CN212270865U - Flood discharge and energy dissipation structure for slowing down impact of water flow slapping vibration of gate chamber of high-gate dam - Google Patents
Flood discharge and energy dissipation structure for slowing down impact of water flow slapping vibration of gate chamber of high-gate dam Download PDFInfo
- Publication number
- CN212270865U CN212270865U CN202020450793.8U CN202020450793U CN212270865U CN 212270865 U CN212270865 U CN 212270865U CN 202020450793 U CN202020450793 U CN 202020450793U CN 212270865 U CN212270865 U CN 212270865U
- Authority
- CN
- China
- Prior art keywords
- stilling
- gate
- sill
- level
- lock chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Barrages (AREA)
Abstract
The utility model discloses a slow down flood discharge dissipation structure of high-gate dam lock chamber rivers slap vibration influence, including setting gradually the one-level stilling pool in the low reaches of lock chamber, second grade stilling pool and tail bank, lock chamber end export nose bank adopts flat sill, and the one-level stilling pool sets up vertical falling bank first, and one-level stilling pool afterbody sets up the upright continuous type stilling bank of upstream face, and when continuous type stilling bank was located low water level operation control operating mode in low reaches, submerged water leaps 1 ~ 2m in the critical point position upper reaches that takes place in the one-level stilling pool. The utility model discloses an adjustment outlet structure bodily form will let out rivers and control the guide, at first control form the driving formula water jump far away from the lock chamber when low water level operation at the low reaches, then form the critical or submerged water jump slightly and carry out the energy dissipation, both satisfied structural safety, normal use functional requirement, have better economic nature simultaneously, have fine exemplar and reference meaning to the design of other similar engineering.
Description
Technical Field
The utility model relates to a flood discharge dissipation structure especially relates to a slow down flood discharge dissipation structure of high-gate dam lock chamber rivers slapping vibration influence.
Background
The flood discharge and energy dissipation of the sluice project generally adopts an underflow energy dissipation mode, and water energy is dissipated by forming water jump. The gate scheduling operation mode of the porous and high gate dam engineering with large single-width flow, low Froude number and large upstream and downstream water level amplitude is complex, and the water level boundary condition during operation is also complex. In the conventional underflow energy dissipation design, in order to reduce the length of the stilling pool as much as possible to save the engineering amount, part of energy dissipation areas are often positioned in the internal area of the lock chamber, the energy in the range is concentrated when the gate is opened, and the single-hole or small-hole operation is performed, and in addition, the energy dissipation rate of the underflow energy dissipater is low, and the flow velocity in the pool is high, so that the water flow turbulence in the energy dissipation areas of the lock chamber is strong. Especially, when pulsating pressure caused by water flow turbulence acts on a hydraulic structure of a high gate dam and a multihole gate, wherein the gate pier is high in height and thin, the structure is often induced to generate water flow slapping vibration, so that the deformation amplitude of the upper part of the structure is large, and the operation safety of the structure is influenced. When the downstream tail water is in a lower operation condition, a stable water jump is more difficult to form in the underflow stilling basin, the energy dissipation rate is low, the energy dissipation requirement cannot be met, and the influence degree of water flow slapping vibration on the gate chamber is also increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a flood discharge dissipation structure that high floodgate dam lock chamber rivers slap vibration influence that slows down that the structural style is simple, economic nature is better, low, the construction process requires, the construction is comparatively convenient is provided.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a slow down flood discharge dissipation structure of high-gate dam lock chamber rivers slap vibration influence, is including setting gradually the one-level stilling pond, second grade stilling pond and the tail bank in the lock chamber low reaches of sluice, the terminal export nose bank of lock chamber of sluice adopts flat sill, the first vertical bank that falls that sets up in the pond of one-level stilling pond, the one-level stilling pond afterbody sets up the upright continuous type stilling bank of upstream face, when continuous type stilling bank was located low water level operation control operating mode of low reaches, 1 ~ 2m on the critical point position upper reaches that submerged water leaps the emergence in the one-level stilling pond.
The flat bottom nose ridge and the vertical falling ridge enable the downstream to be in a low water level operation control working condition, and the lower leakage water jump head is located outside the sluice gate.
The continuous type force absorption ridge adopts an upright trapezoidal section of the upstream face, the height is 3-5 m, and the top elevation is 0.5-1 m higher than that of a tail ridge of the secondary force absorption pool.
The single width flow of the downward-discharging water flow in the flood discharging and energy dissipating structure is 150-200 m3The Froude number in the pool is 1-2, the flow velocity is 14-20 m/s, the height of the lock chamber is 30-50 m, and the transverse thickness of the lock chamber structure is 3-6 m.
The utility model has the advantages that: the design concept that the conventional underflow energy dissipation outlet section is adopted to instantly form a submerged hydraulic jump for energy dissipation in the energy dissipation design of the general sluice engineering is broken through adjustment of the shapes of the outlet nose sill and the drop sill of the sluice chamber, the downward discharge water flow is controlled and guided, the far-driving type hydraulic jump far away from the sluice chamber is formed when the downstream low water level operates, and then the critical or slightly submerged hydraulic jump is formed for energy dissipation, so that the requirements of structural safety and normal use functions are met, and the method has better economy and has good exemplary and reference significance for the design of other similar engineering.
Drawings
Fig. 1 is the utility model discloses a slow down flood discharge energy dissipation structure section schematic diagram of high-gate dam lock chamber rivers slap vibration influence.
In the figure:
1-sluice chamber;
2-first-stage stilling pool;
3-flat bottom ridge;
4-vertical drop sill;
5-continuous type absorption ridge;
6-secondary stilling pool;
7-end ridge.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1, the utility model discloses a slow down flood discharge dissipation structure of high-gate dam lock chamber rivers slapping vibration influence, including setting gradually one-level stilling pool 2 in 1 low reaches of sluice lock chamber, second grade stilling pool 6 and tail sill 7, 1 end export nose sill in sluice lock chamber adopts flat sill 3, 2 ponds in one-level stilling pool set up vertical falling sill 4 first, 2 afterbody in one-level stilling pool set up the upright continuous type stilling sill 5 of upstream face, when continuous type stilling sill 5 is located low water level operation control operating mode in low reaches, submerge 1 ~ 2m on the critical point position upper reaches that the hydraulic jump takes place in one-level stilling pool 2.
The flat bottom nose sill 3 and the vertical drop sill 4 enable the downstream to be in a low water level operation control working condition, and the lower leakage water jump head is located outside the sluice chamber 1.
The continuous type stilling sill 5 is a trapezoidal section with an upright upstream surface, the height is 3-5 m, and the top elevation is 0.5-1 m higher than that of a tail sill 7 sill of the secondary stilling pool.
The single width flow of the downward-discharging water flow in the flood discharging and energy dissipating structure is 150-200 m3The Froude number in the pool is 1-2, the flow velocity is 14-20 m/s, the height of the lock chamber is 30-50 m, and the transverse thickness of the lock chamber structure is 3-6 m.
The outlet threshold at the tail end of the lock chamber adopts a flat-bottom threshold, the pool head drop threshold is a vertical drop threshold, and the combination of the two thresholds enables the control working condition that the downstream is low-water-level operation to form a remote-drive water jump, so that the lower-leakage water jump head is positioned at the downstream side outside the lock chamber; a continuous stilling sill is arranged in the stilling pool at the lower part of the lock chamber to form a primary stilling pool and a secondary stilling pool, and the arrangement position of the continuous stilling sill is to ensure that the water flow in the primary stilling pool is in critical or slightly submerged hydraulic jump; the flat bottom nose ridge is arranged at the tail end of the gate chamber, the vertical falling ridge is arranged at the head of the stilling pool, so that a remote driving type hydraulic jump is formed under the control working condition of low-water-level operation at the downstream, the hydraulic jump is moved to the downstream and pushed out of the gate chamber, energy is dissipated behind the gate chamber, strong turbulence of water flow in the gate chamber is reduced, and the impact of the water flow on slapping vibration of a high-rise single-thin gate pier structure is relieved. By arranging the vertical continuous stilling threshold on the upstream face at the front section of the stilling pool, a critical or slightly submerged hydraulic jump is formed in the first-stage stilling pool, so as to facilitate energy dissipation. The device controls the height of the stilling threshold and the upstream body shape by controlling the secondary falling amplitude of water flow caused by overlarge height of the stilling threshold or unreasonable body shape setting, and avoiding overlarge energy increase of secondary energy dissipation protection. The residual energy after the first energy dissipation is further dissipated by a second-stage stilling pool behind the stilling threshold so as to achieve the energy dissipation target.
The following is a detailed description with reference to specific examples:
in a large hydropower station project, a main building of a junction consists of a concrete gate dam and a riverbed type factory building. The system is characterized in that an installation room, a plant host room, a left guide wall connecting dam section, a left 5-hole sand washing flood gate, a right guide wall connecting dam section, a right 7-hole sand washing flood gate, a right bank non-overflow dam section and the like are sequentially arranged from left to right. The width of the flood discharge gate pier is 5m, the clear width of a single hole is 14m, the maximum height of the gate pier at the tail end of the chamber is 37.5m, and the designed peak flow of a century is 27500m3The flow of the check flood peak in thousand years is 32600m3And s. According to the principle of opening the gate of the water outlet building, the left five-hole sand-washing flood discharge gate is opened first, and then the right seven-hole sand-washing flood discharge gate is opened. Therefore, the sand washing flood discharge gate with five left holes is frequently used and is the key point of downstream protection. When the left 5-hole sand-washing flood discharge gate is opened, single-hole or few-hole operation is performed, the single-width flow is large, the energy is concentrated, the flow speed is high, the water flow in the gate chamber is turbulent, the first-order fundamental frequency of the gate pier under the wet mode is about 2.0Hz, the first-order fundamental frequency is close to the transverse river direction oscillation mode fundamental frequency of the gate structure, and the coupling vibration of the structure is easy to occur; meanwhile, under the operating condition, because the upstream and downstream water level amplitude is large, the single width flow change of the stilling pool entering the pool is large, the Froude number is low, when the conventional underflow energy dissipation is adopted, the stilling pool has poor adaptability, a stable hydraulic leap flow state is difficult to form, the flow state of the water flow is poor, the energy dissipation rate is low, the water flow flows out of the tail sill of the stilling pool in a rapid flow form, the pool outlet flow speed of the stilling pool is 6-11 m/s and is greater than the shock resistance flow speed of bedrock, and a relatively serious scouring problem generally exists in the range of about 80m behind the tail sill.
The design of the downstream energy dissipation scour prevention structure not only meets the requirement of downstream energy dissipation scour prevention, but also reduces the influence of downward water flow on the slapping vibration of the gate pier as much as possible. In order to reduce the strong turbulence of water flow in the gate chamber and slow down the impact of the water flow on the slapping vibration of a high-rise single-thin gate pier structure, the downward-discharging water flow needs to be controlled and guided, is sent out of the gate chamber as smoothly as possible, and simultaneously jumps water to move downstream and is pushed out of the gate chamber. Therefore, a combined structural form of the flat bottom threshold and the vertical drop threshold is provided, and the purpose is to ensure that a remote drive hydraulic jump is formed under the control working condition that the downstream is operated at a low water level: a flat-bottom bucket is arranged at the tail end of the lock chamber to ensure the smooth downward discharge of water flow; and a vertical drop sill is arranged at the head of the stilling pool to form a remote driving hydraulic jump, and the jump head is pushed out of the lock chamber section. By adopting the structure, although the influence of water flow slapping vibration of the gate chamber is relieved, the energy is pushed to the downstream stilling pool. In order to solve the problem of water flow energy dissipation after the water flow goes out of a brake, simultaneously improve the energy dissipation rate as much as possible, slow down the water surface fluctuation of the water flow going out of the brake, reduce the length of a stilling pool and reduce the protection engineering quantity, a continuous stilling bank standing on the upstream side is arranged at the front section of the stilling pool to block up the water level, and a first-stage stilling pool is formed. The arrangement position of the stilling threshold is to ensure that the water flow in the first-stage stilling pool generates critical or slightly submerged hydraulic jump. In order to eliminate the energy of the downward-discharging water flow as soon as possible and increase the height of the stilling sill to increase the volume of the energy dissipation water body, the height of the stilling sill needs to be controlled in order to avoid the secondary drop of the water flow caused by the overlarge height of the stilling sill and the overlarge increase of the energy of the secondary energy dissipation protection of the secondary stilling pool. Meanwhile, hydraulic model tests prove that the upstream surface of the continuous type force-absorbing ridge is slightly lower than the water surface of the ridge top after water is dammed up by adopting a slope surface, and secondary falling of water flow after the force-absorbing ridge is reduced. And the residual energy after the first energy dissipation is further dissipated by a second-stage stilling pool behind the stilling threshold so as to achieve the energy dissipation target. Considering the reasons of the connection of the water flow at the outlet of the tail ridge behind the second-stage stilling pool and the downstream water level, the coordination of the heights of the first-stage stilling pool and the second-stage stilling pool tail ridge, the reduction of the energy required for braking in the second-stage stilling pool compared with the first-stage stilling pool and the like, the difference between the top heights of the stilling pool and the tail ridge is not large, and the top height of the second-stage stilling pool tail ridge is slightly lower than that of the first-stage stilling pool by 0.5-1 m.
Rely on the practice of engineering to show, the structure, to big single wide flow, low Froude number, the high floodgate dam engineering that the upstream and downstream water level becomes big, through setting up flat bottom sill, vertical bank of falling, the upright continuous type bank of falling in one-level stilling pond and upper reaches, the back connects the modular structure type in second grade stilling pond, the far-driving water jump that the velocity of flow obtained control need form at first to let out rivers down, release the outside downstream side of lock chamber with rivers energy, avoid or slowed down the influence that the rivers of letting out down hit the vibration to the lock chamber rivers, also make the energy of far-driving water jump control, the straight continuous type bank of falling to the surface of water that sets up the control bank height in the rethread bank of stilling carries out the energy dissipation for the first time, the energy dissipation rate has been improved promptly, the energy of secondary energy dissipation protection has also been controlled, thereby the length in whole stilling pond has been shortened, the engineering protective volume has been reduced. The energy dissipation structure pattern breaks through the design concept that the energy dissipation is carried out by adopting the conventional underflow energy dissipation outlet section to instantly form a submerged hydraulic jump in the energy dissipation design of the general sluice engineering, the discharged water flow is controlled and guided by adjusting the shape of the outlet structure, the remote-drive type hydraulic jump far away from the sluice chamber is firstly formed, and then the critical or slightly submerged hydraulic jump is formed to carry out the energy dissipation, so that the requirements of structural safety and normal use functions are met, and meanwhile, the energy dissipation structure pattern has better economy and has better demonstration and reference significance for the design of other similar engineering.
The above-mentioned embodiments are only used for illustrating the technical ideas and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and to implement the present invention accordingly, the scope of the present invention should not be limited by the embodiment, that is, all equivalent changes or modifications made by the spirit of the present invention should still fall within the scope of the present invention.
Claims (4)
1. The utility model provides a slow down flood discharge dissipation structure of high-gate dam lock chamber rivers slap vibration influence, including setting gradually one-level stilling pond (2), second grade stilling pond (6) and tail sill (7) in sluice lock chamber (1) low reaches, its characterized in that, the terminal export sill of sluice lock chamber (1) adopts flat sill (3), one-level stilling pond (2) pond head sets up vertical falling sill (4), one-level stilling pond (2) afterbody sets up-ward vertical continuous type stilling sill (5), when continuous type stilling sill (5) are located low water level operation control operating mode of low reaches, 1 ~ 2m in the critical point position upper reaches that submerged water leaps and takes place in one-level stilling pond (2).
2. The flood discharge energy dissipation structure for alleviating impact of water current slapping vibration in the gate chamber of the high-gate dam according to claim 1, wherein the flat bottom threshold (3) and the vertical drop threshold (4) enable the downstream to be in a low-water-level operation control working condition, and the downward water current jump head is positioned outside the gate chamber (1).
3. The flood discharge and energy dissipation structure for relieving the impact of water flow slapping vibration on the gate chamber of the high-gate dam according to claim 1, wherein the continuous absorption sill (5) adopts a trapezoidal section with an upright upstream surface, the height is 3-5 m, and the top elevation is 0.5-1 m higher than the sill top elevation of a tail sill (7) of the secondary absorption basin.
4. The flood discharge energy dissipation structure for reducing impact of water flow slapping vibration in the gate chamber of the high-gate dam according to claim 1, wherein the single width flow rate of downward water flow in the flood discharge energy dissipation structure is 150-200 m3The Froude number in the pool is 1-2, the flow velocity is 14-20 m/s, the height of the lock chamber is 30-50 m, and the transverse thickness of the lock chamber structure is 3-6 m.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020450793.8U CN212270865U (en) | 2020-03-31 | 2020-03-31 | Flood discharge and energy dissipation structure for slowing down impact of water flow slapping vibration of gate chamber of high-gate dam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020450793.8U CN212270865U (en) | 2020-03-31 | 2020-03-31 | Flood discharge and energy dissipation structure for slowing down impact of water flow slapping vibration of gate chamber of high-gate dam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212270865U true CN212270865U (en) | 2021-01-01 |
Family
ID=73883729
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020450793.8U Active CN212270865U (en) | 2020-03-31 | 2020-03-31 | Flood discharge and energy dissipation structure for slowing down impact of water flow slapping vibration of gate chamber of high-gate dam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212270865U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111395276A (en) * | 2020-03-31 | 2020-07-10 | 中国电建集团北京勘测设计研究院有限公司 | A Flood Release and Energy Dissipation Structure for Alleviating the Impact of the Slap Vibration of the Sluice Chamber of a High Gate Dam |
| CN117166421A (en) * | 2023-08-21 | 2023-12-05 | 江苏山水环境建设集团股份有限公司 | A river ecological restoration system based on corrugated fish scale dam and its construction method |
-
2020
- 2020-03-31 CN CN202020450793.8U patent/CN212270865U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111395276A (en) * | 2020-03-31 | 2020-07-10 | 中国电建集团北京勘测设计研究院有限公司 | A Flood Release and Energy Dissipation Structure for Alleviating the Impact of the Slap Vibration of the Sluice Chamber of a High Gate Dam |
| CN111395276B (en) * | 2020-03-31 | 2025-04-01 | 中国电建集团北京勘测设计研究院有限公司 | A flood discharge energy dissipation structure for alleviating the impact of water flow impact vibration on high dam chamber |
| CN117166421A (en) * | 2023-08-21 | 2023-12-05 | 江苏山水环境建设集团股份有限公司 | A river ecological restoration system based on corrugated fish scale dam and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108086260B (en) | Differential type High-low Bucket Energy Dissipation Building-height falls bank type stilling pond system and energy dissipating method | |
| CN109778800B (en) | Gradual sloping stilling pool | |
| CN103498451A (en) | Collision type combined underflow energy dissipater structure | |
| CN111809579B (en) | Self-aeration ternary hydraulic jump stilling basin | |
| CN107503330B (en) | Weak pressure, sudden drop and sudden expansion jet stilling pool energy dissipation system in the cave | |
| CN212896234U (en) | Connection structure of bank spillway slow-leveling section and steep groove section | |
| CN209429070U (en) | Fill in flood discharging tunnel figure in hole | |
| CN111395276B (en) | A flood discharge energy dissipation structure for alleviating the impact of water flow impact vibration on high dam chamber | |
| CN110593221A (en) | Fold-line type flip bucket at outlet of bank spillway/flood discharge tunnel | |
| CN211256912U (en) | Fold-line type flip bucket at outlet of bank spillway/flood discharge tunnel | |
| CN221523485U (en) | A deep cylindrical energy dissipation well for water withdrawal from a river in a water diversion project | |
| CN113718727B (en) | Sudden expansion and falling sill absorption basin suitable for large single wide discharge of high water head | |
| CN217580021U (en) | Arc-shaped force dissipation wall at outlet of flood discharge tunnel | |
| CN217974257U (en) | Space energy dissipation and aerated spillway structure | |
| CN212896232U (en) | Reduce pond structure that disappears of bottom plate pulsating pressure | |
| CN213173611U (en) | Arch dam flood discharge surface hole flip bucket structure | |
| CN201943051U (en) | Self-regulating annular overflow weir | |
| CN111893963A (en) | Low limit wall pastes triangle body contraction type flip bucket | |
| CN218116357U (en) | An energy dissipation structure at the outlet of a flood discharge tunnel | |
| CN215290013U (en) | Stilling pool structure for enhancing hydraulic jump energy dissipation | |
| CN203530942U (en) | High water head bottom hole flood discharge and energy dissipation structure | |
| CN210946733U (en) | Energy dissipation structure of diversion tunnel outlet | |
| CN208219577U (en) | Vertical shaft eddy flow bottom baffle box | |
| CN108316257B (en) | Discharge chute structure with large and small discharge capacity | |
| CN115928654A (en) | A river-type energy-dissipating rolling dam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |