CN212000792U - Temporary isolation net for road and bridge construction - Google Patents

Temporary isolation net for road and bridge construction Download PDF

Info

Publication number
CN212000792U
CN212000792U CN202020516345.3U CN202020516345U CN212000792U CN 212000792 U CN212000792 U CN 212000792U CN 202020516345 U CN202020516345 U CN 202020516345U CN 212000792 U CN212000792 U CN 212000792U
Authority
CN
China
Prior art keywords
isolation net
mounting
net body
road
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020516345.3U
Other languages
Chinese (zh)
Inventor
王国翠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Tuofang Metal Products Co ltd
Original Assignee
Hebei Tuofang Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Tuofang Metal Products Co ltd filed Critical Hebei Tuofang Metal Products Co ltd
Priority to CN202020516345.3U priority Critical patent/CN212000792U/en
Application granted granted Critical
Publication of CN212000792U publication Critical patent/CN212000792U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a temporary separation net is used in road bridge construction, including two sets of mount pads, two sets of erection column and separation net dictyosome, it is two sets of the surface lower extreme difference joint of erection column is on two sets of mount pads, the surface of erection column is provided with two sets of stop device, the equal fixed mounting in surface both ends of separation net dictyosome has two sets of connecting device, connecting device is connected with stop device. A temporary separation net is used in road and bridge construction, at first, can be convenient for people equipment and dismantle temporary separation net, secondly, can regularly spray the water smoke to the periphery for dust in the peripheral air subsides down, improves the construction environment, reduces the interference of construction dust to the external world moreover, and make the more multiple functional of temporary separation net, at last, need not to dismantle temporary separation net repeatedly when changing the construction position, can directly transport temporary separation net, bring better use prospect.

Description

Temporary isolation net for road and bridge construction
Technical Field
The utility model relates to a road bridge construction field, in particular to temporary separation net is used in road bridge construction.
Background
With the rapid development of society, the living standard of people is continuously improved, vehicles are more and more, people build roads and erect bridges on a large scale for the convenience of going out, people invent some auxiliary equipment for the convenience of construction, wherein, temporary isolation nets for road and bridge construction exist, and with the development of science and technology, the requirements of people on the temporary isolation nets for road and bridge construction are higher and higher, so that the existing temporary isolation nets for road and bridge construction cannot meet the use requirements of people;
the existing temporary isolation net for road and bridge construction has a certain bottom when in use, firstly, the net body and the support column of the existing temporary isolation net for road and bridge construction are usually directly connected by bolts, the joints are directly exposed in the air, dust and water vapor are easily adhered to the joints, the situation of bolt surface oxidation and blocking is easily caused, and the temporary isolation net is inconvenient to disassemble for people.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a temporary separation net is used in road bridge construction can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the temporary isolation net for road and bridge construction comprises two groups of mounting seats, two groups of mounting columns and an isolation net body, wherein the lower ends of the outer surfaces of the two groups of mounting columns are respectively clamped on the two groups of mounting seats, two groups of limiting devices are arranged on the outer surfaces of the mounting columns, two groups of connecting devices are fixedly arranged at two ends of the outer surface of the isolation net body, the connecting devices are connected with the limiting devices, a dust settling device is arranged on the outer surface of the upper end of the isolation net body, and a maintenance display device is arranged at the middle position inside the isolation net body.
Preferably, the limiting device comprises an installation ferrule fixedly installed on the outer surface of the installation column through a bolt, a clamping plate is welded on the outer surface of the installation ferrule, a limiting groove is formed in the outer surface of the upper end of the clamping plate, the connecting device comprises a limiting plate welded on the outer surface of the isolation net body and a rotary movable plate movably installed on the isolation net body, a limiting block is arranged on the limiting plate, and the limiting block is located inside the limiting groove.
Preferably, the dust settling device comprises a water tank fixedly mounted on the outer surface of the rear end of the isolation net body close to the lower end position and a water spraying device fixedly mounted on the outer surface of the upper end of the isolation net body, the water tank is connected with the water spraying device through a water pipe, and a water pump is arranged inside the water tank.
Preferably, the water spraying device comprises an installation pipe fixedly installed on the outer surface of the upper end of the isolation net body through a support column and a plurality of groups of atomizing spray heads fixedly installed on the outer surface of the upper end of the installation pipe, and a water storage cavity is arranged inside the installation pipe.
Preferably, the maintenance display device comprises a display screen fixedly installed in the middle of the outer surface of the front end of the isolation net body and a photovoltaic power generation device fixedly installed on the outer surface of the rear end of the isolation net body, an LED illuminating lamp is fixedly installed on the outer surface of the upper end of the mounting column, and the photovoltaic power generation device is connected with the display screen and the LED illuminating lamp through wires.
Preferably, the lower extreme surface fixed mounting of erection column has the joint, the mounting groove has been seted up to the upper end surface of mount pad, the joint is located inside the mounting groove, the joint passes through bolt and mount pad swing joint.
Preferably, the outer surface of the clamping head is provided with a clamping groove close to the lower end, the inner surface of the mounting groove is welded with a plurality of groups of clamping strips, and the outer surface of the lower end of the clamping head is fixedly provided with a universal wheel.
Compared with the prior art, the utility model provides a temporary separation net is used in road bridge construction has following beneficial effect:
1. through the installation seat and the connection device, when the isolation net is used, the limiting plate on the isolation net body is aligned to the clamping plate on the installation sleeve ring, so that the limiting block enters the limiting groove, then the rotary movable plate is rotated, the lower end of the rotary movable plate is attached to the clamping plate, the isolation net body can be fixed, when the isolation net is disassembled, the rotary movable plate is rotated, the isolation net body can be directly taken down by lifting the isolation net body, and the isolation net body is convenient to install and disassemble;
2. through the dust settling device, when the temporary isolation net is used, the dust settling device on the isolation net body is started at regular time, and water mist is sprayed to the periphery at regular time, so that dust in the peripheral air is settled, the construction environment is improved, the interference of construction dust to the outside is reduced, the temporary isolation net is more environment-friendly, and the functions of the temporary isolation net are more complete;
3. through the mount pad that sets up and the joint of setting at the erection column lower extreme, the erection column joint during installation is inside the mount pad, the mount pad contacts ground, people can separate mount pad and erection column in the transportation for the universal wheel direct contact ground of joint lower extreme directly promotes the good interim isolation net of equipment, need not to dismantle interim isolation net repeatedly when changing the construction position, it is more convenient to use, and whole road and bridge construction is with interim isolation net's structure is fairly simple moreover, excellent in use effect, and is comparatively practical.
The parts of the device not involved are the same as or can be implemented using prior art.
Drawings
Fig. 1 is a schematic view of the overall structure of a temporary separation net for road and bridge construction of the present invention;
FIG. 2 is a structural diagram of an isolation net body in the temporary isolation net for road and bridge construction of the present invention;
FIG. 3 is a structural diagram of a mounting post in the temporary isolation net for road and bridge construction of the present invention;
FIG. 4 is a structural diagram of a mounting seat in a temporary isolation net for road and bridge construction according to the present invention;
FIG. 5 is a structural diagram of a ferrule installed in a temporary isolation net for road and bridge construction according to the present invention;
fig. 6 is a connection diagram of the installation ferrule in the temporary separation net for road and bridge construction of the utility model.
In the figure: 1. a mounting seat; 2. mounting a column; 3. an isolation mesh body; 4. installing a ferrule; 5. clamping a plate; 6. a limiting plate; 7. rotating the movable plate; 8. a water tank; 9. installing a pipe; 10. an atomizing spray head; 11. a clamping head; 12. mounting grooves; 13. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
A temporary isolation net for road and bridge construction is shown in figures 1-6 and comprises two groups of mounting seats 1, two groups of mounting columns 2 and an isolation net body 3, the lower ends of the outer surfaces of the two groups of mounting columns 2 are respectively clamped on the two groups of mounting seats 1, two groups of limiting devices are arranged on the outer surfaces of the mounting columns 2, two groups of connecting devices are fixedly mounted at two ends of the outer surface of the isolation net body 3 and connected with the limiting devices, a dust settling device is arranged on the outer surface of the upper end of the isolation net body 3, and a maintenance display device is arranged in the middle of the inner portion of the isolation net body 3.
The limiting device comprises an installation ring 4 fixedly installed on the outer surface of the installation column 2 through a bolt, a clamping plate 5 is welded on the outer surface of the installation ring 4, a limiting groove is formed in the outer surface of the upper end of the clamping plate 5, the connecting device comprises a limiting plate 6 welded on the outer surface of the isolation net body 3 and a rotary movable plate 7 movably installed on the isolation net body 3, a limiting block is arranged on the limiting plate 6, and the limiting block is located inside the limiting groove.
The dust settling device comprises a water tank 8 fixedly mounted on the outer surface of the rear end of the isolation net body 3 and close to the lower end of the isolation net body 3 and a water spraying device fixedly mounted on the outer surface of the upper end of the isolation net body 3, the water tank 8 is connected with the water spraying device through a water pipe, and a water pump is arranged inside the water tank 8.
The water spraying device comprises a mounting pipe 9 fixedly mounted on the outer surface of the upper end of the separation net body 3 through a support column and a plurality of groups of atomizing spray heads 10 fixedly mounted on the outer surface of the upper end of the mounting pipe 9, and a water storage cavity is arranged inside the mounting pipe 9.
The maintenance display device comprises a display screen fixedly installed in the middle of the outer surface of the front end of the isolation net body 3 and a photovoltaic power generation device fixedly installed on the outer surface of the rear end of the isolation net body 3, an LED illuminating lamp is fixedly installed on the outer surface of the upper end of the mounting column 2, and the photovoltaic power generation device is connected with the display screen and the LED illuminating lamp through wires.
The fixed surface of the lower extreme of erection column 2 installs joint 11, and mounting groove 12 has been seted up to the upper end surface of mount pad 1, and joint 11 is located inside mounting groove 12, and joint 11 passes through bolt and 1 swing joint of mount pad.
The outer surface of joint 11 is close to the lower extreme position and has seted up the draw-in groove, and the internal surface welding of mounting groove 12 has a plurality of groups card strip, and the lower extreme surface fixed mounting of joint 11 has universal wheel 13.
It should be noted that, the utility model relates to a temporary separation net for road and bridge construction, during the use, the bayonet joint 11 of the lower end of the erection column 2 is aligned with the installation groove 12 on the installation seat 1, so that the bayonet groove on the bayonet joint 11 is clamped on the clamping strip on the inner surface of the installation groove 12, the installation ferrule 4 is fixed on the outer surface of the erection column 2 through the bolt, then the limiting plates 6 at the two ends of the separation net body 3 are aligned with the clamping plates 5 on the installation ferrule 4, so that the limiting blocks on the limiting plates 6 are clamped in the limiting grooves on the clamping plates 5, then the rotary movable plate 7 is rotated, the lower end of the rotary movable plate 7 is in contact with the lower end surface of the clamping plates 5, thereby;
when the water tank is used, the display screen plays information and construction information of surrounding roads, the water tank 8 is connected with a water supply device through a pipeline, a water pump in the water tank 8 is started at regular time, a water source is conveyed into a water storage cavity of the installation pipe 9, and finally the water source is sprayed into air through the atomizing nozzle 10;
when a construction site is changed, people can rotate the bolts on the mounting base 1 to separate the mounting column 2 from the mounting base 1, so that the universal wheels 13 at the lower end of the clamping joints 11 on the mounting column 2 are directly contacted with the ground, and the temporary isolation net is directly pushed to the next construction site;
through the installation seat 1 and the connecting device, when in use, the limiting plate 6 on the isolation net body 3 is aligned to the clamping plate 5 on the installation ring 4, so that the limiting block enters the limiting groove, then the rotary movable plate 7 is rotated, the lower end of the rotary movable plate 7 is attached to the clamping plate 5, the isolation net body 3 can be fixed, when in disassembly, the rotary movable plate 7 is rotated, the isolation net body 3 can be directly taken down by lifting the isolation net body 3, and the isolation net body 3 is convenient to install and disassemble;
through the arranged dust settling device, when the temporary isolation net is used, the dust settling device on the isolation net body 3 is started at regular time, and water mist is sprayed to the periphery at regular time, so that dust in the peripheral air is settled, the construction environment is improved, the interference of construction dust to the outside is reduced, the temporary isolation net is more environment-friendly, and the functions of the temporary isolation net are more complete;
through mount pad 1 that sets up and the joint 11 of setting at 2 lower extremes of erection column, 2 joints of erection column are inside mount pad 1 during the installation, mount pad 1 contact ground, people can separate mount pad 1 and erection column 2 in the transportation, make the universal wheel 13 direct contact ground of 11 lower extremes of joint, people can directly promote the temporary separation net of equipment, transport construction position with it, need not to dismantle temporary separation net repeatedly when changing construction position, it is more convenient to use, and whole road bridge construction is with temporary separation net's structure fairly simple, excellent in use effect, and is comparatively practical.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. A temporary separation net for road and bridge construction is characterized in that: the dust-settling isolation net comprises two groups of mounting seats (1), two groups of mounting columns (2) and an isolation net body (3), wherein the lower ends of the outer surfaces of the two groups of mounting columns (2) are respectively clamped on the two groups of mounting seats (1), two groups of limiting devices are arranged on the outer surface of the mounting columns (2), two groups of connecting devices are fixedly mounted at two ends of the outer surface of the isolation net body (3), the connecting devices are connected with the limiting devices, a dust-settling device is arranged on the outer surface of the upper end of the isolation net body (3), and a maintenance display device is arranged in the middle of the inner portion of the isolation net body (3).
2. The temporary isolation net for road and bridge construction according to claim 1, wherein: the limiting device comprises an installation ring (4) fixedly installed on the outer surface of the installation column (2) through a bolt, a clamping plate (5) is welded on the outer surface of the installation ring (4), a limiting groove is formed in the outer surface of the upper end of the clamping plate (5), the connecting device comprises a limiting plate (6) welded on the outer surface of the isolation net body (3) and a rotary movable plate (7) movably installed on the isolation net body (3), a limiting block is arranged on the limiting plate (6), and the limiting block is located inside the limiting groove.
3. The temporary isolation net for road and bridge construction according to claim 1, wherein: the dust settling device comprises a water tank (8) fixedly mounted on the outer surface of the rear end of the isolation net body (3) and close to the lower end of the isolation net body and a water spraying device fixedly mounted on the outer surface of the upper end of the isolation net body (3), the water tank (8) is connected with the water spraying device through a water pipe, and a water pump is arranged inside the water tank (8).
4. The temporary isolation net for road and bridge construction according to claim 3, wherein: the water spraying device comprises an installation pipe (9) fixedly installed on the outer surface of the upper end of the isolation net body (3) through a support column and a plurality of groups of atomizing nozzles (10) fixedly installed on the outer surface of the upper end of the installation pipe (9), and a water storage cavity is arranged inside the installation pipe (9).
5. The temporary isolation net for road and bridge construction according to claim 1, wherein: the maintenance display device comprises a display screen fixedly installed in the middle of the outer surface of the front end of the isolation net body (3) and a photovoltaic power generation device fixedly installed on the outer surface of the rear end of the isolation net body (3), an LED illuminating lamp is fixedly installed on the outer surface of the upper end of the mounting column (2), and the photovoltaic power generation device is connected with the display screen and the LED illuminating lamp through wires.
6. The temporary isolation net for road and bridge construction according to claim 1, wherein: the mounting structure is characterized in that a clamping joint (11) is fixedly arranged on the outer surface of the lower end of the mounting column (2), a mounting groove (12) is formed in the outer surface of the upper end of the mounting seat (1), the clamping joint (11) is located inside the mounting groove (12), and the clamping joint (11) is movably connected with the mounting seat (1) through a bolt.
7. The temporary isolation net for road and bridge construction according to claim 6, wherein: the outer surface of joint (11) is close to the lower extreme position and has seted up the draw-in groove, the internal surface welding of mounting groove (12) has a plurality of groups card strip, the lower extreme external surface fixed mounting of joint (11) has universal wheel (13).
CN202020516345.3U 2020-04-10 2020-04-10 Temporary isolation net for road and bridge construction Expired - Fee Related CN212000792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020516345.3U CN212000792U (en) 2020-04-10 2020-04-10 Temporary isolation net for road and bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020516345.3U CN212000792U (en) 2020-04-10 2020-04-10 Temporary isolation net for road and bridge construction

Publications (1)

Publication Number Publication Date
CN212000792U true CN212000792U (en) 2020-11-24

Family

ID=73414633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020516345.3U Expired - Fee Related CN212000792U (en) 2020-04-10 2020-04-10 Temporary isolation net for road and bridge construction

Country Status (1)

Country Link
CN (1) CN212000792U (en)

Similar Documents

Publication Publication Date Title
CN212000792U (en) Temporary isolation net for road and bridge construction
CN206093877U (en) Multifunctional street lamp
CN112753539A (en) Environment-friendly watering device for municipal works
CN210278629U (en) Construction site raise dust controlling means
CN211625090U (en) Combined solar street lamp integrating atomization spraying and road lighting
CN214392986U (en) New forms of energy intelligence sightseeing vehicle frame automatic welder
CN213943679U (en) Novel cubical switchboard processing device
CN215369112U (en) Novel environmental protection is multi-functional encloses fender
CN213527928U (en) Highway engineering construction dust device
CN213193017U (en) Dust and haze removing spraying device for urban roads
CN219864207U (en) Construction device for green building
CN220619896U (en) Road guardrail for smart city
CN216304426U (en) Landscape lighting guardrail structure
CN216244049U (en) Environment-friendly energy-saving signal lamp for subway
CN215369116U (en) Road bridge construction is with combination formula fender that encloses
CN217058876U (en) Multifunctional wireless environment monitoring equipment
CN218092071U (en) Energy-concerving and environment-protective construction equipment of green building
CN206680937U (en) A kind of novel building engineering solarization wetting system
CN221297643U (en) Building site safety warning device
CN109296983A (en) A kind of LED street lamp
CN212200138U (en) Novel pedestrian cross street warning equipment
CN217079959U (en) Convenient to install's urban road construction encloses fender
CN220424891U (en) Dust suppression device for municipal cleaning
CN219508409U (en) Transmission line safety warning reminding device
CN218206180U (en) Fender is enclosed in municipal works construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201124

CF01 Termination of patent right due to non-payment of annual fee