CN212002061U - Connecting device for building external hanging and building main body - Google Patents
Connecting device for building external hanging and building main body Download PDFInfo
- Publication number
- CN212002061U CN212002061U CN202020418728.7U CN202020418728U CN212002061U CN 212002061 U CN212002061 U CN 212002061U CN 202020418728 U CN202020418728 U CN 202020418728U CN 212002061 U CN212002061 U CN 212002061U
- Authority
- CN
- China
- Prior art keywords
- building
- hanging
- board
- external hanging
- bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本实用新型涉及建筑设备技术领域,具体为一种建筑外挂与建筑主体的连接装置,包括外挂板、减震机构以及防护架,所述外挂板前端设有固定板,所述固定板基面设有第一挂件和第二挂件,所述固定板四周设有固定螺栓,所述第一挂件和第二挂件底端固定有连接螺栓,所述连接螺栓两端设有螺母,所述减震机构两端设有压板,所述压板底端设有复位弹簧、导向柱以及减震座,所述减震机构位于中心位置设有通孔,所述防护架两端外部设有调节螺栓,所述防护架两端内部设有螺杆,所述螺杆一端连接有卡板,通过设置的外挂板,外挂板前端设有固定板,固定板基面设有第一挂件和第二挂件,节省了物力和财力,提高了工作效率,使得设备安装时更加的高效。
The utility model relates to the technical field of construction equipment, in particular to a connecting device for a building external hanging and a building main body, comprising an external hanging board, a shock absorbing mechanism and a protective frame, the front end of the external hanging board is provided with a fixing plate, and the base surface of the fixing board There are a first hanging piece and a second hanging piece, fixing bolts are arranged around the fixing plate, connecting bolts are fixed at the bottom ends of the first hanging piece and the second hanging piece, nuts are provided at both ends of the connecting bolts, and the shock absorbing mechanism Both ends are provided with pressure plates, the bottom end of the pressure plate is provided with a return spring, a guide column and a shock-absorbing seat, the shock-absorbing mechanism is provided with a through hole at the center position, and adjustment bolts are provided outside the two ends of the protective frame. The two ends of the protective frame are provided with screws, and one end of the screws is connected with a card board. Through the set external hanging board, the front end of the external hanging board is provided with a fixed board, and the base surface of the fixed board is provided with a first hanging piece and a second hanging piece, which saves material resources and costs. Financial resources, improve work efficiency, and make equipment installation more efficient.
Description
技术领域technical field
本实用新型涉及建筑设备技术领域,具体为一种建筑外挂与建筑主体的连接装置。The utility model relates to the technical field of construction equipment, in particular to a connecting device for a building external hanging and a building main body.
背景技术Background technique
我国住宅建设正逐步向产业化方向发展,住宅建设产业化是将建筑物上的墙板等构件事先通过工业化车间生产,然后再将墙板等构件安装在建筑物的框架上,以此大大减少了现场施工的工作量,它能够从根本上提高施工效率和降低施工成本,并能够大大减轻现场施工给环境造成的污染,目前对于建筑外挂装饰预制件的安装,现有技术主要分为两种形式:一、建筑物框架为钢筋混凝土时,在每层框架和外墙板上的预留钢筋相互连接并浇筑混凝土使其成为一个整体,待养护期后在拆除托架;二、建筑物框架为钢结构时,在每层框架的周边开设固定孔,并且在每块外墙板周边安装连接件,起重设备将外墙板调到每层框架处,是外墙板上的连接件与框架上的固定孔配合紧固,以此使外墙板固定在框架上。my country's residential construction is gradually developing in the direction of industrialization. The industrialization of residential construction is to produce the wall panels and other components on the building in advance through the industrialized workshop, and then install the wall panels and other components on the frame of the building, thereby greatly reducing the cost. It can fundamentally improve the construction efficiency and reduce the construction cost, and can greatly reduce the pollution caused by the on-site construction to the environment. At present, for the installation of prefabricated parts for building external decoration, the existing technologies are mainly divided into two types. Form: 1. When the building frame is made of reinforced concrete, the reserved steel bars on each layer of the frame and the outer wall panel are connected to each other and concrete is poured to make it a whole, and the brackets will be removed after the maintenance period; 2. The building frame When it is a steel structure, a fixing hole is opened around the frame of each layer, and a connector is installed around each outer wall panel, and the lifting device adjusts the outer wall panel to the frame of each layer. The fixing holes on the frame are matched and fastened, so that the outer wall panel is fixed on the frame.
现如今的建筑外挂和建筑主体连接装置虽然拥有许多种类,但大多数只是形式上的变化,其功能并没有太大的改变,现如今的连接装置由于预埋件需要特殊定制加工,通常制作要求较高,施工工艺复杂,且现如今的连接装置在长时间使用会导致和建筑主体固定的螺栓受到外力时产生松动,且在安装完成后并没有对其进行保护,常常导致长时间不使用的连接装置受到雨水侵蚀导致腐蚀,影响后期使用,因此需要一种建筑外挂与建筑主体的连接装置来改变现状。Although there are many types of building plug-in and building main connecting devices today, most of them are only changes in form, and their functions have not changed much. Today's connecting devices need special customized processing due to embedded parts, usually production requirements It is relatively high, the construction process is complicated, and the long-term use of the current connecting device will cause the bolts fixed to the main body of the building to be loosened by external forces, and they are not protected after the installation is completed, which often leads to long-term non-use. The connection device is corroded by rainwater erosion, which affects the later use. Therefore, a connection device between the building exterior and the building main body is required to change the status quo.
实用新型内容Utility model content
本实用新型的目的在于提供一种建筑外挂与建筑主体的连接装置,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a connecting device for a building external hanging and a building main body, so as to solve the problems raised in the above background technology.
为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:
一种建筑外挂与建筑主体的连接装置,包括外挂板、减震机构以及防护架,所述外挂板背部设有建筑本体,所述外挂板前端设有固定板,所述固定板基面设有第一挂件和第二挂件,所述固定板四周设有固定螺栓,所述第一挂件和第二挂件底端固定有连接螺栓,所述连接螺栓两端设有螺母,所述第一挂件和第二挂件拐角处设有加强筋,所述减震机构两端设有压板,所述压板底端设有复位弹簧、导向柱以及减震座,所述减震机构位于中心位置设有通孔,所述防护架两端外部设有调节螺栓,所述防护架两端内部设有螺杆,所述螺杆一端连接有卡板。A connection device between a building external hanging and a building main body, comprising an external hanging board, a shock absorbing mechanism and a protective frame, the back of the external hanging board is provided with a building body, the front end of the external hanging board is provided with a fixing plate, and the base surface of the fixing board is provided with The first pendant and the second pendant, the fixing plate is provided with fixing bolts around, the bottom ends of the first and second pendants are fixed with connecting bolts, the two ends of the connecting bolts are provided with nuts, the first pendant and Reinforcing ribs are provided at the corners of the second pendant, pressure plates are arranged at both ends of the damping mechanism, a return spring, a guide column and a damping seat are provided at the bottom end of the pressure plate, and a through hole is provided at the center of the damping mechanism. The two ends of the protective frame are provided with adjustment bolts outside, the two ends of the protective frame are internally provided with a screw, and one end of the screw is connected with a clamping plate.
优选的,所述防护架为不锈钢材质制成,且外端涂覆有防水漆。Preferably, the protective frame is made of stainless steel, and the outer end is coated with waterproof paint.
优选的,所述固定螺栓和螺母底端均设有橡胶密封垫。Preferably, rubber gaskets are provided at the bottom ends of the fixing bolts and nuts.
优选的,所述调节螺栓和螺杆传动连接。Preferably, the adjustment bolt and the screw drive are connected.
优选的,所述连接螺栓穿过固定板通过一组螺母进行固定。Preferably, the connecting bolts pass through the fixing plate and are fixed by a set of nuts.
优选的,所述第一挂件和第二挂件均为直角结构。Preferably, the first pendant and the second pendant are both right-angle structures.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:
1.本实用新型中,通过设置的外挂板,外挂板前端设有固定板,固定板基面设有第一挂件和第二挂件,固定板四周通过固定螺栓固定于建筑本体,第一挂件和第二挂件底端固定有连接螺栓,连接螺栓两端设有螺母,固定螺栓和螺母底端均设有橡胶密封垫,连接螺栓穿过固定板通过一组螺母进行固定,方便安装和拆卸,且固定件均为同一型号,减少了配货时的麻烦,节省了物力和财力,提高了工作效率,使得设备安装时更加的高效。1. In the present utility model, through the cladding plate set, the front end of the cladding plate is provided with a fixing plate, the base surface of the fixing plate is provided with a first pendant and a second pendant, and the periphery of the fixing plate is fixed to the building body by fixing bolts, and the first pendant and The bottom end of the second pendant is fixed with a connecting bolt, the two ends of the connecting bolt are provided with nuts, the bottom ends of the fixing bolt and the nut are both provided with rubber gaskets, and the connecting bolts pass through the fixing plate and are fixed by a set of nuts, which is convenient for installation and disassembly, and The fixed parts are all of the same model, which reduces the trouble of distribution, saves material and financial resources, improves work efficiency, and makes equipment installation more efficient.
2.本实用新型中,通过设置的减震机构,减震机构两端设有压板,压板底端设有复位弹簧、导向柱以及减震座,减震机构位于中心位置设有通孔,减震机构位于固定板和外挂板之间,且通过固定螺栓进行固定,因此可以防止固定螺栓因长期受到振动进而发生松动现象,保证了装置使用时的稳固性和安全性,使得设备使用时更加的安全。2. In the present utility model, the damping mechanism is provided, the damping mechanism is provided with pressure plates at both ends, the bottom end of the pressure plate is provided with a return spring, a guide column and a damping seat, The vibration mechanism is located between the fixing plate and the outer hanging plate, and is fixed by fixing bolts, so it can prevent the fixing bolts from loosening due to long-term vibration, ensure the stability and safety of the device during use, and make the equipment more reliable. Safety.
3.本实用新型中,通过设置的防护架,防护架两端外部设有调节螺栓,防护架两端内部设有螺杆,螺杆一端连接有卡板,调节螺栓和螺杆传动连接,进而通过手动旋转调节螺栓,进而调节螺栓转动带动螺杆从动传动,进而卡板发生位于螺杆上端的上下移动,从而卡板对固定板进行固定,进而对防护架进行固定,防护架可以在连接装置长时间不使用时对连接装置进行保护,避免其长时间裸露在外端受雨水侵蚀,进而影响后续的使用,减少了更换成本,使得设备使用时更加的方便。3. In the present utility model, through the protective frame provided, the two ends of the protective frame are provided with adjustment bolts, the inside of both ends of the protective frame is provided with a screw, one end of the screw is connected with a clamping plate, the adjustment bolt and the screw are connected by transmission, and then rotated manually. Adjust the bolt, and then the adjustment bolt rotates to drive the screw to be driven, and then the card plate moves up and down at the upper end of the screw, so that the card plate fixes the fixing plate, and then the protective frame is fixed. The protective frame can be used for a long time in the connecting device. The connection device is protected at times to prevent it from being exposed to rainwater at the outer end for a long time, thereby affecting the subsequent use, reducing the replacement cost, and making the device more convenient to use.
附图说明Description of drawings
图1为本实用新型整体示意图;Fig. 1 is the overall schematic diagram of the utility model;
图2为本实用新型连接装置横截面示意图;Fig. 2 is the cross-sectional schematic diagram of the connecting device of the present invention;
图3为本实用新型减震机构结构示意图;3 is a schematic structural diagram of the damping mechanism of the present invention;
图中:1-外挂板、2-减震机构、3-防护架、4-建筑本体、5-固定板、6-第一挂件、7-第二挂件、8-连接螺栓、9-螺母、10-加强筋、11-压板、12-复位弹簧、13-导向柱、14-减震座、15-通孔、16-调节螺栓、17-螺杆、18-卡板、19-固定螺栓In the picture: 1-external hanging plate, 2-shock absorber mechanism, 3-protective frame, 4-building body, 5-fixed plate, 6-first pendant, 7-second pendant, 8-connecting bolt, 9-nut, 10- Reinforcing rib, 11- Pressure plate, 12- Return spring, 13- Guide column, 14- Damping seat, 15- Through hole, 16- Adjusting bolt, 17- Screw rod, 18- Card plate, 19- Fixing bolt
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. For example, based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.
请参阅图1-3本实用新型提供一种技术方案:Please refer to Figures 1-3 The present utility model provides a technical solution:
一种建筑外挂与建筑主体的连接装置,包括外挂板1、减震机构2以及防护架3,外挂板1背部设有建筑本体4,外挂板1前端设有固定板5,固定板5基面设有第一挂件6和第二挂件7,固定板5四周设有固定螺栓19,第一挂件6和第二挂件7底端固定有连接螺栓8,连接螺栓8两端设有螺母9,第一挂件6和第二挂件7拐角处设有加强筋10,通过设置的外挂板1,外挂板1前端设有固定板5,固定板5基面设有第一挂件6和第二挂件7,固定板5四周通过固定螺栓19固定于建筑本体4,第一挂件6和第二挂件7底端固定有连接螺栓8,连接螺栓8两端设有螺母9,固定螺栓19和螺母9底端均设有橡胶密封垫,连接螺栓8穿过固定板5通过一组螺母9进行固定,方便安装和拆卸,且固定件均为同一型号,减少了配货时的麻烦,节省了物力和财力,提高了工作效率,使得设备安装时更加的高效,减震机构2两端设有压板11,压板11底端设有复位弹簧12、导向柱13以及减震座14,减震机构2位于中心位置设有通孔15,通过设置的减震机构2,减震机构2两端设有压板11,压板11底端设有复位弹簧12、导向柱13以及减震座14,减震机构2位于中心位置设有通孔15,减震机构2位于固定板5和外挂板1之间,且通过固定螺栓19进行固定,因此可以防止固定螺栓19因长期受到振动进而发生松动现象,保证了装置使用时的稳固性和安全性,使得设备使用时更加的安全,防护架3两端外部设有调节螺栓16,防护架3两端内部设有螺杆17,螺杆17一端连接有卡板18,通过设置的防护架3,防护架3两端外部设有调节螺栓16,防护架3两端内部设有螺杆17,螺杆17一端连接有卡板18,调节螺栓16和螺杆17传动连接,进而通过手动旋转调节螺栓16,进而调节螺栓16转动带动螺杆17从动传动,进而卡板18发生位于螺杆17上端的上下移动,从而卡板18对固定板5进行固定,进而对防护架3进行固定,防护架3可以在连接装置长时间不使用时对连接装置进行保护,避免其长时间裸露在外端受雨水侵蚀,进而影响后续的使用,减少了更换成本,使得设备使用时更加的方便,具有一定的推广价值。A connecting device between a building external hanging and a building main body, comprising an external hanging board 1, a
本实用新型工作流程:使用时,通过螺母9将第一挂件6和第二挂件7底端的连接螺栓8固定于固定板5之上,从而将第一挂件6和第二挂件7固定,随后通过多组固定螺栓19将固定板5固定于外挂板1和建筑本体4之上,减少了配货时的麻烦,节省了物力和财力,提高了工作效率,通过减震机构2可以防止固定螺栓19因长期受到振动进而发生松动现象,保证了装置使用时的稳固性和安全性,通过手动旋转调节螺栓16,进而调节螺栓16转动带动螺杆17从动传动,进而卡板18发生位于螺杆17上端的上下移动,从而卡板18对固定板5进行固定,进而对防护架3进行固定,防护架3可以在连接装置长时间不使用时对连接装置进行保护,避免其长时间裸露在外端受雨水侵蚀,有一定的推广价值。The working process of the utility model: when in use, the connecting
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020418728.7U CN212002061U (en) | 2020-03-27 | 2020-03-27 | Connecting device for building external hanging and building main body |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020418728.7U CN212002061U (en) | 2020-03-27 | 2020-03-27 | Connecting device for building external hanging and building main body |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212002061U true CN212002061U (en) | 2020-11-24 |
Family
ID=73421888
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020418728.7U Expired - Fee Related CN212002061U (en) | 2020-03-27 | 2020-03-27 | Connecting device for building external hanging and building main body |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212002061U (en) |
-
2020
- 2020-03-27 CN CN202020418728.7U patent/CN212002061U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111980222A (en) | A housing steel structure prefabricated wall panel | |
| CN208870242U (en) | A kind of aluminum facade mounting structure | |
| CN106906928B (en) | Assembled does not have skeleton cavity GRC unit curtain | |
| CN209958571U (en) | Glass curtain wall fixing device for new building | |
| CN109217204A (en) | A kind of cable testing bridge being easily installed | |
| CN205171550U (en) | Piping lane fixed bolster chute structure | |
| CN209703781U (en) | A curtain wall connection structure | |
| CN211572896U (en) | Multifunctional guardrail for economic building | |
| CN211524098U (en) | Special hole plugging device for aluminum alloy template | |
| CN214879742U (en) | Tower crane attachment pull rod | |
| CN212317242U (en) | Mounting and fixing support for assembled building curtain wall | |
| CN223228006U (en) | A conveniently fixed water pipe lateral earthquake-resistant bracket | |
| CN222376052U (en) | Quick positioning and mounting device for steel column | |
| CN221255498U (en) | A SMW method pile steel cross bracing device | |
| CN221856022U (en) | Stainless steel railing claw easy to fix | |
| CN218233809U (en) | Assembled building supporting seat | |
| CN221193879U (en) | Bearing device for building curtain wall engineering components | |
| CN221151245U (en) | Photovoltaic system mounting platform suitable for high pile foundation | |
| CN216974177U (en) | Deformation joint protective structure is built in room | |
| CN220550721U (en) | Wallboard connecting structure of steel structure factory building | |
| CN220203025U (en) | A fixing device to improve the construction quality of water-stop steel plates | |
| CN219033769U (en) | A supporting mechanism for assembled prefabricated concrete slabs | |
| CN206859398U (en) | A kind of connecting structure of balcony and wall | |
| CN219364954U (en) | Outdoor container transformation room node connecting device | |
| CN221799063U (en) | High-protection construction mechanism |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201124 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
