CN212000648U - Prefabricated beam frame facility work machine lateral shifting braced system - Google Patents

Prefabricated beam frame facility work machine lateral shifting braced system Download PDF

Info

Publication number
CN212000648U
CN212000648U CN202020229268.3U CN202020229268U CN212000648U CN 212000648 U CN212000648 U CN 212000648U CN 202020229268 U CN202020229268 U CN 202020229268U CN 212000648 U CN212000648 U CN 212000648U
Authority
CN
China
Prior art keywords
shaped steel
frame
lattice type
type shaping
shaping jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020229268.3U
Other languages
Chinese (zh)
Inventor
王舒哲
张迪
秦亮
肖礼鹏
马春桃
彭建锋
黎平
肖攀
张曼
邓亮
张光华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN202020229268.3U priority Critical patent/CN212000648U/en
Application granted granted Critical
Publication of CN212000648U publication Critical patent/CN212000648U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a transverse movement supporting system of a prefabricated beam frame facility machine, which is characterized in that the supporting system is a multi-group lattice type shaping jig frame fixed on the lower concrete strip foundation; adjacent lattice type shaping jig frames are connected into a whole by adopting a connecting piece; four steel pipe upright posts on each group of lattice type shaping jig frames are welded on two long double-spliced H-shaped steel main beams which are completely long along the transverse bridge direction; two long double-spliced H-shaped steel main beams with the full length in the transverse bridge direction are welded with a longitudinal short H-shaped steel distribution beam at intervals, and the guide rail beam is fixed on the short H-shaped steel distribution beams in the longitudinal bridge direction along the transverse bridge direction. The front support leg of the prefabricated beam frame facility machine is placed on a front span cover beam, the middle support leg is placed on a guide rail beam based on a lattice type shaping jig frame, the prefabricated beam frame facility machine moves the prefabricated box beam from one frame to the other frame through transverse movement, and finally the box beam is erected from a half frame to a full frame, so that the full frame erection of the box beam is met.

Description

Prefabricated beam frame facility work machine lateral shifting braced system
The technical field is as follows:
the utility model belongs to bridge engineering field mainly relates to a prefabricated beam structure facility tool and machinery lateral shifting braced system based on lattice formula design bed-jig
Background art:
at present, the prefabricated box girder is widely applied to various projects, the construction efficiency can be improved, and the construction period can be effectively shortened. At present, for a left-right separated bridge, the construction process is influenced by various problems such as settlement or construction progress, breakpoints and the like, the erection of a certain precast beam can only be met, and the erection work of a full-width bridge precast beam cannot be effectively carried out.
The invention content is as follows:
the utility model aims at receiving all kinds of expropriations or construction progress in the disconnect-type bridge work progress about solving, the breakpoint scheduling problem influences, a prefabricated beam frame facility tool lateral shifting braced system based on lattice design bed-jig is provided, before constructing the tool through the extension prefabricated beam frame facility, the mode of well landing leg guide rail roof beam, place preceding landing leg guide rail roof beam on the bent cap of previous span, well landing leg guide rail roof beam is placed and is being supported temporarily at prefabricated beam frame facility tool based on lattice design bed-jig, make prefabricated beam frame facility tool can follow a width of cloth and change to another width of cloth, thereby satisfy the whole width of cloth of box girder and erect, practice thrift the time limit for a project, safety and reliability.
The utility model provides a technical scheme that technical problem adopted is:
the utility model provides a prefabricated beam frame facility industrial machinery lateral shifting braced system, includes concrete bar foundation, a plurality of group's lattice formula design bed-jig, two long double pin H shaped steel girders, a plurality of short H shaped steel distribution roof beams, guide rail roof beam, its characterized in that: a plurality of groups of lattice type shaping jig frames are fixed on the lower concrete strip foundation through expansion bolts; adjacent lattice type shaping jig frames are connected into a whole by adopting a connecting piece; four steel pipe upright posts on each group of lattice type shaping jig frames are welded on two long double-spliced H-shaped steel main beams which are completely long along the transverse bridge direction; the two long double-spliced H-shaped steel main beams with the full length in the transverse bridge direction are welded with a longitudinal short H-shaped steel distribution beam at intervals, the guide rail beam is fixed on the short H-shaped steel distribution beams in the longitudinal bridge direction along the transverse bridge direction, and the guide rail beam is used as a fulcrum of a supporting leg in the prefabricated beam frame facility machine.
The lattice type shaping jig frame consists of four steel pipe columns, cross braces and inclined braces, and the center distance of each steel pipe column is 1.0-3.0 m; and the steel pipe upright columns are connected and fixed by adopting cross braces and inclined braces. The steel pipe upright post, the channel steel and the angle steel can ensure reliable stress and stability in the construction process of the industrial machinery of the prefabricated beam frame facility. The connecting piece is made of short channel steel, and the short channel steel connects the adjacent lattice type shaping tire frames into a whole through transverse and oblique directions.
The distance between the short H-shaped steel distribution beams is 0.5-1.5 m.
The long double-spliced H-shaped steel main beam and the short H-shaped steel distribution beam are both made of H600-shaped steel. The distance and the material selection of the long double-spliced H-shaped steel main beam and the short H-shaped steel distribution beam can ensure the stress and the stability reliability in the construction process of the prefabricated beam frame facility machine, and the concrete mark number and the foundation bearing capacity of the concrete strip foundation at the bottom of the lattice type shaping jig frame can meet the stress requirement in the construction process of the prefabricated beam frame facility machine.
And an anchor ear is arranged between the lattice type shaping jig frame and the adjacent pier column, and the lattice type shaping jig frame and the adjacent pier column are connected into a whole by the anchor ear. The hoop is made of I16I-shaped steel.
The construction method of the transverse moving support system of the machine tool utilizing the prefabricated beam frame facility is characterized by comprising the following steps of:
firstly, measurement and paying-off and foundation treatment: carrying out accurate paying-off positioning on a field area, and carrying out treatment and replacement on a bad foundation to ensure that the bearing capacity of the foundation can meet the requirement of normal construction of the prefabricated beam frame facility construction machinery;
secondly, pouring, maintaining and constructing the concrete strip foundation: c40 reinforced concrete construction is adopted, and the concrete is vibrated and compacted by a 30-type vibrating rod; and the elevation and the surface evenness of the concrete are strictly controlled. After concrete pouring is finished, finishing surface light collection, covering with a plastic film, and arranging warning signs around to avoid trampling by personnel;
thirdly, mounting a lattice type shaping jig: and after the strength of the foundation concrete reaches 75% of the design requirement, the shaping lattice type jig frame is qualified through inspection, is transported to the site, is hoisted by using a 25t truck crane, and well controls the flatness and the elevation of the top surface of the lattice type shaping jig frame. C10 channel steel cross braces and L100 multiplied by 7 angle steel cross braces are welded and fixed between each group of lattice type shaping jig frames, C18 channel steel cross braces and C18 channel steel cross braces are connected between adjacent lattice type shaping jig frames, an anchor ear is arranged between each lattice type shaping jig frame and an adjacent pier stud and is made of I16I-shaped steel, and the lattice type shaping jig frames and the adjacent pier studs are connected into a whole through the anchor ear.
Fourthly, constructing the upper platform of the lattice type shaping jig: welding and fixing two long double-spliced H-shaped steel main beams at the top of the lattice type shaping jig frame in the transverse bridge direction with the lattice type shaping jig frame; and short H-shaped steel distribution beams are welded at every two sections in the longitudinal direction of the longitudinal bridge on the upper parts of the two long double-spliced H-shaped steel main beams in the transverse direction of the bridge. The guide rail beam is fixed on the short H-shaped steel distribution beam in the longitudinal bridge direction along the transverse bridge direction.
And fifthly, front support legs of the prefabricated beam frame facility machine are placed on the front span cover beam, middle support legs are placed on the guide rail beam based on the lattice type shaping jig frame, the prefabricated beam frame facility machine moves the prefabricated box beam from one frame to the other frame for erection through transverse movement, and finally the box beam is erected from half frame to full frame.
The utility model discloses a truck crane hoist and mount lattice formula design bed-jig construction, the construction is fast, and the time limit for a project is short, and overall stability is high. A safe and reliable supporting system and a construction method are provided for expanding the single-width precast beam erection to the full-width precast beam erection.
Description of the drawings:
fig. 1 is a schematic elevation view of the support system of the present invention.
Fig. 2 is a schematic plan view of the support system of the present invention.
Fig. 3 is a schematic layout view of the lattice type shaping jig frame and the prefabricated beam frame facility machine support leg of the present invention.
Fig. 4 is a schematic cross-sectional view of the support system of the present invention.
Reference numerals: the method comprises the following steps of 1-concrete strip foundation, 2-steel tube stand columns, 3-cross braces, 4-diagonal braces, 5-long double H-shaped steel, 6-short H-shaped steel distribution beams, 7-guide rail beams, 8-pier columns, 9-capping beams, 10-precast beams, 11-lattice type shaping jig frames (parts shown by dotted line frames), 12-connecting pieces, 13-hoops and 14-precast beam frame facility machinery.
The specific implementation mode is as follows:
the present invention will be further explained with reference to the accompanying drawings and the specific example of the 30m prefabricated small box girder.
As shown in fig. 1, fig. 2, fig. 3 and fig. 4, the supporting system of the present invention comprises a concrete strip foundation 1, two long double-spliced H-beam girders 5, a plurality of short H-beam distribution beams 6, a plurality of groups of lattice-type shaping jig frames 11, and is characterized in that: all the lattice type shaping jig frames 11 are fixed on a lower concrete strip foundation 1 through expansion bolts, each group of lattice type shaping jig frames 11 consists of four steel pipe stand columns 2, cross braces 3 and inclined braces 4, the steel pipe stand columns 2 are connected and fixed through the channel steel cross braces 3 and the angle steel inclined braces 4, and the center distance of each steel pipe stand column is 2 m; adjacent lattice type shaping jig frames 11 are connected into a whole by short channel steel connecting pieces 12; the top of each group of lattice type shaping jig frames 11 is welded on two long double-spliced H-shaped steel main beams 5 which are arranged in parallel and are full-length along the transverse bridge direction by taking each steel pipe upright post 2 as a fulcrum; h-shaped steel distribution beams 6 which are short in the longitudinal direction are welded on two double-spliced H-shaped steel main beams 5 which are long in the transverse direction at intervals of 1m, guide rail beams 7 are fixed on the H-shaped steel distribution beams 6 which are short in the longitudinal direction along the transverse direction, and the guide rail beams 7 are used as supporting points of supporting legs in the prefabricated beam frame facility machine 14. And the precast beam frame facility working machinery 14 finishes the transverse bridge translation and erection of the precast beam through the guide rail beam 7. Finally, the prefabricated beam erecting equipment 14 can be rotated from one frame to another frame, so that the full-width erection of the box beam is met. An anchor ear 13 is arranged between the lattice type shaping jig frame 11 and the adjacent pier column 8, the anchor ear is made of I16I-steel, and the lattice type shaping jig frame and the adjacent pier column are connected into a whole by the anchor ear.
The steel tube upright posts in the lattice type shaping jig frame are P325 multiplied by 8mm steel tube upright posts, L100 multiplied by 7 angle steel inclined struts and C10 channel steel transverse struts are transversely connected between the steel tube upright posts, and connecting pieces 12, namely the inclined struts and the transverse struts, between the adjacent lattice type shaping jig frames 11 are connected by C18 channel steel. The long double-spliced H-shaped steel main beam 5 adopts double-spliced H600-shaped steel, and the short H-shaped steel distribution beam 6 adopts H600-shaped steel. The hoop 13 is made of I16I-shaped steel.
The construction method of the transverse moving support system of the machine tool utilizing the prefabricated beam frame facility is characterized by comprising the following steps of:
firstly, measurement and paying-off and foundation treatment: carrying out accurate paying-off positioning on a field area, and carrying out treatment and replacement on a bad foundation to ensure that the bearing capacity of the foundation can meet the requirement of normal construction of the prefabricated beam frame facility construction machinery;
secondly, pouring, maintaining and constructing the concrete strip foundation: c40 reinforced concrete construction is adopted, and the concrete is vibrated and compacted by a 30-type vibrating rod; and the elevation and the surface evenness of the concrete are strictly controlled. After concrete pouring is finished, finishing surface light collection, covering with a plastic film, and arranging warning signs around to avoid trampling by personnel;
thirdly, mounting a lattice type shaping jig: and after the strength of the foundation concrete reaches 75% of the design requirement, the shaping lattice type jig frame is qualified through inspection, is transported to the site, is hoisted by using a 25t truck crane, and well controls the flatness and the elevation of the top surface of the lattice type shaping jig frame. C10 channel steel cross braces and L100 multiplied by 7 angle steel diagonal braces are welded and fixed between each group of lattice type shaping tire frames, C18 channel steel slant and C18 channel steel transverse connection are adopted between adjacent lattice type shaping tire frames 11, an anchor ear 13 is arranged between each lattice type shaping tire frame and an adjacent pier stud, and I16I-shaped steel is adopted by the anchor ear to connect the lattice type shaping tire frames with the pier studs.
Fourthly, constructing the upper platform of the lattice type shaping jig: welding and fixing two long double-spliced H-shaped steel main beams 5 at the top of the lattice type shaping jig frame in the transverse bridge direction and the lattice type shaping jig frame 11; and short H-shaped steel distribution beams 6 are welded at intervals of 1m in the longitudinal direction of the upper part of two long double-spliced H-shaped steel main beams 5 in the transverse direction of the bridge. The guide rail beam 7 is fixed on the short H-shaped steel distribution beam 6 in the longitudinal direction along the transverse direction.
And fifthly, front supporting legs of the prefabricated beam frame facility machine 14 are placed on the front span cover beam 9, middle supporting legs are placed on the guide rail beams 7 based on the lattice type shaping jig frame, and as shown in the figure 3, the prefabricated beam frame facility machine moves the prefabricated box beams 10 from one frame to the other frame through transverse movement to be erected, and finally, the box beams are erected from half frame to full frame.

Claims (8)

1. The utility model provides a prefabricated beam frame facility industrial machinery lateral shifting braced system, includes concrete bar foundation, a plurality of group's lattice formula design bed-jig, two long double pin H shaped steel girders, a plurality of short H shaped steel distribution roof beams, guide rail roof beam, its characterized in that: a plurality of groups of lattice type shaping jig frames are fixed on the lower concrete strip foundation; adjacent lattice type shaping jig frames are connected into a whole by adopting a connecting piece; four steel pipe upright posts on each group of lattice type shaping jig frames are welded on two long double-spliced H-shaped steel main beams which are completely long along the transverse bridge direction; two long double-spliced H-shaped steel main beams with the full length in the transverse bridge direction are welded with a longitudinal short H-shaped steel distribution beam at intervals, and the guide rail beam is fixed on the short H-shaped steel distribution beams in the longitudinal bridge direction along the transverse bridge direction.
2. The precast beam facility work machine lateral movement support system of claim 1, wherein: the lattice type shaping jig frame is composed of four steel pipe stand columns, cross braces and inclined braces, and the steel pipe stand columns are fixedly connected through the cross braces and the inclined braces.
3. The precast beam facility work machine lateral movement support system of claim 2, wherein: the center distance of each steel tube upright post is 1.0-3.0 m.
4. The precast beam facility work machine lateral movement support system of claim 1, wherein: the distance between the short H-shaped steel distribution beams is 0.5-1.5 m.
5. The precast beam facility work machine lateral movement support system of claim 1, wherein: the connecting piece is made of short channel steel, and the short channel steel connects the adjacent lattice type shaping tire frames into a whole through transverse and oblique directions.
6. The precast beam facility work machine lateral movement support system of claim 1, wherein: the long double-spliced H-shaped steel main beam and the short H-shaped steel distribution beam are both made of H600-shaped steel.
7. The precast beam facility work machine lateral movement support system of claim 1, wherein: and an anchor ear is arranged between the lattice type shaping jig frame and the adjacent pier column, and the lattice type shaping jig frame and the adjacent pier column are connected into a whole by the anchor ear.
8. The precast beam facility work machine lateral movement support system of claim 7, wherein: the hoop is made of I16I-shaped steel.
CN202020229268.3U 2020-02-29 2020-02-29 Prefabricated beam frame facility work machine lateral shifting braced system Active CN212000648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020229268.3U CN212000648U (en) 2020-02-29 2020-02-29 Prefabricated beam frame facility work machine lateral shifting braced system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020229268.3U CN212000648U (en) 2020-02-29 2020-02-29 Prefabricated beam frame facility work machine lateral shifting braced system

Publications (1)

Publication Number Publication Date
CN212000648U true CN212000648U (en) 2020-11-24

Family

ID=73423430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020229268.3U Active CN212000648U (en) 2020-02-29 2020-02-29 Prefabricated beam frame facility work machine lateral shifting braced system

Country Status (1)

Country Link
CN (1) CN212000648U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188281A (en) * 2020-02-29 2020-05-22 中建三局第二建设工程有限责任公司 Transverse moving support system for prefabricated beam frame facility working machinery and construction method
CN115653114A (en) * 2022-11-07 2023-01-31 中建八局第四建设有限公司 Method for mounting rows of ultrahigh swing columns

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188281A (en) * 2020-02-29 2020-05-22 中建三局第二建设工程有限责任公司 Transverse moving support system for prefabricated beam frame facility working machinery and construction method
CN115653114A (en) * 2022-11-07 2023-01-31 中建八局第四建设有限公司 Method for mounting rows of ultrahigh swing columns
CN115653114B (en) * 2022-11-07 2025-05-13 中建八局第四建设有限公司 Installation method of rows of super high swing columns

Similar Documents

Publication Publication Date Title
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN111287095A (en) Special construction method for main beam of lower-towing super-large bridge
CN113463768A (en) 120 m-span prestressed triangular steel pipe truss girder construction method
CN114214920B (en) Large-span double-layer built-up steel truss arch bridge and construction method thereof
CN216891927U (en) Large-span double-layer combined construction steel truss arch bridge
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN102605717A (en) Pier-top longitudinal support scaffolding method
CN115467421A (en) Hoisting construction method for complex large-span steel roof
CN111794119A (en) Temporary support system and hoisting method for basket type steel box tied arch
CN212000648U (en) Prefabricated beam frame facility work machine lateral shifting braced system
CN114263114A (en) Construction system and construction method of large-section steel box girder
CN112854004A (en) Fish-bellied box girder column type support construction method
CN110629691B (en) Totally-enclosed sound barrier structure for noise reduction engineering of high-speed railway
CN101324054B (en) Construction Method of Pushing into Place for Temporary Piers of Segmental Beams of Bridges
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN111188281A (en) Transverse moving support system for prefabricated beam frame facility working machinery and construction method
CN111827678A (en) A hoisting method of truss steel structure at the top of a silo
CN105604183A (en) Construction method of rear welded joints of a truss
CN212897482U (en) Construction platform for high-rise building overhanging structural layer
CN211333866U (en) High-speed railway beam-making pedestal suitable for unfavorable geology
CN118979438A (en) A construction method for erecting and installing large-span steel trusses in sections and pieces
CN117488647A (en) Combined beam suitable for upper and lower two-layer steel truss web rods of overhead in urban area and construction method
CN215052133U (en) Steel case roof beam is alternately construction supporting structure from top to bottom
CN215629403U (en) Supporting system for temporary via hole of bridge girder erection machine
CN214005439U (en) Installation bed-jig of bent cap reinforcing bar part article construction