CN212001125U - Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion - Google Patents

Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion Download PDF

Info

Publication number
CN212001125U
CN212001125U CN202020454058.4U CN202020454058U CN212001125U CN 212001125 U CN212001125 U CN 212001125U CN 202020454058 U CN202020454058 U CN 202020454058U CN 212001125 U CN212001125 U CN 212001125U
Authority
CN
China
Prior art keywords
existing tunnel
foundation pit
arch cover
arch
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020454058.4U
Other languages
Chinese (zh)
Inventor
戴志仁
廖晖
李谈
喻忠
张庆闯
吕海军
赵亚军
段剑锋
许红春
刘彤
张毓斌
查家宏
王维
马琳琳
王文彬
王耀辉
陈新平
孟宪全
黄彦彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN202020454058.4U priority Critical patent/CN212001125U/en
Application granted granted Critical
Publication of CN212001125U publication Critical patent/CN212001125U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion, which comprises fender posts, a grid steel frame and an arch cover structure; the foundation pit is layered with a plurality of small foundation pits on the plane, and the foundation pit fender posts are positioned on two sides of the existing tunnel, are arranged in rows longitudinally and extend downwards below the arch bottom of the existing tunnel; the arch cover is positioned above the existing tunnel, and arch feet at two ends are rigidly connected with the fender post to effectively transfer force; the enclosure system of the small foundation pit above the existing tunnel is composed of longitudinal enclosure piles and transverse grid steel frames, and the grid steel frames and the enclosure piles divide the area above the existing tunnel into a plurality of small foundation pits. The utility model discloses based on "break up whole into parts" foundation ditch excavation mode, the at utmost has reduced the influence of existing tunnel top soil body excavation uninstallation, and based on the arched cover transform structure will newly-built structure load transmission to stratum depths simultaneously, avoided underground structure load to the adverse effect in the tunnel that crouches down, found the new method of existing tunnel top newly-built underground structure, it is convenient to be under construction.

Description

Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion
Technical Field
The utility model belongs to the technical field of underground works, concretely relates to existing tunnel stridees across system based on foundation ditch jump is dug and is encircleed the conversion.
Background
At present, with the construction of a new round of construction planning project of urban rail transit in various regions, various construction for traversing the existing operation tunnel becomes a normal state gradually, but the safety of the existing operation tunnel during the traversing construction is difficult to be completely ensured by the current technical level, so that the existing line proximity construction including the crossing is an important technical problem which needs to be broken through at great stroke.
Under general conditions, a newly-built project is constructed by crossing an existing operation tunnel, the excavation and unloading of a foundation pit inevitably cause the uplift and deformation of a lower lying tunnel, various stratum reinforcing measures are carried out at the same time, however, no matter what reinforcing scheme is adopted, the influence on peripheral traffic and adjacent structures (such as underground pipelines) is inevitable, and sometimes even serious environmental destruction phenomenon can be caused. Meanwhile, the load of the newly built structure can also generate additional load on the lower horizontal tunnel, so that the lower horizontal tunnel needs to bear the stress process of unloading firstly and loading secondly, and the operation safety is seriously influenced.
Disclosure of Invention
The utility model aims at providing an existing tunnel system of strideing across based on excavation and hunch lid conversion is jumped to foundation ditch, it divides into a series of little foundation ditches to the foundation ditch that will have operated in the tunnel influence scope based on "the whole is zero", adjacent foundation ditch adopts the interval to jump the mode of digging, the foundation ditch adopts the combined type supporting construction of fender pile and grid steelframe, in time execute after little foundation ditch excavates the end of a pit and do the hunch lid structure, the hunch lid structure effectively suppresses the uninstallation of foundation ditch bottom stratum with the fender pile rigid connection along tunnel longitudinal arrangement, the resilience uplift of tunnel crouches down in the at utmost reduction, simultaneously hunch lid and foundation ditch fender pile form effectual hunch lid transform structure, the hunch lid structure can shift newly-built underground structure additional load to stratum depth department, newly-built underground structure corresponding load effect route can optimize and do: underground structure → arched cover → pile foundation → stratum depths, the maximum degree reduces the tunnel that crouches down and bears the additional load of newly-built underground structure, the maximum degree ensures existing line operation safety.
The utility model discloses the technical scheme who adopts does:
the utility model provides an existing tunnel system of strideing based on foundation ditch jump is dug and is encircleed lid conversion which characterized in that:
the system comprises fender posts, a grid steel frame and an arch cover;
the guard piles are positioned at two sides of the existing tunnel, are arranged in rows in parallel and longitudinally with the tunnel, and extend downwards below the arch bottom of the existing tunnel;
the arch cover is positioned above the existing tunnel, and the two transverse ends of the arch cover are rigidly connected with the fender post;
the effective influence area above the existing tunnel is divided into a plurality of small foundation pits by the foundation pit contour line, the side wall of the small foundation pit perpendicular to the existing tunnel is supported by a grid steel frame, and the grid steel frame and the fender pile jointly form a small foundation pit supporting system.
The top of the enclosure pile of the small foundation pit is provided with a pile top crown beam, and when the pile top crown beam at the top of the enclosure pile is constructed, a groove is pulled and excavated at the pile top position.
The small foundation pit is arranged at the position of the grid steel frame, and the ground surface is provided with a locking collar beam.
And the locking collar beam and the pile top crown beam at the position of the grid steel frame are integrally cast at one time to form a closed horizontal beam.
And steel bars are reserved below the locking collar beams and are welded with the first truss steel frames, and the subsequent adjacent truss steel frames are connected by vertical steel bars.
The grid steel frame is vertical perpendicular with the tunnel, and grid steel frame both ends are located between the adjacent fender pile, and the steelframe end is located outside the fender pile center.
The small foundation pit construction adopts an interval jumping excavation mode, each grid steel frame is drilled with a foot-locking anchor rod, the horizontal included angle of the foot-locking anchor rod is not less than 35 degrees, the longitudinal distance of the rings is 1 x 1m, and cement slurry is injected into the foot-locking anchor rod.
The upper part of the arch cover is horizontal and serves as a structural bottom plate of a newly-built underground structure, the lower part of the arch cover is arc-shaped, and arch feet at two ends are rigidly connected with the fender posts at corresponding positions to form an effective force transmission node.
The bottom of the arch cover, the side wall of the underground structure and the top plate are provided with full-package waterproof layers, and the bottom of the arch cover is pre-paved with anti-sticking waterproof rolls.
The utility model has the advantages of it is following:
the utility model discloses the new foundation ditch that new-built underground structure corresponds in the influence zone of existing operation tunnel top divides into a plurality of little foundation ditches, adopt the interval to jump the mode of digging adjacent little foundation ditch, reduce the foundation ditch bottom stratum uninstallation effect that the foundation ditch excavation arouses, combine newly-built structure bottom plate simultaneously, execute and do the arch cover structure bottom the foundation ditch, through the effective connection of arch cover structure and foundation ditch fender pile, additional load transmission to the stratum depths that will newly-built underground structure corresponds, the operation tunnel that crouches under avoiding bears too big additional load, the foundation ditch excavation uninstallation and newly-built structure additional load two-sided effective control that has carried out. The fender pile, the grid steel frame, the locking anchor rod, the locking collar beam and the concrete and steel structure for the arch cover structure, which are involved in foundation pit excavation, are common waterproof concrete and conventional steel, and a plain concrete cushion layer below the arch cover structure and a closed waterproof material around the underground main body structure are all conventional waterproof coiled materials or waterproof coatings. The corresponding size is conventional type, and the processing and the manufacturing are convenient; along the little foundation ditch cut-off line of tunnel horizontal longitudinal arrangement, can be according to the nimble adjustment size of little foundation ditch bottom uninstallation influence degree, along tunnel longitudinal arrangement's foundation ditch fender post diameter and interval, can be according to the nimble adjustment of foundation ditch self stability needs, the hunch lid structure that sets up of little foundation ditch bottom, the rise ratio of its bottom hunch structure (generally be greater than 1/10), hunch foot and the concrete thickness of central part etc. can carry out the pertinence design according to upper portion underground structure load condition, the deep at the tunnel hunch end is stretched into to foundation ditch fender post, generally be not less than 3m, specifically rely on the stratum condition and decide. The utility model discloses simple process, construction are simple and convenient, have higher economic benefits and social, have extensive application prospect in existing tunnel crossing engineering such as urban rail transit, railway, municipal tunnel.
Drawings
Fig. 1 is a plan layout view of small foundation pits crossing an existing line tunnel.
Fig. 2 is a layout diagram of a small foundation pit cross section and an arch cover conversion structure.
Fig. 3 is a longitudinal section layout diagram of a small foundation pit crossing an existing line tunnel.
Fig. 4 is a diagram of an underground structure layout based on vertical load transfer.
In the figure, 1-existing tunnel, 2-small foundation pit contour line, 3-small foundation pit, 4-fender pile, 5-pile top crown beam, 6-fore shaft ring beam, 7-grid steel frame, 8-locking anchor rod, 9-arch cover and 10-underground structure.
Detailed Description
The present invention will be described in detail with reference to the following embodiments.
The utility model relates to an existing tunnel stridees across system based on foundation ditch jump is dug and is encircleed the lid conversion, the utility model discloses widened current existing operation tunnel top foundation ditch excavation of strideing and executed the technology with underground structure, richened foundation ditch excavation uninstallation control thinking based on "break the whole into parts" excavation mode, richened existing tunnel top overload treatment and load conversion theory based on encircleing the lid conversion structure.
The system comprises fender posts 4, grid steel frames 7 and arch covers 9; the fender posts 4 are positioned at two sides of the existing tunnel 1, are arranged in rows longitudinally and extend downwards below the arch bottom of the existing tunnel 1; the arch cover 9 is positioned above the existing tunnel 1, and arch feet at two ends are rigidly connected with the fender post 4 to effectively transfer force; the grid steel frame 7 is vertical to the tunnel 1 in the longitudinal direction, two ends of the grid steel frame 7 are located between adjacent fender piles 4, and the tail end of the steel frame is located outside the centers of the fender piles 4; the space above the existing tunnel 1 is divided into a plurality of small foundation pits 3 by the grid steel frame 7 and the fender piles 4. 3 jump excavation constructions of little foundation ditch can effectively restrain the resilience uplift of tunnel 1 has been built to the below, and the atress transform structure that arch apron and support stake formed can effectively shift the additional load of newly-built underground structure to stratum depths, avoids forming additional load to the tunnel has been built to the below.
And (3) digging pull grooves at the tops of the guard piles 4 longitudinally arranged in rows, binding reinforcing steel bars, and pouring pile top crown beams 5 at the tops of the guard piles 4. And a locking collar beam 6 is arranged at the top of the grid steel frame 7, and two ends of the locking collar beam 6 and the pile top crown beam 5 are integrally cast to form a closed horizontal beam.
The first grid steel frame 7 is effectively connected with the locking collar beam 6, and the adjacent grid steel frames 7 are connected by vertical steel bars. Grid steelframe 7 is vertical perpendicular with tunnel 1, and 7 both ends of grid steelframe are located between adjacent fender pile 4, and the steelframe end is located beyond the fender pile 4 center.
The construction of the small foundation pit 3 adopts an interval jumping excavation mode, each grid steel frame 7 needs to be drilled with a foot-locking anchor rod 8, the horizontal included angle of the foot-locking anchor rod 8 is generally not less than 35 degrees, the longitudinal distance of the ring can be considered according to 1 multiplied by 1m, cement paste is timely injected into the foot-locking anchor rod 8
The arch cover 9 is used as a structural bottom plate of the upper underground structure 10, and arch feet at two sides are effectively connected with the fender pile 4 and rigidly transfer force. The bottom of the arch cover 9 is provided with a pre-paved reverse-adhered waterproof coiled material.
Referring to the drawings:
tunnel 1 top foundation ditch is cut apart into a plurality of little foundation ditches 3 by little foundation ditch outline line 2 on the plane, along tunnel longitudinal arrangement's cut-off line, generally with tunnel 1 clear distance control about 3m, along 1 transverse arrangement's cut-off line in tunnel, 3 planar projection area in little foundation ditch will be controlled on the one hand, pass between the adjacent fender post 4 along tunnel longitudinal arrangement on the one hand, ensure that horizontal grid steelframe 7 can block between adjacent fender post 4 and die, form effectual mechanical connection, increase little foundation ditch 3's self stability.
The small foundation pit 3 mainly comprises a fender post 4 arranged along the longitudinal direction of the tunnel, a grid steel frame 7 vertical to the longitudinal direction of the tunnel, and a foot locking anchor rod 8 required to be arranged on each grid steel frame 7, a post top crown beam 6 is arranged at the top of the fender post 4, and a locking collar beam 6 is arranged at the top of the grid steel frame 7. Between fore shaft ring roof beam 6 and grid steelframe 7, between the adjacent grid steelframe 7 from top to bottom, adopt vertical reinforcing bar to weld, in time pressure injection grout in lock foot stock 8 plays fixed grid steelframe 7 on the one hand, prevents that the steelframe that the foundation ditch probably leads to during down excavation from sinking, can grout in advance on the one hand and consolidate the below stratum, increases foundation ditch lateral wall stability.
The arch cover 9 is positioned between the underground structure 10 and the existing tunnel 1, the arch cover 9 can be used as a part of a bottom plate of the underground structure 10, and the rise ratio and the effective height of the section of the arch section at the lower part of the arch cover 9 can be determined according to the underground structure 10 and the load calculation of the overlying soil body.
The arch cover 9 arch feet and the fender post 4 are mutually anchored through stressed steel bars to realize rigid connection joints, effective force transmission is ensured, the fender post 4 is also used as a permanent support post, and the durability is considered according to a permanent structure.
During the pouring of the underground structure 10, retaining the fender posts 4 of the small foundation pits 3 at the outermost sides, and breaking the fender posts 4 and the grid steel frames 7 between the adjacent foundation pits section by section (from bottom to top).
The utility model discloses based on "break up whole zero" foundation ditch excavation mode, the at the bottom of the pit uninstallation effect that existing operation tunnel top soil body excavation arouses has been reduced to the at utmost, simultaneously shift newly-built underground structure load to stratum depths based on hunch lid transform structure, the at utmost has reduced underground structure load effect and has crouched the adverse effect in operation tunnel down, the brand-new method of newly-built underground structure in existing operation tunnel top has been established, and simultaneously, little foundation ditch quantity and scale, fender pile degree of depth and diameter, and the concrete shape of hunch lid structure and effective height etc. all can be adjusted according to the actual engineering condition is nimble. The structure mode is simple, construction is convenient.
The existing tunnel crossing system construction method based on foundation pit jumping excavation and arch cover conversion comprises the following steps:
the method comprises the following steps: performing tunneling construction according to design requirements, and completing construction of a main structure of the tunnel engineering to form an existing tunnel 1;
step two: dividing an effective influence area of the existing tunnel 1 into a plurality of small foundation pits 3 through foundation pit contour lines 2 according to an effective influence range of the existing tunnel 1;
step three: according to the contour line 2 of the foundation pit, a full-slewing drilling machine is adopted, fender posts 4 are longitudinally constructed along two sides of the existing tunnel 1, and the arrangement of the fender posts 4 meets the requirement that the contour line of the foundation pit vertical to the tunnel 1 is positioned in the middle of the adjacent fender posts 4; the bottom of the fender post 4 extends into the tunnel 1 to be at least 3m below the arch bottom, and a pile top crown beam 5 is constructed by drawing a groove at the top of the fender post 4;
step four: according to the arrangement of the interval jumping excavation process, a certain small foundation pit 3 right above the existing tunnel 1 is selected for earthwork construction, before excavation, a fore shaft ring beam 6 is transversely constructed along the existing tunnel 1, and two ends of the fore shaft ring beam 6 and a pile top crown beam 5 are integrally cast to form a circle of closed horizontal beams;
step five: in the process of excavation of a foundation pit, timely constructing grid steel frames 7 perpendicular to the direction of the existing tunnel 1, effectively connecting locking collar beams 6 with the grid steel frames 7 through reinforcing steel bars, connecting adjacent grid steel frames 7 through vertical reinforcing steel bars, performing spraying and mixing treatment on the grid steel frames 7, then arranging a foot locking anchor rod 8 at each grid steel frame 7, and injecting cement paste;
step six: when the bottom of the small foundation pit 3 is about to be excavated, no foot-locking anchor rods 8 are arranged at the last 2-3 grid steel frames 7, so that the foot-locking anchor rods 8 are prevented from invading the contour of the existing tunnel 1 below;
step seven: manually excavating the small foundation pit 3 within 0.5m of the bottom, and finishing according to the arched profile of the bottom of the arch cover 9;
step eight: laying waterproof materials and plain concrete cushion layers at the pit bottom as required, then binding steel bars, pouring an arch cover 9 structure, and connecting arch feet at two sides of the arch cover 9 with the fender posts 4 at corresponding positions through embedded steel bars to form a rigid force transmission node;
step nine: according to the excavation steps of the small foundation pit 3 and the construction steps of the arch cover 9, jumping and excavating the rest small foundation pits 3 at intervals to finish the excavation construction of all soil bodies within the influence range of the tunnel 1;
step ten: according to the plan outline range of the underground structure 10 to be built and the sectional pouring height of the main structure, the grid steel frames 7 and the foot locking anchor rods 8 on the side walls of the small foundation pits 3 are removed in sections, the fender posts 4 between the adjacent small foundation pits 3 are removed in sections, and then the side wall waterproof layers are laid and the underground structure 10 is poured as required;
step eleven: and after the underground structure 10 reaches the design strength, coating waterproof materials on a top plate of the underground structure, chiseling off the foundation pit support structure within the range of 3m below the earth surface, and simultaneously backfilling soil above the top plate and compacting to restore the pavement.
Under the condition of extremely strict control standard of the existing operation tunnel, a construction method which can adapt to excavation of foundation pits above the tunnel and construction of an underground structure under any condition is theoretically found out, and under the existing theoretical level and construction technical conditions, the construction method still has considerable difficulty, because the capabilities of various existing operation tunnels for resisting longitudinal uneven load are different, stratum conditions are changed into various forms, foundation pit supporting and excavation modes are different, the foundation pit excavation above the existing operation tunnel still follows the basic idea of 'breaking the whole into zero', a soil body in the influence range of the tunnel is divided into a plurality of small foundation pits, a pressing plate is timely applied to the pit bottom of each small foundation pit according to the idea of jumping excavation at intervals, the exposure time of the stratum at the pit bottom is reduced to the greatest extent, and the unloading degree and the influence range thereof are reduced; simultaneously, a stress conversion structure combining an arch cover and a pile foundation is constructed at the bottom of the pit in time, and the additional load of the newly-built underground structure above the tunnel is effectively transferred to the deep part of the stratum. At present, basic principles of first function, local adjustment, medicine application according to the symptoms and flexible application are still needed for excavation of foundation pits above existing operation tunnels and construction of new underground structures.
The utility model relates to an existing line crossing construction process based on the small foundation pit jumping excavation and arch cover conversion structure, which mainly divides a foundation pit corresponding to a newly-built underground structure in the influence range above an existing operation tunnel into a plurality of small foundation pits, the adjacent small foundation pits adopt an interval jumping excavation mode, the unloading effect of the stratum at the bottom of the foundation pit caused by excavation of the foundation pit is reduced, and meanwhile, a newly-built structural bottom plate is combined, the arch cover structure is constructed at the bottom of the foundation pit, the additional load corresponding to the newly-built underground structure is transmitted to the deep part of the stratum through the effective connection of the arch cover structure and the foundation pit fender post, the phenomenon that the lower horizontal operation tunnel bears overlarge additional load is avoided, effective control is carried out on two aspects of excavation unloading and additional load of the newly-built structure from the foundation pit, higher economic benefit and social benefit are achieved, and the application prospect is wide in projects such as urban rail transit, railways and market channels.
The content of the present invention is not limited to the examples, and any equivalent transformation adopted by the technical solution of the present invention is covered by the claims of the present invention by those skilled in the art through reading the present invention.

Claims (9)

1. The utility model provides an existing tunnel system of strideing based on foundation ditch jump is dug and is encircleed lid conversion which characterized in that:
the system comprises fender posts (4), grid steel frames (7) and arch covers (9);
the fender posts (4) are positioned at two sides of the existing tunnel (1), are parallel to the tunnel (1), are arranged in rows longitudinally, and extend downwards below the arch bottom of the existing tunnel (1);
the arch cover (9) is positioned above the existing tunnel (1), and the two transverse ends of the arch cover are rigidly connected with the fender post (4);
the foundation pit contour line (2) divides an effective influence area above the existing tunnel (1) into a plurality of small foundation pits (3), the side wall of the small foundation pit (3) perpendicular to the existing tunnel (1) is supported by a grid steel frame (7), and the grid steel frame (7) and the fender pile (4) jointly form a supporting system of the small foundation pit (3).
2. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion is characterized in that:
the top of the fender pile (4) of the small foundation pit (3) is provided with a pile top crown beam (5), and when the pile top crown beam (5) at the top of the fender pile (4) is constructed, a groove is pulled and excavated at the pile top position.
3. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion is characterized in that:
the small foundation pit (3) is arranged at the position of the grid steel frame (7), and the ground surface is provided with a locking collar beam (6).
4. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion is characterized in that:
the locking collar beam (6) and the pile top crown beam (5) are integrally cast at the position of the grid steel frame (7) at one time to form a closed horizontal beam.
5. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion is characterized in that:
and reinforcing steel bars are reserved below the locking collar beams (6) and are welded with the first grid steel frames (7), and the subsequent adjacent grid steel frames (7) are connected by vertical reinforcing steel bars.
6. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion is characterized in that:
grid steelframe (7) are vertical perpendicular with tunnel (1), and grid steelframe (7) both ends are located between adjacent fender pile (4), and the steelframe end is located fender pile (4) center outside.
7. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion is characterized in that:
the construction of the small foundation pit (3) adopts an interval jumping excavation mode, each grid steel frame (7) is drilled with a foot-locking anchor rod (8), the included angle of the foot-locking anchor rods (8) in the horizontal direction is not less than 35 degrees, the longitudinal distance of the rings is 1 x 1m, and cement paste is pressed in the foot-locking anchor rods (8).
8. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion as claimed in claim 7, wherein:
the upper part of the arch cover (9) is horizontal and serves as a structural bottom plate of a newly-built underground structure (10), the lower part of the arch cover (9) is arc-shaped, and arch feet at two ends are rigidly connected with the fender post (4) at the corresponding position to form an effective force transmission node.
9. The existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion as claimed in claim 8, wherein:
the bottom of the arch cover (9), the side wall of the underground structure and the top plate are provided with a full-package waterproof layer, and the bottom of the arch cover (9) is pre-paved with anti-adhesion waterproof rolls.
CN202020454058.4U 2020-04-01 2020-04-01 Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion Active CN212001125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020454058.4U CN212001125U (en) 2020-04-01 2020-04-01 Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020454058.4U CN212001125U (en) 2020-04-01 2020-04-01 Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion

Publications (1)

Publication Number Publication Date
CN212001125U true CN212001125U (en) 2020-11-24

Family

ID=73422386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020454058.4U Active CN212001125U (en) 2020-04-01 2020-04-01 Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion

Country Status (1)

Country Link
CN (1) CN212001125U (en)

Similar Documents

Publication Publication Date Title
CN101338678B (en) Supporting arch hidden digging top-down construction method
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN102995659A (en) Method for constructing from central area to periphery of ultra-large type underground engineering
CN108589771B (en) Construction method for layer-adding transfer node of operated underground station
CN111305219A (en) Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion and construction method
CN101215815B (en) Method for building integrated cantilever structure composite road adapted for precipitous mountainous area
CN212001125U (en) Existing tunnel crossing system based on foundation pit jumping excavation and arch cover conversion
CN101892670B (en) Multifunctional cofferdam of steel sheet piles and concrete arch rings construction method thereof
CN109338909B (en) Integral pier reinforcing structure and construction method thereof
CN110939139A (en) Pile slab wall structure based on rigid contact of post-pile special-shaped retaining wall and construction method thereof
CN110258362A (en) A kind of city underground engineering passes through the deformation control method of existing bridge
CN106283946B (en) The compound framing type support rail beam transition section structure of medium-and low-speed maglev two-wire excavation location pile foundation
CN104712341B (en) Bed shallow covering shield driving stratum consolidation system and its construction method
CN212533543U (en) Single track roadbed structure of hard rock area straddle type
CN212405174U (en) Supporting structure and building of soft rock foundation pit at lower part of upper soil layer
CN212001126U (en) Concrete support and structure top plate combined building system based on permanent-temporary combination
CN212154780U (en) Antiskid tunnel structure
CN211498975U (en) Anti structure of floating of shallow earthing underground structure
CN214363533U (en) Highway side slope antiskid assembled double row pile becomes stake structure
CN210636443U (en) Tunnel top foundation pit reinforcing structure
CN210141142U (en) Underground structure is built in same direction as digging in hole stake secret
JP3930954B2 (en) Construction method of structure
CN211848646U (en) Deep cutting structure for expansive rock soil of high-speed railway
CN213867835U (en) Compound foundation ditch supporting construction
CN212452680U (en) Isolation supporting structure of highway tunnel foundation pit of underpass pipeline