CN211966604U - Upper beam assembling tool - Google Patents
Upper beam assembling tool Download PDFInfo
- Publication number
- CN211966604U CN211966604U CN202020546331.6U CN202020546331U CN211966604U CN 211966604 U CN211966604 U CN 211966604U CN 202020546331 U CN202020546331 U CN 202020546331U CN 211966604 U CN211966604 U CN 211966604U
- Authority
- CN
- China
- Prior art keywords
- front beam
- positioning
- line card
- card guide
- guide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Automatic Assembly (AREA)
Abstract
The utility model discloses an upper beam assembly fixture, including frock piece, upper front beam and upper back beam, the center department on frock piece surface transversely is equipped with more than one location step, all be equipped with a constant head tank that is used for fixing a position first line card guide rail between the adjacent location step, the middle department that frock piece surface lies in location step upwards protrudes and forms one and prevent slow-witted step, upwards the protrusion forms first front beam location limit on frock piece length direction's a side, upwards the protrusion forms a second front beam location limit and one upper back beam location limit on frock piece width direction's a side, all be equipped with first line card guide rail in the constant head tank, first line card guide rail both ends all extend to the external world, and install on upper front beam and upper back beam, it has second line card guide rail to prevent that slow-witted step goes up the cover, second line card guide rail both ends are also installed on upper front beam and upper back beam. The utility model discloses simple structure, the practicality is strong, the operability is simple, is applicable to on most of assembly sub-assemblies rivet numerous rivets.
Description
Technical Field
The utility model relates to the field of assembly technique, concretely relates to upper beam assembly fixture.
Background
The subassembly of present assembly installation ply-yarn drill guide rail and last front beam, last back beam aggregate erection is comparatively complicated, through the fixed numerous ply-yarn drill of manual operation at last preceding, last back beam combination pull rivet, and the work efficiency of assembly is just wasted time and influence equally, and no profit can be struggled. Therefore, the efficiency of the tool for further improving the efficiency of the tool for the wire clamp guide rail of the matched assembly and the rivets on the upper front beam piece and the upper rear beam piece is further improved.
Disclosure of Invention
The utility model aims to solve the technical problem that a put up beam assembly fixture is provided to solve the problem of proposing among the above-mentioned background art.
The utility model discloses a realize through following technical scheme: the utility model provides an upper beam assembly fixture, including the frock piece, go up front-axle beam and last back beam, the center department on frock piece surface transversely is equipped with more than one location step, all be equipped with a constant head tank that is used for fixing a position first line card guide rail between the adjacent location step, the middle department that frock piece surface lies in location step upwards protrudes and forms one and prevent slow-witted step, upwards the protrusion forms first front-axle beam location limit on a side of frock piece length direction, upwards the protrusion forms a second front-axle beam location limit and one and goes up back beam location limit on a side of frock piece width direction, all be equipped with first line card guide rail in the constant head tank, first line card guide rail both ends all extend to the external world, and install on last front-axle beam and last back beam, it has second line card guide rail to prevent slow-witted step cover, second line card guide rail both ends are also installed on last front-axle beam and.
As a preferred technical scheme, the first front beam positioning edge and the second front beam fixed edge are connected and arranged in an L-shaped structure.
According to the preferable technical scheme, the upper front beam is arranged on the surface of the tooling part, one side face of the upper front beam is abutted against the first front beam positioning edge, the other end face of the upper front beam is abutted against the second front beam positioning edge, and the upper front beam is arranged above the positioning step.
As the preferred technical scheme, the upper back beam is arranged below the positioning step, the upper back beam and the upper front beam are arranged in parallel, and one end of the upper back beam is abutted to the positioning edge of the upper back beam.
The utility model has the advantages that: the utility model discloses simple structure, the practicality is strong, the operability is simple, is applicable to on most of assembly sub-assemblies rivet numerous rivets.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a tooling member of the present invention;
fig. 2 is a schematic structural diagram during assembly of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may for example be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1 and fig. 2, the upper beam assembling tool of the present invention comprises a tool 1, an upper front beam 12 and an upper rear beam 11, more than one positioning step 2 is transversely arranged at the center of the surface of the tool fitting part 1, a positioning groove 3 for positioning a first line card guide rail 8 is arranged between every two adjacent positioning steps 2, the surface of the tool fitting part 1 is positioned in the middle of the positioning steps 2 and protrudes upwards to form a foolproof step 4, a first front beam positioning edge 5 is formed by protruding upwards on one side edge of the length direction of the tool fitting part 1, a second front beam positioning edge 6 and an upper rear beam positioning edge 7 are formed by protruding upwards on one side surface of the width direction of the tool fitting part 1, the first line card guide rails 8 are arranged in the positioning grooves, and both ends of the first line card guide rails 8 extend to the outside, and is installed on the upper front beam 12 and the upper back beam 11, the fool-proof step 4 is sleeved with a second wire clamp guide rail 9, and two ends of the second wire clamp guide rail 9 are also installed on the upper front beam 12 and the upper back beam 11.
In this embodiment, the first front beam positioning edge 5 and the second front beam positioning edge 6 are connected and arranged in an "L" shape, and the first front beam positioning edge and the second front beam positioning edge are integrally arranged and also integrally arranged with the bottom plate at the lower end and the positioning step at one side.
In this embodiment, the upper front beam 12 is disposed on the surface of the tooling member 1, one side surface of the upper front beam 12 abuts against the first front beam positioning edge 5, the other end surface abuts against the second front beam positioning edge 6, and the upper front beam 12 is disposed above the positioning step 2.
In this embodiment, the upper back beam 11 is disposed below the positioning step 2, the upper back beam 11 and the upper front beam 12 are disposed in parallel, one end of the upper back beam 11 abuts against the upper back beam positioning edge 7, and the upper back beam positioning edge, the bottom plate and the positioning step are integrally configured.
During the use, install first line card guide rail in the constant head tank, and second line card guide rail is located on the second line card guide rail through the square mouthful cover of self, has increased stability, and the both ends of first, second line card guide rail then distribute extend to on the front-axle beam and last back beam to all through fix with rivet, promote the assembly efficiency of line card guide rail and last front-and-back beam combination locking screw fast.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.
Claims (4)
1. The utility model provides an upper beam assembly fixture which characterized in that: the tool comprises a tool piece (1), an upper front beam (12) and an upper rear beam (11), wherein more than one positioning step (2) is transversely arranged at the center of the surface of the tool piece (1), positioning grooves (3) for positioning first line card guide rails (8) are respectively arranged between every two adjacent positioning steps (2), the middle of the surface of the tool piece (1) positioned on the positioning steps (2) is upwards protruded to form a foolproof step (4), one side edge of the length direction of the tool piece (1) is upwards protruded to form a first front beam positioning edge (5), one side surface of the width direction of the tool piece (1) is upwards protruded to form a second front beam positioning edge (6) and an upper rear beam positioning edge (7), first line card guide rails (8) are respectively arranged in the positioning grooves, two ends of the first line card guide rails (8) extend to the outside and are arranged on the upper front beam (12) and the upper rear beam (11), and second line card guide rails (9) are sleeved on the foolproof step (4), two ends of the second wire clamp guide rail (9) are also arranged on the upper front beam (12) and the upper rear beam (11).
2. The upper beam assembling tool according to claim 1, characterized in that: the first front beam positioning edge (5) and the second front beam positioning edge (6) are connected and arranged in an L-shaped structure.
3. The upper beam assembling tool according to claim 1, characterized in that: the upper front beam (12) is arranged on the surface of the tooling part (1), one side surface of the upper front beam (12) is abutted against the first front beam positioning edge (5), the other end surface of the upper front beam (12) is abutted against the second front beam positioning edge (6), and the upper front beam (12) is arranged above the positioning step (2).
4. The upper beam assembling tool according to claim 1, characterized in that: the upper back beam (11) is arranged below the positioning step (2), the upper back beam (11) and the upper front beam (12) are arranged in parallel, and one end of the upper back beam (11) is abutted to the upper back beam positioning edge (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020546331.6U CN211966604U (en) | 2020-04-14 | 2020-04-14 | Upper beam assembling tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020546331.6U CN211966604U (en) | 2020-04-14 | 2020-04-14 | Upper beam assembling tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211966604U true CN211966604U (en) | 2020-11-20 |
Family
ID=73385492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020546331.6U Active CN211966604U (en) | 2020-04-14 | 2020-04-14 | Upper beam assembling tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211966604U (en) |
-
2020
- 2020-04-14 CN CN202020546331.6U patent/CN211966604U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211966604U (en) | Upper beam assembling tool | |
CN219214697U (en) | Vehicle door structure and vehicle | |
CN218920358U (en) | Solar photovoltaic module frame | |
CN211038132U (en) | Combined lock tongue | |
CN212192033U (en) | DC trough assembly fixture | |
CN211722471U (en) | Chair frame | |
CN208760735U (en) | Connector and automobile frame installation structure | |
CN214534054U (en) | Combined anti-loosening aluminum profile | |
CN211992776U (en) | Bottom plate guide rail frock | |
CN213774364U (en) | Simple and easy template installation auxiliary assembly | |
CN202622618U (en) | Trunk lock catch assembling fixture | |
CN217652086U (en) | Accurate firm piece of curtain board combination | |
CN210660864U (en) | Aluminum profile with splicing structure | |
CN214532698U (en) | Rolling slats door aluminium alloy aggregate erection structure | |
CN214535633U (en) | Accurate combined aluminium alloy | |
CN216113333U (en) | Special alloy plate | |
CN216471136U (en) | Paper processing is carried and is spliced structure | |
CN217462870U (en) | Metal buckle for mounting sheet metal part | |
CN211341271U (en) | Vertical connection structure of assembled integration composite wall | |
CN214356297U (en) | Section bar for carriage | |
CN212117655U (en) | Sofa backrest connecting structure and sofa assembly | |
CN219938291U (en) | Corner connector and photovoltaic module | |
CN218643752U (en) | Wallboard mounting structure | |
CN213560148U (en) | Aluminum ingot rough milling cutter holder | |
CN213497680U (en) | A back plate for CNC |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |