CN212059712U - A batch pressure test and drying equipment for inclined steel pipe assembly - Google Patents

A batch pressure test and drying equipment for inclined steel pipe assembly Download PDF

Info

Publication number
CN212059712U
CN212059712U CN202020005991.3U CN202020005991U CN212059712U CN 212059712 U CN212059712 U CN 212059712U CN 202020005991 U CN202020005991 U CN 202020005991U CN 212059712 U CN212059712 U CN 212059712U
Authority
CN
China
Prior art keywords
pressing
pipe
inclined steel
throat
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020005991.3U
Other languages
Chinese (zh)
Inventor
武子静
陈亚雄
毛如明
孙元庆
刘丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Hean Machinery Manufacturing Co Ltd
Original Assignee
Hefei Hean Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Hean Machinery Manufacturing Co Ltd filed Critical Hefei Hean Machinery Manufacturing Co Ltd
Priority to CN202020005991.3U priority Critical patent/CN212059712U/en
Application granted granted Critical
Publication of CN212059712U publication Critical patent/CN212059712U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本实用新型公开了一种倾斜钢管总成批量试压吹干设备,包括有机架,机架上架设有槽体、放置板、用于装夹产品的工装组件、用于压紧产品的压紧组件、可移动式前、后端口水候快装组件,工装组件包括有用于支撑架设焊接式的倾斜钢管总成的多个支撑块,支撑块上分别设有方便卡装管体的卡槽;压紧组件包括有压紧气缸驱动的可翻转的压头;可移动式前、后端口水候快装组件包括有与前端口水候对接水平设置的前、后压合喉管,前、后压合喉管的前后移动分别由其一侧的压合气缸一驱动。本实用新型能实现一次试压多根倾斜钢管的目的,且装配效率高,同时该设备在试压实验后对钢管内部吹气,能够实现吹干工序,实现了试压与吹干的工序的简化,工作效率提升。

Figure 202020005991

The utility model discloses a batch pressure-testing and drying equipment for inclined steel pipe assemblies, which comprises a frame, on which a groove body, a placing plate, a tooling component for clamping products, and a pressing device for pressing the products are framed on the frame. Tightening components, movable front and rear port water weather quick-installing components, tooling components include a plurality of support blocks for supporting and erecting welded inclined steel pipe assemblies, and the support blocks are respectively provided with card slots for easy clamping of the pipe body ; The pressing component includes a reversible pressure head driven by a pressing cylinder; the movable front and rear port water weather quick-install components include front and rear pressing throats that are horizontally arranged with the front port water, the front and rear The forward and backward movement of the press-fit throat is driven by the press-fit cylinders on one side respectively. The utility model can realize the purpose of testing a plurality of inclined steel pipes at one time, and has high assembly efficiency. At the same time, the equipment blows air inside the steel pipe after the pressure testing experiment, which can realize the drying process and realize the integration of the pressure testing and drying processes. Simplify and improve work efficiency.

Figure 202020005991

Description

一种倾斜钢管总成批量试压吹干设备A batch pressure test and drying equipment for inclined steel pipe assembly

技术领域:Technical field:

本实用新型涉及倾斜钢管总成批量生产加工测试领域,主要涉及一种倾斜钢管总成批量试压吹干设备。The utility model relates to the field of batch production, processing and testing of inclined steel pipe assemblies, and mainly relates to a batch pressure test and drying equipment for inclined steel pipe assemblies.

背景技术:Background technique:

叉车倾斜油缸和多路阀连接的油管钢管总成又称为倾斜钢管总成,倾斜钢管总成用量大,品种单一。由于倾斜钢管总成是通过焊接形成,需要确保焊接效果,一般通过耐压实验,其耐压压力为40MPa,时间为3min,无泄漏表示焊接效果良好,泄漏表示倾斜钢管总成不合格,吹干,再进行下一步的工序;现有的倾斜钢管总成的试压与吹干工序都是通过人工实现的,首先在试压工序上,将倾斜钢管通过过渡接头、堵头将其连接与密封,过程十分耗费时间与人工,进行耐压试验,试验之后合格件再进行吹干工序,其吹干也是通过人手拿取气枪进行吹干,但实际上很难将内部残留的水吹干,而且效率非常低,不能满足大批量加工生产的要求。The oil pipe steel pipe assembly connected by the forklift tilting cylinder and the multi-way valve is also called the inclined steel pipe assembly. The inclined steel pipe assembly has a large amount and a single variety. Since the inclined steel pipe assembly is formed by welding, it is necessary to ensure the welding effect. Generally, the pressure resistance test is carried out. The pressure resistance is 40MPa and the time is 3 minutes. No leakage means that the welding effect is good, and leakage means that the inclined steel pipe assembly is unqualified. , and then proceed to the next step; the pressure test and drying process of the existing inclined steel pipe assembly are all realized manually. First, in the pressure test process, the inclined steel pipe is connected and sealed through transition joints and plugs. , the process is very time-consuming and labor-intensive, and the pressure test is carried out. After the test, the qualified parts are subjected to the drying process. The drying process is also carried out by taking an air gun by hand, but it is actually difficult to dry the residual water inside, and The efficiency is very low and cannot meet the requirements of mass production.

实用新型内容:Utility model content:

本实用新型目的就是为了弥补已有技术的缺陷,提供一种倾斜钢管总成批量试压吹干设备,能实现一次试压多根倾斜钢管的目的,且装配效率高,同时该设备在试压实验后对钢管内部吹气,能够实现吹干工序,实现了试压与吹干的工序的简化,工作效率提升。The purpose of the utility model is to make up for the defects of the prior art, and to provide a batch pressure test and drying equipment for inclined steel pipe assemblies, which can realize the purpose of testing multiple inclined steel pipes at one time, and has high assembly efficiency. After the experiment, blowing air inside the steel pipe can realize the drying process, simplify the process of pressure test and drying, and improve the work efficiency.

本实用新型是通过以下技术方案实现的:The utility model is achieved through the following technical solutions:

一种倾斜钢管总成批量试压吹干设备,包括有机架,所述机架上架设有试验台,所述试验台包括有槽体,所述槽体上分布有多个间隔设置的放置板,其每个放置板为一个检测工位,且每个检测工位上分别设置有用于装夹产品的工装组件、用于压紧产品的压紧组件、可移动式前端口水候快装组件以及可移动式后端口水候快装组件;A batch pressure-testing and drying equipment for inclined steel pipe assemblies, comprising a frame on which a test bench is set up, the test bench comprising a trough body, and a plurality of spaced placements are distributed on the trough body Plates, each of which is a detection station, and each detection station is provided with a tooling component for clamping products, a pressing component for pressing products, and a movable front port. And removable rear port weather quick assembly;

所述工装组件包括有用于支撑架设焊接式的倾斜钢管总成的多个支撑块,所述支撑块上分别设有方便卡装管体的卡槽,所述支撑块上分布有安装孔,且通过固定销固定安装在对应工位的放置板上;The tooling assembly includes a plurality of support blocks for supporting and erecting the welded inclined steel pipe assembly, the support blocks are respectively provided with clamping grooves for easy clamping of the pipe body, and mounting holes are distributed on the support blocks, and It is fixedly installed on the placement plate of the corresponding station through the fixing pin;

所述的压紧组件为多组,其间隔式分布在倾斜钢管总成的水平设置的管体上,所述压紧组件包括有压紧气缸驱动的可翻转的压头,所述压头的底端面分别设有与管体配合的卡紧槽;The pressing components are in multiple groups, which are distributed at intervals on the horizontally arranged pipe body of the inclined steel pipe assembly. The pressing components include a reversible pressing head driven by a pressing cylinder. The bottom end faces are respectively provided with clamping grooves matched with the pipe body;

所述的可移动式前端口水候快装组件包括有与前端口水候对接水平设置的前压合喉管,所述前压合喉管内设有与前端口水候对接的通道,所述前压合喉管的后端部设有与其内部通道连接的且用于连接汇流管道的连接管一,所述前压合喉管的前后移动分别由其一侧的压合气缸一驱动;The movable front port water weather quick-installation assembly includes a front press-fit throat pipe that is horizontally arranged to be connected with the front port water weather pipe. The rear end of the throat pipe is provided with a connecting pipe 1 which is connected to its inner channel and is used for connecting the confluence pipe, and the front and rear movement of the front pressing throat pipe is driven by the pressing cylinder 1 on one side thereof;

所述可移动式后端口水候快装组件包括有与后端口水候对接竖直设置的后压合喉管,所述后压合喉管内设有与后端口水候对接的通道,所述后压合喉管的中部设有与其内部通道连接的且用于连接汇流管道的连接管二,所述后压合喉管的上下移动分别由其一侧的竖直设置的压合气缸二驱动。The movable rear port water weather quick-installation assembly includes a rear compression throat pipe that is vertically arranged to be connected with the rear port water weather, and the rear compression throat pipe is provided with a channel for docking with the rear port water weather. The middle part of the rear compression throat is provided with a connecting pipe 2 which is connected to its inner channel and is used to connect the confluence pipe. The up and down movement of the rear compression throat is respectively driven by the second vertically arranged compression cylinder on one side of the rear compression throat. .

所述的机架的一端架设有操作台,所述操作台上分布有手动操作按钮,所述操作台内设置有控制器。One end of the frame is provided with an operation table, manual operation buttons are distributed on the operation table, and a controller is arranged in the operation table.

所述的槽体上设有可翻转的安全防护罩,所述安全防护罩的一侧设有方便观察的观察窗口,所述安全防护罩的内端面安装有照明灯。The tank body is provided with a reversible safety shield, one side of the safety shield is provided with an observation window for easy observation, and a lighting lamp is installed on the inner end face of the safety shield.

所述的放置板的两端放置在槽体两侧的固定梁上。Both ends of the placement plate are placed on the fixed beams on both sides of the tank body.

所述的压紧气缸竖直向上设置,其底端面放置在对应的放置板上,所述压头的后端端部铰接在压紧气缸的活塞杆端部,所述压头的后端部通过耳板与其下方的支撑板转动连接,所述支撑板上还设有用于卡装限位的限位槽,所述压紧气缸缸体上端部通过固定耳固定与支撑板连接固定。The pressing cylinder is arranged vertically upward, its bottom end face is placed on the corresponding placing plate, the rear end of the pressing head is hinged on the end of the piston rod of the pressing cylinder, and the rear end of the pressing head The lug plate is rotatably connected with the support plate below it, the support plate is also provided with a limit groove for clamping and limiting, and the upper end of the pressing cylinder is fixed to the support plate by fixing ears.

所述的前压合喉管的下方设有支撑座,所述支撑座上设有与前压合喉管导向配合的套管,所述套管的前端部用于卡装固定前端口水候的卡接固定耳一,所述前端口水候通过其端部旋合固定螺母固定在卡接固定耳一上,所述前压合喉管的前端部设有与前端口水候端头配合的锥形插接头,所述锥形插接头上套装有橡胶密封套。There is a support seat below the front press-fit throat, the support seat is provided with a sleeve that guides and cooperates with the front press-fit throat, and the front end of the sleeve is used for clamping and fixing the front port water. The first clamping and fixing ear, the front port water is fixed on the first clamping and fixing ear by screwing the fixing nut at its end, and the front end of the front pressing throat is provided with a tapered shape that matches with the front port's water and weather end. A plug connector is provided with a rubber sealing sleeve on the tapered plug connector.

所述的前压合喉管和压合气缸一水平并列设置,所述压合气缸一的活塞杆伸出与前压合喉管的后端部通过连接板连接,所述压合气缸一固定安装在支撑座上。The front press-fitting throat pipe and the press-fitting cylinder one are arranged horizontally side by side, the piston rod of the press-fitting cylinder one extends out and the rear end of the front press-fitting throat pipe is connected by a connecting plate, and the press-fitting cylinder one is fixed. Installed on the support base.

所述的后压合喉管的内侧架设有支座,所述支座的外侧面卡装有用于与后压合喉管导向配合的导套,所述导套的上端部设有用于卡装固定前端口水候的卡接固定耳二,所述后端口水候通过其端部旋合固定螺母固定在卡接固定耳二上,所述后压合喉管的上端部设有与后端口水候端头配合的锥形插接头,所述锥形插接头上套装有橡胶密封套。The inner side of the rear compression throat is provided with a support, the outer side of the support is clamped with a guide sleeve for guiding and matching with the rear compression throat, and the upper end of the guide sleeve is provided with a clamp for clamping. The second clamping fixing ear for fixing the front port water, the rear port water is fixed on the clamping fixing ear two by screwing the fixing nut at its end, and the upper end of the rear pressing throat is provided with the rear port water. A conical plug connector to which the waiting end is matched is provided with a rubber sealing sleeve.

所述后压合喉管和压合气缸二竖直并列设置,所述压合气缸二的活塞杆伸出与前压合喉管的下端部通过连接板连接,所述压合气缸二固定安装在支座上。The rear compression throat pipe and the second compression cylinder are arranged vertically side by side, the piston rod of the second compression cylinder extends out and the lower end of the front compression throat is connected through a connecting plate, and the second compression cylinder is fixedly installed on the stand.

所述的连接管一连接的汇流管道连通有输水管道和输气管道,所述输水管道连接至测试介质箱体,且管道中安装有并列设置的低压泵和高压泵以及相应的控制阀,所述输气管道上安装有吹气阀,所述的连接管二连接的汇流管道连通有排出管道,所述排出管道连接至测试介质箱体,所述排出管道上安装有排气阀。The confluence pipeline connected by the connecting pipe is connected with a water delivery pipeline and an air delivery pipeline, the water delivery pipeline is connected to the test medium box, and a low-pressure pump, a high-pressure pump and a corresponding control valve arranged in parallel are installed in the pipeline. , a blowing valve is installed on the gas transmission pipeline, an exhaust pipeline is connected to the confluence pipeline connected by the connecting pipe two, the exhaust pipeline is connected to the test medium box, and an exhaust valve is installed on the exhaust pipeline.

其原理是:通过工装组件的设置可对倾斜钢管总成进行快速的装夹固定,而且由于试验台上设有多个检测工位,因此可一次性安装多个倾斜钢管总成,从而能实现了一次试压多根倾斜钢管的目的,装夹时直接将倾斜钢管总成对应卡装在支撑块上的卡槽上即可,操作方便、快捷,装夹之后通过其上方的压紧组件进行压紧,压紧组件的分布与倾斜钢管总成的水平管体分布对应,通过气缸直接驱动压紧头即可,压紧之后通过两端的可移动式前端口水候快装组件和可移动式后端口水候快装组件对倾斜钢管总成的前端口水候和后端水候进行封堵,然后排气阀打开,低压泵动作,将水完全充满测试工件,排气阀关闭,高压泵工作,系统进入加压,带达到设定压力后,高压泵关闭,系统进行保压计时,保压时间到,排气阀打开,系统泄压,同时吹气阀打开,压缩空气进入测试管中,将管体内的测试介质冲干、吹干,达到预定时间,管体内吹干即试验结束,排气和冲干采用时间控制,根据经验设定时间。综上,整体装配效率高,同时该设备在试压实验后可直接对钢管内部吹气,能够实现吹干工序,实现了试压与吹干的工序的简化,工作效率提升。The principle is that the inclined steel pipe assembly can be quickly clamped and fixed through the setting of the tooling components, and since there are multiple detection stations on the test bench, multiple inclined steel pipe assemblies can be installed at one time, so as to realize For the purpose of testing multiple inclined steel pipes at one time, the inclined steel pipe assembly can be directly clamped to the groove on the support block during clamping, which is convenient and fast to operate. Pressing, the distribution of the pressing components corresponds to the distribution of the horizontal pipe body of the inclined steel pipe assembly, and the pressing head can be directly driven by the air cylinder. The port water weather quick-install component seals the front port water and the back end of the inclined steel pipe assembly, and then the exhaust valve is opened, the low-pressure pump acts, completely fills the test workpiece with water, the exhaust valve is closed, and the high-pressure pump works, The system is pressurized. After the belt reaches the set pressure, the high-pressure pump is turned off, and the system performs pressure-holding timing. When the pressure-holding time is up, the exhaust valve is opened, and the system is depressurized. At the same time, the blowing valve is opened, and the compressed air enters the test tube. The test medium in the tube body is flushed and blown dry until the predetermined time is reached, and the test is completed when the tube body is blown dry. The exhaust and flushing are time-controlled, and the time is set according to experience. In summary, the overall assembly efficiency is high, and at the same time, the equipment can directly blow air into the steel pipe after the pressure test experiment, which can realize the drying process, realize the simplification of the pressure testing and drying process, and improve the work efficiency.

本实用新型的优点是:The advantages of the utility model are:

本实用新型结构设计合理,能实现一次试压多根倾斜钢管的目的,且装配效率高,同时该设备在试压实验后对钢管内部吹气,能够实现吹干工序,实现了试压与吹干的工序的简化,工作效率提升,满足了大批量生产试压的目的。The utility model has a reasonable structure design, can achieve the purpose of testing a plurality of inclined steel pipes at one time, and has high assembly efficiency. At the same time, the equipment blows air into the steel pipe after the pressure testing experiment, which can realize the drying process and realize the pressure testing and blowing. The dry process is simplified and the work efficiency is improved, which satisfies the purpose of mass production pressure test.

附图说明:Description of drawings:

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为图1的局部结构放大图;Fig. 2 is the partial structure enlarged view of Fig. 1;

图3中为一个检测工位上去掉压紧组件的结构示意图;Fig. 3 is a structural schematic diagram of removing the pressing component on a detection station;

图4为可移动式后端口水候快装组件的局部结构示意图;Fig. 4 is the partial structure schematic diagram of the movable rear port weather quick assembly assembly;

图5为压紧组件的结构示意图;Figure 5 is a schematic structural diagram of a compression assembly;

图6为本实用新型工作流程的结构示意图;Fig. 6 is the structural representation of the working flow of the utility model;

图7为本实用新型试压原理的系统图。FIG. 7 is a system diagram of the pressure test principle of the utility model.

具体实施方式:Detailed ways:

参见附图。See attached image.

一种倾斜钢管总成批量试压吹干设备,包括有机架1,所述机架1上架设有试验台,所述试验台包括有槽体2,所述槽体2上分布有多个间隔设置的放置板 3,其每个放置板3为一个检测工位,且每个检测工位上分别设置有用于装夹产品的工装组件4、用于压紧产品的压紧组件5、可移动式前端口水候快装组件6 以及可移动式后端口水候快装组件7;A batch pressure-testing and drying equipment for inclined steel pipe assemblies, comprising a frame 1 on which a test bench is set up, and the test bench includes a tank body 2 on which a plurality of The placement plates 3 arranged at intervals, each placement plate 3 is a detection station, and each detection station is respectively provided with a tooling component 4 for clamping products, a pressing component 5 for pressing products, and The mobile front port weather quick-installation assembly 6 and the movable rear port water weather quick-installation assembly 7;

所述工装组件4包括有用于支撑架设焊接式的倾斜钢管总成8的多个支撑块 4-1,所述支撑块4-1上分别设有方便卡装管体的卡槽4-2,所述支撑块4-1上分布有安装孔,且通过固定销固定安装在对应工位的放置板3上;The tooling assembly 4 includes a plurality of supporting blocks 4-1 for supporting and erecting the welded inclined steel pipe assembly 8. The supporting blocks 4-1 are respectively provided with clamping slots 4-2 for convenient clamping of the pipe body. The support block 4-1 is distributed with mounting holes, and is fixedly mounted on the placement plate 3 of the corresponding station by fixing pins;

所述的压紧组件5为多组,其间隔式分布在倾斜钢管总成8的水平设置的管体上,所述压紧组件5包括有压紧气缸5-3驱动的可翻转的压头5-1,所述压头 5-1的底端面分别设有与管体配合的卡紧槽5-2;The pressing components 5 are in multiple groups, which are distributed at intervals on the horizontally arranged pipe bodies of the inclined steel pipe assembly 8. The pressing components 5 include a reversible pressing head driven by a pressing cylinder 5-3. 5-1, the bottom end face of the indenter 5-1 is respectively provided with a clamping groove 5-2 which is matched with the pipe body;

所述的可移动式前端口水候快装组件6包括有与前端口水候9对接水平设置的前压合喉管6-1,所述前压合喉管6-1内设有与前端口水候对接的通道,所述前压合喉管6-1的后端部设有与其内部通道连接的且用于连接汇流管道的连接管一6-2,所述前压合喉管6-1的前后移动分别由其一侧的压合气缸一6-3驱动;The movable front port water weather quick-installation assembly 6 includes a front press-fit throat 6-1 that is horizontally arranged to be connected with the front port water chamber 9. The front press-fit throat pipe 6-1 is provided with a front port water chamber. The butted channel, the rear end of the front compression throat pipe 6-1 is provided with a connecting pipe 6-2 which is connected to its internal channel and is used to connect the confluence pipe. The front compression throat pipe 6-1 The forward and backward movement is driven by the pressing cylinder one 6-3 on one side;

所述可移动式后端口水候快装组件7包括有与后端口水候10对接竖直设置的后压合喉管7-1,所述后压合喉管7-1内设有与后端口水候对接的通道,所述后压合喉管7-1的中部设有与其内部通道连接的且用于连接汇流管道的连接管二7-2,所述后压合喉管7-1的上下移动分别由其一侧的竖直设置的压合气缸二 7-3驱动。The movable rear port water weather quick assembly 7 includes a rear compression throat pipe 7-1 that is vertically arranged in abutment with the rear port weather 10. The rear compression throat pipe 7-1 is provided with a The port is a channel for docking with water, the middle of the rear compression throat pipe 7-1 is provided with a connecting pipe 2 7-2 which is connected to its internal channel and is used to connect the confluence pipeline, and the rear compression throat pipe 7-1 is provided. The up and down movement is driven by the vertically arranged pressing cylinder two 7-3 on one side.

所述的机架1的一端架设有操作台11,所述操作台11上分布有手动操作按钮,所述操作台11内设置有控制器。One end of the rack 1 is erected with an operating table 11 , and manual operation buttons are distributed on the operating table 11 , and a controller is arranged in the operating table 11 .

所述的槽体2上设有可翻转的安全防护罩12,所述安全防护罩12的一侧设有方便观察的观察窗口13,所述安全防护罩12的内端面安装有照明灯。The tank body 2 is provided with a reversible safety shield 12 , one side of the safety shield 12 is provided with an observation window 13 for easy observation, and an inner end surface of the safety shield 12 is provided with a lighting lamp.

所述的放置板3的两端放置在槽体两侧的固定梁上。Both ends of the placing plate 3 are placed on the fixed beams on both sides of the tank body.

所述的压紧气缸5-3竖直向上设置,其底端面放置在对应的放置板3上,所述压头5-1的后端端部铰接在压紧气缸5-3的活塞杆端部,所述压头5-1的后端部通过耳板与其下方的支撑板5-4转动连接,所述支撑板5-4上还设有用于卡装限位的限位槽,所述压紧气缸5-3缸体上端部通过固定耳5-5固定与支撑板5-4 连接固定。The pressing cylinder 5-3 is arranged vertically upward, and its bottom end face is placed on the corresponding placing plate 3, and the rear end of the pressing head 5-1 is hinged to the piston rod end of the pressing cylinder 5-3. The rear end of the indenter 5-1 is rotatably connected to the support plate 5-4 below it through the lug plate. The support plate 5-4 is also provided with a limit groove for clamping The upper end of the cylinder body of the pressing cylinder 5-3 is fixedly connected to the supporting plate 5-4 through the fixing ears 5-5.

所述的前压合喉管6-1的下方设有支撑座14,所述支撑座14上设有与前压合喉管6-1导向配合的套管15,所述套管15的前端部用于卡装固定前端口水候的卡接固定耳一16,所述前端口水候通过其端部旋合固定螺母固定在卡接固定耳一16上,所述前压合喉管6-1的前端部设有与前端口水候端头配合的锥形插接头,所述锥形插接头上套装有橡胶密封套。A support seat 14 is provided below the front press-fit throat pipe 6-1. The support seat 14 is provided with a sleeve 15 that guides and cooperates with the front press-fit throat pipe 6-1. The front end of the sleeve 15 The first part is used for clamping and fixing the snap-fitting fixing ear 1 16 of the front port. The front end of the connector is provided with a conical plug fitting matched with the water weather end of the front port, and a rubber sealing sleeve is sleeved on the conical plug fitting.

所述的前压合喉管6-1和压合气缸一6-3水平并列设置,所述压合气缸一 6-3的活塞杆伸出与前压合喉管的后端部通过连接板连接,所述压合气缸一6-3 固定安装在支撑座14上。The front press-fitting throat pipe 6-1 and the press-fitting cylinder one 6-3 are arranged horizontally side by side, and the piston rod of the press-fitting cylinder one 6-3 extends out and the rear end of the front press-fitting throat pipe passes through the connecting plate. connected, the press-fit cylinder 1 6-3 is fixedly installed on the support base 14 .

所述的后压合喉管7-1的内侧架设有支座17,所述支座17的外侧面卡装有用于与后压合喉管7-1导向配合的导套18,所述导套18的上端部设有用于卡装固定前端口水候的卡接固定耳二19,所述后端口水候通过其端部旋合固定螺母固定在卡接固定耳二19上,所述后压合喉管7-1的上端部设有与后端口水候端头配合的锥形插接头,所述锥形插接头上套装有橡胶密封套。The inner side of the rear compression throat pipe 7-1 is provided with a support 17, and the outer side of the support 17 is clamped with a guide sleeve 18 for guiding and matching with the rear compression throat pipe 7-1. The upper end of the sleeve 18 is provided with a snap-on fixing ear 2 19 for snap-fitting and fixing the front port water, and the rear port water is fixed on the snap-on fixing ear 2 19 by screwing a fixing nut at its end, and the rear pressure The upper end of the throat closing pipe 7-1 is provided with a conical plug fitting matched with the water weather end of the rear port, and a rubber sealing sleeve is sleeved on the conical plug fitting.

所述后压合喉管7-1和压合气缸二7-3竖直并列设置,所述压合气缸二7-3 的活塞杆伸出与前压合喉管的下端部通过连接板连接,所述压合气缸二7-3固定安装在支座17上。The rear compression throat pipe 7-1 and the second compression cylinder 7-3 are arranged vertically side by side, and the piston rod of the second compression cylinder 7-3 extends out and is connected with the lower end of the front compression throat through a connecting plate , the second pressing cylinder 7-3 is fixedly installed on the support 17.

所述的连接管一6-2连接的汇流管道连通有输水管道和输气管道,所述输水管道连接至测试介质箱体20,且管道中安装有并列设置的低压泵21和高压泵22 以及相应的控制阀23,所述输气管道上安装有吹气阀24,所述的连接管二7-2 连接的汇流管道连通有排出管道25,所述排出管道25连接至测试介质箱体20,所述排出管道上安装有排气阀26。The confluence pipeline connected by the connecting pipe-6-2 is connected with a water pipeline and a gas pipeline, the water pipeline is connected to the test medium box 20, and a low-pressure pump 21 and a high-pressure pump arranged in parallel are installed in the pipeline. 22 and the corresponding control valve 23, the air blowing valve 24 is installed on the gas transmission pipeline, the confluence pipeline connected by the connecting pipe 2 7-2 is connected with the discharge pipeline 25, and the discharge pipeline 25 is connected to the test medium tank The body 20 is provided with an exhaust valve 26 on the exhaust pipe.

上述结构的具体工作流程是:The specific workflow of the above structure is:

首先安装好工件,将倾斜钢管总成对应卡装在支撑块上的卡槽上即可,操作方便、快捷,装夹之后通过其上方的压紧组件进行压紧,压紧组件的分布与倾斜钢管总成的水平管体分布对应,通过气缸直接驱动压紧头即可,压紧之后通过压合气缸一驱动前压合喉管向前推进,推进过程中前压合喉管在套管中导向,当锥形插接头插入前端口水候时,即可实现前端口水候的封堵以及与连接管一连接的汇流管道连通,所述压合气缸二驱动后压合喉管向上推进,推进过程中前压合喉管在导套中导向,当锥形插接头插入前端口水候时,即可实现前端口水候的封堵以及与连接管二连接的汇流管道连通,封堵之后开始试压操作:排气阀打开,低压泵动作,将水完全充满测试工件,排气阀关闭,高压泵工作,系统进入加压,带达到设定压力后,高压泵关闭,系统进行保压计时,保压时间到,排气阀打开,系统泄压,同时吹气阀打开,压缩空气进入测试管中,将管体内的测试介质冲干、吹干,达到预定时间,管体内吹干即试验结束,排气和冲干采用时间控制,根据经验设定时间。First install the workpiece, and then clamp the inclined steel pipe assembly to the groove on the support block. The operation is convenient and fast. After clamping, it is compressed by the compression assembly above it. The distribution and inclination of the compression assembly The distribution of the horizontal pipe body of the steel pipe assembly corresponds to that. The pressing head can be directly driven by the cylinder. After pressing, the front pressing throat is driven forward by the pressing cylinder. During the advancing process, the front pressing throat is in the casing. Guide, when the conical plug connector is inserted into the front port water, the sealing of the front port water and the communication with the confluence pipe connected with the connecting pipe 1 can be realized. The middle and front press-fit throats are guided in the guide sleeve. When the conical plug connector is inserted into the front port, the front port can be blocked and the confluence pipe connected with the connecting pipe 2 can be connected. After the plugging, the pressure test operation can be started. : The exhaust valve is opened, the low-pressure pump is activated, the water is completely filled with the test workpiece, the exhaust valve is closed, the high-pressure pump works, the system is pressurized, and when the belt reaches the set pressure, the high-pressure pump is closed, and the system conducts pressure-keeping timing and pressure-keeping When the time is up, the exhaust valve is opened, the system is depressurized, and the blowing valve is opened at the same time, the compressed air enters the test tube, and the test medium in the tube is flushed and blown dry until the predetermined time is reached. Air and flushing are time-controlled, and the time is set according to experience.

主要参数:The main parameters:

1、可进行按国标规定的保压测试。1. The pressure-holding test according to the national standard can be carried out.

2、试验压力范围:1~40MPa2. Test pressure range: 1~40MPa

3、压力测量精度:±0.5%3. Pressure measurement accuracy: ±0.5%

4、保压测试压力调节精度:±3%4. Pressure adjustment accuracy of pressure holding test: ±3%

5、控制柜上安装方便控制和显示的硬件,包括日本三菱PLC、品牌电脑、液晶显示屏和AD模块控制。5. The control cabinet is equipped with convenient control and display hardware, including Japan's Mitsubishi PLC, brand computer, LCD screen and AD module control.

6、动力系统采用气驱泵,增压比为1:100。系统稳定,操作方便。6. The power system adopts air-driven pump, and the boosting ratio is 1:100. The system is stable and easy to operate.

7、可手动升压测试,升压平均速率:1~30bar/s(可调)。电脑设定,保压时间,测压值。升压速度,保压时间都可调。可进行多段自动升压保压测试,自动判断泄露。多段测试的保压时间可以任意设定。7. Manual boost test is possible, the average rate of boost: 1~30bar/s (adjustable). Computer setting, pressure holding time, pressure measurement value. Both the boosting speed and the holding time are adjustable. It can carry out multi-stage automatic pressure boosting and maintaining pressure test, and automatically judge the leakage. The dwell time of the multi-stage test can be set arbitrarily.

8、试验介质温度:常温8. Test medium temperature: normal temperature

试验介质为:水、液压油或乳化液The test medium is: water, hydraulic oil or emulsion

试验箱的温度为:室温The temperature of the test box is: room temperature

保压时间:1~9999秒可任意设定Holding time: 1 to 9999 seconds can be set arbitrarily

时间控制精度:±1%Time control accuracy: ±1%

9、电脑记录数据,在线显示实验压力、和压力-时间曲线,生成图表文件,可任意打印。曲线的高度和长度何以任意设定。9. The computer records the data, displays the experimental pressure and the pressure-time curve online, and generates a chart file, which can be printed arbitrarily. The height and length of the curve can be arbitrarily set.

10、完全封闭的测试环境,试压机自带水箱,水箱采用不锈钢制作,循环使用水,前部制作观察窗,可确保测试的安全、可靠及观察实验状况,观察窗为钢化玻璃。水、液压油或乳化液箱位于机器下方。护罩使用A3板。10. Completely closed test environment, the pressure tester has its own water tank, the water tank is made of stainless steel, the water is recycled, and the observation window is made in the front to ensure the safety and reliability of the test and observe the experimental status. The observation window is tempered glass. Water, hydraulic oil or emulsion tanks are located under the machine. The shield uses an A3 board.

11、设备安全可靠,工件安装方便,测试过程中发现异常,自动停止测试并泄压、报警。11. The equipment is safe and reliable, and the workpiece is easy to install. If an abnormality is found during the test, the test will be automatically stopped, pressure relief and alarm.

Claims (10)

1. The utility model provides an equipment that weathers is tested to slope steel pipe assembly in batches, including frame (1), its characterized in that: the above-mentioned
A test bed is erected on a rack (1) and comprises a groove body (2), a plurality of placing plates (3) arranged at intervals are distributed on the groove body (2), each placing plate (3) is a detection station, and each detection station is respectively provided with a tooling assembly (4) for clamping a product, a pressing assembly (5) for pressing the product, a movable front port water-waiting quick assembly (6) and a movable rear port water-waiting quick assembly (7);
the tool assembly (4) comprises a plurality of supporting blocks (4-1) for supporting and erecting a welded inclined steel pipe assembly (8), clamping grooves (4-2) for conveniently clamping a pipe body are respectively formed in the supporting blocks (4-1), mounting holes are distributed in the supporting blocks (4-1), and the supporting blocks are fixedly mounted on a placing plate (3) of a corresponding station through fixing pins;
the pressing assemblies (5) are distributed on a pipe body of the inclined steel pipe assembly (8) in an interval mode, the pressing assemblies (5) comprise reversible pressing heads (5-1) driven by pressing cylinders (5-3), and clamping grooves (5-2) matched with the pipe body are formed in the bottom end face of each pressing head (5-1);
the movable front-port weather quick-assembly component (6) comprises a front pressing throat pipe (6-1) horizontally arranged in butt joint with a front-port weather (9), a channel in butt joint with the front-port weather is arranged in the front pressing throat pipe (6-1), a first connecting pipe (6-2) which is connected with the inner channel of the front pressing throat pipe (6-1) and is used for connecting a confluence pipeline is arranged at the rear end of the front pressing throat pipe (6-1), and the front and rear movement of the front pressing throat pipe (6-1) is respectively driven by a first pressing cylinder (6-3) at one side of the front pressing throat pipe;
the movable rear port water climate fast-assembly component (7) comprises a rear pressing throat pipe (7-1) which is vertically butted with a rear port water climate (10), a channel which is butted with the rear port water climate is arranged in the rear pressing throat pipe (7-1), a second connecting pipe (7-2) which is connected with the inner channel of the rear pressing throat pipe (7-1) and is used for connecting a confluence pipeline is arranged in the middle of the rear pressing throat pipe (7-1), and the rear pressing throat pipe (7-1) is driven by a second pressing cylinder (7-3) which is vertically arranged on one side of the rear pressing throat pipe to move up and down respectively.
2. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 1, wherein: the above-mentioned
The automatic control device is characterized in that an operating table (11) is erected at one end of the rack (1), manual operation buttons are distributed on the operating table (11), and a controller is arranged in the operating table (11).
3. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 1, wherein: the above-mentioned
The groove body (2) is provided with a reversible safety protection cover (12), and one side of the safety protection cover (12)
An observation window (13) convenient for observation is arranged, and illumination is arranged on the inner end surface of the safety protection cover (12)
And a lamp.
4. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 1, wherein: the above-mentioned
The two ends of the placing plate (3) are placed on the fixed beams at the two sides of the groove body.
5. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 1, wherein: the above-mentioned
The pressing cylinder (5-3) is vertically arranged upwards, the bottom end face of the pressing cylinder is placed on the corresponding placing plate (3), the rear end part of the pressing head (5-1) is hinged to the end part of a piston rod of the pressing cylinder (5-3), the rear end part of the pressing head (5-1) is rotatably connected with a supporting plate (5-4) below the pressing head through an ear plate, a limiting groove for clamping and limiting is further arranged on the supporting plate (5-4), and the upper end part of a cylinder body of the pressing cylinder (5-3) is fixedly connected with the supporting plate (5-4) through a fixing ear (5-5).
6. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 1, wherein: the above-mentioned
The device is characterized in that a supporting seat (14) is arranged below the front pressing throat pipe (6-1), a sleeve pipe (15) which is in guide fit with the front pressing throat pipe (6-1) is arranged on the supporting seat (14), the front end part of the sleeve pipe (15) is used for clamping and fixing a first clamping and fixing lug (16) of the front port climate, the front port climate is fixed on the first clamping and fixing lug (16) through a fixing nut which is screwed on the end part of the front port climate, a conical plug-in connector which is matched with the front port climate end is arranged on the front end part of the front pressing throat pipe (6-1), and a rubber sealing sleeve is sleeved on the conical plug-in connector.
7. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 6, wherein: the above-mentioned
The front pressing throat (6-1) and the first pressing cylinder (6-3) are horizontally arranged in parallel, a piston rod of the first pressing cylinder (6-3) extends out to be connected with the rear end part of the front pressing throat through a connecting plate, and the first pressing cylinder (6-3) is fixedly arranged on the supporting seat (14).
8. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 1, wherein: the above-mentioned
The inner side of the rear pressing throat (7-1) is provided with a support (17), the outer side surface of the support (17) is clamped with a guide sleeve (18) which is used for being matched with the rear pressing throat (7-1) in a guiding mode, the upper end portion of the guide sleeve (18) is provided with a clamping fixing lug II (19) which is used for clamping and fixing the front port water climate, the rear port water climate is fixed on the clamping fixing lug II (19) through a fixing nut which is screwed on the end portion of the rear port water climate, the upper end portion of the rear pressing throat (7-1) is provided with a conical plug-in connector which is matched with the rear port water climate end, and a rubber sealing sleeve is sleeved on the conical plug-in connector.
9. The equipment for drying inclined steel tube assembly under pressure test in batches as claimed in claim 8, wherein: the above-mentioned
The rear pressing throat (7-1) and the second pressing cylinder (7-3) are vertically arranged in parallel, and the second pressing cylinder (7-3)
The piston rod extends out to be connected with the lower end part of the front pressing throat pipe through a connecting plate, and the pressing cylinder II (7-3) is fixedly arranged on the support (17).
10. The equipment for drying inclined steel tube assembly during pressure test in batches as claimed in claim 1, wherein: the above-mentioned
The converging pipeline connected with the first connecting pipe (6-2) is communicated with a water pipeline and a gas pipeline, the water pipeline is connected to the test medium box body, a low-pressure pump, a high-pressure pump and a corresponding control valve which are arranged in parallel are installed in the pipeline, a gas blowing valve is installed on the gas pipeline, the converging pipeline connected with the second connecting pipe (7-2) is communicated with a discharge pipeline, the discharge pipeline is connected to the test medium box body, and a discharge valve is installed on the discharge pipeline.
CN202020005991.3U 2020-01-03 2020-01-03 A batch pressure test and drying equipment for inclined steel pipe assembly Expired - Fee Related CN212059712U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020005991.3U CN212059712U (en) 2020-01-03 2020-01-03 A batch pressure test and drying equipment for inclined steel pipe assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020005991.3U CN212059712U (en) 2020-01-03 2020-01-03 A batch pressure test and drying equipment for inclined steel pipe assembly

Publications (1)

Publication Number Publication Date
CN212059712U true CN212059712U (en) 2020-12-01

Family

ID=73535067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020005991.3U Expired - Fee Related CN212059712U (en) 2020-01-03 2020-01-03 A batch pressure test and drying equipment for inclined steel pipe assembly

Country Status (1)

Country Link
CN (1) CN212059712U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111060405A (en) * 2020-01-03 2020-04-24 合肥和安机械制造有限公司 A batch pressure test and drying equipment for inclined steel pipe assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111060405A (en) * 2020-01-03 2020-04-24 合肥和安机械制造有限公司 A batch pressure test and drying equipment for inclined steel pipe assembly
CN111060405B (en) * 2020-01-03 2025-11-04 合肥和安机械制造有限公司 A batch pressure testing and drying equipment for inclined steel pipe assemblies

Similar Documents

Publication Publication Date Title
CN102620894B (en) Automatic leakage-detecting machine for sealed connecting terminal of compressor
CN202420793U (en) Test bed for detecting sealing performance of parts of engine oil coolers
CN110926718B (en) A sealing detection device for automobile parts
CN104236825B (en) Shell leakage testing clamp
CN212059712U (en) A batch pressure test and drying equipment for inclined steel pipe assembly
CN111060405B (en) A batch pressure testing and drying equipment for inclined steel pipe assemblies
CN104165739A (en) Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine
CN211178874U (en) Automobile parts leakproofness detection device
CN202420780U (en) Automatic leak tester for hermetic connecting terminal of compressor
CN222087237U (en) New energy electric control box casting low-pressure leakage detection device
CN112943594B (en) Water pump water pressure-resistant sealing test bench
CN216770909U (en) Automatic pressure maintaining test system
CN216207327U (en) Pressure testing machine for gas storage tank
CN210664911U (en) End cover gas tightness detection device
CN212340855U (en) Automatic free body water pressure testing equipment for fire extinguisher cylinder
CN216791539U (en) Pressure test device for air tightness of water pump
CN221803288U (en) Automobile rearview mirror air tightness detection device
CN201402202Y (en) Semi-automatic closed leak tester
CN113758655A (en) Shell air tightness detection device and method
CN216978284U (en) Protection device for atmospheric pressure test
CN217424686U (en) Automobile windshield wiper water tank gas tightness check out test set
CN220854058U (en) Pressure testing device for butterfly valve
CN120212036B (en) Energy-saving air compressor and test equipment thereof
CN222964810U (en) A compression fitting air tightness test device
CN222936912U (en) A new energy vehicle air conditioning compressor performance rapid testing equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

CF01 Termination of patent right due to non-payment of annual fee