CN212026880U - Combined floor slab roof building gutter structure - Google Patents
Combined floor slab roof building gutter structure Download PDFInfo
- Publication number
- CN212026880U CN212026880U CN202020288438.5U CN202020288438U CN212026880U CN 212026880 U CN212026880 U CN 212026880U CN 202020288438 U CN202020288438 U CN 202020288438U CN 212026880 U CN212026880 U CN 212026880U
- Authority
- CN
- China
- Prior art keywords
- steel
- composite floor
- steel structure
- chute
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种组合楼板屋面建筑天沟结构,所要解决的问题:减少了楼板支模和楼承板脚手架的搭设,减少了工期,节约了人工成本和材料费用。另外,浇筑而成的女儿墙与屋面板一体成型,这样也避免了在轻钢屋面结构中由于温度变化引起的天沟与墙体开裂导致的屋内渗水的现象;其包括依次设置的钢结构柱、钢结构次梁以及组合楼板钢梁,还包括:组合楼板钢筋混凝土,所述组合楼板钢筋混凝土由压型钢板、栓钉、以及双层双向钢筋组成,所述栓钉贯穿所述压型钢板连接于所述钢结构次梁上。
The utility model discloses a combined floor-slab roof building gutter structure, and the problems to be solved are that the erection of floor-supporting formwork and floor-bearing slab scaffolding is reduced, construction period is shortened, and labor cost and material cost are saved. In addition, the poured parapet and the roof panel are integrally formed, which also avoids the phenomenon of water seepage in the house caused by the cracking of the gutter and the wall caused by the temperature change in the light steel roof structure; it includes the steel structure columns arranged in sequence. , steel structure secondary beams and composite floor steel beams, further comprising: composite floor reinforced concrete, the composite floor reinforced concrete is composed of profiled steel plates, studs, and double-layer bidirectional steel bars, and the studs penetrate the profiled steel plates. connected to the secondary beam of the steel structure.
Description
技术领域technical field
本实用新型涉及建筑结构技术领域,具体地说,涉及一种组合楼板屋面建筑天沟结构。The utility model relates to the technical field of building structures, in particular to a combined floor and roof building gutter structure.
背景技术Background technique
随着经济的快速发展,对建筑的功能性要求也越来越高。在电子设备间的设计中,需要满足建筑的安全、质量、工期、防火、防水、保温等基本要求。若全部采用钢筋混凝土框架结构,其基础、柱子、梁、楼板需要单独浇筑和养护,在养护的过程中还需要进行满堂架的安装和拆除。无形之中增加了人工费和措施费,同时业主对工期的要求十分苛刻,若全部采用钢筋混凝土框架结构形式,其工期也是无法保证。如果我们全部采用钢结构形式虽然可以缩短施工周期,但是也无法满足建筑结构的寿命周期,其防腐、防火、防水方面对施工的技术要求也十分苛刻。处理不当会造成节点处漏水,最终可能会导致电子设备间渗水导致设备烧毁的隐患。With the rapid development of economy, the functional requirements of buildings are also getting higher and higher. In the design of the electronic equipment room, it is necessary to meet the basic requirements of building safety, quality, construction period, fire prevention, waterproof, thermal insulation and so on. If all the reinforced concrete frame structures are used, the foundations, columns, beams and floor slabs need to be poured and maintained separately. During the maintenance process, the installation and removal of the full house frame is also required. Invisibly increased labor costs and measures costs, and the owner's requirements for the construction period are very strict, if all the reinforced concrete frame structure is used, the construction period cannot be guaranteed. If we use all steel structures, although the construction period can be shortened, it cannot meet the life cycle of the building structure, and its technical requirements for anti-corrosion, fire prevention and waterproofing are also very strict. Improper handling will cause water leakage at the nodes, which may eventually lead to the hidden danger of water seepage between electronic equipment and equipment burnout.
实用新型内容Utility model content
为达到上述目的,本实用新型公开了一种组合楼板屋面建筑天沟结构,所要解决的问题:减少了楼板支模和楼承板脚手架的搭设,减少了工期,节约了人工成本和材料费用。另外,浇筑而成的女儿墙与屋面板一体成型,这样也避免了在轻钢屋面结构中由于温度变化引起的天沟与墙体开裂导致的屋内渗水的现象;其包括依次设置的钢结构柱、钢结构次梁以及组合楼板钢梁,还包括:In order to achieve the above purpose, the utility model discloses a gutter structure of a combined floor and roof building, and the problem to be solved is that the erection of floor support formwork and floor deck scaffolding is reduced, the construction period is reduced, and labor costs and material costs are saved. In addition, the poured parapet and the roof panel are integrally formed, which also avoids the phenomenon of water seepage in the house caused by the cracking of the gutter and the wall caused by the temperature change in the light steel roof structure; it includes the steel structure columns arranged in sequence. , steel structural secondary beams, and composite floor steel beams, including:
组合楼板钢筋混凝土,所述组合楼板钢筋混凝土由压型钢板、栓钉、以及双层双向钢筋组成,所述栓钉贯穿所述压型钢板连接于所述钢结构次梁上。The composite floor reinforced concrete is composed of profiled steel plates, studs, and double-layer bidirectional steel bars, and the studs pass through the profiled steel plates and are connected to the secondary beams of the steel structure.
优选的,若干个所述组合楼板钢梁横向连接于并排设置的两个所述钢结构次梁之间,所述钢结构柱竖直支撑连接于所述钢结构次梁和组合楼板钢梁的连接处的底端。Preferably, several of the composite floor steel beams are laterally connected between two of the steel structure secondary beams arranged side by side, and the steel structure columns are vertically supported and connected to the steel structure secondary beams and the composite floor steel beams. bottom end of the connection.
优选的,所述钢结构次梁底端、以及所述组合楼板钢梁两端均焊接于所述钢结构柱顶端。Preferably, the bottom end of the steel structure secondary beam and both ends of the composite floor steel beam are welded to the top end of the steel structure column.
优选的,所述钢结构柱、钢结构次梁以及组合楼板钢梁均采用普通碳钢制成,且外表面涂刷有防腐油漆。Preferably, the steel structure column, the steel structure secondary beam and the composite floor steel beam are all made of ordinary carbon steel, and the outer surface is painted with anti-corrosion paint.
优选的,还包括:Preferably, it also includes:
女儿墙钢筋,所述女儿墙钢筋呈90°折弯设置,所述女儿墙钢筋一端焊接于所述钢结构次梁和/或所述组合楼板钢梁顶端,所述女儿墙钢筋另一端靠近所述组合楼板屋面外边沿设置。Parapet reinforcement, the parapet reinforcement is bent at 90°, one end of the parapet reinforcement is welded to the secondary beam of the steel structure and/or the top of the composite floor steel beam, and the other end of the parapet reinforcement is close to the top of the steel beam. The outer edge of the composite floor roof is set.
优选的,所述女儿墙钢筋另一端折弯高度不大于1.2m。Preferably, the bending height of the other end of the parapet reinforcement is not greater than 1.2m.
优选的,所述女儿墙钢筋内端铺设有防水层。Preferably, the inner end of the parapet reinforcement is covered with a waterproof layer.
优选的,所述防水层厚度为250mm。Preferably, the thickness of the waterproof layer is 250mm.
优选的,所述钢结构柱包括:Preferably, the steel structure column includes:
底座,所述底座安装于预设位置;a base, the base is installed at a preset position;
滑槽,两个所述滑槽平行开设于所述底座顶端,且所述滑槽一端贯穿所述底座侧端设置,所述滑槽槽底呈倾斜式设置,且所述滑槽槽底高位端靠近所述滑槽另一端设置;A chute, two of which are parallel to the top of the base, one end of the chute is arranged through the side end of the base, the bottom of the chute is inclined, and the bottom of the chute is high The end is arranged close to the other end of the chute;
支撑柱,所述支撑柱设置工字钢结构;a support column, the support column is provided with an I-beam structure;
U型安装板,所述U型安装板开口端朝下设置,所述支撑柱顶端连接于所述U型安装板底端,所述钢结构次梁和/或组合楼板钢梁连接于所述U型安装板顶端;U-shaped mounting plate, the open end of the U-shaped mounting plate is arranged downward, the top end of the support column is connected to the bottom end of the U-shaped mounting plate, and the steel structure secondary beam and/or the composite floor steel beam is connected to the U-shaped mounting plate. The top of the U-shaped mounting plate;
固定板,所述固定板连接于所述支撑柱底端;a fixing plate, the fixing plate is connected to the bottom end of the support column;
弹性塑胶垫,所述弹性塑胶垫连接于所述固定板远离支撑柱端;an elastic plastic pad, the elastic plastic pad is connected to the end of the fixing plate away from the support column;
滑块,所述滑块连接于所述固定板远离支撑柱端,所述滑块适配所述滑槽设置,且所述滑块底端贯穿突出所述弹性塑胶垫设置;a sliding block, the sliding block is connected to the end of the fixing plate away from the support column, the sliding block is arranged to fit the chute, and the bottom end of the sliding block is arranged to protrude through the elastic plastic pad;
固定螺孔,所述固定螺孔沿所述滑槽长度方向对称设置于所述滑槽两端;Fixing screw holes, the fixing screw holes are symmetrically arranged at both ends of the chute along the length direction of the chute;
固定螺母,所述固定螺母连接于所述固定螺孔内,并用于紧固所述固定板设置。A fixing nut, the fixing nut is connected in the fixing screw hole and is used to fasten the fixing plate.
附图说明Description of drawings
为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the specific embodiments or the prior art. Obviously, the following descriptions The accompanying drawings are some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative efforts.
图1为本实用新型结构示意图一;Fig. 1 is the structural representation one of the utility model;
图2为本实用新型结构示意图二;Fig. 2 is the structural representation two of the utility model;
图3为本实用新型钢结构次梁与组合楼板钢筋混凝土连接结构示意图一;Fig. 3 is the first schematic diagram of the connection structure between the steel structure secondary beam and the composite floor reinforced concrete of the utility model;
图4为本实用新型钢结构次梁与组合楼板钢筋混凝土连接结构示意图二;4 is a second schematic diagram of the connection structure between the steel structure secondary beam and the composite floor reinforced concrete of the utility model;
图5为本实用新型钢结构柱爆炸图。Figure 5 is an exploded view of the steel structure column of the present invention.
图中:1.钢结构柱;2.钢结构次梁;3.组合楼板钢梁;4.组合楼板钢筋混凝土;5.女儿墙钢筋;11.底座;12.滑槽;13.支撑柱;14.U型安装板;15.固定板;16.弹性塑胶垫;17.滑块;18.固定螺孔;41.压型钢板;42.栓钉。In the picture: 1. Steel structure column; 2. Steel structure secondary beam; 3. Composite floor steel beam; 4. Composite floor reinforced concrete; 5. Parapet reinforcement; 11. Base; 12. Chute; 13. Support column; 14. U-shaped mounting plate; 15. Fixed plate; 16. Elastic plastic pad; 17. Slider; 18. Fixed screw hole; 41. Profiled steel plate; 42. Bolt.
具体实施方式Detailed ways
下面将结合附图对本实用新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
实施例Example
下面将结合附图对本实用新型做进一步描述。The present utility model will be further described below with reference to the accompanying drawings.
如图1至图4所示,本实施例提供的一种组合楼板屋面建筑天沟结构,包括依次设置的钢结构柱1、钢结构次梁2以及组合楼板钢梁3,还包括:As shown in FIGS. 1 to 4 , a gutter structure of a composite floor roof building provided in this embodiment includes a
组合楼板钢筋混凝土4,所述组合楼板钢筋混凝土4由压型钢板41、栓钉 42、以及双层双向钢筋组成,所述栓钉42贯穿所述压型钢板41连接于所述钢结构次梁2上。The composite floor reinforced concrete 4 is composed of a profiled
在本实施例中,若干个所述组合楼板钢梁3横向连接于并排设置的两个所述钢结构次梁2之间,所述钢结构柱1竖直支撑连接于所述钢结构次梁2和组合楼板钢梁3的连接处的底端。In this embodiment, a plurality of the composite
在本实施例中,所述钢结构次梁2底端、以及所述组合楼板钢梁3两端均焊接于所述钢结构柱1顶端。In this embodiment, the bottom end of the steel structure
在本实施例中,所述钢结构柱1、钢结构次梁2以及组合楼板钢梁3均采用普通碳钢制成,且外表面涂刷有防腐油漆。In this embodiment, the
在本实施例中,还包括:In this embodiment, it also includes:
女儿墙钢筋5,所述女儿墙钢筋5呈90°折弯设置,所述女儿墙钢筋5一端焊接于所述钢结构次梁2和/或所述组合楼板钢梁3顶端,所述女儿墙钢筋5 另一端靠近所述组合楼板屋面外边沿设置。Parapet reinforcement bars 5, described parapet reinforcement bars 5 are arranged in a 90° bend, and one end of the parapet reinforcement bars 5 is welded to the top of the
在本实施例中,所述女儿墙钢筋5另一端折弯高度不大于1.2m。In this embodiment, the bending height of the other end of the
在本实施例中,所述女儿墙钢筋5内端铺设有防水层。In this embodiment, a waterproof layer is laid on the inner end of the parapet reinforcement bars 5 .
在本实施例中,所述防水层厚度为250mm。In this embodiment, the thickness of the waterproof layer is 250mm.
上述技术方案的工作原理为:The working principle of the above technical solution is as follows:
本实用新型提供的一种组合楼板屋面建筑天沟结构分别包括了钢结构柱1、钢结构次梁2、组合楼板钢梁3、栓钉42、围护墙体、女儿墙和双层双向钢筋,首先对所有钢结构柱1、钢结构次梁2、组合楼板钢梁3进行吊装,吊装完成后用栓钉42把压型钢板固定在钢结构次梁2、组合楼板钢梁3组成的钢梁龙骨上。所述栓钉42为抗剪栓钉,接着铺设双层双向钢筋和女儿墙钢筋5、临时支撑女儿墙模板,最后整体浇筑混凝土。The utility model provides a combined floor roof building gutter structure, which respectively comprises a
上述技术方案的有益效果为:The beneficial effects of the above technical solutions are:
钢结构柱1、钢结构次梁2、组合楼板钢梁3、栓钉42、围护墙体组成了结构的框架龙骨,给组合楼板屋面和女儿墙体起到一个支撑作用。屋面楼承板和女儿墙的楼承板混凝土同时浇筑,不用设置二次浇罐层,这样就避免了女儿墙和屋面接缝处的渗水。The
如图5所示,本实用新型提供另一个实施例中,所述钢结构柱1包括:As shown in FIG. 5 , in another embodiment provided by the present invention, the
底座11,所述底座11安装于预设位置;a
滑槽12,两个所述滑槽12平行开设于所述底座11顶端,且所述滑槽12 一端贯穿所述底座11侧端设置,所述滑槽12槽底呈倾斜式设置,且所述滑槽12槽底高位端靠近所述滑槽12另一端设置;A
支撑柱13,所述支撑柱13设置工字钢结构;
U型安装板14,所述U型安装板14开口端朝下设置,所述支撑柱13顶端连接于所述U型安装板14底端,所述钢结构次梁2和/或组合楼板钢梁3连接于所述U型安装板14顶端;U-shaped mounting
固定板15,所述固定板15连接于所述支撑柱13底端;a fixing
弹性塑胶垫16,所述弹性塑胶垫16连接于所述固定板15远离支撑柱13 端;an
滑块17,所述滑块17连接于所述固定板15远离支撑柱13端,所述滑块 17适配所述滑槽12设置,且所述滑块17底端贯穿突出所述弹性塑胶垫16设置;A slider 17, the slider 17 is connected to the end of the fixing
固定螺孔18,所述固定螺孔18沿所述滑槽12长度方向对称设置于所述滑槽12两端;Fixing screw holes 18, the fixing screw holes 18 are symmetrically arranged at both ends of the
固定螺母,所述固定螺母连接于所述固定螺孔18内,并用于紧固所述固定板15设置。A fixing nut, the fixing nut is connected in the fixing
上述技术方案的工作原理和有益效果为:The working principle and beneficial effects of the above technical solutions are:
滑块17自所述滑槽12槽底低位端插设于所述滑槽12内,此时,滑块17 向所述滑槽12槽底高位端移动,由于所述滑槽12槽底呈倾斜式设置,进而使所述弹性塑胶垫16发生压缩变形,当所述滑块17移动到所述滑槽12槽底高位端时,在所述固定螺孔18内安装固定螺母,进而限位所述固定板15的横向运动,同时限位所述钢结构柱1的横向运动,同时,由于所述弹性塑胶垫16的压缩,产生方向力,更加约束了所述钢结构1的横向运动,进而对所述钢结构柱1 起到加固的作用,同时方便所述钢结构柱1的拆装,所述支撑柱13顶端塞入所述U型安装板14内,可通过螺栓进行连接,从而便于所述钢结构柱1顶端与所述钢结构次梁2和/或组合楼板钢梁3连接。The sliding block 17 is inserted into the sliding
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。Obviously, the above-mentioned embodiments are only examples for clear description, and are not intended to limit the implementation manner. For those of ordinary skill in the art, changes or modifications in other different forms can also be made on the basis of the above description. There is no need and cannot be exhaustive of all implementations here. And the obvious changes or changes derived from this are still within the protection scope of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020288438.5U CN212026880U (en) | 2020-03-11 | 2020-03-11 | Combined floor slab roof building gutter structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020288438.5U CN212026880U (en) | 2020-03-11 | 2020-03-11 | Combined floor slab roof building gutter structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212026880U true CN212026880U (en) | 2020-11-27 |
Family
ID=73484823
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020288438.5U Expired - Fee Related CN212026880U (en) | 2020-03-11 | 2020-03-11 | Combined floor slab roof building gutter structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212026880U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113482327A (en) * | 2021-06-16 | 2021-10-08 | 五冶集团上海有限公司 | Parapet formwork supporting method |
| CN114704034A (en) * | 2022-01-12 | 2022-07-05 | 中建八局西南建设工程有限公司 | Special-shaped steel-concrete eave structure and construction method thereof |
| CN114961302A (en) * | 2022-07-08 | 2022-08-30 | 中建三局集团有限公司 | Large-span high-roof profiled steel sheet composite floor slab construction auxiliary device and method |
| CN118422870A (en) * | 2024-05-10 | 2024-08-02 | 中国五冶集团有限公司 | A parapet wall formwork method |
-
2020
- 2020-03-11 CN CN202020288438.5U patent/CN212026880U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113482327A (en) * | 2021-06-16 | 2021-10-08 | 五冶集团上海有限公司 | Parapet formwork supporting method |
| CN114704034A (en) * | 2022-01-12 | 2022-07-05 | 中建八局西南建设工程有限公司 | Special-shaped steel-concrete eave structure and construction method thereof |
| CN114961302A (en) * | 2022-07-08 | 2022-08-30 | 中建三局集团有限公司 | Large-span high-roof profiled steel sheet composite floor slab construction auxiliary device and method |
| CN118422870A (en) * | 2024-05-10 | 2024-08-02 | 中国五冶集团有限公司 | A parapet wall formwork method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN212026880U (en) | Combined floor slab roof building gutter structure | |
| CN104947788B (en) | A kind of modular assembly formula building systems and its method of construction | |
| CN205348515U (en) | Oblique roofing system of assembled | |
| CN210369420U (en) | Connecting node structure of externally-hung wallboard | |
| CN108222270B (en) | Assembling construction building method of prefabricated building | |
| CN206428968U (en) | A kind of steel bar girder formula is without supporting template system | |
| CN110409813A (en) | Exempt to split into type beam forms, formwork structure and construction process containing steel reinforcement cage | |
| CN110409811A (en) | Exempt to split into type column template, formwork structure and construction process containing steel reinforcement cage | |
| CN209837426U (en) | Assembled timber structure combination superstructure | |
| CN210086489U (en) | Dry-type connected low-rise assembly type building structure system | |
| CN106121087A (en) | A kind of steel building and wall construction method, beam column steel beam column | |
| CN208168032U (en) | Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node | |
| CN211775096U (en) | Fire prevention anticorrosive heat preservation decorates integration H shaped steel roof beam | |
| CN211622098U (en) | A semi-embedded external waterproof and internal thermal insulation external wall panel | |
| CN112647628B (en) | Assembled external parapet connected node | |
| CN119177742B (en) | A steel-concrete prefabricated pitched roof construction device and construction method | |
| CN111926912A (en) | Integrally prefabricated balcony, connecting node and manufacturing method suitable for assembly type building | |
| CN216810426U (en) | Prefabricated shear wall of partial concrete steel component unit | |
| CN216195711U (en) | Unit prefabricated shear wall with edge being steel-concrete combined component | |
| CN206189697U (en) | Assembled room lid | |
| CN218374567U (en) | Can fix a position ALC wallboard reinforced structure that can exempt from to plaster | |
| CN216840143U (en) | Steel bar truss floor bearing plate with detachable aluminum bottom mold | |
| CN212772980U (en) | A prefabricated composite wall based on C-shaped steel | |
| CN205712715U (en) | A kind of low-rise building lattice heat insulation prefabricated board member | |
| CN213837838U (en) | ALC wall body door opening reinforced structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201127 |