required winding coil, and the work efficiency is improved, and the labor cost is reduced.
Further, the left end of extrusion piece 12 constitutes extending structure through the inner wall with 11 outer walls of telescopic link and support baffle 2, and telescopic link 11 sets up about the axis symmetry of base connecting block 1, through setting up extrusion piece 12, can stretch out and draw back extrusion piece 12 to the state of laminating extrusion piece 12 and stopper 6 and coil through telescopic link 11 like this, it is fixed with required coil, avoid appearing rocking when the unwrapping wire and bring inconvenience, improve the device's work efficiency.
Further, the outer wall of protection casing 13 and the outer wall of support baffle 2 are open cell design, and protection casing 13 is netted setting, through setting up protection casing 13, can avoid outside debris and rubbish to fall into the device inside inconvenient of bringing like this when the unwrapping wire, has solved the pivot and has fallen into the dead problem of production card because of debris, improves the device's work efficiency, reduces the device's artifical maintenance cost.
Further, damping spring 15 all welds inside base 14, and damping spring 15 is the equidistance setting inside base 14, through setting up damping spring 15, can avoid the coil overweight to lead to the base to damage like this when the coil is put into the device inside to handle the device shock attenuation, improve the device's life, improve work efficiency, reduce the cost of labor.
The utility model discloses a theory of operation is: firstly, the device is moved to a required working position, then a bracket baffle 2 of the device is butted with a base connecting block 1, the bracket baffle 2 is arranged, the bracket baffle 2 is connected with the base connecting block 1 through a clamping groove, so that the device can be conveniently disassembled and installed by workers, the working efficiency is improved, then a coil is arranged on a rotating shaft 4 of the device, a damping spring 15 is arranged, when the coil is arranged in the device, the damage of the base caused by overweight of the coil can be avoided, the damping treatment of the device is further realized, the service life of the device is prolonged, the working efficiency is improved, the labor cost is reduced, a limiting block 6 is slid to be in a state of being attached to the coil through the rotating shaft 4, the limiting protection effect on the required wound coil is realized, the phenomenon that the inner part is blocked during winding work is avoided, and the working efficiency is low, and then the extrusion block 12 is stretched to the extrusion block 12 and the limiting block 6 and the coil laminating state through the telescopic rod 11, the required coil is fixed, finally, the turntable connecting block 7 is rotated to a proper position through a rotating shaft according to the working requirement, the required winding coil is rotationally adjusted, the winding and unwinding of the required winding coil are facilitated, the working efficiency is improved, the labor cost is reduced, the protective cover 13 is arranged, so that inconvenience caused by the fact that external sundries and garbage fall into the device is avoided when the coil is unwound, the problem that the rotating shaft is blocked due to the fact that sundries fall into the device is solved, the working efficiency of the device is improved, the manual maintenance cost of the device is reduced, and the use process of the water conservancy construction pipe laying and unwinding device is completed.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (7)

1. The utility model provides a water conservancy construction pipe laying pay-off, includes base connecting block (1), carousel connecting block (7), telescopic link (11), protection casing (13) and base (14), its characterized in that: the support frame comprises a base connecting block (1), a support frame baffle (2) and a support frame baffle (2), wherein a rotating shaft connecting block (3) is arranged above the base connecting block (1), a rotating shaft (4) is arranged on the inner side of the rotating shaft connecting block (3), a sliding connecting block (5) is arranged on the outer side of the rotating shaft (4), a limiting block (6) is arranged on the outer side of the sliding connecting block (5), a rotary disc connecting block (7) is arranged on the right side of the rotating shaft connecting block (3), a rotary disc (8) is arranged on the right side of the rotary disc connecting block (7), a handle (9) is arranged on the right side of the rotary disc (8), a handle anti-skidding sleeve (10) is arranged on the outer side of the handle (9), telescopic rods (11) are arranged above the rotating shaft connecting block (3), extrusion blocks (12) are arranged on the inner side of the telescopic rods (11), and a, the base (14) is arranged below the base connecting block (1), and damping springs (15) are welded inside the base (14).
2. The water conservancy construction pipe laying and paying off device according to claim 1, wherein the support baffle (2) is tightly attached to the base connecting block (1), and the support baffle (2) is connected with the base connecting block (1) through a clamping groove.
3. The water conservancy construction pipe laying and paying off device as claimed in claim 1, wherein the outer wall of the limiting block (6) is slidably connected with the rotating shaft (4) through the inner wall of the sliding connection block (5), and the limiting block (6) is symmetrically arranged relative to the central axis of the base connection block (1).
4. The water conservancy construction pipe laying and paying off device as claimed in claim 1, wherein the left end of the rotary disc connecting block (7) is rotatably connected with the inner wall of the bracket baffle (2) through the outer wall of the rotary shaft connecting block (3), and the outer wall of the rotary disc connecting block (7) and the outer wall of the rotary shaft connecting block (3) are both of an open-cell design.
5. The water conservancy construction pipe laying and paying off device as claimed in claim 1, wherein the left end of the extrusion block (12) forms a telescopic structure with the outer wall of the telescopic rod (11) and the inner wall of the bracket baffle (2), and the telescopic rod (11) is symmetrically arranged about the central axis of the base connecting block (1).
6. The water conservancy construction pipe laying and paying off device according to claim 1, wherein the outer wall of the protective cover (13) and the outer wall of the bracket baffle (2) are both of an open-cell design, and the protective cover (13) is of a net structure.
7. The water conservancy construction pipe laying and paying off device according to claim 1, wherein the damping springs (15) are welded with the base (14), and the damping springs (15) are arranged in the base (14) at equal intervals.
CN202020519120.3U 2020-04-10 2020-04-10 Water conservancy construction pipe laying pay-off Withdrawn - After Issue CN212387437U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020519120.3U CN212387437U (en) 2020-04-10 2020-04-10 Water conservancy construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020519120.3U CN212387437U (en) 2020-04-10 2020-04-10 Water conservancy construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN212387437U true CN212387437U (en) 2021-01-22

Family

ID=74257581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020519120.3U Withdrawn - After Issue CN212387437U (en) 2020-04-10 2020-04-10 Water conservancy construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN212387437U (en)

Similar Documents

Publication Publication Date Title
CN105836522B (en) A kind of cable pay-off rack
CN102217492A (en) Electric flower and fruit thinning machine convenient for manually adjusting operational height and angle and using method thereof
CN111706059A (en) Auxiliary device is used in outer quick-witted construction of building outer wall air conditioner
CN212387437U (en) Water conservancy construction pipe laying pay-off
CN201467762U (en) Greenhouse Roller Blind Device
CN211644022U (en) Coiling mechanism is used in air filter material production
CN209242353U (en) A kind of communication network coil of wire line apparatus
CN207054265U (en) A kind of novel garden sunshade support
CN207811069U (en) A kind of placenta hanging device in tire production
CN219786969U (en) Motor stator laser welding equipment
CN212703186U (en) Headrest type suspension anesthesia device for anesthesia department
CN207303940U (en) A kind of flame-proof elastomer sheath soft cable based on wholesale business
CN208099190U (en) A kind of construction site Portable reinforcing steel bar cutter device
CN218747958U (en) Collecting device of hose making machine
CN221739380U (en) Diameter-adjustable unreeling roller for unreeling machine
CN208455477U (en) A kind of macromolecule bridge railing guard bar structure
CN106300131A (en) Electric heating absorption cable twister removes device
CN222140909U (en) A fence structure for electric power construction
CN213170843U (en) Antiwind fire hose winding device
CN223358853U (en) A road construction protective device that is easy to assemble
CN213569949U (en) A combined portable field emergency water purification device
CN217178339U (en) Fault alarm device for indoor lighting
CN215187854U (en) Communication device for increasing communication effect
CN222006915U (en) A reeling mechanism for recycling waste fishing nets
CN108439093A (en) A kind of device vehicle for ground wire storage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20210122

Effective date of abandoning: 20230926

AV01 Patent right actively abandoned

Granted publication date: 20210122

Effective date of abandoning: 20230926

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned