CN212200087U - Pouring template for double pier stud pier - Google Patents

Pouring template for double pier stud pier Download PDF

Info

Publication number
CN212200087U
CN212200087U CN202020508877.2U CN202020508877U CN212200087U CN 212200087 U CN212200087 U CN 212200087U CN 202020508877 U CN202020508877 U CN 202020508877U CN 212200087 U CN212200087 U CN 212200087U
Authority
CN
China
Prior art keywords
template
pier
double
base
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020508877.2U
Other languages
Chinese (zh)
Inventor
李军辉
王留洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Tianwei Hengchuang Intelligent Technology Co.,Ltd.
Original Assignee
Chengdu Tianwei Template Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Tianwei Template Co ltd filed Critical Chengdu Tianwei Template Co ltd
Priority to CN202020508877.2U priority Critical patent/CN212200087U/en
Application granted granted Critical
Publication of CN212200087U publication Critical patent/CN212200087U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of pier pouring templates, and discloses a pouring template for a double-pier-column pier, which comprises a left template, a right template and a base; a right template is bolted to one side of the left template, and a base is transversely placed in the middle of the inner sides of the left template and the right template; the support is arranged on two sides of the top of the base, the bearing is arranged in the middle of the support, a rotating rod is movably arranged in the bearing, external threads are arranged on the outer wall of the rotating rod at equal intervals, the number of the external threads is three, and an internal thread sleeve is rotatably sleeved on the external threads; the movable seat A is installed at two ends of the internal thread sleeve, and a folding rod is movably installed in the movable seat A. The utility model discloses a clearance size's regulation can be realized to the shrink of baffle to be suitable for the two mound piers in different clearances and pour, improve the flexibility greatly, and the regulation mode is simple convenient, still can do benefit to the dismantlement greatly through the shrink, and the work is built to completion that can be quick, improves the efficiency of construction.

Description

Pouring template for double pier stud pier
Technical Field
The utility model relates to a template technical field is pour to the pier specifically is a template is pour to two pier stud piers.
Background
At present, bridge piers are sub-buildings which support bridge span structures and transmit constant loads and vehicle live loads to foundations, bridge abutments are arranged between two lakes of a bridge, the bridge piers are arranged between the two bridge abutments and are used for supporting the bridge span structures, the face bridge abutments support the bridge span structures and are also connected with embankments and prevent the embankments from sliding off, the double-pier-column bridge piers are composed of two independent pier columns, gaps exist between the two groups of independent pier columns, but the existing pouring templates of the double-pier-column bridge piers have some insufficient places, such as the example;
the notice number is (CN205531324U) two pier stud piers pour the template, and this utility model discloses the independent setting of gap template makes two pier studs can pour simultaneously and improves work efficiency on the one hand, and on the other hand makes the independent drawing of patterns of gap template ability, and in order to make the surface quality that gap template drawing of patterns easy operation is convenient and do not destroy the shaping pier stud, makes the gap template break away from the surface of pier stud through the pull mechanism automation of its connection when the drawing of patterns, but the device still has following shortcoming:
at first, the gap template can not be adjusted to a proper gap size, so that the gap between the double pier studs can not be adjusted according to actual needs, the contraction mode is time-consuming and labor-consuming, and the gap template is free of a limiting mechanism after expansion, so that the gap template can be automatically retracted due to pressure when concrete is poured.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a two pier stud piers pour template has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a pouring template of a double-pier-column pier comprises a left template, a right template and a base;
a right template is bolted to one side of the left template, and a base is transversely placed in the middle of the inner sides of the left template and the right template;
the support is arranged on two sides of the top of the base, the bearing is arranged in the middle of the support, a rotating rod is movably arranged in the bearing, external threads are arranged on the outer wall of the rotating rod at equal intervals, the number of the external threads is three, and an internal thread sleeve is rotatably sleeved on the external threads;
movable seat A is installed at the internal thread cover both ends, movable mounting has the folding rod in the movable seat A, folding rod right-hand member movable mounting has movable seat B, the baffle is installed in the movable seat B outside.
As a preferred embodiment of the utility model, the ring is installed to the bull stick left end.
As an preferred embodiment of the present invention, the mounting seats are installed at both ends of the left and right templates.
As a preferred embodiment of the present invention, a bolt penetrates through the mounting seat, and a nut is rotatably mounted at the end of the bolt.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a template of pouring of two pier stud piers, it is rotatory to drive the external screw thread through the bull stick rotation, the external screw thread is located the interior thread bush rotation and can drives the interior thread bush and move about on being located the bull stick, then can drive the folding rod and be located sliding seat A and sliding seat B internal rotation this moment, and the folding rod can outwards expand, can drive this moment the baffle and carry out shrink work in being located left template and right template, the regulation of clearance size can be realized to the shrink through the baffle, thereby be suitable for the two pier piers pier in different clearances, improve the flexibility greatly, and the adjustment mode is simple convenient, still can do benefit to the dismantlement greatly through the shrink, completion that can be quick builds work, and the efficiency of construction is.
2. The utility model relates to a two pier stud piers pour template can realize running through of bolt through the installation piece, lies in the terminal rotatory mounting nut of bolt again and can accomplish fixedly, the dismouting work of the left template of being convenient for greatly and right template.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic top view of a pouring template for a double-pier stud pier according to the present invention;
fig. 2 is a schematic view of a top view structure of a base and a partition plate of a pouring template of a double pier stud pier of the present invention;
fig. 3 is the utility model relates to a base of the template of pouring of two pier stud piers, the orthographic view structure schematic diagram of baffle.
In the figure: 1. a left template; 2. a template is arranged; 3. a partition plate; 4. a mounting seat; 5. a bolt; 6. a nut; 7. a base; 8. a support; 9. a bearing; 10. a rotating rod; 11. a circular ring; 12. an internal thread sleeve; 13. a movable seat A; 14. a folding bar; 15. and a movable seat B3.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in the model of providing with electrical apparatus only supplies the reference, to the ordinary technical personnel in this field, can change the different models that the function is the same according to the in service use condition and use electrical apparatus, to the ordinary technical personnel in this field, can the particular case understand that above-mentioned term is in the utility model provides a concrete meaning.
Referring to fig. 1-3, the present invention provides a technical solution: a pouring template of a double-pier-column pier comprises a left template 1, a right template 2 and a base 7;
a right template 2 is bolted on one side of the left template 1, and a base 7 is transversely placed in the middle of the inner sides of the left template 1 and the right template 2;
the support 8 is installed on two sides of the top of the base 7, the bearing 9 is installed in the middle of the support 8, the rotating rods 10 are movably installed in the bearing 9, external threads 17 are equidistantly arranged on the outer walls of the rotating rods 10, the number of the external threads 17 is three, and internal thread sleeves 12 are rotatably sleeved on the external threads 17;
sliding seat A13 is installed at internal thread cover 12 both ends, movable mounting has folding rod 14 in the sliding seat A13, folding rod 14 right-hand member movable mounting has sliding seat B15, baffle 3 is installed in the sliding seat B15 outside.
In this embodiment (please refer to fig. 1, fig. 2 and fig. 3), it is rotatory to drive external screw thread 17 through the bull stick 10 rotation, external screw thread 17 is located internal thread cover 12 internal rotation and can drives internal thread cover 12 and move about on the bull stick 10, then can drive folding rod 14 and be located sliding seat A13 and sliding seat B15 internal rotation this moment, and folding rod 14 will expand outwards, can drive baffle 3 and be located left side template 1 and right side template 2 and carry out the work of contracting this moment, the regulation of clearance size can be realized to the shrink through baffle 3, thereby be suitable for the two pier pouring in different clearances, the flexibility is greatly improved, and the regulation mode is simple convenient, still can do benefit to the dismantlement greatly through the shrink, the work of putting up can be quick completion, construction efficiency is improved.
Wherein, the left end of the rotating rod 10 is provided with a circular ring 11.
In this embodiment (see fig. 2), the rotation of the rotating rod 10 can be facilitated by the hook-type rocker being hung in the ring 11 to rotate.
Wherein, mount pad 4 is all installed at left template 1 and right template 2 both ends.
In this embodiment (see fig. 1), the bolt 5 can be conveniently inserted through the mounting seat 4.
Wherein, a bolt 5 penetrates through the mounting seat 4, and a nut 6 is rotatably mounted at the tail end of the bolt 5.
In this embodiment (see fig. 1), the bolt 5 can be inserted through the mounting block 4, and then the mounting nut 6 is rotated at the end of the bolt 5 to complete the fixing, which is greatly convenient for the dismounting of the left template 1 and the right template 2.
The utility model relates to a pouring template of a double pier stud pier, which comprises a left template and a right template; 2. a template is arranged; 3. a partition plate; 4. a mounting seat; 5. a bolt; 6. a nut; 7. a base; 8. a support; 9. a bearing; 10. a rotating rod; 11. a circular ring; 12. an internal thread sleeve; 13. a movable seat A; 14. a folding bar; 15. the movable seat B3, the components are all universal standard parts or components known to those skilled in the art, and the structure and principle thereof are known to those skilled in the art through technical manuals or through routine experimentation.
The working principle is that firstly, a left template 1 and a right template 2 are overlapped, the penetration of a bolt 5 can be realized through a mounting block 4 at the moment, then a mounting nut 6 is rotated at the tail end of the bolt 5 to complete the fixation, meanwhile, a base 7 can be arranged between the left template 1 and the right template 2, at the moment, concrete can be poured in the left template 1 and the right template 2 and is positioned outside a partition plate 3, a gap exists at the position of the partition plate 3, thereby realizing the pouring of a double-pier, a rotating rod 10 can be driven to rotate by hanging a hook in a circular ring 11 and rotating, an external thread 17 can be driven to rotate by rotating the rotating rod 10, the internal thread sleeve 12 can be driven to move left and right on the rotating rod 10 by rotating the external thread 17 in the internal thread sleeve 12, at the moment, a folding rod 14 can be driven to rotate in a movable seat A13 and a movable seat B15, the folding rod 14 can be unfolded outwards, at the moment, the partition plate 3, the clearance size can be realized through the shrink of baffle 3 to be suitable for the two pier pouring in different clearances, improve the flexibility greatly, and the regulation mode is simple convenient greatly, still can do benefit to the dismantlement greatly through the shrink, and the work is built to completion that can be quick, improves the efficiency of construction.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (4)

1. The pouring template for the double-pier-column pier is characterized by comprising a left template (1), a right template (2) and a base (7);
a right template (2) is bolted to one side of the left template (1), and a base (7) is transversely placed in the middle of the inner sides of the left template (1) and the right template (2);
the support (8) is installed on two sides of the top of the base (7), the bearing (9) is installed in the middle of the support (8), the rotating rods (10) are movably installed in the bearing (9), external threads (17) are arranged on the outer wall of each rotating rod (10) at equal intervals, the number of the external threads (17) is three, and internal thread sleeves (12) are rotatably sleeved on the external threads (17);
movable seat A (13) are installed at internal thread cover (12) both ends, movable mounting has folding rod (14) in movable seat A (13), folding rod (14) right-hand member movable mounting has movable seat B (15), baffle (3) are installed in movable seat B (15) outside.
2. The pouring template of the double pier stud pier according to claim 1, wherein: and a circular ring (11) is arranged at the left end of the rotating rod (10).
3. The pouring template of the double pier stud pier according to claim 1, wherein: and mounting seats (4) are respectively installed at the two ends of the left template (1) and the right template (2).
4. The pouring template of the double pier stud pier according to claim 3, wherein: a bolt (5) penetrates through the mounting seat (4), and a nut (6) is rotatably mounted at the tail end of the bolt (5).
CN202020508877.2U 2020-04-09 2020-04-09 Pouring template for double pier stud pier Active CN212200087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020508877.2U CN212200087U (en) 2020-04-09 2020-04-09 Pouring template for double pier stud pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020508877.2U CN212200087U (en) 2020-04-09 2020-04-09 Pouring template for double pier stud pier

Publications (1)

Publication Number Publication Date
CN212200087U true CN212200087U (en) 2020-12-22

Family

ID=73829899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020508877.2U Active CN212200087U (en) 2020-04-09 2020-04-09 Pouring template for double pier stud pier

Country Status (1)

Country Link
CN (1) CN212200087U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114717956A (en) * 2022-04-01 2022-07-08 贵州大通路桥工程建设有限公司 Bridge pier column diaphragm construction umbrella-type support system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114717956A (en) * 2022-04-01 2022-07-08 贵州大通路桥工程建设有限公司 Bridge pier column diaphragm construction umbrella-type support system

Similar Documents

Publication Publication Date Title
CN212200087U (en) Pouring template for double pier stud pier
CN110182700B (en) GIS metal tank body disassembling tool
CN214614019U (en) Civil engineering composite pile
CN209538241U (en) Road inspection well well lid construction equipment
CN214615453U (en) Early-dismantling supporting device for building engineering
CN214560108U (en) Pendant device for shot blasting of casting
CN210981267U (en) Civil engineering distancer with adjustable
CN210419034U (en) GIS metal can body assembly and disassembly tools
CN210216164U (en) Template fastener is used in high-efficient construction of road bridge
CN205099218U (en) Maintenance hoist device and portal slewing crane
CN108502607A (en) A kind of roller position adjusting apparatus in packaging film production
CN211228588U (en) Auxiliary positioning device for foundation bolts of transformer substation
CN210659267U (en) Connecting and locking device for building template
CN209976633U (en) Support for generator
CN112982965A (en) Post-cast strip early-dismantling template system and use method
CN213563250U (en) Concrete placement mould convenient to installation
CN207862787U (en) A kind of pin-connected panel slideway
CN215291403U (en) Pouring template for building construction
CN111463689A (en) Distribution transformer hangs core and overhauls specialized tool
CN203568810U (en) Three-dimension lifting overhead vehicle
CN217028023U (en) Wall-attached supporting device for formwork
CN109594492A (en) A kind of attached standoff color reflective traffic alarm flag
CN213202153U (en) Movable civil engineering construction material lifting means
CN212154135U (en) Building engineering construction is with hanging mould device
CN215107353U (en) Template fixing device for building engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.188, Section 2, East Third Ring Road, Tianpeng Town, Pengzhou City, Chengdu City, Sichuan Province

Patentee after: Chengdu Tianwei Hengchuang Intelligent Technology Co.,Ltd.

Country or region after: China

Address before: No.188, Section 2, East Third Ring Road, Tianpeng Town, Pengzhou City, Chengdu City, Sichuan Province

Patentee before: Chengdu Tianwei template Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address