CN212001562U - Need not to set up steel construction building window installation node of window opening angle steel - Google Patents

Need not to set up steel construction building window installation node of window opening angle steel Download PDF

Info

Publication number
CN212001562U
CN212001562U CN202020239040.2U CN202020239040U CN212001562U CN 212001562 U CN212001562 U CN 212001562U CN 202020239040 U CN202020239040 U CN 202020239040U CN 212001562 U CN212001562 U CN 212001562U
Authority
CN
China
Prior art keywords
window
steel
violently
floor
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020239040.2U
Other languages
Chinese (zh)
Inventor
黄毓祺
周燕
董培文
于丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyuan Mingzhu Science And Technology Co ltd
Original Assignee
Longyuan Mingzhu Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longyuan Mingzhu Science And Technology Co ltd filed Critical Longyuan Mingzhu Science And Technology Co ltd
Priority to CN202020239040.2U priority Critical patent/CN212001562U/en
Application granted granted Critical
Publication of CN212001562U publication Critical patent/CN212001562U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a need not to set up steel construction building window installation node of opening in a window enhancement angle steel, be provided with the installation frame that supplies the window installation between the girder steel at floor and the roof beam that is located the floor top, the installation frame includes that two symmetries set up the riser between the girder steel at floor and floor top, level setting is violently managed with the second in the first violently of between two risers in proper order from bottom to top, two risers and first violently manage, the second is violently managed and is enclosed the opening in a window mouth of establishing into and supplying the window installation, the riser, first violently manage, the second violently manage respectively with the window main frame between through the screw connection. The utility model discloses an installation frame can play the effect that the angle steel combined together is strengthened to vice frame of window and window opening, need not to set up the window opening and strengthens the angle steel, need not to reprocess the installation frame, can directly violently manage by two risers and first violently the pipe, the second and violently install the window in the window opening that encloses the confession window installation of establishing into, has simplified construction process, has saved the engineering time, has improved the efficiency of construction.

Description

Need not to set up steel construction building window installation node of window opening angle steel
Technical Field
The utility model relates to a building engineering technical field, concretely relates to need not to set up steel construction building window erection joint of angle steel is strengthened to opening in a wall or opening in a wall.
Background
The steel structure has the advantages of light weight, high strength, simple and convenient construction, short construction period, excellent building performance, low cost and the like, so the steel structure is widely applied to the fields of airports, commercial circles, playgrounds, sports centers, large-scale factory buildings, houses and the like.
In the existing steel structure building, when a window is installed, after a foundation wall is completed, a reinforcing angle steel is arranged at a reserved window opening, and then a window auxiliary frame is installed. The size of the common window subframe is not completely matched with the size of an actual window opening under normal conditions, and the window subframe can be installed only after being reprocessed according to the actual size of the window opening on a construction site, so that the construction efficiency is low; secondly, the reprocessing of the window subframe is mostly in-situ cutting and welding construction, the construction quality cannot be effectively guaranteed due to uneven quality of constructors, and the anti-pollution, damage prevention and water seepage prevention effects of the finished product are poor.
Therefore, there is an urgent need for a window installation node of a steel structure building that can solve the above problems.
SUMMERY OF THE UTILITY MODEL
For the problem that prior art exists more than solving, the utility model provides a need not to set up steel construction building window erection joint of opening in a wall and reinforcement angle steel.
The utility model discloses the following technical scheme of accessible solves:
the utility model provides a need not to set up steel construction building window installation node of window opening angle steel, is provided with the installation frame that supplies the window installation between the girder steel at floor and the roof beam that is located the floor top, the installation frame includes that two symmetries set up the riser between floor and the girder steel that is located the floor top, and the level sets up first violently pipe and the second between two risers from bottom to top violently the riser with first violently manage, the second is violently managed and is enclosed and establish the window opening mouth that supplies the window installation, riser, first violently manage, the second violently manage respectively with the window main frame between through screw connection.
Furthermore, an embedded part connected with the vertical pipe is arranged in the floor slab.
Further, the girder steel is located that indoor one side coating has fire retardant coating, the girder steel is located outdoor one side and has set gradually ALC piece and fire barrier from inside to outside, the ALC piece is located between the last flange and the bottom flange of girder steel and fixes through the steel sheet net.
Furthermore, a wall body is arranged between the first transverse pipe and a floor slab located at the bottom of the first transverse pipe, and flexible fillers are filled in a gap formed between the wall body and the floor slab.
Furthermore, a lintel is arranged between the second transverse pipe and a steel beam positioned at the top of the second transverse pipe, and a gap formed between the lintel and the steel beam is filled with flexible filler.
Further, both sides of the flexible filler are repaired by repair mortar.
Further, wall body and lintel are located indoor one side and are provided with the interior decoration face, wall body, floor and lintel are located outdoor one side and are provided with the heat preservation, it is continuous between heat preservation and the fire barrier.
Has the advantages that:
1. the utility model discloses an installation frame can play the effect that the angle steel combined together is strengthened to vice frame of window and window opening, therefore need not to set up the window opening and strengthen the angle steel, can directly violently manage by two risers and first violently the pipe, the second violently encloses the interior installation window of the window opening of the confession window installation of establishing, has simplified the work progress, has saved the engineering time, has improved the efficiency of construction, and riser, first violently the pipe, the second violently manage respectively with the window main frame between through the screw connection can, simple to operate is swift.
2. The size of a window opening for installing a window, which is formed by enclosing the two vertical pipes, the first transverse pipe and the second transverse pipe, can be completely matched with the size of a window to be installed, the installation of the window can be directly carried out without reprocessing the installation frame, the construction process is simplified, the construction time is saved, the construction efficiency is improved, the construction quality can be effectively ensured, batch production can be carried out in a factory, the size precision of the installation frame is high, the air tightness and the impermeability are good, the production is efficient and rapid, and no waste is caused by material saving; secondly, as reprocessing on site is not needed, the construction site is ensured to be clean, the anti-pollution, anti-damage and anti-seepage effects of the finished product are better, and the site installation construction efficiency is high.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side sectional view of the present invention;
fig. 3 is a schematic cross-sectional view of the present invention.
1. A riser; 2. a first cross tube; 3. a second cross tube; 4. a floor slab; 5. a steel beam; 6. a wall body; 7. a lintel; 8. a heat-insulating layer; 9. an ALC block; 10. steel plate nets; 11. a fire barrier; 12. a fire retardant coating; 13. repairing mortar; 14. fireproof rock wool; 15. a PE rod; 16. modifying the silicone sealant; 17. interior decoration surface
Detailed Description
The following description of the embodiments of the present invention is provided by way of specific examples, and other advantages and effects of the present invention will be readily apparent to those skilled in the art from the disclosure herein.
As shown in fig. 1, 2 and 3, the utility model discloses a need not to set up steel construction building window installation node of window opening angle steel, floor 4 and the installation frame that is located be provided with between the girder steel 5 at floor 4 top and supplies the window installation, the installation frame includes that two symmetries set up at floor 4 and the girder steel 5 that is located floor 4 top between riser 1, and the level sets up in proper order from bottom to top violently pipe 2 and the second violently manage 3, two riser 1 and first violently pipe 2, the second violently manage 3 and enclose the window opening mouth of establishing into and supplying the window installation, riser 1, first violently pipe 2, the second violently manage 3 respectively with the window main frame between through screw connection.
In this embodiment, the installation frame can play the effect that the angle steel combined together is strengthened to vice frame of window and window opening, therefore need not to set up the window opening and strengthen the angle steel, can be directly violently managed 2, the second by two risers 1 and the first interior installation window of window opening that the confession window installation of violently managing 3 encloses and establish, construction process has been simplified, construction time has been saved, construction efficiency has been improved, and riser 1, first violently manage 2, the second violently manage 3 respectively and window main frame between through the screw connection can, simple to operate is swift.
In the embodiment, the size of the window opening for installing the window, which is defined by the two vertical pipes 1, the first horizontal pipe 2 and the second horizontal pipe 3, can be completely matched with the size of the window to be installed, the installation frame does not need to be reprocessed, and the window can be directly installed, so that the construction process is simplified, the construction time is saved, the construction efficiency is improved, the construction quality can be effectively ensured, the batch production can be carried out in a factory, the size precision of the installation frame is high, the air tightness and the impermeability are good, the production is efficient and rapid, and the materials are saved without waste; secondly, as reprocessing on site is not needed, the construction site is ensured to be clean, the anti-pollution, anti-damage and anti-seepage effects of the finished product are better, and the site installation construction efficiency is high.
In this embodiment, the vertical pipe 1 is connected to the steel beam 5 by welding or bolts, and the vertical pipe 1 is connected to the first horizontal pipe 2 and the second horizontal pipe 3 by welding. And the vertical pipe 1, the first transverse pipe 2 and the second transverse pipe 3 are transported to a construction site for installation after being welded in a workshop in advance. Furthermore, the vertical pipe 1, the first horizontal pipe 2 and the second horizontal pipe 3 are all made of square steel pipes.
In this embodiment, an embedded part connected to the vertical pipe 1 is provided in the floor slab 4.
In this embodiment, the embedded part that the embedded part adopted and was made by metal material to carry out welded connection or bolted connection between riser 1 and the embedded part, thereby need not carry out local cast-in-place to the junction, reduced the installation degree of difficulty of this installation frame, accelerated the installation effectiveness of this installation frame.
As shown in fig. 2, in this embodiment, the steel beam 5 is located indoor side and is coated with fireproof paint 12, the steel beam 5 is located outdoor side and is provided with ALC block 9 and fireproof isolation belt 11 from inside to outside in proper order, and the ALC block 9 is located between the upper flange and the lower flange of the steel beam 5 and is fixed through expanded metal 10.
In this embodiment, be located under the fire retardant coating 12 downwardly extending to the gap that forms between lintel 7 and the girder steel 5 of girder steel 5 lower flange tip of indoor one side, the outside that is located the repair mortar 13 of indoor one side also coats and has fire retardant coating 12, can strengthen girder steel 5's fire behavior like this, can avoid the flame to pass through the gap that forms between lintel 7 and the girder steel 5 with higher speed girder steel 5's intensification, thereby promote girder steel 5's fire resistance, guarantee steel construction building's security.
In the embodiment, different treatment measures are taken for the two sides of the steel beam 5 to perform fireproof treatment, and the ALC block 9 has good fire resistance, sound insulation performance and good heat insulation performance, so that the sound insulation performance and the heat insulation performance of the steel beam 5 can be improved on the premise of ensuring the fireproof performance of the steel beam 5, the living comfort is improved, and the energy consumption is reduced; meanwhile, the spraying amount of the fireproof coating 12 can be reduced, and the field wet operation construction is reduced, so that the field pollution is reduced. Preferably, the fire-retardant coating 12 is a gypsum-based fire-retardant coating.
In this embodiment, the fire-proof isolation belt 11 may be a rock wool fire-proof isolation belt or made of other inorganic heat-insulating materials.
As shown in fig. 1 and 2, in the present embodiment, a wall 6 is disposed between the first horizontal tube 2 and the floor 4 at the bottom of the first horizontal tube 2, and a gap formed between the wall 6 and the floor 4 is filled with a flexible filler.
As shown in fig. 1 and 2, in the present embodiment, a lintel 7 is disposed between the second transverse tube 3 and the steel beam 5 on the top of the second transverse tube 3, and a gap formed between the lintel 7 and the steel beam 5 is filled with a flexible filler.
In the embodiment, as shown in fig. 2, the flexible filler comprises fireproof rock wool 14, a PE rod 15 and a modified silicone sealant 16, and both sides of the flexible filler are repaired by a repair mortar 13.
In this embodiment, the wall 6 may be an ALC wall or a wall made of other materials, and when the ALC wall is adopted, the repair mortar 13 is the repair mortar special for ALC. The lintel 7 may be ALC finished lintel or a lintel made of other materials.
In this embodiment, the flexible filler is filled in the gap formed between the wall 6 and the floor slab 4 and the gap formed between the lintel 7 and the steel beam 5, so that the flexible filler can absorb the deformation between the steel structure and the wall 6 and the lintel 7, and the crack caused by pulling is avoided to form a through seam.
In this embodiment, it should be noted that the order of the fireproof rock wool 14, the PE rod 15 and the modified silicone sealant 16 can be adjusted according to actual needs.
As shown in fig. 2 and 3, in this embodiment, an indoor decoration surface 17 is disposed on an indoor side of the wall 6 and the lintel 7, an insulating layer 8 is disposed on an outdoor side of the wall 6, the floor 4, and the lintel 7, and the insulating layer 8 is continuous with the fireproof isolation strip 11.
In this embodiment, because fire prevention median 11 itself just belongs to the part of outer thermal insulation system of outer wall 6, therefore can make the outer heat preservation on the outer wall 6 continuous to reduce the heat loss of girder steel 5 department, improve building thermal insulation performance and living environment's travelling comfort, reduce the energy consumption simultaneously.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (7)

1. The utility model provides a need not to set up steel construction building window installation node that angle steel is strengthened to opening in a window, its characterized in that: floor (4) and be located and be provided with the installation frame that supplies the window installation between girder steel (5) at floor (4) top, the installation frame includes that two symmetries set up riser (1) between floor (4) and girder steel (5) that are located floor (4) top, and first violently pipe (2) and the second of setting between two riser (1) from bottom to top in proper order the level violently manage (3), two riser (1) and first violently pipe (2), second are violently managed (3) and are enclosed the window entrance to a cave of establishing into and supplying the window installation, riser (1), first violently pipe (2), second are violently managed (3) and are passed through screw connection between the window main frame respectively.
2. The steel structure building window installation node of claim 1, which is free from a window opening reinforcing angle steel, and is characterized in that: and an embedded part connected with the vertical pipe (1) is arranged in the floor slab (4).
3. The steel structure building window installation node of claim 1, which is free from a window opening reinforcing angle steel, and is characterized in that: girder steel (5) are located indoor one side coating and have fire retardant coating (12), girder steel (5) are located outdoor one side and have set gradually ALC piece (9) and fire-proof isolation area (11) from inside to outside, ALC piece (9) are located between the upper flange and the lower flange of girder steel (5) and are fixed through steel sheet mesh (10).
4. The steel structure building window installation node of claim 3, which is free from a window opening reinforcing angle steel, is characterized in that: a wall body (6) is arranged between the first transverse pipe (2) and the floor slab (4) located at the bottom of the first transverse pipe (2), and flexible filler is filled in a gap formed between the wall body (6) and the floor slab (4).
5. The steel structure building window installation node of claim 3, which is free from a window opening reinforcing angle steel, is characterized in that: a lintel (7) is arranged between the second transverse pipe (3) and the steel beam (5) positioned at the top of the second transverse pipe (3), and flexible filler is filled in a gap formed between the lintel (7) and the steel beam (5).
6. The window installation node of the steel structure building without the window opening reinforcing angle steel of claim 4 or 5, wherein: both sides of the flexible filler are repaired by repair mortar (13).
7. The window installation node of the steel structure building without the window opening reinforcing angle steel according to claim 4, characterized in that: wall body (6) and lintel (7) are located indoor one side and are provided with interior decoration face (17), wall body (6), floor (4) and lintel (7) are located outdoor one side and are provided with heat preservation (8), it is continuous between heat preservation (8) and fire barrier (11).
CN202020239040.2U 2020-03-02 2020-03-02 Need not to set up steel construction building window installation node of window opening angle steel Active CN212001562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020239040.2U CN212001562U (en) 2020-03-02 2020-03-02 Need not to set up steel construction building window installation node of window opening angle steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020239040.2U CN212001562U (en) 2020-03-02 2020-03-02 Need not to set up steel construction building window installation node of window opening angle steel

Publications (1)

Publication Number Publication Date
CN212001562U true CN212001562U (en) 2020-11-24

Family

ID=73423380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020239040.2U Active CN212001562U (en) 2020-03-02 2020-03-02 Need not to set up steel construction building window installation node of window opening angle steel

Country Status (1)

Country Link
CN (1) CN212001562U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116927336A (en) * 2023-08-29 2023-10-24 中建科工集团有限公司 Structure and construction method of a lower hanging beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116927336A (en) * 2023-08-29 2023-10-24 中建科工集团有限公司 Structure and construction method of a lower hanging beam

Similar Documents

Publication Publication Date Title
CN103669905A (en) Lightweight composite prefabricated panel combined type house and building method thereof
WO2019085176A1 (en) Load-bearing and aerated block-based prefabricated wall panel and floor panel
CN206128404U (en) Take whole composite roof board that keeps warm of eaves mouth
CN209179402U (en) A kind of concrete exterior wall hanging plate connecting structure
CN219671808U (en) Structure of steel structure building shell
CN111219124A (en) Prefabricated window and prefabricated connected node of window and steel construction main part of wafing
CN212001562U (en) Need not to set up steel construction building window installation node of window opening angle steel
CN207092318U (en) A kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones
CN218437565U (en) Low-energy-consumption heat insulation structure for outer wall plate gap under building roof plate
CN106939699A (en) The construction method of side zinc plated steel plate waterproof layer in a kind of open ceramic plate curtain wall
CN213653772U (en) Fireproof and soundproof structure for the connection between the prefabricated steel structure external wall panel and the steel beam
CN221321889U (en) Solar integrated integral reinforcing structure for brick-concrete structure building
CN115182549A (en) Modularized fast-assembling smoke-proof and fresh air exhaust finished product hoistway
CN211923919U (en) Prefabricated window and prefabricated connected node of window and steel construction main part of wafing
CN217175304U (en) Tubular well plugging structure
CN118241796A (en) Construction of steel building shell
CN215054296U (en) High strength fire prevention heat preservation partition wall structure
CN107989259A (en) The mountable double-deck Side fascia and mounting structure and waterproof construction of band mo(u)lding panel
CN209040480U (en) A kind of concrete exterior wall hanging plate parapet node
CN208023824U (en) Prefabricated mixed structure wallboard with insulation free posing
TWI823712B (en) Steel-structure building envelope
CN107401214A (en) A kind of installation method of assembled architecture
TWI823822B (en) Steel-structure building envelope
TWI823821B (en) Steel-structure building envelope
TWI823823B (en) Steel-structure building envelope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant