CN212248676U - A new type of building construction frame - Google Patents
A new type of building construction frame Download PDFInfo
- Publication number
- CN212248676U CN212248676U CN202020156048.2U CN202020156048U CN212248676U CN 212248676 U CN212248676 U CN 212248676U CN 202020156048 U CN202020156048 U CN 202020156048U CN 212248676 U CN212248676 U CN 212248676U
- Authority
- CN
- China
- Prior art keywords
- base
- fixedly connected
- sliding
- construction
- lead screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009435 building construction Methods 0.000 title description 9
- 238000010276 construction Methods 0.000 claims abstract description 33
- 230000000149 penetrating effect Effects 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 2
- 230000009194 climbing Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000010626 work up procedure Methods 0.000 description 1
Images
Landscapes
- Ladders (AREA)
Abstract
本实用新型公开了一种新型建筑施工架,涉及建筑施工架技术领域,具体包括底座,所述底座内开设有滑槽,滑槽内设置有丝杆一,丝杆一的一端通过轴承与滑槽的内侧面转动连接,丝杆一的另一端贯穿底座的侧面,底座的下表面开设有两个对称设置的滑腔,本实用新型在需要移动时,通过转动丝杆一,丝杆一的转动带动滑块在丝杆一移动,使支撑杆转动,从而使滑板在滑腔内滑动下移,使万向轮抵触地面,将施工架顶起,即可推动施工架进行移动,移动到使用地点后,反转丝杆一收起万向轮,使底座抵触地面进行支撑,再进行施工,从而提高了万向轮的使用寿命,也避免了施工过程中万向轮的损坏带来的危险。
The utility model discloses a novel construction frame, which relates to the technical field of construction frames, and specifically includes a base. The base is provided with a chute, and a screw rod is arranged in the chute. The inner side of the groove is connected in rotation, the other end of the screw rod one penetrates the side surface of the base, and the lower surface of the base is provided with two symmetrically arranged sliding cavities. The rotation drives the sliding block to move on the screw rod, so that the support rod rotates, so that the sliding plate slides down in the sliding cavity, so that the universal wheel touches the ground, and the construction frame is lifted up, which can push the construction frame to move and move to use. After the installation is completed, the reversing lead screw retracts the swivel wheel, so that the base is supported against the ground, and then the construction is carried out, thereby improving the service life of the swivel wheel and avoiding the danger of damage to the swivel wheel during the construction process. .
Description
技术领域technical field
本实用新型涉及建筑施工架技术领域,具体是一种新型建筑施工架。The utility model relates to the technical field of building construction frames, in particular to a novel building construction frame.
背景技术Background technique
建筑施工架是指施工现场为工人操作并解决垂直和水平运输而搭设的各种支架,建筑界的通用术语,指建筑工地上用在外墙、内部装修或层高较高无法直接施工的地方,主要为了施工人员上下作业或外围安全网围护及高空安装构件,在建筑领域扮演着十分重要的角色。Construction frames refer to various supports erected on the construction site for workers to operate and solve vertical and horizontal transportation. A general term in the construction industry refers to the use of external walls, interior decoration or high storey heights on construction sites where direct construction cannot be performed. Mainly for the construction personnel to work up and down or to protect the peripheral safety net and high-altitude installation components, it plays a very important role in the construction field.
专利一种建筑施工架(公告号:CN207048282U),该施工架为了便于移动,其底部安装有自锁万向轮,在使用时,通过自锁万向轮进行移动,但是在支撑时,也是通过底部的自锁万向轮进行支撑,自锁万向轮容易发生损坏而造成危险。The patent is a building construction frame (announcement number: CN207048282U). In order to facilitate the movement, the construction frame is equipped with a self-locking universal wheel at the bottom. When in use, the self-locking universal wheel is used to move, but when it is supported, it is also The self-locking universal wheel at the bottom is used for support, and the self-locking universal wheel is prone to damage and cause danger.
实用新型内容Utility model content
本实用新型的目的在于提供一种新型建筑施工架,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a new type of building construction frame to solve the problems raised in the above background technology.
为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:
一种新型建筑施工架,包括底座,所述底座内开设有滑槽,滑槽内设置有丝杆一,丝杆一的一端通过轴承与滑槽的内侧面转动连接,丝杆一的另一端贯穿底座的侧面,底座的下表面开设有两个对称设置的滑腔,滑腔内设置有相匹配的滑板,滑板的下表面安装有若干数量的万向轮,滑板的上方设置有两个对称设置的支撑杆,两个支撑杆的下端均通过转轴与滑板转动连接,滑板的上方设置有两个对称设置的滑块,两个滑块开设有与丝杆一相匹配的螺纹孔,且两个滑块螺纹孔的螺纹反向相反,两个支撑杆的上端分别通过转轴与两个滑块转动连接,底座的上表面通过若干数量的支撑柱固定连接有踏板,踏板的上表面固定连接有两个对称设置的护栏,踏板的上表面开设有通腔,底座的上表面通过轴承转动连接有丝杆二,丝杆二的另一端贯穿踏板,丝杆二螺纹连接有相匹配的螺母块,螺母块的一侧面固定连接有支撑板,支撑板的上表面固定连接有矩形框。A new type of building construction frame comprises a base, a chute is arranged in the base, a screw rod is arranged in the chute, one end of the screw rod one is rotatably connected with the inner side of the chute through a bearing, and the other end of the screw rod one is rotatably connected. Running through the side of the base, the lower surface of the base is provided with two symmetrically arranged sliding cavities, the sliding cavities are provided with matching sliding plates, a number of universal wheels are installed on the lower surface of the sliding plates, and two symmetrical The lower ends of the two support rods are rotatably connected with the slide plate through the rotating shaft. Two symmetrically arranged sliders are arranged above the slide plate. The threads of the threaded holes of the sliders are reversed. The upper ends of the two support rods are respectively connected to the two sliders through the rotating shaft. The upper surface of the base is fixedly connected with a pedal through a number of support columns, and the upper surface of the pedal is fixedly connected with a pedal. Two symmetrically arranged guardrails, the upper surface of the pedal is provided with a through cavity, the upper surface of the base is rotatably connected with the second screw rod through the bearing, the other end of the second screw rod penetrates the pedal, and the second screw rod is threadedly connected with a matching nut block, A support plate is fixedly connected to one side of the nut block, and a rectangular frame is fixedly connected to the upper surface of the support plate.
作为本实用新型进一步的方案:所述底座的上面固定连接有爬梯,爬梯的上端与踏板的下表面固定连接。As a further solution of the present invention, a climbing ladder is fixedly connected to the top of the base, and the upper end of the climbing ladder is fixedly connected to the lower surface of the pedal.
作为本实用新型进一步的方案:所述底座的上表面固定连接有限位板,限位板的上端与踏板的下表面固定连接,螺母块的侧面与限位板的侧面滑动连接。As a further solution of the present invention, the upper surface of the base is fixedly connected to the limit plate, the upper end of the limit plate is fixedly connected to the lower surface of the pedal, and the side surface of the nut block is slidably connected to the side surface of the limit plate.
作为本实用新型进一步的方案:所述丝杆一贯穿底座侧面的一端和丝杆二贯穿踏板上表面的一端均固定连接有相匹配的手轮。As a further solution of the present invention, one end of the first screw rod penetrating the side of the base and one end of the second screw rod penetrating the upper surface of the pedal are fixedly connected with matching handwheels.
作为本实用新型进一步的方案:所述支撑板的下表面通过加强筋与螺母块的侧面固定连接。As a further solution of the present invention, the lower surface of the support plate is fixedly connected to the side surface of the nut block through reinforcing ribs.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:
1、本实用新型在需要移动时,通过转动丝杆一,丝杆一的转动带动滑块在丝杆一移动,使支撑杆转动,从而使滑板在滑腔内滑动下移,使万向轮抵触地面,将施工架顶起,即可推动施工架进行移动,移动到使用地点后,反转丝杆一收起万向轮,使底座抵触地面进行支撑,再进行施工,从而提高了万向轮的使用寿命,也避免了施工过程中万向轮的损坏带来的危险。1. When the utility model needs to move, by rotating the first screw, the rotation of the first screw drives the sliding block to move on the first screw, so that the support rod rotates, so that the sliding plate slides down in the sliding cavity, so that the universal wheel moves. When the construction frame is pushed up against the ground, the construction frame can be pushed to move. After moving to the place of use, the universal wheel is retracted by reversing the screw rod, so that the base is supported against the ground, and then the construction is carried out, thereby improving the universal direction. The service life of the wheel also avoids the danger of damage to the universal wheel during the construction process.
2、本实用新型在施工过程中,可将物料和工具放置于矩形框内,再通过转动丝杆二,丝杆二的转动带动螺母块向上移动,螺母块向上移动带动支撑板向上移动,从而带动矩形框上移穿过通腔,便于踏板上的施工人员拿取物料和工具,无需施工人员爬上爬下手动拿取,降低了取物过程中坠落的风险。2. In the construction process of the present utility model, the materials and tools can be placed in the rectangular frame, and then the second screw rod is rotated, and the rotation of the second screw rod drives the nut block to move upward, and the upward movement of the nut block drives the support plate to move upward, thereby Drive the rectangular frame to move up through the through cavity, so that the construction personnel on the pedals can easily take the materials and tools, and the construction personnel do not need to climb up and down to manually take them, which reduces the risk of falling during the process of taking things.
附图说明Description of drawings
图1为一种新型建筑施工架的结构示意图。Figure 1 is a schematic structural diagram of a new type of building construction frame.
图2为一种新型建筑施工架剖视的结构示意图。Figure 2 is a schematic structural diagram of a new type of building construction frame cross-section.
图中:滑槽1、底座2、螺母块3、限位板4、丝杆二5、护栏6、丝杆一7、滑腔8、万向轮9、滑板10、支撑杆11、滑块12、支撑柱13、支撑板14、矩形框15、踏板16、通腔17、爬梯18。In the figure:
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请参阅图1~2,本实用新型实施例中,一种新型建筑施工架,包括底座2,底座2内开设有滑槽1,滑槽1内设置有丝杆一7,丝杆一7的一端通过轴承与滑槽1的内侧面转动连接,丝杆一7的另一端贯穿底座2的侧面,底座2的下表面开设有两个对称设置的滑腔8,滑腔8内设置有相匹配的滑板10,滑板10的下表面安装有若干数量的万向轮9,滑板10的上方设置有两个对称设置的支撑杆11,两个支撑杆11的下端均通过转轴与滑板10转动连接,滑板10的上方设置有两个对称设置的滑块12,两个滑块12开设有与丝杆一7相匹配的螺纹孔,且两个滑块12螺纹孔的螺纹反向相反,两个支撑杆11的上端分别通过转轴与两个滑块12转动连接,底座2的上表面通过若干数量的支撑柱13固定连接有踏板16,踏板16的上表面固定连接有两个对称设置的护栏6,踏板16的上表面开设有通腔17,底座2的上表面通过轴承转动连接有丝杆二5,丝杆二5的另一端贯穿踏板16,丝杆二5螺纹连接有相匹配的螺母块3,螺母块3的一侧面固定连接有支撑板14,支撑板14的上表面固定连接有矩形框15。Please refer to FIGS. 1-2. In the embodiment of the present utility model, a new type of building construction frame includes a
本装置在需要移动时,通过转动丝杆一7,丝杆一7的转动带动滑块12在丝杆一7移动,使支撑杆11转动,从而使滑板10在滑腔8内滑动下移,使万向轮9抵触地面,将施工架顶起,即可推动施工架进行移动,移动到使用地点后,反转丝杆一7收起万向轮9,使底座2抵触地面进行支撑,再进行施工,从而提高了万向轮9的使用寿命,也避免了施工过程中万向轮9的损坏带来的危险;本装置在施工过程中,可将物料和工具放置于矩形框15内,再通过转动丝杆二5,丝杆二5的转动带动螺母块3向上移动,螺母块3向上移动带动支撑板14向上移动,从而带动矩形框15上移穿过通腔17,便于踏板16上的施工人员拿取物料和工具,无需施工人员爬上爬下手动拿取,降低了取物过程中坠落的风险。When the device needs to move, by rotating the screw one 7, the rotation of the screw one 7 drives the
底座2的上面固定连接有爬梯18,爬梯18的上端与踏板16的下表面固定连接,通过设置的爬梯18,便于施工人员攀爬到踏板16上,底座2的上表面固定连接有限位板4,限位板4的上端与踏板16的下表面固定连接,螺母块3的侧面与限位板4的侧面滑动连接,通过设置的限位板4,避免螺母块3出现自转的现象,丝杆一7贯穿底座2侧面的一端和丝杆二5贯穿踏板16上表面的一端均固定连接有相匹配的手轮,通过设置的手轮,便于施工人员转动丝杆一7和丝杆二5,支撑板14的下表面通过加强筋与螺母块3的侧面固定连接,通过设置的加强筋,使支撑板14的结构更加稳固。The upper surface of the
在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”、“前”、“后”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制,在本实用新型中,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner" and "outer" , "front", "rear" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must be It has a specific orientation, is constructed and operated in a specific orientation, so it should not be construed as a limitation to the present invention. Terms such as "connection" and "fixed" should be understood in a broad sense. For example, it may be a fixed connection, a detachable connection, or an integrated body; it may be a mechanical connection, a direct connection, or an indirect connection through an intermediate medium. It can be a communication within the two elements or an interaction relationship between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内,不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments are to be considered in all respects as exemplary and not restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is therefore intended that the All changes which come within the meaning and range of equivalents of the claims are intended to be embraced within the present invention, and any reference signs in the claims shall not be construed as limiting the involved claim.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of embodiments, not each embodiment only includes an independent technical solution, and this description in the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020156048.2U CN212248676U (en) | 2020-02-08 | 2020-02-08 | A new type of building construction frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020156048.2U CN212248676U (en) | 2020-02-08 | 2020-02-08 | A new type of building construction frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212248676U true CN212248676U (en) | 2020-12-29 |
Family
ID=73989757
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020156048.2U Active CN212248676U (en) | 2020-02-08 | 2020-02-08 | A new type of building construction frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212248676U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118639835A (en) * | 2024-06-17 | 2024-09-13 | 山东铁信建设集团有限公司 | A building construction support |
-
2020
- 2020-02-08 CN CN202020156048.2U patent/CN212248676U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118639835A (en) * | 2024-06-17 | 2024-09-13 | 山东铁信建设集团有限公司 | A building construction support |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113027169B (en) | Angle-adjustable support frame for building | |
| CN111502219A (en) | Bearing frame for building construction | |
| CN116677307A (en) | A portable wharf ladder that is convenient for disassembly and maintenance | |
| CN211164702U (en) | Beam slab bar planting drilling tool | |
| CN219033973U (en) | Building scaffold | |
| CN211899527U (en) | A steel structure mobile platform for building decoration | |
| CN211341824U (en) | An assembled steel structure sliding frame | |
| CN211998644U (en) | Instrument hoisting device is used in bridge construction | |
| CN217924715U (en) | Scaffold for building | |
| CN220666863U (en) | Scaffold frame | |
| CN220909055U (en) | Building support structure | |
| CN216866028U (en) | An operating platform for building steel bar binding | |
| CN222249977U (en) | A construction platform with stable lifting performance | |
| CN217205208U (en) | Lift for building construction | |
| CN217326357U (en) | Novel be applied to equipment of reforming transform reinforcement engineering | |
| CN220057758U (en) | A temporary guardrail for traffic diversion | |
| CN217871682U (en) | Movable electric lifting scaffold | |
| CN216587578U (en) | Construction support of rural area construction engineering | |
| CN111362179A (en) | An adjustable power equipment mounting frame | |
| CN217759951U (en) | Portable novel construction frame | |
| CN218508972U (en) | Building construction lift platform | |
| CN217734756U (en) | A safe lift for building construction is built in room | |
| CN223240565U (en) | Template support frame | |
| CN221761799U (en) | A construction ladder | |
| CN219569517U (en) | Lifting scaffold for construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240914 Address after: No. 148 Yongfengtun Village, Haidian District, Beijing 100080 Patentee after: Zhai Ailing Country or region after: China Address before: No.10, 19th floor, unit 1, building 4, No.9, Wuqing South Road, Wuhou District, Chengdu, Sichuan 610000 Patentee before: Sichuan Longyuan Taixing Labor Service Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241220 Address after: No. 20 Campus Road, Wangxinzhuang Town, Pinggu District, Beijing 101299 (Cluster Registration) Patentee after: Beijing Zhongjin Hongye Construction Engineering Co.,Ltd. Country or region after: China Address before: No. 148 Yongfengtun Village, Haidian District, Beijing 100080 Patentee before: Zhai Ailing Country or region before: China |
|
| TR01 | Transfer of patent right |
