CN211971549U - A large-scale water pump mobile installation device for reverse slope drainage of long tunnels - Google Patents

A large-scale water pump mobile installation device for reverse slope drainage of long tunnels Download PDF

Info

Publication number
CN211971549U
CN211971549U CN202020318214.4U CN202020318214U CN211971549U CN 211971549 U CN211971549 U CN 211971549U CN 202020318214 U CN202020318214 U CN 202020318214U CN 211971549 U CN211971549 U CN 211971549U
Authority
CN
China
Prior art keywords
water pump
walking track
support frame
transport vehicle
slope drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020318214.4U
Other languages
Chinese (zh)
Inventor
姜栋
陈志强
张新才
杜利军
高飞
刘昕华
解备战
雷腾
石碧青
赵程飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd Of China Raiway First Group
China Railway First Engineering Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd Of China Raiway First Group
China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd Of China Raiway First Group, China Railway First Engineering Group Co Ltd filed Critical Fourth Engineering Co Ltd Of China Raiway First Group
Priority to CN202020318214.4U priority Critical patent/CN211971549U/en
Application granted granted Critical
Publication of CN211971549U publication Critical patent/CN211971549U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

本实用新型公开了一种应用于长大隧道反坡排水的大型水泵移动安装装置,属于隧道反坡排水技术领域,包括总体支撑架、水泵运输车、运输车行走轨道和吊装组件,所述总体支撑架的上端固定有吊装组件,所述总体支撑架的下端一侧设置有运输车行走轨道,所述运输车行走轨道的上端安装有水泵运输车,所述运输车行走轨道的一侧设置有水泵安装位。本实用新型安装装置结构简单,便于加工组装,不必采用其他大型机械吊装,节约能源;水泵安装程序简单,人工安装便于操作,省时省力;安装系统便利,可随意将水泵移动至任意安装位置,工作效率高;安装过程无需人工搬运,不会对水泵造成磕碰或其他损坏,且无安全隐患。

Figure 202020318214

The utility model discloses a large-scale water pump mobile installation device applied to the reverse slope drainage of long tunnels, belonging to the technical field of tunnel reverse slope drainage. The upper end of the support frame is fixed with a hoisting assembly, the lower end side of the overall support frame is provided with a transport vehicle running track, the upper end of the transport vehicle running track is equipped with a water pump transport vehicle, and one side of the transport vehicle running track is provided with a water pump transport vehicle. Pump installation location. The installation device of the utility model has a simple structure, is easy to process and assemble, does not need to be hoisted by other large machines, and saves energy; the installation procedure of the water pump is simple, the manual installation is convenient for operation, saves time and labor; the installation system is convenient, and the water pump can be moved to any installation position at will, High working efficiency; no manual handling is required during the installation process, no bumping or other damage to the pump, and no safety hazard.

Figure 202020318214

Description

一种应用于长大隧道反坡排水的大型水泵移动安装装置A large-scale water pump mobile installation device for reverse slope drainage of long tunnels

技术领域technical field

本实用新型属于隧道反坡排水技术领域,具体涉及一种应用于长大隧道反坡排水的大型水泵移动安装装置。The utility model belongs to the technical field of tunnel reverse slope drainage, in particular to a large-scale water pump mobile installation device used for reverse slope drainage of long tunnels.

背景技术Background technique

隧道固定泵站内,需将大型水泵安装在已经就位的支架平台上,采用人工和机械设备(装载机、挖掘机)相配合的方式。水泵运送至现场后使用机械吊装,一个水泵放置在平台上后,需人力将其缓慢移动到准确位置,因为其重量较大,人工移动极其困难,需要3~5人配合,并采用撬棍辅助移动,过程伴随着艰辛、水泵磕碰、不安全等各项因素。In the fixed pump station of the tunnel, the large water pump needs to be installed on the support platform that has been in place, and the combination of manual and mechanical equipment (loader, excavator) is adopted. After the water pump is transported to the site, it is mechanically hoisted. After a water pump is placed on the platform, it needs to be moved slowly to the exact position by manpower. Because of its large weight, it is extremely difficult to move manually. It requires the cooperation of 3 to 5 people, and is assisted by a crowbar. Moving, the process is accompanied by various factors such as hardships, pump bumps, and insecurity.

现有水泵移动安装技术的缺点和不足:①大型固定泵站一般采用洞室的形式,水泵安装平台在洞室之内。由于空间限制,机械吊装仅能将水泵吊放至洞室外的平台之上,具体的移位、摆动完全需要人工操作,工作过程繁重。②因水泵体积大,重量大,人工移动过程中无法做到轻拿轻放,可能造成水泵磕碰或其他隐形的损伤,导致水泵寿命减弱,或给后期运行产生不利影响。③人工搬运、安装安全隐患大。The shortcomings and deficiencies of the existing water pump mobile installation technology: ① Large-scale fixed pump stations generally use the form of a cavern, and the water pump installation platform is inside the cavern. Due to space limitations, the mechanical hoisting can only hoist the water pump on the platform outside the cavern. The specific displacement and swing need manual operation, and the work process is heavy. ②Due to the large volume and weight of the pump, it cannot be handled with care during manual movement, which may cause the pump to bump or other invisible damage, which will reduce the life of the pump, or adversely affect the later operation. ③ Manual handling and installation have great potential safety hazards.

实用新型内容Utility model content

为解决上述背景技术中提出的问题。本实用新型提供了一种应用于长大隧道反坡排水的大型水泵移动安装装置,具有结构简单,减少人工,节约资源的特点。In order to solve the problems raised in the above background art. The utility model provides a large-scale water pump mobile installation device which is applied to the reverse slope drainage of long tunnels, and has the characteristics of simple structure, labor reduction and resource saving.

为实现上述目的,本实用新型提供如下技术方案:一种应用于长大隧道反坡排水的大型水泵移动安装装置,包括总体支撑架、水泵运输车、运输车行走轨道和吊装组件,所述总体支撑架的上端固定有吊装组件,所述总体支撑架的下端一侧设置有运输车行走轨道,所述运输车行走轨道的上端安装有水泵运输车,所述运输车行走轨道的一侧设置有水泵安装位。In order to achieve the above purpose, the present utility model provides the following technical solutions: a large-scale water pump mobile installation device applied to reverse slope drainage of long tunnels, comprising an overall support frame, a water pump transport vehicle, a transport vehicle running track and a hoisting assembly, the overall The upper end of the support frame is fixed with a hoisting assembly, the lower end side of the overall support frame is provided with a transport vehicle running track, the upper end of the transport vehicle running track is equipped with a water pump transport vehicle, and one side of the transport vehicle running track is provided with a water pump transport vehicle. Pump installation location.

优选的,所述吊装组件包括倒链横向行走轨道、倒链纵向行走轨道和吊装倒链,其中,所述总体支撑架的上端固定有倒链纵向行走轨道,两个所述倒链纵向行走轨道之间连接有倒链横向行走轨道,所述倒链横向行走轨道的下端固定有吊装倒链。Preferably, the hoisting assembly includes an inverted chain transverse travel track, an inverted chain longitudinal travel track and a hoisting inverted chain, wherein the upper end of the overall support frame is fixed with an inverted chain longitudinal travel track, and two of the inverted chain longitudinal travel tracks are An inverted chain lateral running track is connected therebetween, and a hoisting inverted chain is fixed at the lower end of the inverted chain lateral running track.

优选的,所述总体支撑架与倒链纵向行走轨道之间均通过电弧焊焊接固定。Preferably, the overall support frame and the longitudinal running track of the reverse chain are fixed by arc welding.

优选的,所述运输车行走轨道与总体支撑架之间通过电弧焊焊接固定,所述水泵运输车与运输车行走轨道之间滑动连接。Preferably, the traveling track of the transport vehicle and the overall support frame are fixed by arc welding, and the water pump transport vehicle and the traveling track of the transport vehicle are slidably connected.

优选的,所述吊装倒链与倒链横向行走轨道之间以及倒链横向行走轨道与倒链纵向行走轨道之间均通过滑动连接。Preferably, the hoisting upside down chain and the upside-down chain lateral running track and between the upside-down chain transverse travel rail and the upside-down chain longitudinal travel rail are all connected by sliding.

优选的,所述水泵安装位与总体支撑架的底板之间通过紧固栓固定,所述水泵安装位的表面设置有减震橡胶。Preferably, the water pump installation position and the bottom plate of the overall support frame are fixed by fastening bolts, and the surface of the water pump installation position is provided with shock-absorbing rubber.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

本实用新型安装装置结构简单,便于加工组装,不必采用其他大型机械吊装,节约能源;水泵安装程序简单,人工安装便于操作,省时省力;安装系统便利,可随意将水泵移动至任意安装位置,工作效率高;安装过程无需人工搬运,不会对水泵造成磕碰或其他损坏,且无安全隐患。The installation device of the utility model has a simple structure, is convenient for processing and assembly, does not need to be hoisted by other large-scale machinery, and saves energy; the installation procedure of the water pump is simple, the manual installation is convenient for operation, saving time and labor; the installation system is convenient, and the water pump can be moved to any installation position at will, High working efficiency; no manual handling is required during the installation process, no bump or other damage to the pump, and no safety hazard.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的吊装组件结构示意图;2 is a schematic structural diagram of a hoisting assembly of the present invention;

图中:1、总体支撑架;2、水泵运输车;3、水泵安装位;4、运输车行走轨道;5、吊装组件;51、倒链横向行走轨道;52、倒链纵向行走轨道;53、吊装倒链。In the figure: 1. Overall support frame; 2. Water pump transport vehicle; 3. Water pump installation position; , Hoisting upside down chain.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-2,本实用新型提供以下技术方案:一种应用于长大隧道反坡排水的大型水泵移动安装装置,包括总体支撑架1、水泵运输车2、运输车行走轨道4和吊装组件5,总体支撑架1的上端固定有吊装组件5,总体支撑架1的下端一侧设置有运输车行走轨道4,运输车行走轨道4的上端安装有水泵运输车2,为了固定牢固方便滑动,运输车行走轨道4与总体支撑架1之间通过电弧焊焊接固定,水泵运输车2与运输车行走轨道4之间滑动连接,运输车行走轨道4的一侧设置有水泵安装位3,为了方便固定,水泵安装位3与总体支撑架1的底板之间通过紧固栓固定,水泵安装位3的表面设置有减震橡胶。Please refer to Fig. 1-2, the present utility model provides the following technical solutions: a large-scale water pump mobile installation device applied to the reverse slope drainage of long tunnels, comprising an overall support frame 1, a water pump transport vehicle 2, a transport vehicle running track 4 and a hoisting device Component 5, the upper end of the overall support frame 1 is fixed with a hoisting assembly 5, the lower end side of the overall support frame 1 is provided with a transport vehicle running track 4, and the upper end of the transport vehicle running track 4 is installed with a water pump transport vehicle 2, in order to be fixed firmly and conveniently sliding , The transport vehicle running track 4 and the overall support frame 1 are fixed by arc welding, the water pump transport vehicle 2 and the transport vehicle running track 4 are slidably connected, and one side of the transport vehicle running track 4 is provided with a water pump installation position 3, in order to It is convenient to fix, the water pump installation position 3 and the bottom plate of the overall support frame 1 are fixed by fastening bolts, and the surface of the water pump installation position 3 is provided with shock-absorbing rubber.

吊装组件5包括倒链横向行走轨道51、倒链纵向行走轨道52和吊装倒链53,其中,总体支撑架1的上端固定有倒链纵向行走轨道52,为了提高结构稳定性,总体支撑架1与倒链纵向行走轨道52之间均通过电弧焊焊接固定,两个倒链纵向行走轨道52之间连接有倒链横向行走轨道51,倒链横向行走轨道51的下端固定有吊装倒链53,为了方便移动转运,吊装倒链53与倒链横向行走轨道51之间以及倒链横向行走轨道51与倒链纵向行走轨道52之间均通过滑动连接。The hoisting assembly 5 includes an inverted chain transverse travel track 51, an inverted chain longitudinal travel track 52 and a hoisting inverted chain 53. The upper end of the overall support frame 1 is fixed with an inverted chain longitudinal travel track 52. In order to improve the structural stability, the overall support frame 1 It is fixed by arc welding with the reverse chain vertical running rail 52, the reverse chain horizontal running rail 51 is connected between the two reverse chain vertical running rails 52, and the lower end of the reverse chain lateral running rail 51 is fixed with a hoisting reverse chain 53, In order to facilitate moving and transferring, the hoisting inverted chain 53 and the inverted chain lateral running rail 51 and the inverted chain lateral running rail 51 and the inverted chain longitudinal running rail 52 are all connected by sliding.

本实用新型的工作原理及使用流程:本实用新型使用时,在隧道外采用机械设备挖掘机辅助,将需要安装的水泵吊装至水泵运输车2上,水泵运输车2通过运输车行走轨道4移动,将水泵运送至需要安装的水泵安装位3,吊装倒链53通过倒链纵向行走轨道52走至水泵纵向位置,再采用倒链横向行走轨道51精准行走至水泵安装位3,人工放下吊装倒链53,与水泵连接好后,吊起水泵,通过倒链横向行走轨道51运送至水泵安装位3,缓慢放下水泵,精准放置在水泵安装底座上,通过螺栓将水泵和底座连接牢固,重复以上工作动作,将其他水泵安装就位。The working principle and use process of the utility model: when the utility model is used, the mechanical equipment excavator is used outside the tunnel to assist, and the water pump that needs to be installed is hoisted to the water pump transport vehicle 2, and the water pump transport vehicle 2 moves through the transport vehicle walking track 4 , transport the water pump to the installation position 3 of the water pump to be installed, hoist the inverted chain 53 to the longitudinal position of the water pump through the vertical running track 52 of the inverted chain, and then use the horizontal running track 51 of the inverted chain to accurately travel to the installation position 3 of the water pump, and manually lower the hoisting and inverted After the chain 53 is connected with the water pump, lift the water pump, and transport it to the water pump installation position 3 through the horizontal walking track 51 of the reverse chain, slowly lower the water pump, and place it on the water pump installation base accurately. Work action to install other pumps in place.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. The utility model provides a be applied to large-scale water pump of tunnel adverse slope drainage of growing up and remove installation device, includes totality support frame (1), water pump transport vechicle (2), transport vechicle walking track (4) and hoist and mount subassembly (5), its characterized in that: the upper end of totality support frame (1) is fixed with hoist and mount subassembly (5), lower extreme one side of totality support frame (1) is provided with transport vechicle walking track (4), water pump transport vechicle (2) are installed to the upper end of transport vechicle walking track (4), one side of transport vechicle walking track (4) is provided with water pump installation position (3).
2. The large-scale water pump moving and mounting device applied to the reverse slope drainage of the long and large tunnel according to claim 1, is characterized in that: hoist and mount subassembly (5) are including the horizontal walking track of chain block (51), the vertical walking track of chain block (52) and hoist and mount chain block (53), wherein, the upper end of totality support frame (1) is fixed with the vertical walking track of chain block (52), two be connected with the horizontal walking track of chain block (51) between the vertical walking track of chain block (52), the lower extreme of the horizontal walking track of chain block (51) is fixed with hoist and mount chain block (53).
3. The large-scale water pump moving and mounting device applied to the reverse slope drainage of the long and large tunnel according to claim 1, is characterized in that: the general support frame (1) and the chain block longitudinal walking track (52) are fixed through arc welding.
4. The large-scale water pump moving and mounting device applied to the reverse slope drainage of the long and large tunnel according to claim 1, is characterized in that: the transport vehicle walking track (4) and the general support frame (1) are fixed through arc welding in a welding mode, and the water pump transport vehicle (2) is connected with the transport vehicle walking track (4) in a sliding mode.
5. The large-scale water pump moving and mounting device applied to the reverse slope drainage of the long and large tunnel according to claim 2, is characterized in that: the hoisting inverted chain (53) is connected with the inverted chain transverse walking track (51) in a sliding mode, and the inverted chain transverse walking track (51) is connected with the inverted chain longitudinal walking track (52) in a sliding mode.
6. The large-scale water pump moving and mounting device applied to the reverse slope drainage of the long and large tunnel according to claim 1, is characterized in that: the water pump mounting position (3) is fixed with the bottom plate of the overall support frame (1) through a fastening bolt, and damping rubber is arranged on the surface of the water pump mounting position (3).
CN202020318214.4U 2020-03-13 2020-03-13 A large-scale water pump mobile installation device for reverse slope drainage of long tunnels Active CN211971549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020318214.4U CN211971549U (en) 2020-03-13 2020-03-13 A large-scale water pump mobile installation device for reverse slope drainage of long tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020318214.4U CN211971549U (en) 2020-03-13 2020-03-13 A large-scale water pump mobile installation device for reverse slope drainage of long tunnels

Publications (1)

Publication Number Publication Date
CN211971549U true CN211971549U (en) 2020-11-20

Family

ID=73395434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020318214.4U Active CN211971549U (en) 2020-03-13 2020-03-13 A large-scale water pump mobile installation device for reverse slope drainage of long tunnels

Country Status (1)

Country Link
CN (1) CN211971549U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971221A (en) * 2023-08-07 2023-10-31 中国铁建高新装备股份有限公司 Transfer trolley and turnout rail welding operation vehicle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971221A (en) * 2023-08-07 2023-10-31 中国铁建高新装备股份有限公司 Transfer trolley and turnout rail welding operation vehicle

Similar Documents

Publication Publication Date Title
CN203623675U (en) Penstock transportation trolley in hole
CN110127530A (en) For hanging apparatus and its application method in restricted clearance workshop
CN211971549U (en) A large-scale water pump mobile installation device for reverse slope drainage of long tunnels
CN203602254U (en) Support frame for installing precast beam jack
CN213169974U (en) Horizontal transportation and translation tool for large equipment in factory building
CN204526937U (en) A kind of rotation support device of box culvert transport
CN210001467U (en) For hoisting devices in confined space workshops
CN207031936U (en) A kind of bracket
CN214570265U (en) Rotatable monorail hoisting system
CN221141062U (en) Cutter disc center block disassembling device of assembled shell-discarding disassembly shield machine
CN112830407A (en) Hoisting method of petrochemical device module in engineering structure
CN218434693U (en) A kind of I-beam mobile trolley
CN112125152A (en) Monorail crane shed-erecting machine
CN111706051A (en) Steel beam installation rail-type mobile operation platform and installation method of steel beam under high voltage line
CN213865098U (en) Crank arm type monorail crane operation platform
CN218698525U (en) Mobile lifting platform for vehicle inspection
CN218616679U (en) Conveying device for conveying travelling rails of gantry crane
CN221366966U (en) Walking self-moving material transport vehicle
CN205772985U (en) A kind of straddle truck equipment of civil engineering
CN205474641U (en) What maglev train got electric rail send rail device
CN217264360U (en) Be used for overweight rectangle push pipe section of jurisdiction turning device of super large
CN223510970U (en) A shield tunneling trolley retraction device
CN208776223U (en) A kind of highway and railway tunnel ditch cable trench template Special-purpose lifting install equipment
CN221141146U (en) Auxiliary mounting structure for prefabricated box culvert
CN214450866U (en) Movable slope lifting limiting device for wheel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant