CN212095218U - 双刀塔复合加工机床 - Google Patents
双刀塔复合加工机床 Download PDFInfo
- Publication number
- CN212095218U CN212095218U CN202020402653.3U CN202020402653U CN212095218U CN 212095218 U CN212095218 U CN 212095218U CN 202020402653 U CN202020402653 U CN 202020402653U CN 212095218 U CN212095218 U CN 212095218U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- turret
- moving assembly
- direction guide
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Machine Tool Units (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020402653.3U CN212095218U (zh) | 2020-03-26 | 2020-03-26 | 双刀塔复合加工机床 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020402653.3U CN212095218U (zh) | 2020-03-26 | 2020-03-26 | 双刀塔复合加工机床 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212095218U true CN212095218U (zh) | 2020-12-08 |
Family
ID=73638345
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020402653.3U Active CN212095218U (zh) | 2020-03-26 | 2020-03-26 | 双刀塔复合加工机床 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212095218U (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111300053A (zh) * | 2020-03-26 | 2020-06-19 | 浙江海帝克机床有限公司 | 双刀塔复合加工机床 |
| CN115673766A (zh) * | 2022-10-30 | 2023-02-03 | 江苏博尚工业装备有限公司 | 一种双主轴多刀塔车铣复合机床的多组合加工设备 |
-
2020
- 2020-03-26 CN CN202020402653.3U patent/CN212095218U/zh active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111300053A (zh) * | 2020-03-26 | 2020-06-19 | 浙江海帝克机床有限公司 | 双刀塔复合加工机床 |
| CN115673766A (zh) * | 2022-10-30 | 2023-02-03 | 江苏博尚工业装备有限公司 | 一种双主轴多刀塔车铣复合机床的多组合加工设备 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105014098B (zh) | 卧式数控双刀车花机 | |
| CN202070902U (zh) | 多功能车铣复合专用机床结构 | |
| JPH09168933A (ja) | 工作機械 | |
| CN113941861B (zh) | 车铣一体化加工机床 | |
| CN216503388U (zh) | 车铣复合式加工机床 | |
| CN109277829A (zh) | 一种高效数控纵切车铣复合加工机床 | |
| CN204397367U (zh) | 一种动梁柱式龙门五轴加工中心 | |
| CN115229503A (zh) | 一台用于车铣复合加工多轴铣削加工的智能数控机床设备 | |
| TW201446405A (zh) | 多主軸數控加工裝置 | |
| CN212095218U (zh) | 双刀塔复合加工机床 | |
| CN210877739U (zh) | 立卧复合加工中心 | |
| CN218080818U (zh) | 一种直线电机驱动的丝锥螺纹铲磨床 | |
| CN111300053A (zh) | 双刀塔复合加工机床 | |
| CN110315395A (zh) | 多面体一体机 | |
| CN212217764U (zh) | 一种数控动梁式五轴龙门加工中心机床 | |
| CN221516863U (zh) | 一种数控机床的转台结构及五轴联动数控机床 | |
| CN208977539U (zh) | 双工位数控机床 | |
| CN216801919U (zh) | 一种航空导管端面数控成形机 | |
| CN216681169U (zh) | 带编码器高精度零件加工装置 | |
| CN214135068U (zh) | 龙门加工中心 | |
| CN117600853A (zh) | 一种卧式加工中心 | |
| CN109227318A (zh) | 双工位数控机床 | |
| CN211728465U (zh) | 双工位加工机床 | |
| CN109733103B (zh) | 一种立体雕刻机 | |
| CN109774361B (zh) | 一种立体雕刻机 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Double turret composite machining machine Granted publication date: 20201208 Pledgee: Industrial and Commercial Bank of China Limited Jinhua Branch Pledgor: Zhejiang Haidike Machine Tool Co.,Ltd. Registration number: Y2024980025797 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20201208 Pledgee: Industrial and Commercial Bank of China Limited Jinhua Branch Pledgor: Zhejiang Haidike Machine Tool Co.,Ltd. Registration number: Y2024980025797 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Double turret composite machining machine Granted publication date: 20201208 Pledgee: Industrial and Commercial Bank of China Limited Jinhua Branch Pledgor: Zhejiang Haidike Machine Tool Co.,Ltd. Registration number: Y2025980044091 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |