CN212200025U - A type of bridge steel structure - Google Patents

A type of bridge steel structure Download PDF

Info

Publication number
CN212200025U
CN212200025U CN202020229422.7U CN202020229422U CN212200025U CN 212200025 U CN212200025 U CN 212200025U CN 202020229422 U CN202020229422 U CN 202020229422U CN 212200025 U CN212200025 U CN 212200025U
Authority
CN
China
Prior art keywords
shaped steel
steel structure
mounting
bolt
mounting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020229422.7U
Other languages
Chinese (zh)
Inventor
陈杰彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jinggong Steel Structure Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020229422.7U priority Critical patent/CN212200025U/en
Application granted granted Critical
Publication of CN212200025U publication Critical patent/CN212200025U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型涉及钢结构桥梁技术领域,具体为一种桥梁用型钢结构,包括H型钢,所述H型钢的表面开设有定位孔,所述定位孔的下端开设有二号安装孔,所述H型钢的前部和后部均开设有起吊槽,所述H型钢的两侧均设置有安装台,所述安装台的表面开设有一号安装孔,所述H型钢的两侧均设置有加强筋,所述一号安装孔的内壁插接有一号螺栓,本实用新型的目的在于提供一种桥梁用型钢结构,将两个H型钢首尾对齐放好,再用一号螺栓穿过一号安装孔进行固定,再将一号安装板和二号安装板与H型钢进行组装,再用二号螺栓插入二号安装孔中对一号安装板和二号安装板进行固定,拆卸时反向进行上述操作即可,这样就实现了桥梁用型钢的快速安装和拆卸。

Figure 202020229422

The utility model relates to the technical field of steel structure bridges, in particular to a profiled steel structure for bridges, comprising H-shaped steel, the surface of the H-shaped steel is provided with a positioning hole, the lower end of the positioning hole is provided with a No. The front part and the rear part of the section steel are provided with hoisting grooves, both sides of the H-section steel are provided with installation platforms, the surface of the installation platform is provided with a No. 1 installation hole, and both sides of the H-section steel are provided with reinforcing ribs , the inner wall of the No. 1 installation hole is plugged with a No. 1 bolt. The purpose of this utility model is to provide a bridge-used steel structure. The two H-shaped steels are aligned and placed, and then the No. 1 bolt is used to pass through the No. 1 installation hole. Fix it, then assemble the No. 1 mounting plate and the No. 2 mounting plate with the H-beam, and then insert the No. 2 bolt into the No. 2 mounting hole to fix the No. 1 mounting plate and the No. 2 mounting plate. When disassembling, do the above in reverse. It is enough to operate, thus realizing the quick installation and disassembly of the bridge section steel.

Figure 202020229422

Description

一种桥梁用型钢结构A type of bridge steel structure

技术领域technical field

本实用新型涉及钢结构桥梁技术领域,具体为一种桥梁用型钢结构。The utility model relates to the technical field of steel structure bridges, in particular to a profiled steel structure for bridges.

背景技术Background technique

钢结构桥梁在城市基础设施建设中得到了广泛运用,钢结构桥梁采用各种型钢结构组装构成,现有的桥梁用型钢结构多采用工字钢或H型钢与钢板焊接而成,焊缝数量较多,焊接残余应力以及焊接变形严重,直接影响钢结构桥梁的使用性能,存在安全隐患,降低钢结构桥梁使用寿命,现有的桥梁用型钢结构在连接处通过螺栓连接,螺栓数量较多,但连接处的连接强度却不高,多起钢结构桥梁事故都是由于连接处的连接强度薄弱造成的,因此,需要一种连接强度高的桥梁用型钢结构。Steel structure bridges have been widely used in urban infrastructure construction. Steel structure bridges are assembled by various steel structures. The existing bridge steel structures are mostly welded with I-beam or H-beam and steel plates, and the number of welds is relatively large. The welding residual stress and welding deformation are serious, which directly affects the service performance of the steel structure bridge, there are potential safety hazards, and the service life of the steel structure bridge is reduced. The existing bridge steel structures are connected by bolts at the joints. The connection strength of the connection is not high, and many steel structure bridge accidents are caused by the weak connection strength of the connection. Therefore, a bridge steel structure with high connection strength is required.

经检索,中国专利公开号为CN208039009U的专利公开了一种桥梁用型钢结构,包括型钢组件,所述型钢组件包括主型钢,所述主型钢设置有支撑板,所述主型钢两端均设置有安装槽,所述安装槽设置成十字形,所述主型钢连接增强矩形钢,所述型钢组件端部连接节点组件,多组所述型钢组件通过所述节点组件进行连接,构成所需长度。本实用新型设置的桥梁用型钢结构,不需要过多的焊接连接,安装方便快捷,安装效率高,各方面的力学性能均有所提高,使用性能稳定,延长桥梁用型钢结构使用寿命,减少钢结构桥梁的日常维护成本。上述专利存在以下不足:由于型钢都是金属,十分的沉重,非常不方便移动,组件过多,不是非常方便安装,鉴于此,我们提出一种桥梁用型钢结构。After searching, the Chinese Patent Publication No. CN208039009U discloses a profiled steel structure for bridges, including profiled steel components, the profiled steel components include main profiled steel, the main profiled steel is provided with a support plate, and both ends of the main profiled steel are provided with The installation groove is set in a cross shape, the main section steel is connected to the reinforced rectangular steel, the end of the section steel assembly is connected to the node assembly, and multiple groups of the section steel assembly are connected through the node assembly to form the required length. The profiled steel structure for bridges provided by the utility model does not require excessive welding connections, is convenient and quick to install, has high installation efficiency, has improved mechanical properties in all aspects, has stable use performance, prolongs the service life of the profiled steel structures for bridges, and reduces steel consumption. Routine maintenance costs for structural bridges. The above-mentioned patents have the following shortcomings: because the profiled steel is all metal, it is very heavy, very inconvenient to move, and there are too many components, which is not very convenient to install. In view of this, we propose a profiled steel structure for bridges.

实用新型内容Utility model content

本实用新型的目的在于提供一种桥梁用型钢结构,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a profiled steel structure for bridges to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:

一种桥梁用型钢结构,包括H型钢,所述H型钢的表面开设有定位孔,所述定位孔的下表面开设有二号安装孔,所述H型钢的前部和后部均开设有起吊槽,所述起吊槽的内壁设置有连接机构,所述H型钢的两侧均设置有安装台,所述安装台的表面开设有一号安装孔,所述H型钢的两侧均设置有加强筋,所述一号安装孔的内壁插接有一号螺栓。A profiled steel structure for a bridge, comprising H-shaped steel, a positioning hole is provided on the surface of the H-shaped steel, a No. 2 mounting hole is provided on the lower surface of the positioning hole, and the front and the rear of the H-shaped steel are provided with hoisting holes The inner wall of the lifting groove is provided with a connecting mechanism, the two sides of the H-shaped steel are provided with installation platforms, the surface of the installation platform is provided with a No. 1 mounting hole, and the two sides of the H-shaped steel are provided with reinforcing ribs , a No. 1 bolt is inserted into the inner wall of the No. 1 mounting hole.

优选的,所述连接机构包括有一号安装板,所述一号安装板的表面与H型钢的表面均通过二号螺栓固定连接,所述一号安装板的底部焊接有卡接件,所述一号安装板的底部设置有定位凸台,所述定位凸台的表面开设有二号安装孔,所述卡接件的表面滑动连接在卡槽的内部,所述卡槽的底部焊接有二号安装板,所述卡槽的外形和尺寸与起吊槽的外形和尺寸相同。Preferably, the connection mechanism includes a No. 1 mounting plate, the surface of the No. 1 mounting plate and the surface of the H-shaped steel are both fixedly connected by No. 2 bolts, and the bottom of the No. 1 mounting plate is welded with a clip, the The bottom of the No. 1 mounting plate is provided with a positioning boss, the surface of the positioning boss is provided with a No. 2 installation hole, the surface of the clip is slidably connected to the inside of the slot, and the bottom of the slot is welded with two No. 1 mounting plate, the shape and size of the card slot are the same as the shape and size of the lifting slot.

优选的,所述一号螺栓与二号螺栓的规格型号为M12x50。Preferably, the specifications and models of the No. 1 bolt and the No. 2 bolt are M12x50.

优选的,所述加强筋的数量为若干个,且若干个加强筋均以H型钢的中心线为对称轴对称分布。Preferably, the number of the reinforcing ribs is several, and the several reinforcing ribs are distributed symmetrically with the center line of the H-shaped steel as the axis of symmetry.

优选的,所述二号安装板位于一号安装板的上方,所述卡槽的深度与卡接件的高度相同。Preferably, the No. 2 installation plate is located above the No. 1 installation plate, and the depth of the card slot is the same as the height of the clip.

优选的,所述定位孔的直径与定位凸台的直径相等。Preferably, the diameter of the positioning hole is equal to the diameter of the positioning boss.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

1.该桥梁用型钢结构,将第一个H型钢放置好,再将第二个H型钢的前部与第一个H型钢的后部对齐并紧贴在一起,再用一号螺栓穿过紧贴的两个安装台上的一号安装孔对安装台进行固定,再将一号安装板上的定位凸台以H型钢顶部的定位孔进行定位,将一号安装板上的卡接件插入到起吊槽中,使定位凸台全部插入定位孔中,然后用二号安装板从下方插入起吊槽中,让卡接件插进卡槽中,并插到底,使一号安装板和二号安装板与H型钢之间没有间隙,再用二号螺栓插入二号安装孔中对一号安装板和二号安装板进行固定,拆卸时反向进行上述操作即可,这样就实现了桥梁用型钢的快速安装和拆卸。1. This bridge uses section steel structure, place the first H-section steel, then align the front of the second H-section with the rear of the first H-section and stick together, and then use the No. 1 bolt to pass through The No. 1 mounting holes on the two mounting platforms that are close to each other fix the mounting platforms, and then position the positioning bosses on the No. 1 mounting plate with the positioning holes on the top of the H-beam, and place the clips on the No. 1 mounting plate. Insert it into the lifting slot, so that the positioning bosses are all inserted into the positioning holes, and then insert the No. 2 mounting plate into the lifting slot from below, and insert the card connector into the There is no gap between the No. 1 mounting plate and the H-beam, and then insert the No. 2 bolt into the No. 2 mounting hole to fix the No. 1 mounting plate and the No. 2 mounting plate. When disassembling, perform the above operations in reverse, thus realizing the bridge. Quick installation and disassembly with section steel.

2.该桥梁用型钢结构,需要移动时,用吊绳穿过起吊槽,就可以用吊车进行吊起,或用绳索穿过起吊槽,再用木棍穿过绳索,就能实现两人将其抬起,这样就实现了桥梁用型钢的方便移动。2. The bridge is made of profiled steel. When it needs to be moved, it can be lifted with a crane by passing a sling rope through the hoisting groove, or a rope can be passed through the hoisting groove, and then a wooden stick can be passed through the rope, so that two people can lift the bridge. It is lifted, thus realizing the convenient movement of the bridge steel.

附图说明Description of drawings

图1为本实用新型的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present utility model;

图2为本实用新型的连接机构一号安装板示意图;2 is a schematic diagram of the No. 1 mounting plate of the connecting mechanism of the present invention;

图3为本实用新型的连接机构二号安装板示意图。FIG. 3 is a schematic diagram of the second mounting plate of the connecting mechanism of the present invention.

图中:1、H型钢;2、定位孔;3、一号安装孔;4、安装台;5、加强筋;6、一号螺栓; 7、二号螺栓;8、连接机构;9、起吊槽;10、二号安装孔;81、一号安装板;82、卡接件; 83、定位凸台;84、卡槽;85、二号安装板。In the figure: 1. H-beam; 2. Positioning hole; 3. No. 1 mounting hole; 4. Mounting platform; 5. Reinforcing rib; 6. No. 1 bolt; 7. No. 2 bolt; 8. Connection mechanism; 9. Lift Slot; 10, No. 2 mounting hole; 81, No. 1 mounting plate; 82, Clamping piece; 83, Positioning boss; 84, Card slot; 85, No. 2 mounting plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", The orientation or positional relationship indicated by "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. The orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limit.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,“若干”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first", "second" may expressly or implicitly include one or more of that feature. In the description of the present invention, "several" means two or more, unless otherwise expressly and specifically defined.

实施例1Example 1

一种桥梁用型钢结构,如图1-图3所示,包括H型钢1,其特征在于:H型钢1的表面开设有定位孔2,定位孔2的下表面开设有二号安装孔10,H型钢1的前部和后部均开设有起吊槽9,起吊槽9的内壁设置有连接机构8,H型钢1的两侧均设置有安装台4,安装台4的表面开设有一号安装孔3,H型钢1的两侧均设置有加强筋5,一号安装孔3的内壁插接有一号螺栓6。A profiled steel structure for a bridge, as shown in Figures 1 to 3, includes an H-shaped steel 1, characterized in that: the surface of the H-shaped steel 1 is provided with a positioning hole 2, and the lower surface of the positioning hole 2 is provided with a No. 2 mounting hole 10, Both the front and the rear of the H-shaped steel 1 are provided with a hoisting groove 9, the inner wall of the hoisting groove 9 is provided with a connecting mechanism 8, and both sides of the H-shaped steel 1 are provided with a mounting table 4, and the surface of the mounting table 4 is provided with a No. 1 mounting hole 3. Reinforcing ribs 5 are provided on both sides of the H-shaped steel 1, and a No. 1 bolt 6 is inserted into the inner wall of the No. 1 mounting hole 3.

本实施例中,连接机构8包括有一号安装板81,一号安装板81的表面与H型钢1的表面均通过二号螺栓7固定连接,一号安装板81的底部焊接有卡接件82,一号安装板81 的底部设置有定位凸台83,定位凸台83的表面开设有二号安装孔10,卡接件82的表面滑动连接在卡槽84的内部,卡槽84的底部焊接有二号安装板85,目的是方便定位,并使桥梁用型钢进一步组装固定,卡槽84的外形和尺寸与起吊槽9的外形和尺寸相同。In this embodiment, the connection mechanism 8 includes a No. 1 mounting plate 81 , the surface of the No. 1 mounting plate 81 and the surface of the H-shaped steel 1 are fixedly connected by No. 2 bolts 7 , and the bottom of the No. 1 mounting plate 81 is welded with a clip 82 . The bottom of the first mounting plate 81 is provided with a positioning boss 83, the surface of the positioning boss 83 is provided with a second mounting hole 10, the surface of the clip 82 is slidably connected to the interior of the slot 84, and the bottom of the slot 84 is welded There is a No. 2 mounting plate 85 to facilitate positioning and to further assemble and fix the bridge with profiled steel. The shape and size of the clamping slot 84 are the same as those of the lifting slot 9 .

此外,一号螺栓6与二号螺栓7的规格型号为M12x50,目的是增加螺栓的强度,使其不易损坏。In addition, the specifications of the No. 1 bolt 6 and the No. 2 bolt 7 are M12x50, in order to increase the strength of the bolts so that they are not easily damaged.

除此之外,加强筋5的数量为若干个,且若干个加强筋5均以H型钢1的中心线为对称轴对称分布,目的是增加H型钢1的各方面的力学性能,使其承受能力更强。In addition, the number of the reinforcing ribs 5 is several, and the several reinforcing ribs 5 are distributed symmetrically with the center line of the H-shaped steel 1 as the symmetrical axis, the purpose is to increase the mechanical properties of the H-shaped steel 1 in all aspects, so that it can withstand more capable.

值得说明的是,将第一个H型钢1放置好,再将第二个H型钢1的前部与第一个H型钢1的后部对齐并紧贴在一起,再用一号螺栓6穿过紧贴的两个安装台4上的一号安装孔 3对安装台4进行固定,再将一号安装板81上的定位凸台83以H型钢1顶部的定位孔2 进行定位,将一号安装板81上的卡接件82插入到起吊槽9中,使定位凸台83全部插入定位孔2中,然后用二号安装板85从下方插入起吊槽9中,让卡接件82插进卡槽84中,并插到底,使一号安装板81和二号安装板85与H型钢1之间没有间隙,再用二号螺栓7 插入二号安装孔10中对一号安装板81和二号安装板85进行固定,拆卸时反向进行上述操作即可,这样就实现了桥梁用型钢的快速安装和拆卸。It is worth mentioning that, after placing the first H-beam 1, align the front of the second H-beam 1 with the rear of the first H-beam 1 and close them together, and then use the No. 1 bolt 6 to pierce the The No. 1 mounting holes 3 on the two mounting platforms 4 that are too close to each other fix the mounting platform 4, and then position the positioning bosses 83 on the No. 1 mounting plate 81 with the positioning holes 2 on the top of the H-shaped steel 1, Insert the clip 82 on the No. 2 mounting plate 81 into the lifting slot 9 so that the positioning bosses 83 are all inserted into the positioning hole 2, and then insert the No. 2 mounting plate 85 into the lifting slot 9 from below, and let the clip 82 insert into the card slot 84, and insert it to the end, so that there is no gap between the No. 1 mounting plate 81, the No. 2 mounting plate 85 and the H-beam 1, and then insert the No. 2 bolt 7 into the No. 2 mounting hole 10 to the No. 1 mounting plate 81. It is fixed with the No. 2 mounting plate 85, and the above operations can be reversed when disassembling, so that the rapid installation and disassembly of the bridge steel can be realized.

实施例2Example 2

如图2-图3所示,二号安装板85位于一号安装板81的上方,卡槽84的深度与卡接件82的高度相同,目的是方便连接机构8进行组装,并在组装过程中两个安装板与H型钢1的表面没有间隙。As shown in FIGS. 2 to 3 , the No. 2 mounting plate 85 is located above the No. 1 mounting plate 81 , and the depth of the clip slot 84 is the same as the height of the clip 82 , in order to facilitate the assembly of the connecting mechanism 8 , and in the assembly process There is no gap between the two mounting plates and the surface of the H-beam 1.

本实施例中,定位孔2的直径与定位凸台83的直径相等,目的是定位凸台83与定位孔2之间进行定位,方便连接机构8进行安装。In this embodiment, the diameter of the positioning hole 2 is equal to the diameter of the positioning boss 83 , for the purpose of positioning between the positioning boss 83 and the positioning hole 2 to facilitate the installation of the connecting mechanism 8 .

本实用新型的桥梁用型钢结构在使用时,将两个H型钢1首尾对齐放好,用一号螺栓 6穿过安装台4上的一号安装孔3对两个H型钢1上的安装台4进行固定,使用者将一号安装板81和二号安装板85两个安装板对准定位孔2和起吊槽9上下进行组装,一号安装板81在上二号安装板85在下,再用二号螺栓7对两个安装板进行固定,需要拆卸时反向进行上述操作即可,这样就实现了桥梁用型钢的快速安装和拆卸。When the profiled steel structure for the bridge of the present invention is in use, the two H-shaped steels 1 are aligned end to end, and the No. 1 bolt 6 is used to pass through the No. 4. For fixing, the user aligns the two mounting plates No. 1 mounting plate 81 and No. 2 mounting plate 85 with the positioning hole 2 and the lifting slot 9 to assemble them up and down. The two mounting plates are fixed with No. 2 bolts 7, and the above operations can be reversed when disassembly is required, thus realizing the rapid installation and disassembly of the bridge section steel.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的仅为本实用新型的优选例,并不用来限制本实用新型,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles, main features and advantages of the present invention are shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions are only preferred examples of the present invention, and are not intended to limit the present invention, without departing from the present invention. Under the premise of the spirit and scope, the present invention will also have various changes and improvements, and these changes and improvements all fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. The utility model provides a shaped steel structure for bridge, includes H shaped steel (1), its characterized in that: locating hole (2) have been seted up on the surface of H shaped steel (1), No. two mounting holes (10) have been seted up to the lower surface of locating hole (2), lifting by crane groove (9) have all been seted up at the front portion and the rear portion of H shaped steel (1), the inner wall that lifts by crane groove (9) is provided with coupling mechanism (8), the both sides of H shaped steel (1) all are provided with mount table (4), mounting hole (3) have been seted up on the surface of mount table (4), the both sides of H shaped steel (1) all are provided with strengthening rib (5), bolt (6) have been pegged graft to the inner wall of a mounting hole (3).
2. The profile steel structure for a bridge according to claim 1, wherein: coupling mechanism (8) are including mounting panel (81), the surface of mounting panel (81) all is through No. two bolt (7) fixed connection with the surface of H shaped steel (1), the bottom welding of mounting panel (81) has joint spare (82), the bottom of mounting panel (81) is provided with location boss (83), No. two mounting holes (10) have been seted up on the surface of location boss (83), the sliding surface connection of joint spare (82) is in the inside of draw-in groove (84), the bottom welding of draw-in groove (84) has mounting panel (85) No. two, the appearance and the size of draw-in groove (84) are the same with the appearance and the size that lift by crane groove (9).
3. The profile steel structure for a bridge according to claim 1, wherein: the specification models of the first bolt (6) and the second bolt (7) are M12x 50.
4. The profile steel structure for a bridge according to claim 1, wherein: the number of the reinforcing ribs (5) is a plurality, and the plurality of reinforcing ribs (5) are symmetrically distributed by taking the center line of the H-shaped steel (1) as a symmetry axis.
5. The profile steel structure for a bridge according to claim 2, wherein: no. two mounting panels (85) are located the top of a mounting panel (81), the degree of depth of draw-in groove (84) is the same with the height of joint spare (82).
6. The profile steel structure for a bridge according to claim 2, wherein: the diameter of the positioning hole (2) is equal to that of the positioning boss (83).
CN202020229422.7U 2020-02-29 2020-02-29 A type of bridge steel structure Expired - Fee Related CN212200025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020229422.7U CN212200025U (en) 2020-02-29 2020-02-29 A type of bridge steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020229422.7U CN212200025U (en) 2020-02-29 2020-02-29 A type of bridge steel structure

Publications (1)

Publication Number Publication Date
CN212200025U true CN212200025U (en) 2020-12-22

Family

ID=73820516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020229422.7U Expired - Fee Related CN212200025U (en) 2020-02-29 2020-02-29 A type of bridge steel structure

Country Status (1)

Country Link
CN (1) CN212200025U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116676856A (en) * 2023-08-04 2023-09-01 河南大方重型装备有限公司 Bridge connecting device with steel structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116676856A (en) * 2023-08-04 2023-09-01 河南大方重型装备有限公司 Bridge connecting device with steel structure
CN116676856B (en) * 2023-08-04 2023-10-20 河南大方重型装备有限公司 Bridge connecting device with steel structure

Similar Documents

Publication Publication Date Title
CN111979892B (en) Quick connecting device suitable for assembled steel truss bridge and mounting method
CN210421624U (en) Building steel structure combination beam convenient to equipment
CN221219374U (en) A high stability steel structure beam
CN220451396U (en) Cantilever type climbing frame attachment supporting device
CN208347296U (en) A kind of belt lacing rod piece
CN216810947U (en) Pier stud connects high light modularization equipment template under confined space
CN214003773U (en) Assembled multi-wing D-shaped lifting lug
CN205688778U (en) A kind of elevating scaffold special over sling structure
CN222275764U (en) A steel structure beam-column rigid connection node
CN219034083U (en) Beam frame device easy to install
CN217379228U (en) A cold-formed thin-walled light steel keel building structure for a liquefied petroleum gas storage room
CN223433132U (en) A new type of cold box lifting lug
CN223482125U (en) Reinforcing structure of stainless steel color steel roof
CN223937402U (en) Assembled steel structure supports shear force wall
CN210032561U (en) Simple fixing device for steel pipe vertical rod base of overhanging scaffold
CN220908684U (en) Connecting structure is assembled in steel house
CN223256203U (en) Steel construction of assembled eccentric support
CN224015172U (en) Lifting appliance for lifting T-beam steel formwork
CN218264851U (en) Combined quick-mounting cantilever beam
CN223241047U (en) Quickly assembled elevator shaft construction operation platform
CN215160424U (en) Hoisting mechanism for automobile parts
CN216277052U (en) Construction device for additionally arranging supporting point column under splicing top supporting beam and beam
CN220747776U (en) A new standard combined support frame
CN211817860U (en) Lifting truss on attached lifting scaffold
CN222276107U (en) A working platform for steel pipe columns

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230428

Address after: 518000 Floor 4, Building B1, Chenwenli Industrial Park, Louming Road Crossing, Loucun Community, Xinhu Street, Guangming District, Shenzhen, Guangdong

Patentee after: Shenzhen Jinggong Steel Structure Co.,Ltd.

Address before: No.94, Chenzhuang, Jinta village, Shanyao, Quangang District, Quanzhou City, Fujian Province

Patentee before: Chen Jiebin

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201222

CF01 Termination of patent right due to non-payment of annual fee